State Route 99 Corridor Update

15
State Route 99 State Route 99 Corridor Update Corridor Update Kome Ajise Kome Ajise District 10 Director District 10 Director Caltrans Caltrans

description

State Route 99 Corridor Update. Kome Ajise District 10 Director Caltrans. SR 99 Business Plans. 424 Miles of SR 99 In Central Valley State Route 99 Business Plan San Joaquin Valley 274 miles in Districts 6 and 10 Route 70/99 Corridor Business Plan Sacramento Valley - PowerPoint PPT Presentation

Transcript of State Route 99 Corridor Update

Page 1: State Route 99  Corridor Update

State Route 99 State Route 99 Corridor UpdateCorridor Update

Kome AjiseKome AjiseDistrict 10 DirectorDistrict 10 DirectorCaltransCaltrans

Page 2: State Route 99  Corridor Update

SR 99 Business PlansSR 99 Business Plans

424 Miles of SR 99 In Central Valley424 Miles of SR 99 In Central Valley

State Route 99 Business PlanState Route 99 Business Plan

San Joaquin ValleySan Joaquin Valley 274 miles in Districts 6 and 10274 miles in Districts 6 and 10

Route 70/99 Corridor Business PlanRoute 70/99 Corridor Business PlanSacramento ValleySacramento Valley

150 miles in Districts 2 and 3150 miles in Districts 2 and 3

Page 3: State Route 99  Corridor Update

SR 99 Business PlanSR 99 Business Plan(San Joaquin Valley)(San Joaquin Valley)

Plan Covers SR 99 South Of The Plan Covers SR 99 South Of The Sacramento/San Joaquin County LineSacramento/San Joaquin County Line

Priority Category 1Priority Category 1 Freeway ConversionFreeway Conversion (4 projects(4 projects))

Priority Category 2Priority Category 2 Capacity Increasing Projects Capacity Increasing Projects (25 projects)(25 projects)

Priority Category 3Priority Category 3 Major Operational Projects Major Operational Projects (34 projects)(34 projects)

Priority Category 4Priority Category 4 New Interchanges New Interchanges (4 projects)(4 projects)

Page 4: State Route 99  Corridor Update

SR 99 Business Plan SR 99 Business Plan Funding PhasesFunding Phases

20 Year Funding Program20 Year Funding Program

Three Funding Phases ($6 Billion)Three Funding Phases ($6 Billion) Phase 1Phase 1 - - $1.0 B$1.0 B - - Completes Category 1 Completes Category 1

and part of and part of Categories 2 & 3 Categories 2 & 3

Phase 2Phase 2 - - $3.0 B$3.0 B - - Completes Category 2 Completes Category 2

Phase 3Phase 3 - - $2.0 B$2.0 B - - Completes Categories 3 & Completes Categories 3 & 44

Page 5: State Route 99  Corridor Update

SR 99 Business Plan SR 99 Business Plan ObjectivesObjectives

Performance ObjectivePerformance Objective Level Of Service “C” in rural areasLevel Of Service “C” in rural areas Level Of Service “D” in urban areasLevel Of Service “D” in urban areas

Facility ObjectiveFacility Objective Minimum 6 lane freewayMinimum 6 lane freeway 115 of the 274 miles currently meet objective115 of the 274 miles currently meet objective Objective is fully met in Kern and StanislausObjective is fully met in Kern and Stanislaus

Driver Experience ObjectiveDriver Experience Objective Visually attractive corridorVisually attractive corridor SJ Valley identity and sense of placeSJ Valley identity and sense of place

Page 6: State Route 99  Corridor Update

11stst WAVE: WAVE: 5 widening projects currently in 5 widening projects currently in construction phaseconstruction phase

Adds 17 miles of 6 lane freewayAdds 17 miles of 6 lane freeway Results in 48% of corridor attaining 6F Results in 48% of corridor attaining 6F

22ndnd WAVE: WAVE: 7 projects funded by Prop 1B funds 7 projects funded by Prop 1B funds

Adds another 44 miles of 6 lane freewayAdds another 44 miles of 6 lane freeway Will result in 64% of corridor attaining 6FWill result in 64% of corridor attaining 6F

SR 99 Business Plan SR 99 Business Plan ProgressProgress

Page 7: State Route 99  Corridor Update

Regional Transportation

Plans (RTP)

InterregionalTransportation System Plan (ITSP)

SR 99Dist 6

TransportationConceptReport

SR 99Dist 10

TransportationConceptReportEnhancement Plan

+Business Plan =SR 99 Corridor

Master Plan

Partnership (Caltrans, GVC, Kern COG, Tulare CAG, Fresno COG,Madera CTC, Merced CAG, Stanislaus COG, San Joaquin COG)

Page 8: State Route 99  Corridor Update

Master Plan Update Master Plan Update …Next Steps…Next Steps

Prepare Work Plans For Updates Business Plan and Enhancement Plan Elements

Technical Updates Business Plan and Enhancement Plan Elements

Corridor Financial Plan Project Implementation Agreements

Enhancement Plan Advisory Committee

Page 9: State Route 99  Corridor Update

Route 70/99 Business PlanRoute 70/99 Business Plan(Sacramento Valley)(Sacramento Valley)

Plan Covers North Of The Plan Covers North Of The

Sacramento/San Joaquin County LineSacramento/San Joaquin County Line

Route 70/99 Business Plan PrioritiesRoute 70/99 Business Plan Priorities Shared Funding PlanShared Funding Plan Safety componentSafety component Mainline capacityMainline capacity Expressway conversionExpressway conversion

Page 10: State Route 99  Corridor Update

Route 70/99 Route 70/99 Priority CategoriesPriority Categories

Priority Category 1 Priority Category 1 ($524 M)($524 M) Programmed Safety, Capacity Programmed Safety, Capacity

and Expressway Conversionand Expressway Conversion (10 (10 projects)projects)

Priority Category 2Priority Category 2 ($273 M)($273 M) Programmed Safety, Capacity Programmed Safety, Capacity

and Expressway Conversion and Expressway Conversion (11 projects)(11 projects) Priority Category 3Priority Category 3 ($681 M)($681 M)

Planned Projects Planned Projects (34 projects)(34 projects) Priority Category 4Priority Category 4 (TBD)(TBD)

Future Projects Future Projects (40 projects)(40 projects)

Page 11: State Route 99  Corridor Update

SR 99 Bond ProgramSR 99 Bond Program

$1 Billion$1 Billion

400+ Miles Of SR 99 Through The Central 400+ Miles Of SR 99 Through The Central ValleyValley

Program Guidelines Adopted by CTC Dec Program Guidelines Adopted by CTC Dec 20062006

Funding Program Adopted by CTC March Funding Program Adopted by CTC March 20072007 13 Projects for $980 million13 Projects for $980 million

6 Projects - $147 million – Sacramento Valley6 Projects - $147 million – Sacramento Valley 7 Projects - $833 million – San Joaquin Valley7 Projects - $833 million – San Joaquin Valley

Page 12: State Route 99  Corridor Update

SR 99 Bond ProgramSR 99 Bond Program

Expected Results…Expected Results…

44 Miles of 6-lane Freeway44 Miles of 6-lane Freeway 3.3 Miles of 4-lane Conventional 3.3 Miles of 4-lane Conventional

HighwayHighway 2 New Interchanges2 New Interchanges 1 Reconstructed Interchange1 Reconstructed Interchange 2.5 Miles of Aux. Lanes and 2.5 Miles of Aux. Lanes and

Operational ImprovementsOperational Improvements

Page 13: State Route 99  Corridor Update

SR 99 Bond ProgramSR 99 Bond Program

DoneDone 07/0807/08 08/0908/09 09/1009/10 10/1110/11 11/1211/12 12/1312/13

PAEPAEDD

55 11 22 55

PS&PS&EE

11 33 55 44

RWCRWC 33 55 44 11CONCON**

33 66 22 22

* Construction Starts

Page 14: State Route 99  Corridor Update

Questions?Questions?

Page 15: State Route 99  Corridor Update

Sample SJ Valley Identity Sample SJ Valley Identity SignSign