Session 11- Teams & AP
-
Upload
karthik-mirthipati -
Category
Documents
-
view
33 -
download
0
Transcript of Session 11- Teams & AP
![Page 2: Session 11- Teams & AP](https://reader036.fdocuments.us/reader036/viewer/2022062406/55c4e261bb61eb24688b45d8/html5/thumbnails/2.jpg)
4 Teams to work on 5 Areas of SHED 2
PDC/GDC CELL ASSEMBLY
PASTE MIXING & PLATE BUFFING
SLURRY FILLING
Mr. P. Narasimha
Mr. K. Sreedhar
Mr. B.A Srinivas Mr. P. Srinivas
Mr. M. Syam Kumar
Mr. M. Satyanarayana
Mr. V.M Reddy Mr. Mohd. Sadiq
Mr. P. Raghu Ram Reddy,
Mr. Adam Baig
Mr. G.V.V Ramana Mr. G. Raghu Ram
Mr. G. Rakesh Mr. K.L. Subba Rao
Mr. K.Sreehari Babu
Mr. Shaik Ameer Basha
Mr. Yallamanda Rao
Mr. K. Sreenivas
Mr. M.K Reddy Mr. Phani Kumar
![Page 3: Session 11- Teams & AP](https://reader036.fdocuments.us/reader036/viewer/2022062406/55c4e261bb61eb24688b45d8/html5/thumbnails/3.jpg)
An Action Plan
Getting Started.One Session to go out with an open mind to
look out for constraints affecting Throughput & Quality.
Identify Every possible constraint.Divide them under 3 categories
Immediate Intermediate Long Term.
![Page 4: Session 11- Teams & AP](https://reader036.fdocuments.us/reader036/viewer/2022062406/55c4e261bb61eb24688b45d8/html5/thumbnails/4.jpg)
Action Plan
Review meeting every Monday to check progress.
Each team would be giving a small presentation on What constraints were identified? What resistance did your team face? What would be the next plan of action to achieve the
results. Who would be doing what task/ tasks? Take Pictures.
![Page 5: Session 11- Teams & AP](https://reader036.fdocuments.us/reader036/viewer/2022062406/55c4e261bb61eb24688b45d8/html5/thumbnails/5.jpg)
Five Focusing Steps
![Page 6: Session 11- Teams & AP](https://reader036.fdocuments.us/reader036/viewer/2022062406/55c4e261bb61eb24688b45d8/html5/thumbnails/6.jpg)
Common tasks to 4 Teams
Implementation of 6 S.Making Sure Once a Problem is solved, It never
repeats again.Strict implementation & Standardisation to
acheive Zero Defects.Zero Tolerance Approach for not meeting quality
requirementsElaborate Standard Operating Procedure to train
New Workers.
![Page 7: Session 11- Teams & AP](https://reader036.fdocuments.us/reader036/viewer/2022062406/55c4e261bb61eb24688b45d8/html5/thumbnails/7.jpg)
Additional Tasks to 2 Teams
1) Cell Assembly Team 3: Once a Cell exits Shed 2 ; IT IS NOT ACCEPTABLE for it to a)Be Scrapped b)b) have Leaks (Terminal or Heat sealing) c)c) or need for any additional Epoxy Rework.
2) Pasting & Plate Buffing Team 4: Since it is the core area of the battery manufacturing, Please make DOUBLE SURE of Cleanliness & Health and
Safety.
![Page 8: Session 11- Teams & AP](https://reader036.fdocuments.us/reader036/viewer/2022062406/55c4e261bb61eb24688b45d8/html5/thumbnails/8.jpg)
![Page 9: Session 11- Teams & AP](https://reader036.fdocuments.us/reader036/viewer/2022062406/55c4e261bb61eb24688b45d8/html5/thumbnails/9.jpg)
![Page 10: Session 11- Teams & AP](https://reader036.fdocuments.us/reader036/viewer/2022062406/55c4e261bb61eb24688b45d8/html5/thumbnails/10.jpg)