SEPTEMBER 3, 2014 | NEPOOL MARKETS COMMITTEE
Jonathan LowellPRINCIPAL ANALYST | MARKET DEVELOPMENT
Correcting an Inadvertent Omission Regarding Allocation of LSCPR Credit Costs
NCPC Cost Allocation – Tariff Errata
DARD Pump RTLO Is Supposed To Be Excluded from Cost Allocation of NCPC LSCPR Credits
• QA auditing of the Energy Market Offer Flexibility and NCPC software implementation for 12/3/14 identified an inadvertent omission that occurred in the recent rewrite of III.F.3 - NCPC cost allocation
• DARD Pump RTLO is currently excluded from RTLO used to allocate the cost of NCPC for DA & RT LSCPR credits– This design is unchanged under the recent NCPC cost allocation rewrite
• The necessary tariff language in the original cost allocation rules (at III.F.3.1) was not correctly carried over into the rewritten rules.
• To remedy the omission, add “excluding Real-Time Load Obligations associated with Dispatchable Asset Related Demand Resources (pumps only)” to the “new” III.F.3.3