iSP3 DATA SHEET
1 | P a g e C o p y r i g h t © 2 0 1 1
iSP3 ACCELERATE SOLUTION
ADVANCED RESOURCE ASSIGNMENT (ARA)
The Issue: Assignment Resources by Trade
Most asset-intensive companies manage large pools of resources consisting of
employees, contractors and equipment. Work assignments are usually created
and distributed by schedulers responsible for different disciplines of work. By
providing schedulers the ability to quickly match requirements to the available
resources by skill-set greatly increases their effectiveness. But without the
proper tools, the true potential of company resources will be underutilized.
The Solution: Advanced Resource Assignment
By utilizing iSP3’s Accelerate Solution, planners and schedulers will gain access
to a wealth of tools allowing them to do their jobs more effectively and
efficiently. Additional options on the Scheduling Workbench provides the
ability to filter the planning process to a specific work order, group work
together by equipment, and view work order against child components. Such
simple capabilities make a huge difference in the planning process.
Automated & Manual
Assignment by Trades
Efficient Creation of Rotating
Shift- type Schedule
Tradesmen on Leave Entries
Metric Historical Audit
Capabilities
Effective Resource Workloads
Management
Contractor Time Entry
Enhanced PM Forecasting
-
iSP3 DATA SHEET
2 | P a g e C o p y r i g h t © 2 0 1 1
The Crew Availability by Craft program has been greatly enhanced to alloweasier identification of the resource loading by trades within the schedule. Italso assists in determining the number of hours that have been scheduled andunscheduled. This will help to ensure resources are loaded to their idealcapacity of 90%.
JD Edwards currently contains essential information on the resources and workrequirements. The scheduling application has been extended to includefunctionality where filters can be applied directly on the grid through the QBEline. Assigned work orders and tasks flow to the bottom of the list alleviatingthe daunting task of managing a schedule with hundreds of work orders. Themost significant enhancement of this product is its ability to match resources towork based on the default trade without user intervention. Simply by checkingoff two boxes and clicking the assign resource button, the work orders denotedwith the recommended trades will be assigned AUTOMATICALLY to theappropriate individuals with the respective trade qualifications.
Situations will always arise where automation may be limited, but the schedulerhas the ability to redistribute hours as needed at the trade or individual level,allowing significantly more control and precision. The date fields will open sochanges can be made directly without the need to switch between screens.
-
iSP3 DATA SHEET
3 | P a g e C o p y r i g h t © 2 0 1 1
To effectively prepare a schedule it is vital that the availability of your resourcepool be up-to-date; therefore, a front-end application called Tradesman onLeave was developed to capture information that deviates from the normalschedule. Not only can individuals indicate time off, it is also possible to assignadditional hours that are available, such as overtime.
Although a fundamental aspect to managing schedules, the process of creatingthe calendar for rotating shift-type schedules is tedious and cumbersome. Theassumption that an individual works Monday to Friday on a weekly basis is notcommon practice for production sensitive industries. The Rotational Shift Inputprogram allows one to enter the pattern for the schedule in terms of night shift,day shift, and non-work day. Once the first work date and pattern have beenestablished the program will automatically generate the work schedule for anentire year.
-
iSP3 DATA SHEET
4 | P a g e C o p y r i g h t © 2 0 1 1
Visualizing such a complex schedule on a calendar offers the user the ability to
know work assignments on any given day. During the assignment process,
individual schedules are accessible by clicking a single button.
The PM Projection module has experienced significant changes to produce more
accurate and reliable data, and The Update PM Projection process has been
optimally enhanced to ensure completely accurate, absolutely dependable
results. The PM Forecast Calculator is available allowing results to be shown
on-screen and on-demand.
-
iSP3 DATA SHEET
5 | P a g e C o p y r i g h t © 2 0 1 1
Finally, after the work is completed, metrics can be retrieved along with
contractor time for audit purposes. The Contractor Time Entry module
accumulates this information for the purpose of comparative metrics.
The Resource Assignment Global Constants contains settings to control how
many features of the Accelerate Solution will be used. For example, it was
recognized that different companies have unique configuration for identifying
equipment and component relationships. Although the parent-child relationship
is used extensively, it has been found that some companies use the remarks field
(KITL) or description 3 (DL03) to track the parent, such as, package numbers.
Metrics are extremely important to ensure contractor entries are mappedproperly to finance by trade; therefore, the naming convention for trades on thework center is used to identify this information against the payroll codes.
iSP3’s Accelerate Solution is a unique product that will complement yourcompany’s planning and scheduling needs. It will bring efficiencies to yourweekly meetings as well as providing metrics that are vital to continuousimprovement.
-
iSP3 DATA SHEET
6 | P a g e C o p y r i g h t © 2 0 1 1
Feature/Function Highlights
Crew Scheduling
o Accurate preventative maintenance projections
o Work order backlog and planning
o Crew availability with loading metrics
o Schedule saving
o Work assignments by trades or individuals
o Re-scheduling
o Completion of work at the header or detail level
Resource Scheduling
o Resource assignments workbench
o Enhanced searching / filtering capabilities
o Visibility into resource competencies, capacity and current
assignments
o Detail resource assignment screens
Working Hours Calendar Generation
o Ability to handle non-standard rotating shifts
o Visual representation of working hours on a calendar
o Tradesmen on leave entries
o Simplified entries to loading metric by trades
Solution Integration
Advanced Planning
Capital Asset Management
Condition-based Maintenance
Financial Management
Human Capital Management
Logistics
Manufacturing
Procurement and Subcontract Management
Project Management
Service Management
Copyright 2011 iSP3 All Rights Reserved.
This document is provided for information purposes only, and the contents hereof are subject to change without
notice. This document is not warranted to be error-free, nor is it subject to any other warranties or conditions,
whether expressed orally or implied in law, including implied warranties and conditions of merchantability or
fitness for a particular purpose. We specifically disclaim any liability with respect to this document, and no
contractual obligations are formed either directly or indirectly by this document. This document may not be
reproduced or transmitted in any form or by any means, electronic or mechanical, for any purpose, without our
prior written permission.
Oracle, JD Edwards, and PeopleSoft are registered trademarks of Oracle Corporation and/or its affiliates. Other
names may be trademarks of their respective owners.
-
iSP3 DATA SHEET
D a v i d T o ( 2 5 0 _ 2 1 7 - 4 3 0 3 C o p y r i g h t © 2 0 1 1
iSP3 ACCELERATE SOLUTION
ADVANCED RESOURCE ASSIGNMENT (ARA)
Matrix of Highlights
8.11+ ARAResource Working Calendar
Default work hours ■ ■
Working hour overrides by date ■ ■
Automated creation based on scheduled pattern / rotating shifts (e.g., 10 on, 3 off) □ ■
Visual representation of the schedule on a calendar □ ■
Tradesmen on Leave (New Module) Individual can specify changes to their work schedule (exceptions that include vacation and overtime) □ ■
Adjustments to the schedule will appear immediately upon the approval of the request □ ■
Contractor Time Entry (New Module) Actual time entered by contractors for work completed □ ■
Comparison between planned and actual hours according to the resource pool □ ■
Crew Schedule Workbench Ability to pull in carry-over work, unscheduled work and PM forecast ■ ■
Ability to quickly determine part availability (field highlighted in corresponding colours) ■ ■
Ability to filter orders in the schedule by equipment, parent equipment and work orders □ ■
Ability to filter scheduled work orders without assignments □ ■
Assignments Assignments by individuals / asset ■ ■
Assignments by trade regardless of individual □ ■
Automated assignments by trade □ ■
QBE filtering possible on the schedule (e.g., unit no., parent no., order no., trade, and start date) □ ■
Redistribution of hours with significantly more details for a particular work order □ ■
Ability to predefine partial hours on work orders within the current schedule □ ■
Ability to quickly view individual resource capacities visually in a calendar □ ■
Ability to directly remove work orders from the schedule □ ■
Trades are separated between night and day shift and easily shown in the application □ ■
Work can be distributed equally by individuals based on crew size □ ■
Fully assigned work orders immediately move to the bottom of the grid □ ■
Miscellaneous Advance Resource Assignment Global Constant groups all vital settings onto one screen □ ■
Restricts planners / schedulers to their own schedule □ ■
PM Projection Calculator developed to quickly determine when the PM Service will come due □ ■
Over 100+ enhancements to
increase productivity
Tested at 9 sites of varying
resource pool
Leveraging off existing
functionality and processes
Non-intrusive custom
applications
Existing functionality can be
used concurrently
Fully integrated across
existing JDE modules
-
iSP3 DATA SHEET
D a v i d T o ( 2 5 0 _ 2 1 7 - 4 3 0 3 C o p y r i g h t © 2 0 1 1
iSP3 ACCELERATE SOLUTION
ADVANCED RESOURCE ASSIGNMENT (ARA)
Application Touch-points
WORK REQUIREMENTS
Crew Schedule WorkbenchLoading the schedule with work
based on resource loadavailability for the work plan
PQ518320
Crew Schedule AssignmentTying resources by trades or by
individuals based on therequirements of the work order
PQ518330
Carry OverReview the tasks from previous
work plans
PQ518323
Unscheduled WorkLoad unscheduled work into the
current work plan
PQ518321
PM ForecastProjects scheduled tasks coming
due using PM Projections
PQ518324
Update PM ProjectionsCalculates when services are
coming due based on pre-existingtransactions
RQ518411
Work Plan (e.g. weekly)
Detail AssignmentsDaily assignment of hours toindividuals and work orders
PQ518331
Hour DistributionsDaily assignment of hours to
trades and work orders
PQ518311
Review MetricsKPIs for summary load
percentage
PQ518322
WORK PLAN RESOURCE ALLOCATION DETAIL ASSIGNMENT
Schedule MetricsSet hours for the work plan as %
of available hours
PQ518315
Resource Working HoursAvailable hours along withexceptions for all resources
P48307
R/S Calendar GenerationAutomated generation of schedule
patterns and rotating shifts
PQ518M07
Resource MasterMaintain address book for all
trades people with shift and trade
P48310
Tradesmen on LeaveEntries for all exceptions to the
base calendar (+ or -)
PQ518005
Employee Time EntryActual hours from trades personcharged to work orders on the
work plan
P051121
Contractor Time EntryActual hours from contractorscharged to work orders on the
work plan
PQ518010
RESOURCE POOL
RA Metrics History AuditDetailed audit on planned andactual hours for scheduled &
unscheduled tasks
PQ51831H
ACTUALS