Synergy BIM and Lean Construction

33
Civil and Environmental Engineering Technion - Israel Institute of Technology Introduction Lean Construction LeanBIM Synergy Conclusions Synergy: Building Information Modeling and Lean Construction Assoc. Professor Rafael Sacks BIM Handbook Symposium Georgia Tech Atlanta, GA, 13 th March 2008

description

bim 4d

Transcript of Synergy BIM and Lean Construction

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    ConclusionsSynergy:

    BuildingInformationModelingand

    LeanConstruction

    Assoc.ProfessorRafaelSacks

    BIMHandbookSymposium

    GeorgiaTechAtlanta,GA,13th March2008

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    Introduction

    BothLeanandBIMaredeepprocesschanges,inthinkingandinpractices.Bothrequireconcertedlongtermefforts,withinstablebusinessandworkenvironments

    17:50

    DesignersManagers

    Builders

    OperatorsOwners

    Users

    FinanceCommunity

    Government

    Subcontractors

    Insanity: Doing the same thing over and over and expecting a different result (Albert Einstein)

    2

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    WhatisLeanConstruction?

    TheLeanConstructionVision:

    .newprinciplesandmethodsforproductdevelopmentandproductionmanagementspecificallytailoredtotheAEC industry,butakintothosedefiningleanproductionthatprovedtobesosuccessfulinmanufacturing.

    (fromwww.iglc.net)

    Value tobettermeetcustomerdemands Flow AEC processaswellasAEC product RemoveWaste appliestodesign,detailing,supplyand construction

    AEC =Architecture,Engineering,Construction

    3

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    ToyotaProductionSystem17:50

    4

    Standardisedwork

    Remove Waste (Muda)

    Continuous Flow

    Pull system Kaizen -

    continuous improvement

    Stability

    Error-free work

    Value

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    Variationonsite

    5

    17:50

    0

    5

    10

    15

    20

    3

    /

    2

    8

    /

    2

    0

    0

    5

    3

    /

    3

    0

    /

    2

    0

    0

    5

    4

    /

    1

    /

    2

    0

    0

    5

    4

    /

    4

    /

    2

    0

    0

    5

    4

    /

    6

    /

    2

    0

    0

    5

    4

    /

    8

    /

    2

    0

    0

    5

    4

    /

    1

    1

    /

    2

    0

    0

    5

    4

    /

    1

    3

    /

    2

    0

    0

    5

    4

    /

    1

    5

    /

    2

    0

    0

    5

    4

    /

    1

    8

    /

    2

    0

    0

    5

    4

    /

    2

    1

    /

    2

    0

    0

    5

    4

    /

    2

    5

    /

    2

    0

    0

    5

    4

    /

    2

    7

    /

    2

    0

    0

    5

    4

    /

    2

    9

    /

    2

    0

    0

    5

    5

    /

    2

    /

    2

    0

    0

    5

    5

    /

    4

    /

    2

    0

    0

    5

    5

    /

    6

    /

    2

    0

    0

    5

    5

    /

    9

    /

    2

    0

    0

    5

    5

    /

    1

    1

    /

    2

    0

    0

    5

    5

    /

    1

    5

    /

    2

    0

    0

    5

    5

    /

    1

    7

    /

    2

    0

    0

    5

    5

    /

    1

    9

    /

    2

    0

    0

    5

    5

    /

    2

    2

    /

    2

    0

    0

    5

    5

    /

    2

    4

    /

    2

    0

    0

    5

    5

    /

    2

    6

    /

    2

    0

    0

    5

    5

    /

    2

    9

    /

    2

    0

    0

    5

    5

    /

    3

    1

    /

    2

    0

    0

    5

    6

    /

    2

    /

    2

    0

    0

    5

    6

    /

    5

    /

    2

    0

    0

    5

    6

    /

    7

    /

    2

    0

    0

    5

    6

    /

    9

    /

    2

    0

    0

    5

    6

    /

    1

    2

    /

    2

    0

    0

    5

    6

    /

    1

    4

    /

    2

    0

    0

    5

    6

    /

    1

    9

    /

    2

    0

    0

    5

    6

    /

    2

    2

    /

    2

    0

    0

    5

    6

    /

    2

    6

    /

    2

    0

    0

    5

    6

    /

    2

    8

    /

    2

    0

    0

    5

    6

    /

    3

    0

    /

    2

    0

    0

    5

    6/42/242/233/43/64/33/53/32/102/93/233/193/93/243/223/213/203/183/173/163/153/132/82/72/62/52/42/3

    Sum of workers

    Date

    Aprts.

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    ImpactofVariation

    6

    17:50

    Project managers on high-end projects reported spending up to 60% of their time managing client changes and the resulting complexity of instructions to specialty contractors.

    , rise Apartment Buildings-Lean Management Model for Construction of High(2007). , M.,GoldinSacks, R., and 384-, Vol. 133 No. 5 pp. 374Journal of Construction Engineering and ManagementASCE

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    LEAPCON CashFlows

    7

    17:50

    $(20,000)

    $(15,000)

    $(10,000)

    $(5,000)

    $0

    $5,000

    $10,000

    $15,000

    $20,000

    0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00

    Simulation Time (min.sec)

    C

    a

    s

    h

    F

    l

    o

    w

    F': Lean, no customization

    F: Lean

    A': Conventional, no customization

    A: Conventional

    LEAPCON Simulationwww.technion.ac.il/~cvsacks/tech-leap.htm

    Pull flowMulti-skilling

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    BuildingInformationModelingBuildingInformationModeling(BIM)

    Tools,processesandtechnologiesthatarefacilitatedbydigital,machinereadabledocumentationaboutabuilding,itsperformance,itsplanning,itsconstructionandlateritsoperation.

    ThereforeBIMdescribesanactivity,notanobject.Todescribetheresultofthemodelingactivity,weusethetermBuildingInformationModel,ormoresimplyBuildingModel infull.

    BuildingModel

    Adigital,machinereadablerecordofabuilding,itsperformance,itsplanning,itsconstructionandlateritsoperation.

    ARevit modeloraDigitalProject modelofabuildingareexamplesofBuildingModels.BuildingModel canbeconsideredthenextgenerationreplacementforconstructiondrawings,orarchitecturaldrawings.

    17:50

    8

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    17:50OneIslandEast,Swire,HongKong

    Owner

    9

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    BIMBenefits

    10

    Benefit Description

    Productivity Reducedesignandengineeringlabor

    Quality Preventdesignandcoordinationerrors

    Duration Shortendesignduration

    Accuracy Heightenaccuracyforallanalyses

    Industrialization Producedetailedfabricationdata,increasepreassemblyandprefabrication

    Management Improveinformationflow

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    Pullflowofinformation

    LeanandBIMSynergies17:50

    Design

    Detailing

    Construction

    Reducedesigndevelopmentcycletime

    Errorfreeconstructio

    n

    Increasedprefabricationandpullof

    parts

    Manageinformation

    flows Standardisedwork

    methods

    MaintainValue ofInformation

    Pullflowdetailing OperateandMaintain

    Standardizedwork

    methods

    Maintaininformationvalue

    Pullflowofinformation

    Pullflowoflabor

    11

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    BIM model collaborative process

    MaintainInformationValue

    12

    17:50

    OPERATIONSFEASIBILITY DESIGN CONSTRUCTION

    V

    a

    l

    u

    e

    o

    f

    d

    e

    s

    i

    g

    n

    d

    o

    c

    u

    m

    e

    n

    t

    a

    t

    i

    o

    n

    Time, Project Phase

    Traditional single, stage,

    paper drawings

    Loss of value due to handover,

    recreation of information

    Retrofit utilizing as-built and existing facility documentation

    BIM Handbook, Eastman et al. 2008, John Wiley and Sons.Value

    Leanconstructionneed BIMfacility

    MaximizeValue toClient Reuseofmodelinformation

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    ReduceDesignCycleTime

    13

    17:50

    Cycle Time

    80 days

    Sacks, R., (2004),

    34 days

    Evaluation of the economic impact of computer-integration in precast concrete construction, ASCE Journal of Computing in Civil Engineering, Vol. 18 No. 4. pp. 301-312.

    Leanconstructionneed BIMfacility

    ReduceCycleTime Reviewmodelinsteadofdrawings,automaticdrawingproduction

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    ManageDesignInformationFlow

    14

    Continuous Flow

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    InformationDevelopmentVelocity17:50

    15

    I

    n

    f

    o

    r

    m

    a

    t

    i

    o

    n

    D

    e

    v

    e

    l

    o

    p

    m

    e

    n

    t

    V

    e

    l

    o

    c

    i

    t

    y

    I

    n

    f

    o

    r

    m

    a

    t

    i

    o

    n

    D

    e

    v

    e

    l

    o

    p

    m

    e

    n

    t

    V

    e

    l

    o

    c

    i

    t

    y

    Using project extranets with building models:

    Continuous Flow

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    ProbabilityofBottleneck

    16

    P

    r

    o

    b

    a

    b

    i

    l

    i

    t

    y

    o

    f

    i

    n

    f

    o

    r

    m

    a

    t

    i

    o

    n

    b

    o

    t

    t

    l

    e

    n

    e

    c

    k

    P

    r

    o

    b

    a

    b

    i

    l

    i

    t

    y

    o

    f

    i

    n

    f

    o

    r

    m

    a

    t

    i

    o

    n

    b

    o

    t

    t

    l

    e

    n

    e

    c

    k

    Using project extranets:

    Leanconstructionneed ITandBIMfacility

    Visualization offlow design MonitoringofdesigninformationflowusingBIMandmodelserversorprojectintranets

    Continuous Flow

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    PullingDetailingInformation

    17

    4D Simulation; Set sequence priority (e.g. walls for medium pressure duct); pull detailing work only when construction approaches

    Pull flow

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    PullingDetailingInformation17:50

    18

    Clash checking

    Leanconstructionneed BIMfacility

    Pull detailingandfabrication/assemblyofbuildingsystemcomponentsaccordingtoshorttermplans

    Collaborativedetailingwithintegrationacrossdisciplines,automatedclashchecking

    Pull flow Collaborative

    Design

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    StandardizedWork

    19

    17:50

    J.W. McCLENAHAN CO.

    1. Drawings for each work package generated automatically from the model;

    2. Parts fabricated and packaged off-site;3. Installed on site as a package

    StandardisedWork

    Leanconstructionneed BIMfacility

    Standardised work Automatedassemblyinstructionsandbillsofmaterial

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    4DModeling,TemporaryFacilities17:50

    20

    Leanconstructionneed BIMfacility

    Stablework effectiveprojectplanning,predictingproblems,avoidingproblems

    4Danimationandmodelingoftemporaryprocessfacilities,errorfreedesignanddetailingError free stable work

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    21

    Campbell, Architecture Week 2006

    IncreasedPrefabrication

    Remove WasteQuality

    21

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    IncreasedPrefabrication17:50

    Remove Waste

    Remove WasteQuality

    22

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    17:50IncreasedPrefabrication

    Remove Waste

    23

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    17:50IncreasedPrefabrication

    Remove Waste

    24

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    17:50IncreasedPrefabrication

    Remove Waste

    25

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    17:50IncreasedPrefabrication

    Leanconstructionneed BIMfacility

    Prefabrication removewasteofunnecessaryorinefficientactivities

    Accurateerrorfreedetailingforprefabrication

    Remove Waste

    26

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    Pullingprefabricatedparts17:50

    27

    Leanconstructionneed ITandBIMfacility

    PullofmaterialsandKanban signalsforfabrication

    OnlinepullofmaterialsandsignalsthroughmanagementinformationlinkedthroughaBIMserver

    Pull flow

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    PullingLaborandVisualizingStatus17:50

    Pull flow

    28

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    PullingLaborandVisualizingStatus17:50

    Pull flow

    29

    Leanconstructionneed BIMfacility

    Pullflowsignalsarenotvisible,likeinmanufacturing,sodirectivestoteamspullwork

    Onlinepullflowsignalscanbecommunicatedtoteamsonline

    Projectstatuschanges rapidlyandsometimesunexpectedly.Informationiscomplex,diverse,plentifulanddifficulttointegrate

    Goodvisualization isneededforconstructionprocessandworkreadinessinformation

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    Safety Riskforecastforworkplanning

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    31

    17:50

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    Safety Riskforecastforworkplanning

    Leanconstructionneed BIMfacility

    Safeprocesses nowaste BIMsupportsdynamicsafetyconsciousplanning

  • Civil and Environmental Engineering Technion - Israel Institute of Technology

    Introduction

    LeanConstruction

    LeanBIMSynergy

    Conclusions

    Conclusions

    33

    BIMmakesconstructionleaner;LeanthinkingfocusesBIMimplementation

    OwnershaveauniqueroletoplayasleadersofLeanandBIMinitiatives LeanandBIMcanimproveanownersbottomline,butalsohavearipple

    effectacrosstheconstructionindustry

    To perform lean, BIM-enabled projects ..

    .worthy of inclusion as best practice case studies in the 2nd edition of the BIM Handbook !!!

    The challenge to all owners, designers, contractors and fabricators:

    Synergy: Building Information Modelingand Lean ConstructionIntroductionWhat is Lean Construction?Toyota Production SystemVariation on siteImpact of VariationLEAPCON Cash FlowsBuilding Information ModelingOne Island East, Swire, Hong KongBIM BenefitsLean and BIM SynergiesMaintain Information ValueReduce Design Cycle TimeManage Design Information FlowInformation Development VelocityProbability of BottleneckPulling Detailing InformationPulling Detailing InformationStandardized Work4D Modeling, Temporary FacilitiesIncreased PrefabricationIncreased PrefabricationIncreased PrefabricationIncreased PrefabricationIncreased PrefabricationIncreased PrefabricationPulling prefabricated partsPulling Labor and Visualizing StatusPulling Labor and Visualizing StatusSafety Risk forecast for work planningSafety Risk forecast for work planningConclusions