Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon
-
Upload
hoang-nhat-khanh -
Category
Documents
-
view
121 -
download
1
Transcript of Lean Construction & Applied BIM - Thomas Strong, Canada EllisDon
Lean Construction & Applied BIMApplied BIM Thomas Strong, g,Director, CanBIMDirector, Virtual Construction, EllisDon
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Productivity in the Construction Industryy y
4)pr
il 14
, 200
4po
int #
4 (A
pby
tes
View
p
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
AE
Cb
Productivity in the Construction Industryy yWHY?...
Unknowns =
Traditional Contract Risk =
Adversarial relationships =
Inefficiencies in the field
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Productivity in the Construction Industryy y
s,
or O
wne
rs, E
ngin
eers
dam
enta
l Con
cept
s fo
on U
nive
rsity
, 199
8or
Con
stru
ctio
n Fu
ndck
son,
Car
negi
e M
ello
ojec
t Man
agem
ent f
oB
uild
ers
Chr
is H
endr
icA
dapt
ed fr
om P
roA
rchi
tect
s an
d B
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Obstacles in the Construction IndustryyManagement focus is on control and prevents creativityprevents creativity.
Planning is not conceived as a skill rather then a process or system.
Current planning &scheduling does includeCurrent planning &scheduling does include real-time crew level input.
S h d l f i t dSchedule performance is not measured. (quality of the plan, not site progress)
Planning failures are not analyzed to identify and act on root causes.
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
What is Lean Construction?What is Lean Construction?
Production management based approach to projectProduction management based approach to project delivery.
Work is done throughout the delivery process with theWork is done throughout the delivery process with the goal of maximizing value and minimizing waste.
Trades are at the table to collaborate every step of theTrades are at the table to collaborate every step of the way as the work is planned and scheduled.
The focus is the total project rather then specifyThe focus is the total project rather then specify activities.
Measuring the plan’s performance is critical toMeasuring the plan s performance is critical to improve.
Monitoring Results" vs "making things happen " (Not this…)
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Monitoring Results vs making things happen. ( )
Lean Design & ConstructionLean Design & Construction
d 20
00)
(afte
r Bal
lard
ery
Sys
tem
(P
roje
ct D
eliv
eLe
an P
Process design and product design are created together.
Optimizing for Pre-fabrication, off-site manufacture & logistics are considered as d i it i
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
design criteria
Benefits of Lean ConstructionBenefits of Lean Construction
It challenges the belief that there must always be aIt challenges the belief that there must always be a trade between time, cost, and quality
S db i i li i t d f h d liSandbagging is eliminated from scheduling process.
Collaboration is not only the ethical choice but isCollaboration is not only the ethical choice but is also based on aligned commercial interests.
C l ti f th t i t ttiCo-location of the team in open concept setting helps in dissolving boundaries.
Owner has more control of design outcomes vs traditional Design Build.
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Multiple Schedule LevelsMultiple Schedule Levels
M lti l l l f h d lMultiple level of schedules are linked thru set of milestones carried from master schedule.
Review road blocks. (Design/ RFI/ Change Order )
ion
Resources (material, equipment and labour) are committed on
Con
stru
ct
and labour) are committed
Number of executed tasks over esy
of E
llisD
o
Number of executed tasks over total number of planned tasks ratio is calculated.
mag
e C
ourte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
1. Projects as Collective Enterprise1. Projects as Collective Enterprise
Financial incentives are alignedFinancial incentives are aligned.
Shared gain / Shared painShared gain / Shared pain.
Critical to changing behavior. ion Critical to changing behavior.
Long term outcomes can be onC
onst
ruct
gweighed against short term gain.
esy
of E
llisD
o
Networks of commitments are pulled from trades vs pushed on th m
age
Cou
rte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
them. Im
Projects as Collective EnterpriseProjects as Collective Enterprise
ion
onC
onst
ruct
esy
of E
llisD
om
age
Cou
rte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
Projects as Collective EnterpriseProjects as Collective Enterprise
on
nC
onst
ruct
iosy
of E
llisD
om
age
Cou
rtes
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
2. Impeccable Coordination2. Impeccable Coordination
FULL coordinationFULL coordination creates predictable workflow within andworkflow within and across trades and disciplines io
n
disciplines.
BIM & Vi t l onC
onst
ruct
BIM & Virtual Construction Process d li thi es
y of
Elli
sDo
delivers this coordination.
mag
e C
ourte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
Impeccable CoordinationImpeccable Coordination
ion
onC
onst
ruct
D i C t ti F iliti esy
of E
llisD
o
Design Construction Facilities Management
mag
e C
ourte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
Typical Coordination & Submission / Approval process
ion
onC
onst
ruct
esy
of E
llisD
om
age
Cou
rte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
Typical Coordination & Submission / Approval process
RFIs
ion
onC
onst
ruct
Bulk of RFI process occurs once material is on site, causing rework, delays, costs
d di t esy
of E
llisD
o
and disputes…
mag
e C
ourte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
BIM Coordination & Submission / Approval process
ion
onC
onst
ruct
esy
of E
llisD
om
age
Cou
rte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
BIM Coordination & Submission / Approval process
RFIs
Reduced site time. io
n
Bulk of RFI process occurs while models are being produced, ensuring that resulting shop
site time.
onC
onst
ruct
g p , g g pdrawings are accurate and avoiding rework and delays in the field.
More systems are prefabricated reducing esy
of E
llisD
o
More systems are prefabricated reducing onsite labor and waste while increasing profitability for trades.
mag
e C
ourte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
3. Projects as Production Systems3. Projects as Production Systems
Structure of work is suited to the project’s ongoing needs rather follow a rigid binding plan.
Pulling commitments vs Pushing schedulePulling commitments vs Pushing schedule dates
Modularization, off-site fabrication, and multi-trade composition of work, can be made possible.
Keep work flowing so that the crews are alwaysproductive installing product;productive installing product;
Reduce inventory of material and tools on site.
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Just in time delivery.
Projects as Production SystemsProjects as Production Systems
Reliable promises are obtained throughReliable promises are obtained through collaborative planning
Stand up write down your commitmentStand up, write down your commitment and post it on the board. Trades agree on what they will get from previous trade and
h t th ill d li t f ll i t dwhat they will deliver to following trade
All players see each other as clients.All players see each other as clients.
Sandbagging is prevented by peer pressurepressure.
Project challenges are solved as a team
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Traditional Construction ProcurementTraditional Construction Procurement
Coordination
Suppliers
Coordination
Trades
Suppliers
Trades
Site ion
Trades
Site delivery
SuppliersCoordination onC
onst
ruct
Trades SuppliersSite delivery
Coordination
esy
of E
llisD
o
Site delivery Trades
Trades
mag
e C
ourte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
SuppliersCoordination
Coordination
Im
BIM enabled Prefab ProcurementBIM enabled Prefab Procurement
Suppliers
Suppliers
Suppliers
ion
SiteBIM onC
onst
ruct
Offsite PreFabrication
Site delivery
BIM Coordination
ProcessSite
InstallationSite
Commissioning &
Testing
TurnOver
esy
of E
llisD
o
Trades Trades
mag
e C
ourte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Trades
Trades
Im
3D D i F b i ti PF2F2F File to factory to field
3D Driven Fabrication ProcessF2F2F – File to factory to field
Prefabrication
CNC fabrication
ion
Economies of scale through modularization
onC
onst
ruct
Increased precision & Speed
Solving field labor shortages esy
of E
llisD
o
g g
mag
e C
ourte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
Bridging the Model to Site activitiesBridging the Model to Site activities
F b i ti d lFabrication model
ion
onC
onst
ruct
As built condition
esy
of E
llisD
om
age
Cou
rte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
BIM & FM / Asset ManagementBIM & FM / Asset Management
ion
onC
onst
ruct
esy
of E
llisD
om
age
Cou
rte
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Im
http://www.leanconstruction.org/
http://www.canbim.com/
http://en.wikipedia.org/wiki/Lean_construction
http://www buildingsmartalliance orghttp://www.buildingsmartalliance.org
htt //fi t h /http://fiatech.org/
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment
Th StThomas Strong, Director, CanBIMDi t Vi t l C t tiDirector, Virtual Construction,
[email protected] 896 8900905.896.8900
Canada BIM CouncilConseil canadien de la modélisation des données de bâtiment