![Page 1: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/1.jpg)
Oakville Triangle & Route 1 Corridor Planning
Advisory Group Meeting #1 Potomac Yard Fire Station
Community Room April 29, 2014
![Page 2: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/2.jpg)
2 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Agenda
• Introductions • Purpose and Tasks of AG • Work program deliverables &
milestones • Scope of planning study • Background Info • Group Activity
![Page 3: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/3.jpg)
3 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing
Oakville/Route 1 Advisory Group
• Established by City Council March 2014, appointed by City Manager April 2014
• Provide recommendations on principles for Master Plan Amendment, illustrative plan for future development of Oakville/Route 1 West
• Ensure that regulatory submissions are consistent with the intent of the principles above
• Serve as facilitators at meetings • Convey information between constituents and AG • Listen to and incorporate input from community
![Page 4: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/4.jpg)
4 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing
![Page 5: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/5.jpg)
5 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Work Program
![Page 6: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/6.jpg)
6 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing
Study area in context of City
![Page 7: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/7.jpg)
7 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Scope of Planning Study
![Page 8: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/8.jpg)
8 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Study Area and Existing SAPs
Oakville Triangle/Route 1 Corridor
![Page 9: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/9.jpg)
9 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Land Use, Planning, Development
History & Context
“The City holds open the possibility of reevaluating the area [Oakville Triangle] in the future as development occurs in the Route 1 corridor. The area may be considered as a CDD in the future.” -1992 Potomac West Master Plan
![Page 10: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/10.jpg)
10 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Ownership
• Insert map
![Page 11: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/11.jpg)
11 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Open Space
![Page 12: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/12.jpg)
12 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Land Uses (Planned and Existing)
![Page 13: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/13.jpg)
13 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Max Building Heights (Existing Zoning)
![Page 14: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/14.jpg)
14 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing
40 – 50 ft. (4-5 stories)
50 - 60 ft. (5-6 stories) 60 - 80 ft. (6-7 stories)
30 – 40 ft. (3-4 stories)
Building Heights
![Page 15: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/15.jpg)
15 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Streetscape – Connections
Raymond Avenue Mount Jefferson Park Entrance
![Page 16: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/16.jpg)
16 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Streetscape – Connections
Route 1 Crystal City/Potomac Yard Transitway
![Page 17: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/17.jpg)
17 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Stormwater Requirements
• Impervious areas increase stormwater runoff volume, peak flow and pollution carried to local water bodies
• New Environmental Management Ordinance Requirements – 20% (> 1 acre of disturbance) or 10% (<1 acre of
disturbance) reduction in pollution (phosphorus) – Treatment of the first ½” of stormwater runoff from
all impervious surfaces – Post-development runoff peak flows must be less than
pre • Strategies for meeting requirements
– Reduce impervious area post development – Install underground facilities such as sand filters or
proprietary filter systems – Incorporate green roofs, cisterns, pervious pavement
into design
![Page 18: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/18.jpg)
18 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Transportation Policies & Framework
![Page 19: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/19.jpg)
19 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing
Transportation Policies & Framework
• City Council Strategic Plan
• Transportation Master Plan
• Eco-City Action Plan
• Pedestrian & Bicycle Plan
• Complete Streets Policy
![Page 20: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/20.jpg)
20 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Crystal City/
Potomac Yard Transitway • 5-mile corridor connecting
Pentagon City, Crystal City, Potomac Yard, and Braddock Road
• First 0.8 mile segment in Alexandria currently under construction – 2-lane transit-only corridor
with 12-ft landscaped medians on both sides
• Anticipated opening Summer 2014
20
![Page 21: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/21.jpg)
21 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Transportation Network
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing
![Page 22: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/22.jpg)
22 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Transportation Study Area
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing
![Page 23: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/23.jpg)
23 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing
Group Work: Defining the Issues Questions 1. Are there additional topics to address? 2. What are the key issues within each of the topic areas that need to be addressed and resolved?
Topic Areas
Land Use – Height Affordable Housing Community Amenities Open Space Environmental Sustainability Multimodal Connectivity Pedestrian Environment
![Page 24: Oakville Triangle & Route 1 Corridor Planning...4.29.2014 3 Oakville Triangle and Route 1 Corridor Planning Oakville/Route 1 Advisory Group • Established by City Council March 2014,](https://reader033.fdocuments.us/reader033/viewer/2022043013/5fadc037aec473468a2e0294/html5/thumbnails/24.jpg)
24 Meeting #1: Introduction, Background, & Defining the Issues 4.29.2014
Oakv
ille T
riang
le a
nd R
oute
1 C
orrid
or P
lann
ing Next Steps
April 29 Meeting #1 Introduction, Background, Defining the Issues
May 20
Meeting #2 Virtual Site(s) Tour
June 2
Meeting #3 Land Use, Open Space, Community Amenities
June 23
Meeting #4 Connectivity, Streets, Building Massing, Density
Summer Subcommittee Meetings
Potential meetings of subcommittees if needed, schedule TBD