SMEC International Pty. Ltd. in Association with SMEC India Pvt. Ltd. & RODIC Consultants Pvt. Ltd. 5th Floor, Tower C, DLF Building No. 8, DLF Cyber City, Phase II, Gurgaon, (Haryana), INDIA Telephone: +91-124-4552800, 4501100 Facsimile: +91-124-4380043 [email protected] www.smec.com
SMEC International Pty. Ltd. in Association with SMEC India Pvt. Ltd. & RODIC Consultants Pvt. Ltd. Project Site Office: Gund Adul Koot, Banihal, District Ramban, Jammu&Kashmir, 182146, INDIA
Date: 13th December 2014
The Project Director Our Ref.: 5061142/788 Project Implementation Unit, National Highway Authority of India, Airport Road, Parry Pora, Srinagar Jammu and Kashmir - 190005. Telefax – 0194 - 2478026.
Sub.: Independent Engineer services for 4-laning of Quazigund to Banihal section from Km 189.350 to Km 204.700 of NH 1A including 2 tunnels (2 lane) of 0.69 km and 8.45 km length on NH-1A on BOT(Annuity) basis in the State of Jammu & Kashmir (Package No. IE/NHDP-Phase-II/BOT/II/J&K)
Monthly Inspection Report No. 41
Ref: Dear Sir, It is our pleasure to submit to you five copies of the Monthly Inspection Report No.41 for the month of November 2014. Yours faithfully Michael Kastner Authorised Representative SMEC International Pty. Ltd.
CC: 1. Chief General Manager, RO, NHAI, Jammu (J&K) (by email) - along with one copy 2. M/s. NEC, Village – Nowgam, Banihal, (J&K) (by email) - along with two copies
3. Mr. M.A.Rankin,Team Leader, SMEC International Pty. Ltd., ND (by email) 4. RODIC Consultants, Gurgaon (by email)
attachment: monthly report November 2014.
.
1
Monthly Inspection Report November- 2014
Independent Engineer services for 4-laning of Quazigund to Banihal section from Km 189.350 to Km 204.700 of NH 1A including 2 tunnels (2 lane) of 0.69 km and 8.45 km length on NH-1A on BOT(Annuity) basis in
the State of Jammu & Kashmir
(Package No.: IE/NHDP-Phase-II/BOT/II/J&K)
SMEC International Pty.Ltd.
In association with
SMEC India Pvt.Ltd. & RODIC Consultants Pvt.Ltd.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
2
INS
PE
CT
ION
RE
PO
RT
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
3
INS
PE
CT
ION
RE
PO
RT
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
4
INS
PE
CT
ION
RE
PO
RT
Contents:
1. SALIENT FEATURESOF PROJECT...................................................................... 05-06
2. PROGRESS AT A GLANCE…………………………………………………………. 07-08
3. GEOLOGICALREPORT......................................................................................... 09
4. EXCAVATION REPORT………………………………………………………………. 10-12
5. GEOTECHNICAL REPORT…………………………………………………………… 13-14
6. TUNNEL LINING REPORT..................................................................................... 15-17
7. MATERIAL REPORT.............................................................................................. 18
8. HYDROLOGICAL / DRAINAGE REPORT............................................................. 19-20
9. BRIDGES / STRUCTURES REPORT..................................................................... 21
10. SURVEY REPORT…………………………………………………………………….. 22
11. ROAD AND HIGHWAY……………………………………………………………….. 23
12. MONTHWISE PROGRESS REPORT..................................................................... 24-32
13. TUNNEL ACTIVITIES............................................................................................. 33
14. UPTO DATE PROGRESS REPORT...................................................................... 34
15. MAN-POWER DEPLOYED FOR PROJECT.......................................................... 35-39
16. PLANT AND MACHINERIES.................................................................................. 40-43
17. CORRESPONDANCE LISTS................................................................................. 44-47
18. PROGRESS REPORT ON L- SECTION…………………………………………… 48
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
5
INS
PE
CT
ION
RE
PO
RT
1. SALIENT FEATURES OF PROJECT
Employer : M/S National Highways Authority of India Independent Engineer: M/S SMEC International Pty. Ltd., in
association with SMEC India Pvt. Ltd. & RODIC Consultants Pvt. Ltd.
Concessionaire : M/S NavayugaQuazigund Expressway Pvt. Ltd. EPC Contractor : M/S Navayuga Engineering Company Ltd. Concession Period: 20 Years (Including 5 Years Construction Period) Date of Signing of CA : 13th Day of July’ 2010 Appointed Date : 5th June 2011 Performance Security : Rs.99.35 Crores Total Project Cost : Rs.1987.00 Crores (Concession Agreement) Annuity (Half Yearly) : Rs.245.00 Crores Schedule Project Completion Date : 2nd June’ 2016 Targeted Project Completion Date : 31st December’ 2015
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
6
INS
PE
CT
ION
RE
PO
RT
MAIN FEATURES OF DESIGNED ALIGNMENT (A) Tunnels One tunnel for crossing of Main Pir Panjal Ranges have been designed, main features of this tunnel is:
Tunnel No.2
Special Features Twin Tube Solution*
Length 1stTube: 8429 m and 2ndTube: 8444 m, Both tunnels are connected with crosspassages at an interval of 500 m
Functional Cross Section
7.0 m single lane carriage waywith an emergency lane, Driving lane 3.75 m wide andemergency lane 3.25 m wide, Vertical clearance 5 m
Firefighting and Scudder system
SCADA System, Fire Fighting system
* Twin tube solution approved by NHAIvideletter no.NHAI/BOT/11019/5/2010/QB/387
Dt.26.05.2011 **Viaduct of length 1526 m approved by NHAI HO & conveyed vide PD’s letter no.PD/SGR/14001/2014/Gen/049 dated: 30.10.2014 In lieu of short tunnel T 1 (696 m length & viaduct of length 730 m) (B) Bridges and other Structures
Major Bridges – 1 No. Four Lane Bridge across River Bichlari at km.189.420
Minor Bridges – 6 Nos.
Across a stream/ Distributary at km 189.85 Across a Distributary at km 190.110 Across a stream at km 190.810 Across a stream at km 191.300 Across a Stream at km 193.380 Across a Stream at km 193.66
Rail Under Bridge RUB on Katra-Quazigund New B.G. Railway line at km.191.097 (Railway Chainage 151.710).
Viaduct Viaduct at km.192.248 Bridge cum viaduct at km.194.870
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
7
INS
PE
CT
ION
RE
PO
RT
2. PROGRESS AT A GLANCE TOTAL PROGRESS PLANNED V/S ACHIEVED UPTO 30-11-2014
Po
rtal
Tu
be
Act
ivit
y
Cumulative Ending November 2014
Planned Programme
Ach
iev
ed
Excess/ Shortage (Length Wise)
Excess/ Shortage (%)
Ori
gin
al
Rev
ised
Rev
ised
Ori
gin
al
Rev
ised
Rev
ised
Ori
gin
al
Rev
ised
Rev
ised
Jul-11
Jul-13
Jul-14
Jul-11
Jul-13
Jul-14
Jul-11
Jul-13
Jul-14
So
uth
1
Heading 3430 3171 2857 2102 -1328 -1069 -755 -39 -34 -26 Benching 3385 3027 2530 2002 -1383 -1025 -528 -41 -34 -21
Water Proofing & Geo-textile
NM 2240 NM 375 - -1865 - - -83 -
Lining 3210 2013 1507 358 -2852 -1655 -1149 -89 -82 -76 Top Slab 3060 1788 0 0 -3060 -1788 0 -100 -100 0
2
Heading 3430 3161 2709 2074 -1356 -1087 -635 -40 -34 -23 Benching 3385 3053 2600 1865 -1520 -1188 -735 -45 -39 -28
Water Proofing & Geo-textile
NM 2192 NM 0 - -2192 - - -100 -
Lining 3210 1823 1067 0 -3210 -1823 -1067 -100 -100 -100 Top Slab 3060 1626 0 0 -3060 -1626 0 -100 -100 0
No
rth
1
Heading 3020 3191 2973 2252 -768 -939 -721 -25 -29 -24 Benching 2990 3046 2676 2047 -943 -999 -629 -32 -33 -24
Water Proofing & Geo-textile
NM 2240 NM 225 - -2015 - - -90 -
Lining 2840 2113 914 188 -2653 -1925 -727 -93 -91 -79 Top Slab 2790 1788 0 0 -2790 -1788 0 -100 -100 0
2
Heading 3020 3115 2836 2122 -898 -993 -714 -30 -32 -25
Benching 2990 3043 2593 *1974 -1016 -1069 0 -34 -35 -24 Water
Proofing & Geo-textile
NM 2240 NM 0 - -2240 - - -100 -
Lining 2840 1938 1328 0 -2840 -1938 -1328 -100 -100 -100 Top Slab 2790 1788 0 0 -2790 -1788 0 -100 -100 0
*upto1868 & 1875 to 1955 & 2022 to 2048
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
8
INS
PE
CT
ION
RE
PO
RT
TOTAL PROGRESS PLANNED V/S ACHIEVED during November 2014 P
ort
al
Tu
be
Act
ivit
y
During November-2014
Planned Programme
Ach
ieve
d
Excess/ Shortage (Length Wise)
Excess/ Shortage (%)
Ori
gin
al
Rev
ised
Rev
ised
Ori
gin
al
Rev
ised
Rev
ised
Ori
gin
al
Rev
ised
Rev
ised
Jul-
11
Jul-
13
Jul-
14
Jul-
11
Jul-
13
Jul-
14
Jul-
11
Jul-
13
Jul-
14
Sou
th
1
Heading 100 100 140 0 -100 -100 -140 -100 -100 -100 Benching 80 112 112 0 -80 -112 -112 -100 -100 -100
Water Proofing & Geo-textile
NM 160 NM 0 - -160 - - -100 -
Lining 80 162.5 245 0 -80 -162.5 -245 -100 -100 -100 Top Slab 100 162.5 0 0 -100 -162.5 0 -100 -100 0
2
Heading 100 100 134 0 -100 -100 -134 -100 -100 -100 Benching 80 112 112 0 -80 -112 -112 -100 -100 -100
Water Proofing & Geo-textile
NM 160 NM 0 - -160 - - -100 -
Lining 80 162.5 249 0 -80 -162.5 -249 -100 -100 -100
Top Slab 100 162.5 0 0 -100 -162.5 0 -100 -100 0
Nor
th
1
Heading 80 100 147 0 -80 -100 -147 -100 -100 -100
Benching 80 112 129 0 -80 -112 -129 -100 -100 -100
Water Proofing & Geo-textile
NM 160 NM 0 - -160 - - -100 -
Lining 80 162.5 153
-80 -162.5 -153 -100 -100 -100
Top Slab 100 162.5 0 0 -100 -162.5 0 -100 -100 0
2
Heading 80 105 147 0 -80 -105 -147 -100 -100 -100
Benching 80 84 111 0 -80 -84 -111 -100 -100 -100
Water Proofing & Geo-textile
NM 160 NM 0 - -160 - - -100 -
Lining 80 162.5 264 0 -80 -162.5 -264 -100 -100 -100
Top Slab 100 162.5 0 0 -100 -162.5 0 -100 -100 0
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
9
INS
PE
CT
ION
RE
PO
RT
3. GEOLOGICAL REPORT No excavation progress in Tube-1 & in Tube-2 in Banihal area (South) and in Tube-1 & Tube-2 in Quazigund area (North) was achieved during the month of November-2014 by the Concessionaire.
The IE team remained busy with the inspection of Tunnels in South (Banihal) and in North (Qazigund) during the month under report. Such Tunnels were closely monitored to check any type of failure like buckling, bulging, development of all types of cracks due to hydraulic pressure and final adjustment of blasted rocks.
The final adjustment / settlement of rocks through which two tubes encompass was also kept under close supervision by inspecting the tubes repeatedly by IE Team.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
10
INS
PE
CT
ION
RE
PO
RT
4. EXCAVATION REPORT
South Portal / North Portal: Excavation in both the tubes of South Portal as well as North Portal remained suspended from 3rd week of April 2014 due to material shortage and in particular due to shortage of diesel.
Planned programme formulated in July 2011, July 2013& July 2014 got affected and the progress from month of May toNovember 2014 remained zero. As per above planned programs, the progress at the end of November 2014 should have been as follows:
TOTAL PROGRESS PLANNED V/S ACHIEVED UPTO 30-11-2014
Po
rtal
Tu
be
Act
ivit
y
Cumulative Ending November 2014
Planned Programme
Ach
iev
ed
Excess/ Shortage (Length Wise)
Excess/ Shortage (%)
Ori
gin
al
Rev
ised
Rev
ised
Ori
gin
al
Rev
ised
Rev
ised
Ori
gin
al
Rev
ised
Rev
ised
Jul-11 Jul-13 Jul-14 Jul-11 Jul-13 Jul-14
Jul-11
Jul-13
Jul-14
So
uth
1 Heading 3430 3171 2857 2102 -1328 -1069 -755 -39 -34 -26 Benching 3385 3027 2530 2002 -1383 -1025 -528 -41 -34 -21
2 Heading 3430 3161 2709 2074 -1356 -1087 -635 -40 -34 -23 Benching 3385 3053 2600 1865 -1520 -1188 -735 -45 -39 -28
No
rth
1 Heading 3020 3191 2973 2252 -768 -939 -721 -25 -29 -24 Benching 2990 3046 2676 2047 -943 -999 -629 -32 -33 -24
2 Heading 3020 3115 2836 2122 -898 -993 -714 -30 -32 -25 Benching 2990 3043 2593 *1974 -1016 -1069 0 -34 -35 -24
*Upto1868 & 1875 to 1955 & 2022 to 2048
In addition to above, the plan for executing the work during the month of November-2014could not be achieved and the progress during the month of November 2014 should have been as follows.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
11
INS
PE
CT
ION
RE
PO
RT
TOTAL PROGRESS PLANNED V/S ACHIEVED during November 2014
Po
rtal
Tu
be
Act
ivit
y
During November-2014
Planned Programme
Ach
ieve
d
Excess/ Shortage (Length Wise)
Excess/ Shortage (%)
Ori
gin
al
Rev
ised
Rev
ised
Ori
gin
al
Rev
ised
Rev
ised
Ori
gin
al
Rev
ised
Rev
ised
Jul-11 Jul-13
Jul-14
Jul-11
Jul-13
Jul-14
Jul-11
Jul-13
Jul-14
Sou
th 1
Heading 100 100 140 0 -100 -100 -140 -100 -100 -100
Benching 80 112 112 0 -80 -112 -112 -100 -100 -100
2 Heading 100 100 134 0 -100 -100 -134 -100 -100 -100
Benching 80 112 112 0 -80 -112 -112 -100 -100 -100
Nor
th 1
Heading 80 100 147 0 -80 -100 -147 -100 -100 -100
Benching 80 112 129 0 -80 -112 -129 -100 -100 -100
2 Heading 80 105 147 0 -80 -105 -147 -100 -100 -100
Benching 80 84 111 0 -80 -84 -111 -100 -100 -100 The concessioner has not even adhered to revised program R2 also and the progress during this month also remained zero which will increase the delay period and will become impossible to complete the project in time. In order to cover the shortages and to complete the work in time the concessioner has to make proper arrangements of machinery, manpower and most importantly material, so that work is not affected anymore in future and even the shortages can be covered with minimum loss of time. As already submitted the report regarding the development of cracks above portal at north side, no remedial measures are being taken to protect the portal slopes as yet.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
12
INS
PE
CT
ION
RE
PO
RT
Cracks above North Portal
In view of the preparedness for the proposed resumption of work, IE team did enquire about the status of the machinery from Mr. Raju, Mechanical head NEC north portal. He gave us assurance that they are in a position to start the work instantly without any delay once they get green signal from head office. All the equipment’s at north portal are being checked/started/driven twice in a month. Batteries of all the equipment’s are being removed and kept on charging periodically.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
13
INS
PE
CT
ION
RE
PO
RT
5. GEOTECHNICAL REPORT
1. There is no change in the Progress achieved during the month of November 14 either in Heading / Benching and is same as reported last in respect of both the Portals besides that no Convergence observations can be shared due to non-sharing of any convergence diagrams by NEC during the month.
2. There is no change in the Progress achieved during the month of November 14 either in Heading / Benching and is same as reported last in respect of both the Portals besides that no Convergence observations can be shared due to non-sharing of any convergence diagrams by NEC during the month.
3. The Eupalinos software for the development of convergences on both Sides i.e. South Portal side as well as North Portal side,has got expired by the end of September 14, and is awaiting its renewal. NEC’S attention is solicited to be drawn for its early renewal for timely and effective monitoring, which at present in not being carried out by NEC due to non-availability of Eupalinos software.
4. Contractual obligation under contract Sub clause 362.1.1.5 and the IS code 15026-2002 is not being followed and adhered to by NEC in the best interest of the project.
5. No measures have been initiated by the NEC till the end of Nov 14 regarding Stabilization of North Portal Formation (Pl refer letter No 5061142/760 dated 13.10.14). NEC’s attention is solicited towards the same.
6. No initiative is being taken by the NEC for the Installation of Load cells / Extensometer although Geotechnical Instrumentation and Monitoring document from GEO Consultants and the IS code 15026-2002 clearly specifies for the Installation of Load cells / Extensometer as a permanent requirement for the prolonged monitoring and observance of displacements if any in the Tunnels, (may please refer chapter 3 of GEO CONSULTANTS in this regard) Since at present no work is in progress and it would have been appropriate to go for the installation of Load cells / Extensometer but the same is not being attention by NEC.
7. The lattice Girders as well as the Wire mesh which forms a major component of Support system is lying in open subjecting it to weathering conditions / rusting, thereby losing its structural properties and the status holds good for Both South and North Portal Sides.
NEC’s attention is solicited in this regard besides for checking Structural Property as per Design and the relevant IS codes before its use.
Stacking of Wire Mesh / Lattice Girders / Rock Bolts in Open
8. Number of patches has developed both in T1 and T2 (North Portal) due to erosion of shotcrete from the rock surface, a lot of un-attended moisture too has helped the development of shotcrete less patches leaving the rock surface exposed.
NEC’s attention is solicited to be drawn for taking care of such spots / patches for the structural stability/safety of the Tunnels, rather than leaving the Caverns un-attended for long.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
14
INS
PE
CT
ION
RE
PO
RT
Non- Conformity Reports
Two numbers NCR’s bearing No 35 & 36 are still open to get addressed by the NEC.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
15
INS
PE
CT
ION
RE
PO
RT
6. TUNNEL LINING REPORT South Portal/ North Portal Final Lining work which was in progress for Tube – 1 of both the portal i.e North as well as South Portal was slowly progressingtill 3rd week of April 2014 and thereafter it was suspended in the month of May 2014. The Programmed Progress and the actual achievement shows lot of difference which is reproduced as follows:
TOTAL PROGRESS PLANNED V/S ACHIEVED UPTO 30-11-2014
Po
rtal
Tu
be
Act
ivit
y
Cumulative Ending November 2014
Planned Programme
Ach
ieve
d
Excess/ Shortage (Length Wise)
Excess/ Shortage (%)
Ori
gin
al
Rev
ised
Rev
ised
Ori
gin
al
Rev
ised
Rev
ised
Ori
gin
al
Rev
ised
Rev
ised
Jul-11
Jul-13
Jul-14
Jul-11
Jul-13
Jul-14
Jul-11
Jul-13
Jul-14
Sou
th
1
Water Proofing & Geo-textile
NM 2240 NM 375 - -1865 - - -83 -
Lining 3210 2013 1507 358 -2852 -1655 -1149 -89 -82 -76 Top Slab 3060 1788 0 0 -3060 -1788 0 -100 -100 0
2
Water Proofing & Geo-textile
NM 2192 NM 0 - -2192 - - -100 -
Lining 3210 1823 1067 0 -3210 -1823 -1067 -100 -100 -100 Top Slab 3060 1626 0 0 -3060 -1626 0 -100 -100 0
Nor
th
1
Water Proofing & Geo-textile
NM 2240 NM 225 - -2015 - - -90 -
Lining 2840 2113 914 188 -2653 -1925 -727 -93 -91 -79
Top Slab 2790 1788 0 0 -2790 -1788 0 -100 -100 0
2
Water Proofing & Geo-textile
NM 2240 NM 0 - -2240 - - -100 -
Lining 2840 1938 1328 0 -2840 -1938 -1328 -100 -100 -100 Top Slab 2790 1788 0 0 -2790 -1788 0 -100 -100 0
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
16
INS
PE
CT
ION
RE
PO
RT
TOTAL PROGRESS PLANNED V/S ACHIEVED during November 2014 P
orta
l
Tub
e
Act
ivity
During November-2014
Planned Programme
Ach
ieve
d
Excess/ Shortage (Length Wise)
Excess/ Shortage (%)
Orig
inal
Rev
ised
Rev
ised
Orig
inal
Rev
ised
Rev
ised
Orig
inal
Rev
ised
Rev
ised
Jul-11 Jul-13 Jul-14
Jul-11
Jul-13 Jul-14 Jul-11 Jul-13
Jul-14
Sou
th
1
Water Proofing & Geo-textile
NM 160 NM 0 - -160 - - -100 -
Lining 80 162.5 245 0 -80 -162.5 -245 -100 -100 -100
Top Slab 100 162.5 0 0 -100 -162.5 0 -100 -100 0
2
Water Proofing & Geo-textile
NM 160 NM 0 - -160 - - -100 -
Lining 80 162.5 249 0 -80 -162.5 -249 -100 -100 -100
Top Slab 100 162.5 0 0 -100 -162.5 0 -100 -100 0
Nor
th
1
Water Proofing & Geo-textile
NM 160 NM 0 - -160 - - -100 -
Lining 80 162.5 153 -80 -162.5 -153 -100 -100 -100
Top Slab 100 162.5 0 0 -100 -162.5 0 -100 -100 0
2
Water Proofing & Geo-textile
NM 160 NM 0 - -160 - - -100 -
Lining 80 162.5 264 0 -80 -162.5 -264 -100 -100 -100
Top Slab 100 162.5 0 0 -100 -162.5 0 -100 -100 0 In view of the above progress details and suspension of works due to material shortage, it is very difficult to complete the work in time and if the work remained suspended for more time then achieving and completing work in time is next to impossible for which concessioner had to bear great loss due to extension of time.
Block No. SP1 SP2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69
F.Lining 22.9.13 12.12.13 1.10.13 7.10.13 20.12.13 6.1.14 27.12.13 14.10.13 19.10.13 22.10.13 25.10.13 08.1.14 15.1.14 29.10.13 20.1.14 2.11.13 11.11.13 20.11.13 27.1.14 31.1.14 7.2.14 14.02.14 15.03.14 28.03.14 29.03.14 2.06.14 10.06.14
Membrane
28.9
B_1 B_4 B_5 B_2 B_1 B_4 B5+B2 B_1 B_4 B5+B2 B9+B2
205.
0
Niche G1/2 G3/4 E1 G5/6 G7/8 F1 G9/10 G11/12 E2 G13/14 G15/16
Month
NP2 NP1 673 672 671 670 669 668 667 666 665 664 663 662 661 660 659 658 657 656 655 654 653 652 651 650 649 648 647 646 645 644 643 642 641 640 639 638 637 636 635 634 633 632 631 630 629 628 627 626 625 624 623 622 621 620 619 618 617 616 615 614 613 612 611 610 609 608 607 606
3.9.13 26.9.13 13.9.13 1.11.13 8.11.13 30.1.14 2.2.14 8.2.14 12.2.14 21.2.14 12.3.14 15.3.14 24.3.14 8.4.14
B_10 B_1 B2+B3 B_4 B_5 B_2 B_4 B_5 B_2 B_4 B5+B2 B9+B8
G285/286 E34 G279/280 277/278 F33 E33 F32
This chart is prepared as per Location of Inner Lining Block Joints 1 South Portal
2 North Portal
B_1,B_2,B_3,B_4,B_5,B_8,B_9 & B_10
North Portal South Portal
Tube No.1 16.80 + 8.15 +(3X12.50) = m Tube No.1 16.80 + 3.45 +(1X12.50) = m
Tube No.2 16.80 +0.925 +(4X12.50) = m Tube No.2 16.80 +5.07 +(1X12.50) = m
LINING PROGRESS
T 1 T 1
T 2 T 2
Narinder Sharma Assistant Tunnel Lining Engineer.
UPTO 30-11-2014Month: November 2014 LINING STATUS REPORT
North Portal
South Portal
1963
43.7
90
1963
56.2
90
1963
68.7
90
1963
81.2
90
1963
93.7
90
1964
06.2
90
649.
95
662.
45
674.
95
687.
45
699.
95
712.
45
724.
95
737.
45
749.
95
2032
43.7
50
2032
31.2
50
2032
18.7
50
2032
06.2
50
2031
93.7
50
2031
81.2
50
2031
68.7
50
1964
18.7
90
762.
45
774.
95
787.
45
799.
95
812.
45
824.
95
837.
45
849.
95
862.
45
2031
56.2
50
2031
43.7
50
795.
25
807.
75
820.
25
832.
75
845.
25
857.
75
870.
25
1961
31.2
90
1961
43.7
90
1961
56.2
90
1961
68.7
90
1961
81.2
90
1961
93.7
90
1962
06.2
90
1962
18.7
90
1962
31.2
90
1962
43.7
90
1962
56.2
90
1962
68.7
90
1962
81.2
90
1962
93.7
90
1963
06.2
90
1963
18.7
90
1963
31.2
90
682.
75
695.
25
707.
75
720.
25
732.
75
745.
25
757.
75
770.
25
782.
75
570.
25
582.
75
595.
25
607.
75
620.
25
632.
75
645.
25
657.
75
670.
25
2033
56.2
50
2033
43.7
50
2033
31.2
50
2033
18.7
50
2033
06.2
50
2032
93.7
50
2032
81.2
50
2032
68.7
50
2032
56.2
50
574.
95
2034
43.7
50
2034
31.2
50
2034
18.7
50
2034
06.2
50
2033
93.7
50
2033
81.2
50
2033
68.7
50
587.
45
599.
95
612.
45
624.
95
637.
45
1961
18.7
90
399.
95
G273/274
2035
93.7
5041
2.45
2035
68.7
50
2035
81.2
50
2036
68.7
50
362.
45
1960
56.2
90
2034
56.2
50
487.
4520
3518
.750
499.
95
512.
45
524.
95
2035
43.7
50
2035
31.2
50
462.
45
474.
95
562.
45
G269/270G271/272 Jetfan53/54
South Portal (West Tube)
North Portal (West Tube)
Tu
be
N
o.1
537.
45
549.
95
199.
95
212.
45
224.
95
237.
45
124.
95
137.
45
149.
95
162.
45
174.
95
62.4
5
449.
95
437.
45
151.
0
134.
0
127.
0
557.
7519
6106
.290
482.
75
495.
25
507.
75
520.
25
532.
75
545.
25
407.
75
420.
25
432.
75
445.
25
457.
75
470.
25
Remarks
1958
18.7
90
295.
25
307.
75
Jetfan 3/4
112.
45
424.
95
312.
45
324.
95
337.
45
349.
95
1957
31.2
90
G281/282 G275/276
2037
18.7
50
2037
06.2
50
357.
75
370.
25
374.
95
130.
0
164.
0
382.
75
395.
25
320.
25
1959
56.2
90
1958
68.7
90
1958
06.2
90
1957
18.7
90
1957
43.7
90
1957
56.2
90
1957
81.2
90
270.
25
282.
75
1958
93.7
90
1959
06.2
90
332.
75
345.
25
1958
81.2
90
1958
31.2
90
1958
43.7
90
170.
25
125.
0
132.
0
135.
0
137.
0
207.
75
120.
25
Jetfan 1/2
115.
0
117.
0
115.
0
Invert/Abutment
Invert/Abutment
Block No.
F.Lining
Membrane
20.2
5
32.7
5
1955
56.2
90
1955
68.7
90
1955
81.2
90
Tu
be
N
o.1
0.00
16.8
0
Ch
ain
age
in K
M.
Block Chainage
1955
48.5
40
2039
06.2
50
74.9
5
87.4
5
99.9
5
95.2
5
150.
0
37.4
545
.25
57.7
5
70.2
5
107.
75
132.
75
145.
25
157.
75
172.
0
Fire Fighting Recess
LEGEND
Groundwater Niche
Emergency Niche
Abutment
Note:
12.4
5
Jetfan59/60
82.7
519
5631
.290
1956
56.2
90
1956
68.7
90
1956
43.7
90
G283/284
1955
93.7
90
1956
06.2
90
220.
25
195.
25
232.
75
274.
95
1957
93.7
90
257.
75
245.
25
182.
75
1957
06.2
90
1957
68.7
90
187.
45
146.
0
262.
45
2040
06.2
00
2039
93.7
50
2039
81.2
50
2039
68.7
50
2039
56.2
50
2039
43.7
50
2039
31.2
50
2036
93.7
50
62.450
Reinforcement Area
Sidewall Drain
Smoothning Layer
Waterproofing
Final Lining
2038
93.7
50
2038
81.2
50
2038
68.7
50
2038
56.2
50
2037
81.2
50
2038
43.7
50
2038
31.2
50
2038
18.7
50
2038
06.2
50
2039
18.7
50
67.725
Length of Reinforcement Section
32.750
Invert
Recesses (120x200)
Jetfan Niche
34.37
138.
0
2034
93.7
50
2034
81.2
50
2034
68.7
50
2036
56.2
50
2036
43.7
50
2036
31.2
50
2036
18.7
50
2036
06.2
50
2035
56.2
50
2037
31.2
50
2035
06.2
50
1960
06.2
90
1960
81.2
90
1959
68.7
90
1959
81.2
90
1959
93.7
90
1960
68.7
90
1960
93.7
90
1960
18.7
90
1960
31.2
90
1960
43.7
90
Jetfan55/56
137.
0
140.
0
136.
0
132.
0
159.
0
49.9
5
0.00
24.9
5
142.
0
140.
0
287.
45
102.
0
1956
81.2
90
1956
93.7
90
175.
0
249.
95
145.
0
135.
0
135.
0
117.
0
138.
0
127.
0
Jetfan57/58
136.
0
LEGEND Lining Progress
NATIONAL HIGHWAY AUTHORITY OF INDIA
SMEC INDIA - RODIC CONSULTANTS PVT.LTD.
NH-1A, BANIHAL TO QUAZIGUND ROAD TUNNEL ( Ch.189.350 to Ch.204.700) JAMMU & KASHMIR
387.
45
Month
Chainage in KM.
Block Chainage
Niche
1956
18.7
90
1959
18.7
90
Jetfan 5/6
1959
31.2
90
2037
68.7
50
2037
56.2
50
2037
43.7
50
2037
93.7
50
299.
95
2036
81.2
50
1958
56.2
90
1959
43.7
90
Jet Jet
PC
P-1
Jet
Jet Jet Jet
PC
P-0
6Jet
8.45 KM
4.225 KM2.115 KM 2.115 M
188.00M 358.00 M
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
18
INS
PE
CT
ION
RE
PO
RT
7. MATERIAL REPORT 7.1 Cube Compressive Strength of Bridges/Structures
Date of Casting
Date of testing 7 days
Average Comp.
strength (Mpa)
Date of testing 28 days
Average comp.
strength (Mpa)
Location
13.10.14 20.10.14 24.30 10.11.14 36.74 RCC. Pipe Culvert ,Cusion Concrete, at CH 190.660 KM 13.10.14 20.10.14 23.85 10.11.14 34.67
16.10.14 23.10.14 23.56 13.11.14 33.48 RCC. Pipe Culvert ,Slab & Encasing at CH 190.660 KM 16.10.14 23.10.14 23.85 13.11.14 35.26
Note:
1. Batching plantCalibrationsdone at North Portal.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
19
INS
PE
CT
ION
RE
PO
RT
8. HYDROLOGICAL/DRAINAGE REPORT (A) Drainage in Tunnel Tubes: (a) South Portal:
The seepages during the month under report remained by and large under control. However, damp to wet conditions were observed in tube 1 with no flowing discharge. The seepages in tube 2 were observed from wet to flowing condition with minor flowing @ 1 L/s. The temporary drains though were cleaned to keep the tunnel surface in dry condition but extra care is to be taken to keep the water in drains to flow smoothly without any hindrance in between or damaging the side of drain by moving vehicles inside the tunnel tube. However, The Concessionaire is suggested to take extra care for keeping the temporary drains in good working conditions.
.
(b) North Portal:
The precipitation in this side of the tunnel in form of the rain during the month under report remained almost negligible and also no fresh seepage was observed except seepage which was active for the last three months at face NT2 has considerably decreased and seepage from crown and side walls in the form of trickling of drops also seen at places NT1 and NT2. However side drains are effectively maintained by in-charge of executing agency NECL Pvt. Ltd. at North Portal which is taking care of the water coming out from NT1 and NT2. During the Month under report the work remained suspended again as has been in the last few Months. The executing agency at site has been impressed upon again to take the following majors before work will start again for smooth functioning of the work.
1. Installation of V-notch for measuring discharge in both the tunnels. 2. Conducting of water testing to PVC perforated pipe to ascertain workability of the PVC side
drain before achieving more progress in lining in NT1 to avoid any sort of problem after completion of work.
3. Conducting of water testing to the water coming from NT1 & NT2 at north portal as per the demands of the locals of the area using this water for farming and fish life.
(B) Sedimentation and De-oiling tank: (a) South Portal:
The inflow to the sedimentation tank is slightly less than what was observed last month and because of slightly lower seepage from the tunnel tubes, the discharge of water entering to the tank is under control. As the tank is not being properly regulated for settlement of fine particles, the out flow from tank is not as per normal standards. This untreated water is discharged in nearby stream though it passes through one more sump tank near the stream. However, the executing agency is suggested to regulate the inflow and out flow in a systematic manner so that sedimentation tank work efficiently in absence of regulatory gates. (b) North Portal:
The existing sedimentation and de-oiling tank being defunct, the water coming from NT1 and NT2 directly fall in nearby nallah which results danger to human life, fish life and to the fields using this water for agriculture purpose by the local farmers.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
20
INS
PE
CT
ION
RE
PO
RT
Now executing agency at North Portal has started construction of new sedimentation and de-oiling tank and work is in progress. The in-charge of executing agency has been impressed upon to take all measures during the construction in order to avoid this new sedimentation tank will not become defunct as old one which is not having proper cleaning mechanism. (C) Construction of structural works near stream: The concessioner was many times requested in the past that gauges may be installed near bridge no 1 and RUB , so that discharge is measured in the river and necessary protection works designed in order to prevent floods to damage road alignment. The concessioner is again suggested to install gauges at critical locations so that discharge of river is monitored and necessary remedial measures be taken.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
21
INS
PE
CT
ION
RE
PO
RT
10. BRIDGES/STRUCTURES REPORT
(A) Construction of pipe culvert (single pipe) 191.652km PCC work is completed (B) Viaduct at chainage 194.236 Km Excavation work for approach road towards Pier no 2 left side(P2L)and foundation of P2L is in progress.
Note:
The Bridge no.1 and 4 are in need of steel plate girders, bearings and expansion joints, because at Bridge No.1, cap of abutment A1L, A1R, A2R and A2L, pier cap P1R, P1L, P2L and P2R are completed. At Bridge No. 4 both abutments are ready to receive POT-CUM-PTFE bearings and fabricated steel plate girders. Now it is necessary to expedite fabrication of steel plate girders.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
22
INS
PE
CT
ION
RE
PO
RT
10. SURVEY REPORT
North Portal/ South Portal The work on the project remained suspended during this month also.However following instructions / suggestions where given to the concessioner so that work runs smoothly as and when resumed again. 1. The contractor is instructed to Renew the License of Survey software Eupalinos as it has expired from 30.09.2014.
2. The contractor was instructed to submit the 3.D Monitoring survey data to concerned I.E on monthly basis.
3. The contractor is once again instructed to do the calibration of survey equipment’s on every alternate month & inform the concerned I.E for errors if any.
4. The contractor is instructed to maintain the good ventilation so that the survey work will not get affected due to bad visibility & fumes. The tube-2 in north portal witnessed very bad visibility due to accumulation of gas as the blower was removed for repair purpose and is not installed yet.
5. The contractor is strictly instructed to follow the clause 120.2 of the concession agreement which relates to survey works.
6. The contractor is instructed to maintain proper lighting facility in both tubes of each portals especially during 3D Monitoring & profile checking/marking in order to reduce the errors if any to maximum.
7. No NCR has been issued to the contractor both at North/South Portal during this month under report.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
23
INS
PE
CT
ION
RE
PO
RT
11. ROAD AND HIGHWAY
(A) Details of Progress of proposedroad:
No work carried out during the month under report.
(B) The accidental data on existing NH-44 (1A) for the month of Oct-Nov-2014 collected from respectively department is attached as follows:
ABSTRACT OF ACCIDENT DATA FOR THE MONTH OF OCT- NOV - 2014
Sno
Sta
te
Name Of The Project
Stretch from KM 189.350 to KM
220.700
Leng
th K
M
Details of Accident
Ani
mal
s ki
lled
Rem
arks
From -Km
To- Km Fatal Grievous Minor Total
1 2 3 4 5 6 7 8 9 10 11 12 1
Jam
mu
& K
ashm
ir
4- Laning of Quazigund to
Banihal section from KM
189.350 to 204.700 of NH -1A including 2
tunnels (2-lane) of 0.69km and 8.45km length
oh NH – 44(1A) on BOT
(Annuity) basis in the state of
Jammu & Kashmir
196.200 196.500 0.300 - - 1 1 - -
2 205.200 205.300 0.100 1 - 1 2 - -
3 203.500 204.000 0.500 1 - - 1 - -
4 207.300 207.400 0.100 1 - - 1 - -
5 219.000 219.100 0.100 1 - - 1 - -
6 207.500 207.800 0.300 2 - - 2 - -
7 219.600 219.700 0.100 1 - - 1 - -
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
24
INS
PE
CT
ION
RE
PO
RT
12. MONTHWISE PROGRESS REPORT 12.1 Production (Planned v/s Achieved) ending November 2014 12.1.1 North Portal
3020.00
2990.00
2840.00
2790.00
3191.00
3046.00
2240.00
2113.00
1788.00
2973.00
2676.00
914.00
0.00
2252.00
2047.00
225.00
188.00
0.00
0.00 1000.00 2000.00 3000.00 4000.00
Top Heading
Benching
Water Proofing
Lining
Top Slab
Tube No. 1 AchievedPlanned Revised July 2014Planned Revised July 2013Planned Original July 2011
3020.00
2990.00
2840.00
2790.00
3115.00
3043.00
2240.00
1938.00
1788.00
2836.00
2593.00
1328.00
0.00
2122.00
1974.00
0.00
0.00
0.00
0.00 1000.00 2000.00 3000.00 4000.00
Top Heading
Benching
Water Proofing
Lining
Top Slab
Tube No. 2 Achieved
Planned Revised July 2014
Planned Revised July 2013
Planned Original July 2011
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
25
INS
PE
CT
ION
RE
PO
RT
12.1.2 South Portal
3430.00
3385.00
3210.00
3060.00
3171.00
3027.00
2240.00
2013.00
1788.00
2857.00
2530.00
0.00
2102.00
2002.00
375.00
358.00
0.00
0.00 1000.00 2000.00 3000.00 4000.00
Top Heading
Benching
Water Proofing
Lining
Top Slab
Tube No. 1 AchievedPlanned Revised July 2014Planned Revised July 2013Planned Original July 2011
3430.00
3385.00
3210.00
3060.00
3161.00
3053.00
2192.00
1823.00
1626.00
2709.00
2600.00
1067.00
0.00
2074.00
1865.00
0.00
0.00
0.00
0.00 1000.00 2000.00 3000.00 4000.00
Top Heading
Benching
Water Proofing
Lining
Top Slab
Tube No. 2 Achieved
Planned Revised July 2014
Planned Revised July 2013
Planned Original July 2011
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
26
INS
PE
CT
ION
RE
PO
RT
12.2 Month Wise Progress Report 12.2.1 South Portal
100
80 80
100
100 11
2
160
162.
5
162.
5
140
112
245
00 0 0 0 00
25
50
75
100
125
150
175
200
225
250
275
300
325
Heading Benching Water Proofing and Geo-Textile
Lining Top Slab
Original (2011)
Revised (2013)
Revised (2014)
Achieved During November-14
Tube - 01
100
80 80
100
100 11
2
160
162.
5
162.
5
134
112
249
0
0255075
100125150175200225250275300
Heading Benching Water Proofing and Geo-Textile
Lining Top Slab
Original (2011)
Revised (2013)
Revised (2014)
Achieved During November-14
Tube - 02
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
27
INS
PE
CT
ION
RE
PO
RT
12.2.2 North Portal
80 80 80
100
100 11
2
160
162.
5
162.
5
147
129 15
3
00 0 0 0 00
25
50
75
100
125
150
175
200
225
250
275
300
Heading Benching Water Proofing and Geo-Textile
Lining Top Slab
Original (2011)
Revised (2013)
Revised (2014)
Achieved During November-14
Tube - 0180 80 80
100
105
84
160
162.
5
162.
5
147
111
264
0
0
25
50
75
100
125
150
175
200
225
250
275
300
Heading Benching Water Proofing and Geo-Textile
Lining Top Slab
Original (2011)
Revised (2013)
Revised (2014)
Achieved During November-14
Tube - 02
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
28
INS
PE
CT
ION
RE
PO
RT
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
29
INS
PE
CT
ION
RE
PO
RT
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
30
INS
PE
CT
ION
RE
PO
RT
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
31
INS
PE
CT
ION
RE
PO
RT
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
32
INS
PE
CT
ION
RE
PO
RT
12.3 CYCLE REPORT 12.3.1 North Portal-Tube I / Tube II - South Portal-Tube 1 / Tube II No data for time cycle submitted by the Concessionaire as no work in both the Tubes at both portals in heading and benching carried out during the month under report due to shortage of material.
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
33
INS
PE
CT
ION
RE
PO
RT
13. TUNNEL ACTIVITIES
13.1 North Portal-Tube I / Tube II - South Portal-Tube 1 / Tube II: Work Suspended due to Material Shortage
34
INS
PE
CT
ION
RE
PO
RT
14. UPTO DATE PROGRESS REPORT
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
SMEC INTERNATIONAL PTY. LTD. In association with
SMEC India Pvt. Ltd. & RODIC Consultants Pvt. Ltd.
NH-1A, Banihal to Quazigund Road Tunnel Project (Ch. 189.350 to Ch. 204.700) J & K
Up to Date Progress Report Name of concessionaire: NavayugaQuazigund Expressway Pvt. Ltd.
Name of EPC Contractor: Navayuga Engineering Company
Month:November-2014 Date: 30.11.2014
Tu
be
Un
it
To
tal L
eng
th
Des
crip
tio
n South Portal North Portal
To
tal M
on
th
Pro
gre
ss
To
tal U
p t
o
Dat
e
Bal
ance
Up
to
p
revi
ou
s M
on
th
Du
rin
g
the
Mo
nth
up
to
D
ate
up
to
P
revi
ou
s M
on
th
Du
rin
g
the
Mo
nth
Up
to
D
ate
1 RM 8442.51 Top Heading 2102.00 0 2102.00 2252.00 0 2252.00 0 4354.00 4088.51
Benching 2002.00 0 2002.00 2047.00 0 2047.00 0 4049.00 4393.51
2 RM 8457.45 Top Heading 2074.00 0 2074.00 2122.00 0 2122.00 0 4196.00 4261.45
Benching 1865.00 0 1865.00 1974.00 0 1974.00 0 3839.00 4618.45
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
35
INS
PE
CT
ION
RE
PO
RT
15. MANPOWER DEPLOYED FOR PROJECT Note: The list is updated as per MIR from concessioner submitted in month of August- 2014 Key Staff
Sl.No. Name Designation
1 Mr. Md.Sirajuddin Regional Director from Kolkata 2 Mr. Pannagaraj M.K. Vice President (Project) from CO 3 Mr. Deepak Surinder Kumar General Manager- Tunnel Expert 4 Mr. P. Satyanarayana Deputy General Manager 5 Mr. Ch. BalaSubramanyam Project Manager
Execution South Portal
Sl.No. Name Designation
1 Mr. Binay Kumar Sr. Dy. Manager 2 Mr. NaveedSaifWani Asst. Manager 3 Mr. V.M.V.Ramanchary Senior Engineer 4 Mr. SK Sunil Senior Site Engineer 5 Mr. Anil Bhardwaj Sr. Site Engineer 6 Mr. Suresh Kumar Meena Site Engineer 7 Mr. Rajendra Singh Rawat Geologist 8 Mr. Madhuresh Kumar Singh Jr. Engineer (Electrical) 9 Mr. Pradeep Singh Jr. Officer Geologist 10 Mr. Laxmander Pal Sr. Foreman (Tunnel) 11 Mr. Mujeeb Ur Rehman Foreman-Tunnel 12 Mr. Pawan Kumar Singh Foreman-Tunnel 13 Mr. Ajay Kumar Foreman 14 Mr. Mir Babbar TR. Engineer 15 Mr. Om Prakash Foreman 16 Mr. SehdevRana Foreman 17 Mr. Irshad Ahmed Lone Foreman 18 Mr. Latchayya Foreman 19 Mr. Rambabu Sr. Supervisor 20 Mr. Bashir Ahmed Wani Supervisor (Electrical) 21 Mr. Irfan Amin Itoo Tr Supervisor 22 Mr. SukanthNayak Supervisor 23 Mr. Debasishlanka Supervisor 24 Mr. Bashir Ahmad Supervisor 25 Mr. Ishaq Supervisor 26 Mr. Asruf Supervisor 27 Mr. Safiq Ahmed Kaully Supervisor 28 Mr. Sameer Ahmed Itoo Tr. Supervisor 29 Mr. Muzfara Ahmed wani Tr. Supervisor 30 Mr. Dharma Biswal Tr. Supervisor 31 Mr. Javeed Ahmed Sheikh Tr. Supervisor 32 Mr. Irshad Ahmed Wani Supervisor
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
36
INS
PE
CT
ION
RE
PO
RT
Roads & Bridges
Sl.No. Name Designation
1 Mr. V. SuneelBabu Senior DPM 2 Mr.LoyaNani Site Engineer 3 Mr. L. Aditya Engineer 4 Mr. S. Hari Prasad GTE 5 Mr. B. Raja Reddy Foreman 6 Mr. AamirMushtaq DTE (Mech.) 7 Mr. P. Jagannadam Sr. Supervisor 8 Mr. Kharjur Singh HR Assistant 9 Mr. K. Mohan Rao Sr. Supervisor
10 Mr. Manoj Kumar Swain Sr. Supervisor 11 Mr. M. LaxmanaRao Supervisor 12 Mr. P. MalleswaraRao Sr. Supervisor 13 Mr. G. Suresh Supervisor 14 Mr. Md. Iqbal Dar Supervisor 15 Mr. Imtiyaz Ahmed Mir Supervisor 16 Mr. S. KannaBabu Supervisor 17 Mr. Faiz Ahmed Gowhar Tr. Supervisor 18 Mr. K. KurmaRao Pump Operator
North Portal
Sl.No. Name Designation
1 Mr. DebyenduHaldar Sr. Dy. Manager 2 Mr. Ram PrakashGarla Sr. Engineer (Tunnel) 3 Mr. Jagtar Sigh Sr. Engineer 4 Mr. BalaKoteswaraRaoDasari Senior Site Engineer 5 Mr. Sree Ganesh Senior Site Engineer 6 Mr.SajadurRahmanGani Jr. Engineer (Civil) 7 Mr. Mushtaq Ahmed Bhat Jr. Engineer (Civil) 8 Mr. Davood Ahmed Rathar DTE (Civil) 9 Mr. Laxman Sigh Singwal Officer (Geologist)
10 Mr. Bhoopender Singh Geologist 11 Mr. PankajGulshan Jr. Geologist 12 Mr. Shoib Ahmed Khan DTE (Mech.) 13 Mr. Sheikh Mumin Amin DTE (Civil)
33 Mr. Iftikar Ahmed Supervisor 34 Mr. Babu Ram Nayak Supervisor 35 Mr. FarooqAhmedWani Camp Supervisor 36 Mr. K. Shibu Kumar Sr. Electrician 37 Mr. K. SuriBabu Sr. Mason 38 Mr. Ghani Khan Supervisor 39 Mr. Naval Singh Rajput Mechanic Charge Hand 40 Mr. Rajeev Kumar Singh Supervisor
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
37
INS
PE
CT
ION
RE
PO
RT
14 Mr. ArifHussainBeigh DTE (Mech.) 15 Mr. ZakirHussainNaik Tr. Engineer (Civil) 16 Mr. Y.S.Rathore Site Engineer (Electrical) 17 Mr. Bilal Ahmed Khan Tr. Engineer (Mechanical) 18 Mr. AnupkumarPandey Jr. Foreman 19 Mr. Dilip Kumar Sha Sr. Foreman 20 Mr. Vijay Kumar Charge man (Fitter) 21 Mr. Deepak Kumar Asstt. Foreman Electrical 22 Mr. Ritu Raj Suman Sr. Supervisor 23 Mr. Abdul QuayumParray Sr. Supervisor 24 Mr. K. Kumar Electrician 25 Mr. JakirHussain Computer Operator 26 Mr. Amrit Pal Singh Supervisor 27 Mr. Kamleshorai Supervisor 28 Mr. Irshad Ahmed Wani Supervisor 29 Mr. Mohd. Ismail Wani Tr.Supervisor
Plant & Machinery
Sl.No. Name Designation
1 Mr. Mushtaq Ahmed Ganai Chief Manager (Electrical) 2 Mr. Muneeb Ahmed Tak Sr. Manager (Electrical) 3 Mr. K. GopalKrishnamRaju Manager (Mech. Roads) 4 Mr. Niranjan Reddy Asst. Manager 5 Mr. IrfanElahi Lone Asst. Manager 6 Mr. Sunil Kumar Chauhan Sr.SiteEngineer (Fabrication) 7 Mr. HamsaRaju Asstt. Project Manager (Electrical) 8 Mr. JaggaRao Site Engineer 9 Mr. Jaya Prakash Site Engineer (Fabrication) 10 Mr. Tinku Adak Site Engineer (Fabrication) 11 Mr. Rama Bangaru Naidu Site Engineer (Electrical) 12 Mr. Rajesh Chakraborthi Site Engineer 13 Mr. Kuldeep Singh Site Engineer 14 Mr. G. VamsiKrishnam Naidu Site Engineer (Electrical) 15 Mr. V. Ramanna Site Engineer (Mech.) 16 Mr. MohitPlaha Site Engineer (Electrical) 17 Mr. G. Vinay Kumar GTE (Mech.) 18 Mr. GLR Srinivasa Reddy Site Engineer (Electrical) 19 Mr. Sunil Chand Ramola Sr. Foreman (Electrical) 20 Mr. T. Ansari Electrician 21 Mr. Farooq Ahmed Tantry Record keeper 22 Mr. Kurban Ansari Concrete Pump Operator 23 Mr. Ram KripalChoudhary Senior Mechanic 24 Mr. Satyendra Singh Foreman (Electrical)
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
38
INS
PE
CT
ION
RE
PO
RT
Planningand Monitoring
Sl.No. Name Designation 1 Mr. K. Sangamesh Sr. Engineer 2 Mrs. S. Sandhya Sr. Engineer
Quality Analysis and Quality Control
Sl.No. Name Designation
1 Mr. Kala Srinivasu Manager 2 Mr. Kranthi Kumar Site Engineer 3 Mr. Suraj Kumar Das G.T.E. 4 Mr. Rithesh Kumar Tiwari Sr. Lab Technician 5 Mr. Gajendra Singh Operator (B/Plant) 6 Mr. KoteswaraRao Lab Tech. 7 Mr. D. Damoder Operator (B/Plant) 8 Mr. K. ChinnaVenkanna Lab Assistant 9 Mr. D. Gangayya Lab Technician 10 Mr. TirupatiRao B/P Operator
Administration
Survey
Sl.No. Name Designation 1 Mr. P. Rama Krishna Accounts Officer 2 Mr. A.SrinivasaRao Sr. HR Officer 3 Mr. Vinay Jain Chief Liaison Officer 4 Mr. Gh. Mustafa Khan P.R.O 5 Mr. GulamMohd. Khan Jr. P.R.O. 6 Mr. Narasayya HR Asst. 7 Mr. G. Mahesh Kumar HR Asstt. 8 Mr. GovindaRao Accountant 9 Mr. Md. Kutbuddin Asst. Accountant 10 Mr. Ravi kanth Asstt. Accountant 11 Mr. Ch. SrinivasaRao Asstt. Accountant 12 Mr. P Surya Ramanjaneya Raju Assitt. Engineer (SIM) 13 Mr. Prakash Chand Jat Systam Administrator
1 Mr. Sameem Ahmed Asstt. Project Manager 2 Mr. Sumit Singh Senior Surveyor 3 Mr. Babun Roy Senior Surveyor 4 Mr. Pradeep Das Senior Surveyor 5 Mr. Ram BabrawnPinate Surveyor 6 Mr. Sandeep Sasmal Surveyor 7 Mr. Pradeep Rathi Surveyor 8 Mr. Sougata Jana Surveyor 9 Mr. R. Santosh Naidu Surveyor 10 Mr. Subjit Gosh Junior Surveyor
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
39
INS
PE
CT
ION
RE
PO
RT
Store
1 Mr. P.S. Lobo Asst. Manager (In charge) 2 Mr. A. A. Naidu Sr. Store In Charge 3 Mr. SK. Mastan Ali Sr. Store in Charge - Jammu 4 Mr. SPS Chauhan Sr. Store in Charge 5 Mr. L. Simhadri Naidu Sr.Store Assistant 6 Mr. SatyanarayanaGundabathula Sr. Store Keeper 7 Mr. R. Ramana Sr. Store Assistant 8 Mr. Y. Appala Naidu Store Assistant 9 Mr. Suresh.B Store Assistant
10 Mr. Krishna Store Assistant 11 Mr. Mallesh Sr. Store Assistant 12 Mr. Meeraj Store Assistant 13 Mr. AB.Rashid Mir Store Assistant 14 Mr. Pankaj Kumar Sahu Store Assistant 15 Mr. K.V. Ramana Store Assistant 16 Mr. G. Murali Krishna Store Assistant 17 Mr. Baljit Singh Store Assistant 18 Mr . M Appalna Naidu Store Assistant 19 Mr. Ch. Polidas Store Assistant 20 Mr T Sravan Kumar Store Assistant 21 Mr. RevathiPathi Store Assistant 22 MrAnand Store Assistant
Safety
1 Mr. B. Ramesh Rao Safety Officer 2 Mr. Venkkatesha Safety Officer 3 Mr. Sheikh Bilal Ahmed Safety Supervisor 4 Mr. Manawarali Sr. Safety Supervisor 5 Mr. Bilal Ahmed Wasay Safety Supervisor 6 Mr. Irfan Amin Itoo Safety Supervisor
11 Mr. SajaySav Junior Surveyor 12 Mr. ArghayadipSamanta Junior Surveyor 13 Mr. Shanawaz Bhat Asstt. Surveyor 14 Mr. Rakesh Kumar Sharma Asstt. Surveyor
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
40
INS
PE
CT
ION
RE
PO
RT
16. PLANT AND MACHINERIES
S.No. Equipment Description
Make Model Capacity Total Nos.
Location Remarks
1 DG Set Silent Old & Used
Leyland 62.5 Kva 5
1-work shop 3-Road&
Bridges 1-North Portal
Working
2 DG Set Silent Old & Used
Greaves GV125 SP 125 Kva 3 2-Colony 1-North Portal
Working
3 DG Set Silent Caterpillar 3306DITA-
GP-4 250 Kva 4
1-Colony 2-South Portal
1-North Portal Working
4 DG Set Silent Caterpillar C-18 600 Kva 2 1-South Portal 1-North Portal
Working
5 DG Set Silent Caterpillar C-18 500 Kva 2 2-North Portal Working
6 DG Set Silent Caterpillar C-32 1010Kva 2 1-South Portal
1Crusher Plant
Working
7 DG Set Silent Mahindra 4375 25 kva 1 DGM Rest
House Working
8 DG Set Silent Old & Used
Leyland 40 kva 1 North Portal Working
9 DG Set Silent Mahindra & Mahindra
2185 GM 15KVA 1 Dharsipura Working
10 DG Set Silent Portable
Honda EXK-
2000AC 1.6 Kva 1 Dharsipura Working
11 DG Set Silent Portable
Honda EXK-2800 2 Kva 1 DGM Rest
House Working
12 Dozer Caterpillar D6G 1 Batching Plant Working
13 Dozer BEML BD80 1 Working
13 Excavator Volvo
Volvo EC290BLC 1.1cum 4
1-Road&Bridges 2-South Portal 1North Portal
Working
14 Excavator Volvo
Volvo EC210B 0.9 cum 2 1-South Portal 1North Portal
Working
15 Tunnel Excavator
Liebherr R 944 C T
Litronic 258 hp 2
1-South Portal 1North Portal
S.P- Break Down, N.P -
Working
16 Tipper Volvo Volvo FM 400
8X4 18.7 cum 20
12-South Portal 08-
North Portal Working
17 Motor Grader Volvo G930 1 01-North
Portal Working
18 Tractor with Dozing Blade
Mahindra TR 605
CEU 60HP 2
01-North Portal 1-Road& Bridges
Working
19 JCB Back Hoe /Loader
JCB India Super 3DX
4WD 2 1-South Portal 1-North Portal
Working
20 Vibratory Volvo SD110 2 1-Road 1- Working
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
41
INS
PE
CT
ION
RE
PO
RT
Compactor North Portal
21 Boomer Atlas Copco E2C 120 Kw 4 2-South Portal 2-North Portal
Working
22 Boomer Atlas Copco XE3C 175Kw 1 1-North Portal
23
Camper Tata 207 Crew 6
Members 3
1-South Portal 2-North Portal 3-Road Works
Working
24 Explosive Vans Tata 207 Crew 2 South & North
Portal Working
25 Diamond Coring Tool
Hilti DD130 M 1 1-Lab Working
26 Rock Cutter Hydraulic
Sandvik ATH-150 1 1-Lab Working
27 Concrete Spray Machine
SikaPutzmeister SPM 500
PC 30m3/hr 4
2-South Portal 2North Portal
Working
28 Shotcrete Pump Dry
CanstroEngg.Works 1 1-North Portal Working
29 Grout Pump Atlas Copco MAI
M400NT 5 3-South Portal 2-North Portal
Working
30 Grout Pump Atlas Copco E200-55-
12H 1 1-North Portal Working
31 Explosive Van Tata Motors SK 1616 9 ton 2 2-work shop Working
32 Wheel Loader Volvo L120 2 1-South Portal 1North Portal
Working
33 Wheel Loader Volvo L220G 4 2-South Portal 2North Portal
Working
34 Hydraulic Rock Breaker
Atlas Copco MB1500
Star select 2 1-South Portal 1North Portal
Working
35 Truck Chassis/Scissor lift
Tata Motors LPT1613 2 1-South Portal 1-North Portal
Working
36 Air receiver Integrated engineers 3-cum 4
2-South Portal 2-North Portal
Working
37 Crawler Drill ROC
Atlas Copco ROC 203
PC XXXX 1 1-North Portal Working
38 Air Compressor Atlas Copco XA280CUD 600cfm 2 2-South Portal Working
39 Air Compressor Electric
Atlas Copco GA160 2 2-South Portal Working
40 Crane Mobile Pick & Carry
ESCORTS F-15 14 ton 2 1-road 1-
North Portal Working
41 Re-Bar Cutting Machine
Spartan SCM-42 36 MM 5 1-Fabrication
Yard 4-np
42 Re-Bar Bending Machine
Spartan SBM-42S 36 MM 5 1-Fabrication
Yard Working
43 Concrete Mixer Old
Universal RM800 1.0 Cum 1 scrap Working
44 Grinding Machine
Atlas Copco Secoroc
BQ3 1 1-South Portal Working
45 Lathe Machine SomnathMachine
Tools 52mm 2 1-South Portal 1-North Portal
Working
46 Lathe Machine Somnath Machine
Tools 300mm 1 1-South Portal Working
47 Batching Plant SchwingStetter CP-30 30 1 1-north portal Working
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
42
INS
PE
CT
ION
RE
PO
RT
Cum/hr
48 Batching Plant SchwingStetter M1 60
Cum/hr 2 2-south portal Working
49 Concrete Pump Schwing SP1400 52cum/hr 4 1-Work Shop
3-Road&Bridges
Working
50 Concrete Pump Schwing 350 EXT 46cum/hr 1 1-Work Shop Working
51 Transit-Mixer SchwingStetter AM6 SHN-
RH 6 Cum/hr 12
6-South Portal 6-North Portal
Working
52 Silo for Cement SchwingStetter NA 100 ton 4 3-Batching
Plant 1-North portal
Working
53 Crushing Plant Mobile
Metso Minerals LOCO TRACK
200TPH 1 1-south portal Working
54 Tata Safari 4X4 Tata Motors Dicor 2179CC 1 1-south portal Working
55 Scorpio Sle 2WD
Mahindra SLE 2WD 2600cc 1 1-south portal Working
56 Scorpio VLX 4WD
Mahindra VLX4WD
BS-4 2179CC 2 1-south portal Working
57 Utility Vehicle Mahindra Bolero
Camper 4WD
5 4-South portal 1-North portal
Working
58 Ambulance Tata Motors Winger 1 1-south portal Working
59 Ambulance Maruti Omni 1 1-North portal Working
60 Water Tanker Locally Made Trolley
Mounted 2 2-Work Shop Working
61 Mini Truck Tata Motors SFC407EX 3 ton 2 1-South Portal Working
62 Weigh Bridge 18X3
EssaeDigitrinics TM-960 100 ton 1 1-South Portal 1-North Portal
Working
63 Motor Bike Bajaj Discover 150 cc 1 Jammu Working
64 Bus 24 Seater Tata Motors Tata Star
Bus 1 1-South Portal Working
65 Prime Mover for Trailer
Tata Motors LPS 3518 1 1-South Portal Working
66 Diesel Tanker Chassis
Ashok Leyland 1012 E COMET
6KL 2 2-South Portal Working
67 Excavator TATA -Hitachi EX 200
LCH 1 1-Crusher
Plant Working
68 Threading Machine
Industrial Machines Pvt. Ltd.
- - 1 1-Work shop Working
69 Water Tanker Chassis
Ashok Leyland - 12KL 2 2-South Portal Working
70 Welding DG SET
ESAB EDW 400 & 350
Amps
1 each
2-Roads & Bridges
Working
71 Motor Cycles Hero Glamour 2 Seater 2 2-South Portal Working 72 Dozer BEML BD80 180HP 1 South Portal Working
73 Tipper AMW AMW 2518TP 14Cum 4 2-Crusher
Plant 2-Roads & Bridges
Working
74 Batching Plant Schwing Stetter
M1 1 Working
75 Transit Mixer Tata Motors 4 Roads & Bridges,
Working
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
43
INS
PE
CT
ION
RE
PO
RT
76 High Pressure Jet Cleaner
Western Floor PW-
H25D1110 PM
Working
77 JCB Backhoe / Loader
JCB INDIA 3DX South Portal Working
78 Hydraulic Rock Breaker
DAEMO ALICON-
B210 North Portal Working
79 Wheel Loader Hindustan HM2021 1.7 Cum 1 South Portal Working 80 Crawler Crane P&H 320 20Ton 1 RUB Working
81 Crane Mobile Pick & Carry
Escorts Hydra14 14Ton 1 South Portal Working
82 Concrete Spray Machine
SikaPutzmeister SPM4210 WETKRET
20m3/hr 2 1 North Portal 1 South Portal
Working
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
44
INS
PE
CT
ION
RE
PO
RT
17. CORRESPONDENCE I. Correspondence from SMEC International Pty. Ltd In association with SMEC India pvt Ltd & RODIC Consultants Pvt Ltd Banihal to NHAI Srinagar. Sl No.
Date Reference No. Regarding Remarks/Mode
1 01.11.2014 5061142/767 Invoice No. 41 of October 2014 By Mail
2 03.11.2014 5061142/769 Provision of Viaduct in Lieu of Short Tunnel By Mail
3 03.11.2014 5061142/770 Muck Dumping - Assessment of Contractual Issues
By Mail
4 03.11.2014 5061142/771 Proforma for online monthly monitoring of NHAI Project
By Mail
5 05.11.2014 5061142/772 Status Report on the Project on Quazigund Banihal Stretch of NH-1A and Condition
By Mail
6 15.11.2014 5061142/773 Election Holidays By Mail
7 19.11.2014 5061142/774 MIR October-2014 By Hand
8 27.11.2014 5061142/775 Overseas Medical Treatment for T.L By Mail
9 27.11.2014 5061142/777 Key Personnel - Senior Geologist - Request approval for Mr. Ram paul Verma
By Mail
II. Correspondence from SMEC International Pty. Ltd In association with SMEC India Pvt Ltd & RODIC Consultants Pvt Ltd Banihal to R.O NHAI Jammu. Sl No.
Date Reference No. Regarding Remarks/Mode
III. Correspondence from SMEC International Pty. Ltd In association with SMEC India Pvt Ltd & RODIC Consultants Pvt Ltd Banihal to M/S NAVAYUGA Quazigund Expressway Pvt Ltd Sl No.
Date Reference No. Regarding Remarks/Mode
1 27.11.2014 5061142/776 Design / Drawings of proposed viaduct in lieu of short Tunnel-1
By Mail
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
45
INS
PE
CT
ION
RE
PO
RT
IV. From NHAI New Delhi to SMEC International Pty. Ltd In association with SMEC India Pvt Ltd & RODIC Consultants Pvt Ltd - Gurgaon Sl No.
Date Reference No. Regarding Remarks/Mode
V. Correspondence Letter from NHAI Srinagar to M/S NAVAYUGA Quazigund Expressway Pvt Ltd Nowgam And Copy to SMEC International Pty. Ltd In association with SMEC India Pvt Ltd & RODIC Consultants Pvt Ltd Banihal Consultants Pvt. Ltd. Banihal From NHAI, Srinagar
Sl No.
Date Reference No. Regarding Remarks/Mode
1 03.11.2014 PD/SGR/140001/2014/Gen/058
Eco-friendly geotechincal solution for several type of Civil Engineering issue
By E-Mail
2 03.11.2014 PD/SGR/140001/2014/Gen/062
Snow Clearing and Road Maintenance By E-Mail
3 05.11.2014 PD/SGR/14016/2014/All Pkg/01
Signages including Photos of former Ministers Etc on NH
By E-Mail
4 10.11.2014 PD/SGR/14003/01/2014/NQEL/04
Muck Dumping Assessment of Contractual Issues
By E-Mail
5 12.11.2014 PD/SGR/14003/01/2014/NQEL/06
Snow Clearance on existing Jammu - Srinagar highway between Quazigund - Banihal
By E-Mail
6 18.11.2014 by e-mail Meeting with Member Fin. At NHAI HQ on 20.11.2014
By E-Mail
7 19.11.2014 by e-mail Current Financial year Targets for the Projects
By E-Mail
8 25.11.2014 PD/SGR/14003/01/2014/NQEL/08
Maintenance and safety requirement on existing highway
By E-Mail
9 28.11.2014 PD/SGR/14003/01/2014/NQEL/09
Notice under Clause 37.1 of CA By E-Mail
10 28.11.2014 PD/SGR/14003/01/2014/NQEL/10
Design/Drawings of proposed viaduct in lieu of short tunnel-1
By E-Mail
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
46
INS
PE
CT
ION
RE
PO
RT
VI. Correspondence Letter from M/S NAVAYUGA Quazigund Expressway Pvt Ltd Nowgam to NHAI, Srinagar & Delhi And Copy to SMEC International Pty. Ltd In association with SMEC India Pvt Ltd & RODIC Consultants Pvt Ltd Banihal From M/S Navayuga Engineering Company Ltd. Nowgam
Sl No.
Date Reference No. Regarding Remarks/Mode
1 19.11.2014 NQEPL-1239/JK/2014-15/065
Shifting of 33KV existing Tethar - Banihal line near Railway Bridge falling ROW
By E-Mail
2 27.11.2014 by e-mail Extension of performance security BG By E-Mail
3 29.11.2014 NQEPL-1239/JK/2014-15/067
Reply letter to notice under clause 37.1 of AC to cure
By E-Mail
4 29.11.2014 NQEPL-1239/JK/2014-15/068
Request for constituting Public Negatiation Committee (PNC) for acquistion of additional land in village Cheryl Lamber, Tethar, for viaduct and ventilation building /Electric Substation
By E-Mail
VII. Correspondence Letter From M/S NAVAYUGA Quazigund Expressway Pvt Ltd Nowgam, To SMEC International Pty. Ltd In association with SMEC India Pvt Ltd & RODIC Consultants Pvt Ltd Banihal
Sl No Date Reference No. Regarding Remarks/Mode
1 12.11.2014
NQEPL/1239/NHAI/SMEC/DWG/Viaduct/T/001
Submission of Drawing & Design note
By Hand
2 12.11.2014 NQEPL-1239/JK/2014-15/064
Submission of Trial Mix Results for Steel Fiber
By E-Mail
3 29.11.2014
NQEPL-1239/NHAI/SMEC/BBC/T/008
Viaduct Pier Reinforcement Details
By E-Mail
4 29.11.2014 NQEPL/1239/NHAI/SMEC/DWG/Viaduct/T/002
Reinforcement Details for Pier By E-Mail
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
47
INS
PE
CT
ION
RE
PO
RT
VIII. Correspondence Letter From NHAI, Srinagar, To SMEC International Pty. Ltd In association with SMEC India Pvt Ltd & RODIC Consultants Pvt Ltd Banihal Sl No.
Date Reference No. Regarding Remarks/Mode
1 03.11.2014 by e-mail Project Monitoring By E-Mail
2 05.11.2014 by e-mail Governor's Reference By E-Mail
3 05.11.2014 PD/SGR/14005/01/2014/SMEC/01
Provision for Viaduct in Lieu of Short Tunnel
By E-Mail
4 13.11.2014 by e-mail Meeting with Member Finance on 20.11.2014 at HQ New Delhi NHAI
By E-Mail
5 16.11.2014 by e-mail Snow Clearance on existing Jammu - Srinagar highway between
By E-Mail
6 18.11.2014 by e-mail Urgent information required for Rajya Sabha
By E-Mail
7 18.11.2014 PD/SGR/14016/01/2014/All Pkg/03
Daily Attendance of Consultants Staff
By E-Mail
8 18.11.2014 PD/SGR/14016/01/2014/All Pkg/04
Swach Bharat Mission of NHAI - Activities in NHAI
By E-Mail
9 19.11.2014 by e-mail Current Financial year Targets for the Projects
By E-Mail
10 28.11.2014 PD/SGR/14005/01/2014/SMEC/02
Utilization of man months of Key Professional /Sub Professional
By E-Mail
11 29.11.2014 PD/SGR/14005/01/2014/SMEC/03
Overseas Medical Treatment for Team Leader
By E-Mail
Monthly Inspection Report Rehabilitation, Strengthening and FourLaning of Quazigund to Banihal
48
INS
PE
CT
ION
RE
PO
RT