Research on Lean Management by BIM Technology in Shanghai Tower Ge Qing, Vice GM & Chief Engineer Shanghai Tower Construction & Development Co., Ltd.

Transcript of Research on Lean Management by BIM Technology in Shanghai ...

Page 1: Research on Lean Management by BIM Technology in Shanghai ...

Research on Lean Management by BIM

Technology in Shanghai Tower

Ge Qing, Vice GM & Chief Engineer

Shanghai Tower Construction & Development Co., Ltd.

Page 2: Research on Lean Management by BIM Technology in Shanghai ...

Project Overview

Strategy Briefing

Similar Case Study

IT Management Mode Selection

Benefit Promotion by BIM

Reflections

Agenda

Page 3: Research on Lean Management by BIM Technology in Shanghai ...

• Location Z3 lot, Lujiazui Fanatical Center

• Section / Floor – 9 sections, underground:5 floors, Ground : 121 floors

• Building Height – 632m

• Construction Area – 570,000 ㎡ (0.16M underground, 0.41M ground)

• Functional Orientation – 24 hours opening International High Level office,

– Super five-star hotel and ancillary facilities

– Deluxe Shopping Mall

– Tourism and Entertainment

– Features Meeting Facilities

Project Overview

Page 4: Research on Lean Management by BIM Technology in Shanghai ...

December 2011

Progress

•Core tube surpassed 540m •Ex. curtain wall 57F •In. curtain wall surpassed 60F

August 2012

Page 5: Research on Lean Management by BIM Technology in Shanghai ...

Vertical Community Green Community

Smart Community

Humanistic Community

China Green Building: LEED-CS2.0: Golden

Cloud Computing BIM Intelligence

High specification requirements

High specification standards

High Difficulty Issues

Page 6: Research on Lean Management by BIM Technology in Shanghai ...

Strategy Briefing

Issues

Too many sub

contractors to

coordinate

Hard to share the

complex & huge

information

Difficult to achieve

cost control in such a

big project

Methodologies Solutions

Difficult to achieve

schedule control in

such a long

life-cycle project

Setup the team by

organization behavioristic

Flexible operation system,

using new tech: virtual

construction, pre-

fabrication, etc.

Blue Ocean Strategy:

Value Innovation

Quantified Value Creation

Comparative Analysis,

Strategy selection

Stretigic positioning

All stuff participation &

Specification

Responsibility & Coordination

Efficiency & Execution

Design:BIM detailed design

Construction:factory precast

M&A:One-Stop service

Viable benefit allocation policy by

BIM

low risk and high chance

win-win model

For Shanghai tower: Owner

leading, contractors participating:

Lean management by BIM

Page 7: Research on Lean Management by BIM Technology in Shanghai ...

Willing But Unable

Similar Case Study (Project Management Mode Options Analysis)

(Project

Management

Mode)

(Owner Own Project)

(Financing Own

Project)

(General Contractor

Own Project)

Owner self-manage mode

PM mode

PMC mode

……

DBB mode

DB mode

EPC mode

……

(Trinity Manage Mode - Owner,

general contract & Design )

Poor Info Flow

业主/监理

总包 设计信息流动

信息流动

信息流动

Info flow GC Design

Owner

Page 8: Research on Lean Management by BIM Technology in Shanghai ...

BIM features and usages

Coordination

Management for

Multi Targets

Improve Decision-

making

Sharing

Information in BIM

Model

Seamless Project

Management

Usage of BIM

The bottleneck for the info

technology adoption in

building engineering is

information sharing, and BIM

is reliable solution for

providing effective

approaches of framing info

sharing and management

platform.

IT Management Mode Selection

Page 9: Research on Lean Management by BIM Technology in Shanghai ...

BIM in the World

There are twe revolutions in AEC

First is from manual to CAD

Second is CAD to BIM

Status of Building Info adoption after China 11th 5 years plan

建筑业

现代化 工业化 信息化

技术信息化(BLM)

BIM PIM

管理信息化(ERP)

人事 财务 OA 采购

BIM

可视化 系统

协调法规要求

有限元

CFD

日照分析

能耗模拟

声学计算

视线模拟碰撞

检查施工图

成本预算

施工计划

可施工性

工业化

设施管理

运营评估

社区互动

市场需求

BIM in AEC industry

To Be Proceed

IT Management Mode Selection

Pro

ceeded

Page 10: Research on Lean Management by BIM Technology in Shanghai ...

BIM Management Model: Options & analysis

Enterprise Management via BIM

En

terprise B

IM P

ractice Sco

pe

Enterprise BIM Capacity Development

IT Management Mode Selection

External experts perform

one work of one project

with BIM

External experts perform

one work of all projects

or all works of one

project with BIM

External experts perform

all works of all projects

with BIM

Internal experts perform

one work of one project

with BIM

Internal experts perform

one work of all projects

or all works of one

project with BIM

Outside experts perform

all works of all projects

with BIM

All staffs perform one

project with one relevant

work with BIM

All staffs perform one

work of all projects or

all works of one project

with BIM

All staffs perform all

works of all projects

with BIM

Initial phase

Intermediate

phase

Ultimate phase

Fro

m ex

pert B

IM to

all sta

ff BIM

From isolated BIM to integrated BIM

Page 11: Research on Lean Management by BIM Technology in Shanghai ...

Function & Effect

BIM Adoption Mode Scope Effect Adoption Level

Driven by DI Design Phase min wide

Driven By Contract Design & Construction Phase mid few

Driven By Owner The whole project life cycle max Very a few

基于BIM“三位一体”精细化管理模式

(Lean BIM-based Management Mode )

业主、总包、设计“三位一体”模式(Trinity

Management Mode: Owner, General contract & Design )

Owner Leading

All contractors participating

Lean Management Mode

BIM Management Model: Options & analysis

IT Tech Change Management Model

业主/监理

总包 设计信息流动

信息流动

信息流动

Owner/

Supervisor

Contractor Designer

Information flow

Owner/

Supervisor

Contractor Designer Information flow

业主/监理

总包 设计

BIM数据平台

虚拟管理平台

信息流动

信息流动

信息流动

BIM data

platform

Page 12: Research on Lean Management by BIM Technology in Shanghai ...

Benefit Promotion by BIM

BIM Compare with Traditional Project Management Mode

Additional Cost Causing by Information Sharing Issue

Additional Cost Caused by Information Sharing Issue

(NIST,2004)

Information Sharing Issue in AEC

Schedule issues in Construction cased by lacking of information sharing

(McGraw-Hill Construction,2007)

There are so much additional cost in traditional project management mode causing by information sharing issue

Average:3.1%

Averatge:3.3%

Page 13: Research on Lean Management by BIM Technology in Shanghai ...

US owner BIM ROI

McGraw-Hill Construction, 2009

BIM Compare with Traditional Project Management Model

Stanford CIFE center summarized huge gains and effects by

BIM application according to 32 projects in US:

1)Eliminates 40% of the extra-budgetary changes

2)Time of cost estimation reduced by 80%;

3)The contract price reduced by 10% (the average profit of the

contractor in the past five years is between 2.8% -3.3% in China);

4)The duration of the project reduced by an average of 7%.

Total construction area of 2010 was 7 billion square meters, the finished area was 2.6 billion

square meters, construction investment was 10 billion Yuan. However, each 10,000 square meters of

residential construction generated 500-600 tones of construction waste and accounted for 25% of

municipal waste, the amount of dust accounted for 22% of the city.

With BIM adoption, cost estimation time can be cut off by 80%, and 40% of the budget changes

can be eliminated .

(China Construction Research Institute, 2012 statistics)

Benefit Promotion by BIM

Page 14: Research on Lean Management by BIM Technology in Shanghai ...

Framing Shanghai Tower Management Structure & Progress Based on BIM Technology

Three Principles of Lean Management:

• All stuff participation & Specification

• Responsibility & Coordination

• Efficiency & Execution

Shanghai Tower BIM Strategy Include:

What is the BIM Strategy Goal and how to Schedule it?

How to use BIM to increase ROI, accelerate growth?

How to Setup a qualified BIM Management Team?

How to Setup BIM Standard & Progress?

How to Manage & Coordinate all the designer contractor through contract terms

How to Examine BIM Adoption & Achievements?

Benefit Promotion by BIM

Page 15: Research on Lean Management by BIM Technology in Shanghai ...

Framing Shanghai Tower Management Structure & Progress based on BIM Technology

Shanghai Tower – Autodesk MOU Ceremony

2010.05.17

Benefit Promotion by BIM

Page 16: Research on Lean Management by BIM Technology in Shanghai ...

Framing Shanghai Tower Management Structure & Progress based on BIM Technology

Benefit Promotion by BIM

Vault

Design phase

Site management

3D piping

design

Prefabricatio

n

Fabrication

optimization Navisworks

Revit

Inventor

3ds Max Navisworks

Navisworks

Site info.

Phone

RFID

4D construction

simulation

Navisworks

Schedule info.

Project

P3

Equipment

manageme

nt

Emergency

optimization

Ecotect

3ds Max Naviswork

s

Olive

Equipment

info.

Phone

RFID

Operation

optimization

Property

managemen

t

Archibus

Design

Review

Tecton

Tecton

Construction phase Operation phase

RAC RST RME

BIM Database

Structure Architecture MEP

Autodesk product Other product

Virtual design Sustainable design

Structure

analysis Design

coordination

Lean

design

Ecotect

IES

GBS

PKPM

Etabs

Robot

Maya

3ds Max

Navisworks

Cost

software Navisworks

Laser info.

Inventor

Page 17: Research on Lean Management by BIM Technology in Shanghai ...

(Ref

ined

man

agem

ent

pro

cess

es)

SC GC BC

SC= Sub Contract

GC=General Contract

BC=BIM Consulting

SHT= Shangai Tower

SHT Owner SHT Expert group

Model review

BIM App.

(Scheduling)

Change review

Modeling

Model Sign off

Model Change

Final model

Sub-Model

Model review Model review guide

Model review guide

Model review guide

Publish

Assembled Model

Model review

Sub-dep. Of SHT Owner

Framing Shanghai Tower Management Structure & Progress based on BIM Technology

Benefit Promotion by BIM

Page 18: Research on Lean Management by BIM Technology in Shanghai ...

Better Design Better Construction Better FM

Framing Shanghai Tower Management Structure & Progress based on BIM Technology

Benefit Promotion by BIM

BIM data model

Design Construction Investment/Procurement Operation

Com

plex

form

Pip

ing co

mpreh

ensiv

e

desig

n

Clash

detectio

n

Con

structio

n p

lan

discu

ssion

4D

simulatio

n

Site m

onito

ring

Material statistics

Equip

men

t info

.

main

tenan

ce

Space u

sage ch

ange

Bid

din

g an

d ten

derin

g

man

agem

ent

Page 19: Research on Lean Management by BIM Technology in Shanghai ...

BIM Team Organization in Shanghai Tower

Shanghai Tower

BIM Consultant

General

Contractor Designer

Benefit Promotion by New Management Mode

Benefit Promotion by BIM

Hu

nin

g S

teel

Bao

Steel

Yu

an

da

Cu

rtain

wall

Jia

ngh

e Cu

rtain

wall

SC

G M

EP

Mitsu

bish

i Elev

ato

r

Gold

man

tis Deco

ratio

n

Sh

an

gh

ai D

ecora

tion

……

Sch

ind

ler Elev

atio

n

Steel C

urta

in w

all

Su

b C

on

tracto

rs

Page 20: Research on Lean Management by BIM Technology in Shanghai ...

1、Design Phrase

1)Improve by multi-discipline collaboration

2)Improve by visual design management

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 21: Research on Lean Management by BIM Technology in Shanghai ...

Parametric Design

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

formula drive data drive

scripts drive

data input parameters input conditions input

data output model output

share analyze feedback

model final system selection

return

Page 22: Research on Lean Management by BIM Technology in Shanghai ...

Sustainable Design

Light Pollution Analysis

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 23: Research on Lean Management by BIM Technology in Shanghai ...

Sustainable Design

Building wind environment

simulation

Indoor natural lighting simulation

Underground natural lighting simulation

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 24: Research on Lean Management by BIM Technology in Shanghai ...

Construction phase

Improve construction management efficiency thru visualized simulation

Ensure a safe distance

Necessary to analyze the critical

state of the dual-lift crane.

When vertical angle of bar

lever is 15.5° :

horizontal angle is -58°~58°

When vertical angle is 60 °:

horizontal angle is -71 ° to 71

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 25: Research on Lean Management by BIM Technology in Shanghai ...

Construction phase

Improve construction efficiency via multi-discipline collaboration

MEP

Architectural structure

Steel structure

Ex. Curtain wall

In. Curtain wall

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 26: Research on Lean Management by BIM Technology in Shanghai ...

Construction phase

Shorten construction duration thru 4D-Simulation

BIM施工模型 (model)

Shorten Construction Duration & Decrease Cost via BIM

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Co

nstru

ction

sched

ule

Page 27: Research on Lean Management by BIM Technology in Shanghai ...

Lean Fabrication and Construction

Improve the efficiency and reduce the cost in steel work thru pre-assemble simulation

Construction phase

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 28: Research on Lean Management by BIM Technology in Shanghai ...

Improve the efficiency and reduce the cost in steel work

thru pre-assemble simulation

Lean fabrication and construction with BIM model

Construction phase

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 29: Research on Lean Management by BIM Technology in Shanghai ...

Benefit Promotion by BIM

Lean Fabrication and Construction

Construction phase

Benefit Promotion by New Management Mode

Curtain wall: Improve the efficiency of design and installation thru pre-fabrication & pre-assemble simulation

Page 30: Research on Lean Management by BIM Technology in Shanghai ...

MEP: Improve the efficiency and quality of design and prefabrication thru detailed design and pre-

assemble simulation with BIM

Construction phase

Lean fabrication and construction with BIM

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 31: Research on Lean Management by BIM Technology in Shanghai ...

Retrieve info via scanning code on

ducts

Retrieve info of location ,properties & parameters, including installer,

installation time

Retrieve electronic info from

paper

Construction phase

MEP: Improve the efficiency and quality of design and prefabrication thru detailed design and pre-

assemble simulation)

Benefit Promotion by BIM

Lean fabrication and construction with BIM

Benefit Promotion by New Management Mode

Page 32: Research on Lean Management by BIM Technology in Shanghai ...

Benefits from Lan Prefabrication and construction plan:

1)60% site work reduction

2)90% reduction in hazard and poisonous work, ex. welding, glue, etc.)

3)70% prefabrication of duct and pipe

MEP: Improve the efficiency and quality of design and prefabrication thru detailed design and pre-

assemble simulation

Construction phase

Benefit Promotion by BIM

Lean fabrication and construction with BIM

Benefit Promotion by New Management Mode

Page 33: Research on Lean Management by BIM Technology in Shanghai ...

BIM for Decoration : improve quality and efficiency and reduce site work thru BIM model based design

Urinal unit Displaced view of Urinal

Construction phase

Benefit Promotion by BIM

Lean fabrication and construction with BIM

Benefit Promotion by New Management Mode

Page 34: Research on Lean Management by BIM Technology in Shanghai ...

BIM Model vs. On-site Installation Results

BIM for Decoration : improve quality and efficiency and reduce site work thru BIM model based design

Construction phase

Benefit Promotion by BIM

Lean fabrication and construction with BIM

Benefit Promotion by New Management Mode

Page 35: Research on Lean Management by BIM Technology in Shanghai ...

Site monitoring via 3D laser scanning and BIM

Construction phase

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 36: Research on Lean Management by BIM Technology in Shanghai ...

BIM Model vs. Point Cloud:9.2mm average tolerance in 15F

Site monitoring via 3D laser scanning and BIM

Construction phase

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 37: Research on Lean Management by BIM Technology in Shanghai ...

Site monitoring via 3D laser scanning and BIM

Construction phase

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 38: Research on Lean Management by BIM Technology in Shanghai ...

FM Phase

Improve FM Efficiency with BIM Data

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 39: Research on Lean Management by BIM Technology in Shanghai ...

Improve practice of accident warning and emergency management with BIM

Evacuation Routing Optimization

FM Phase

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 40: Research on Lean Management by BIM Technology in Shanghai ...

Economic Indicator of BIM

ex.opening unit cost of direct construction(CNY)

slab opening 2600 block opening 19800 block opening 5400 MEP opening 1600 total conflict 8400

total cost 10,000,000 average unit cost 1190.48

BIM economic indicators

(reference )

area unit 9F model floor 4656.1㎡

10F model floor 4648.4㎡

total area of model floor 9304.5㎡

total area of Shanghai tower 570000㎡

total conflict of model floor 1013

reference average cost 1190.48CNY

total cost of model floor 1,205,952.38CNY

total economic indicator

cost of SHT 73,877,463.29CNY

BIM economic indicator estimation of SHT

(by reference unit cost of conflict)

SHT Total CNY 12 billion Change rate 3%-5% in average

Fee subject to change CNY 360 million)

BIM economic indicator estimation result of Shanghai tower (Cost per changes )

Analogy

Shanghai Tower save at least CNY 100 million with BIM adoption

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 41: Research on Lean Management by BIM Technology in Shanghai ...

Viable Benefit Allocation

Establish reasonable reward tactics

建设单位

设计单位

施工单位

监理单位

其他单位

建设单位

设计单位

施工单位

监理单位

其他单位Reward the companies

with the saved cost

subject to new tech

adoption, and put the

statement inside the

contract.

Owner

Design Institute

Construction companies

Audit companies

Other

Owner

Design Institute

Construction companies

Audit companies

Other

Benefit Promotion by BIM

Benefit Promotion by New Management Mode

Page 42: Research on Lean Management by BIM Technology in Shanghai ...

Reflections

2. Need to setup national BIM Implementation and related standards

•The overall BIM adoption in China is at the very primary stage

•Lacking of national-wide standards

•Lacking of mechanism for BIM adoption

•Suggest government set up unified BIM standards and promote BIM into real practices

1. The mode is decided by enterprise development strategies

•Involve lean BIM-based mode gradually into the company’s

management activities

•Shanghai Tower set up a structure to involve all parties

•Invited BIM consultants to take (as much as) advantages of BIM

Page 43: Research on Lean Management by BIM Technology in Shanghai ...

Building Information Management

Building Information Manufacture

Building Information Modeling

Tech

Management

Reflections

Real BIM Management by BIM Tec- How?

Page 44: Research on Lean Management by BIM Technology in Shanghai ...

Science and Technology empower the new

economy

Better Design Quality

Better FM

Better Construction

Management

BIM