Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

27
Lean Construction & Applied BIM Applied BIM Thomas Strong, Director, CanBIM Director, Virtual Construction, EllisDon Canada BIM Council Conseil canadien de la modélisation des données de bâtiment

Transcript of Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Page 1: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Lean Construction & Applied BIMApplied BIM Thomas Strong, g,Director, CanBIMDirector, Virtual Construction, EllisDon

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Page 2: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Productivity in the Construction Industryy y

4)pr

il 14

, 200

4po

int #

4 (A

pby

tes

View

p

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

AE

Cb

Page 3: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Productivity in the Construction Industryy yWHY?...

Unknowns =

Traditional Contract Risk =

Adversarial relationships =

Inefficiencies in the field

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Page 4: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Productivity in the Construction Industryy y

s,

or O

wne

rs, E

ngin

eers

dam

enta

l Con

cept

s fo

on U

nive

rsity

, 199

8or

Con

stru

ctio

n Fu

ndck

son,

Car

negi

e M

ello

ojec

t Man

agem

ent f

oB

uild

ers

Chr

is H

endr

icA

dapt

ed fr

om P

roA

rchi

tect

s an

d B

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Page 5: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Obstacles in the Construction IndustryyManagement focus is on control and prevents creativityprevents creativity.

Planning is not conceived as a skill rather then a process or system.

Current planning &scheduling does includeCurrent planning &scheduling does include real-time crew level input.

S h d l f i t dSchedule performance is not measured. (quality of the plan, not site progress)

Planning failures are not analyzed to identify and act on root causes.

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Page 6: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

What is Lean Construction?What is Lean Construction?

Production management based approach to projectProduction management based approach to project delivery.

Work is done throughout the delivery process with theWork is done throughout the delivery process with the goal of maximizing value and minimizing waste.

Trades are at the table to collaborate every step of theTrades are at the table to collaborate every step of the way as the work is planned and scheduled.

The focus is the total project rather then specifyThe focus is the total project rather then specify activities.

Measuring the plan’s performance is critical toMeasuring the plan s performance is critical to improve.

Monitoring Results" vs "making things happen " (Not this…)

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Monitoring Results vs making things happen. ( )

Page 7: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Lean Design & ConstructionLean Design & Construction

d 20

00)

(afte

r Bal

lard

ery

Sys

tem

(P

roje

ct D

eliv

eLe

an P

Process design and product design are created together.

Optimizing for Pre-fabrication, off-site manufacture & logistics are considered as d i it i

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

design criteria

Page 8: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Benefits of Lean ConstructionBenefits of Lean Construction

It challenges the belief that there must always be aIt challenges the belief that there must always be a trade between time, cost, and quality

S db i i li i t d f h d liSandbagging is eliminated from scheduling process.

Collaboration is not only the ethical choice but isCollaboration is not only the ethical choice but is also based on aligned commercial interests.

C l ti f th t i t ttiCo-location of the team in open concept setting helps in dissolving boundaries.

Owner has more control of design outcomes vs traditional Design Build.

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Page 9: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Multiple Schedule LevelsMultiple Schedule Levels

M lti l l l f h d lMultiple level of schedules are linked thru set of milestones carried from master schedule.

Review road blocks. (Design/ RFI/ Change Order )

ion

Resources (material, equipment and labour) are committed on

Con

stru

ct

and labour) are committed

Number of executed tasks over esy

of E

llisD

o

Number of executed tasks over total number of planned tasks ratio is calculated.

mag

e C

ourte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 10: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

1. Projects as Collective Enterprise1. Projects as Collective Enterprise

Financial incentives are alignedFinancial incentives are aligned.

Shared gain / Shared painShared gain / Shared pain.

Critical to changing behavior. ion Critical to changing behavior.

Long term outcomes can be onC

onst

ruct

gweighed against short term gain.

esy

of E

llisD

o

Networks of commitments are pulled from trades vs pushed on th m

age

Cou

rte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

them. Im

Page 11: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Projects as Collective EnterpriseProjects as Collective Enterprise

ion

onC

onst

ruct

esy

of E

llisD

om

age

Cou

rte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 12: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Projects as Collective EnterpriseProjects as Collective Enterprise

on

nC

onst

ruct

iosy

of E

llisD

om

age

Cou

rtes

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 13: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

2. Impeccable Coordination2. Impeccable Coordination

FULL coordinationFULL coordination creates predictable workflow within andworkflow within and across trades and disciplines io

n

disciplines.

BIM & Vi t l onC

onst

ruct

BIM & Virtual Construction Process d li thi es

y of

Elli

sDo

delivers this coordination.

mag

e C

ourte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 14: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Impeccable CoordinationImpeccable Coordination

ion

onC

onst

ruct

D i C t ti F iliti esy

of E

llisD

o

Design Construction Facilities Management

mag

e C

ourte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 15: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Typical Coordination & Submission / Approval process

ion

onC

onst

ruct

esy

of E

llisD

om

age

Cou

rte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 16: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Typical Coordination & Submission / Approval process

RFIs

ion

onC

onst

ruct

Bulk of RFI process occurs once material is on site, causing rework, delays, costs

d di t esy

of E

llisD

o

and disputes…

mag

e C

ourte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 17: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

BIM Coordination & Submission / Approval process

ion

onC

onst

ruct

esy

of E

llisD

om

age

Cou

rte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 18: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

BIM Coordination & Submission / Approval process

RFIs

Reduced site time. io

n

Bulk of RFI process occurs while models are being produced, ensuring that resulting shop

site time.

onC

onst

ruct

g p , g g pdrawings are accurate and avoiding rework and delays in the field.

More systems are prefabricated reducing esy

of E

llisD

o

More systems are prefabricated reducing onsite labor and waste while increasing profitability for trades.

mag

e C

ourte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 19: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

3. Projects as Production Systems3. Projects as Production Systems

Structure of work is suited to the project’s ongoing needs rather follow a rigid binding plan.

Pulling commitments vs Pushing schedulePulling commitments vs Pushing schedule dates

Modularization, off-site fabrication, and multi-trade composition of work, can be made possible.

Keep work flowing so that the crews are alwaysproductive installing product;productive installing product;

Reduce inventory of material and tools on site.

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Just in time delivery.

Page 20: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Projects as Production SystemsProjects as Production Systems

Reliable promises are obtained throughReliable promises are obtained through collaborative planning

Stand up write down your commitmentStand up, write down your commitment and post it on the board. Trades agree on what they will get from previous trade and

h t th ill d li t f ll i t dwhat they will deliver to following trade

All players see each other as clients.All players see each other as clients.

Sandbagging is prevented by peer pressurepressure.

Project challenges are solved as a team

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Page 21: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Traditional Construction ProcurementTraditional Construction Procurement

Coordination

Suppliers

Coordination

Trades

Suppliers

Trades

Site ion

Trades

Site delivery

SuppliersCoordination onC

onst

ruct

Trades SuppliersSite delivery

Coordination

esy

of E

llisD

o

Site delivery Trades

Trades

mag

e C

ourte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

SuppliersCoordination

Coordination

Im

Page 22: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

BIM enabled Prefab ProcurementBIM enabled Prefab Procurement

Suppliers

Suppliers

Suppliers

ion

SiteBIM onC

onst

ruct

Offsite PreFabrication

Site delivery

BIM Coordination

ProcessSite

InstallationSite

Commissioning &

Testing

TurnOver

esy

of E

llisD

o

Trades Trades

mag

e C

ourte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Trades

Trades

Im

Page 23: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

3D D i F b i ti PF2F2F File to factory to field

3D Driven Fabrication ProcessF2F2F – File to factory to field

Prefabrication

CNC fabrication

ion

Economies of scale through modularization

onC

onst

ruct

Increased precision & Speed

Solving field labor shortages esy

of E

llisD

o

g g

mag

e C

ourte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 24: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Bridging the Model to Site activitiesBridging the Model to Site activities

F b i ti d lFabrication model

ion

onC

onst

ruct

As built condition

esy

of E

llisD

om

age

Cou

rte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 25: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

BIM & FM / Asset ManagementBIM & FM / Asset Management

ion

onC

onst

ruct

esy

of E

llisD

om

age

Cou

rte

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Im

Page 26: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

http://www.leanconstruction.org/

http://www.canbim.com/

http://en.wikipedia.org/wiki/Lean_construction

http://www buildingsmartalliance orghttp://www.buildingsmartalliance.org

htt //fi t h /http://fiatech.org/

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment

Page 27: Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon

Th StThomas Strong, Director, CanBIMDi t Vi t l C t tiDirector, Virtual Construction,

[email protected] 896 8900905.896.8900

Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment