Schematic Lighting Design
Natty Boh Building
Baltimore , Maryland
Eric Singley
Penn State University
Architectural Engineering
![Page 2: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/2.jpg)
Location Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Brewers Hill
Baltimore , Maryland
![Page 3: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/3.jpg)
Project Information
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Building Statistics:
Overall Building Size : 189,550 ft2.
Maximum Height : 9 stories
Multi-purpose: office, storage, residential, commercial
Building Character:
Old home of the Gunther Brewing Company.
Consists of 6 sections of differing heights.
Declared a historic place in 2002.
![Page 4: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/4.jpg)
Design Spaces Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Large Work Space
Friday’s Day Care Center
Circulation Space
Canton Self Storage Lobby
Outdoor Space
Parking lot and rear facade
Special Purpose Space
Countrywide conference room
![Page 5: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/5.jpg)
Day Care Center
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Space Properties
Floor area 4092 ft2.
Exposed ceiling at 14 ft.
Large windows on east and
west walls.
Interior partitions dividing
kitchen and storage areas.
Space Tasks
Primarily play and learning
area for small children.
Light kitchen use.
![Page 6: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/6.jpg)
Day Care Center
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
![Page 7: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/7.jpg)
Day Care Center
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Design Goals
Separate the spaces by function with lighting.
Create a more ‘playful’ atmosphere within the child care area.
Make use of the large windows to introduce daylighting to the space.
Flynn mode – Relaxed.
Power Density
1.5 Watts per square foot allowed.
![Page 8: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/8.jpg)
Day Care Center
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Design Solution
Drop ceiling to 9’.
Recessed linear fluorescent
downlights in walkways.
Recessed CFL downlights in
childrens’ area and kitchen.
Under-cabinet lights in kitchen.
LED color spots on columns.
![Page 9: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/9.jpg)
Day Care Center
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Daylight Integration
Kitchen lights and window-
side children’s are lights on
their own circuit. Use
Photometric sensor with
manual override for control.
![Page 10: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/10.jpg)
Lobby Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Space Properties
Floor Area ≈ 2500 ft2
Ceiling at 8 ft and 21.5 ft
No windows
Entrances on both levels
Space Tasks
Light office work
Display of model storage unit
Sales / Receptionist desks
![Page 11: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/11.jpg)
Lobby Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
![Page 12: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/12.jpg)
Lobby Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Design Goals
Accentuate the double height ceiling.
Direct customers from entrances to the sales desk.
Provide a non-complex design solution.
Flynn mode – Spacious.
Power Density
1.3 Watts per square foot allowed.
![Page 13: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/13.jpg)
Lobby Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
![Page 14: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/14.jpg)
Lobby Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Design Solution
CFL downlights over desks.
Recessed CFL downlights in 9’6” portion lower ceiling.
Linear fluorescent wallwash along open wall.
Wallwashers on 21 ft walls to accent their height.
![Page 15: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/15.jpg)
Conference Room
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Space Properties
Floor Area : 150 ft2
Ceiling at 8 ft
Conference table with chairs
No windows
Space Tasks
Professional and Casual
conferences
Possible light video
conferencing
![Page 16: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/16.jpg)
Conference Room
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
![Page 17: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/17.jpg)
Conference Room
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Design Goals
Create a comfortable yet professional environment.
Provide flexibility to accommodate different uses. Including:
Presentations
Video conferencing
Roundtable discussion
Flynn mode – Spacious/Focused
Power Density
1.5 Watts per square foot allowed
![Page 18: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/18.jpg)
Conference Room
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Roundtable Discussion
Recessed CFL downlights on the
conference table.
Linear Fluorescents washing walls
and ceiling to provide ambient lighting.
![Page 19: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/19.jpg)
Conference Room
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Presentation
Ambient lighting remains on.
Reduce the number of downlights
on the conference table.
Two spot lamps on podium.
![Page 20: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/20.jpg)
Conference Room
Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Video Conferencing
Dimmed ambient lighting.
Spot lamps on individual faces.
Downlights on table reduced further.
![Page 21: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/21.jpg)
Exterior Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Space Properties
Ground Area : 37,050 ft2
Surrounded on 3 sides by buildings
Historically significant
Space Tasks
Parking for Natty Boh Building
Entrance to the building
![Page 22: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/22.jpg)
Exterior Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
![Page 23: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/23.jpg)
Exterior Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Design Goals
Provide sufficient light to allow drivers to read signs and see parking lines.
Call attention to the building entrances.
Achieve 100% Dark Sky compliance.
Maintain similar luminaire appearance.
Power Density
0.3 Watts per square foot allowed
![Page 24: Schematic Lighting Design](https://reader035.fdocuments.us/reader035/viewer/2022062308/56812ad9550346895d8ec003/html5/thumbnails/24.jpg)
Exterior Natty Boh Building
Penn State AE Eric SingleySchematic Lighting Proposal
Design Solution
Spotlight building entrances.
Prevent spill into windows.
Keep light poles on existing