Schedule A - IPS Pipe Schedule B - PIP & C905 Pipe ... - 2015-2016 Pipe Bid summary.pdfSchedule C -...
Transcript of Schedule A - IPS Pipe Schedule B - PIP & C905 Pipe ... - 2015-2016 Pipe Bid summary.pdfSchedule C -...
Engineers Estimate HD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
YES YES YES
YES YES YES
YES YES YES
YES YES YES
$58,465.00 $58,646.00 $57,822.00
$4,618.74 $4,633.03 $4,567.94
$69,050.61 $63,083.74 $63,279.03 $62,389.94
$334,670.00 $342,478.00 $333,662.00
$26,438.93 $27,055.76 $26,359.30
$398,863.14 $361,108.93 $369,533.76 $360,021.30
$155,580.10 $132,411.59 $153,747.91
$12,290.83 $10,460.51 $12,146.08
$212,960.07 $167,870.93 $142,872.10 $165,893.99
$24,250.40 $37,237.40
$1,915.78 $2,941.75
$29,133.00 No Bid $26,166.18 $40,179.15
$147,296.00 $135,353.02 $233,351.86
$11,636.38 $10,692.89 $18,434.80
$163,291.54 $158,932.38 $146,045.91 $251,786.66
Vender Total $873,298.36 $315,084.19 $422,411.24
Bid Total
Schedule A - IPS Pipe
Schedule E - Valves, Vents, and Fittings
Schedule D - Steel Pipe
Schedule C - IPS, PIP & C905 PVC Fittings
Schedule B - PIP & C905 Pipe
August 20, 2015 11:00am Bid Opening
2015-2016 ELIPS Pipe Materials Bid Summary
Sales tax @ 7.9%
Total Bid Amount
$737,495.43
Subtotal (Items 1-3)
Sales tax @ 7.9%
Total Bid Amount
Subtotal (Items 1-41)
Sales tax @ 8.3%
Total Bid Amount
Subtotal (Items 1-56)
Sales tax @ 7.9%
Total Bid Amount
Subtotal (Items 1-5)
Sales tax @ 7.9%
Total Bid Amount
Subtotal (Items 1-5)
Supplier
Bid Bond
Signed Proposal Form
Schedule of Prices
Signed Addendum #1
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 4" 125psi IPS PVC G FT 1000 0.94 940.00 0.98 980.00 0.92 920.00
2 6" 125psi IPS PVC G FT 4200 2.00 8,400.00 2.09 8,778.00 1.96 8,232.00
3 8" 125psi IPS PVC G FT 1800 3.45 6,210.00 3.53 6,354.00 3.41 6,138.00
4 10" 100psi IPS PVC G FT 6100 4.35 26,535.00 4.36 26,596.00 4.30 26,230.00
5 12" 100psi IPS PVC G FT 2600 6.30 16,380.00 6.13 15,938.00 6.27 16,302.00
Bid Proposal - Schedule A (IPS Pipe)
PVC PIPE
Subtotal (Items 1-5)
Sales tax @ 7.9%
Total Bid Amount
58,465.00
4,618.74
63,083.74
58,646.00
4,633.03
63,279.03
57,822.00
4,567.94
62,389.94
Units QntyHD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
Item Size Specification Material Type
1
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 15" 100 psi PIP PVC G FT 3400 8.75 29,750.00 8.96 30,464.00 8.72 29,648.00
2 21" 100 psi PIP PVC G FT 1800 18.95 34,110.00 19.20 34,560.00 18.84 33,912.00
3 24" 100 psi PIP PVC G FT 3700 23.80 88,060.00 24.62 91,094.00 23.66 87,542.00
4 27" 100 psi PIP PVC G FT 3000 30.75 92,250.00 32.70 98,100.00 30.62 91,860.00
5 30" 100 psi C905 G FT 2000 45.25 90,500.00 44.13 88,260.00 45.35 90,700.00
Bid Proposal - Schedule B (PIP & C905 Pipe)
PVC PIPE
Sales tax @ 7.9% 26,438.93 27,055.76 26,359.30
Total Bid Amount 361,108.93 369,533.76 360,021.30
QntyHD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
Subtotal (Items 1-5) 334,670.00 342,478.00 333,662.00
Item Size Specification Material Type Units
2
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 2" 90 IPS PVC SXS EA 60 0.64 38.40 0.82 49.20 7.32 439.20
2 4" 90 IPS PVC SXS EA 80 4.20 336.00 16.25 1,300.00 4.98 398.40
3 6" 11.25 IPS PVC SXS EA 5 18.60 93.00 16.25 81.25 18.49 92.45
4 6" 22.5 IPS PVC SXS EA 5 19.30 96.50 27.47 137.35 24.28 121.40
5 8" 22.5 IPS PVC SXS EA 5 32.00 160.00 31.75 158.75 31.27 156.35
6 8" 45 IPS PVC SXS EA 15 32.00 480.00 41.45 621.75 36.64 549.60
7 10" 11.25 IPS PVC SXS EA 5 47.00 235.00 41.45 207.25 47.19 235.95
8 10" 22.5 IPS PVC SXS EA 5 48.00 240.00 41.45 207.25 47.19 235.95
9 10" 45 IPS PVC SXS EA 15 48.00 720.00 47.64 714.60 76.96 1,154.40
10 12" 11.25 IPS PVC SXS EA 10 77.00 770.00 65.57 655.70 74.65 746.50
11 12" 22.5 IPS PVC SXS EA 10 77.00 770.00 65.57 655.70 74.65 746.50
12 12" 45 IPS PVC SXS EA 15 88.00 1,320.00 67.14 1,007.10 88.91 1,333.65
13 15" 11.25 PIP PVC GXG EA 5 140.00 700.00 123.83 619.15 136.05 680.25
14 15" 22.5 PIP PVC GXG EA 5 140.00 700.00 123.83 619.15 136.05 680.25
15 15" 45 PIP PVC GXG EA 4 170.00 680.00 153.86 615.44 169.03 676.12
16 21" 11.25 PIP PVC GXG EA 4 250.00 1,000.00 247.47 989.88 245.00 980.00
17 21" 22.5 PIP PVC GXG EA 4 275.00 1,100.00 269.35 1,077.40 266.66 1,066.64
18 21" 45 PIP PVC GXG EA 6 290.00 1,740.00 287.88 1,727.28 285.00 1,710.00
19 24" 11.25 PIP PVC GXG EA 4 370.00 1,480.00 363.64 1,454.56 360.00 1,440.00
20 24" 22.5 PIP PVC GXG EA 4 420.00 1,680.00 414.14 1,656.56 410.00 1,640.00
21 24" 45 PIP PVC GXG EA 5 440.00 2,200.00 434.34 2,171.70 430.00 2,150.00
22 27" 22.5 PIP PVC GXG EA 4 530.00 2,120.00 521.21 2,084.84 516.00 2,064.00
23 27" 45 PIP PVC GXG EA 10 630.00 6,300.00 621.21 6,212.10 615.00 6,150.00
Bid Proposal - Schedule C (IPS, PIP & C905 PVC Fittings)
Units QntyHD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
Item Size Specification Material Type
3
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
24 30" 22.5 C905 GXG EA 4 920.00 3,680.00 909.09 3,636.36 900.00 3,600.00
25 30" 45 C905 GXG EA 8 1,110.00 8,880.00 1,092.93 8,743.44 1,082.00 8,656.00
26 6"x4" IPS PVC SXS EA 20 10.00 200.00 9.68 193.60 9.88 197.60
27 8"x6" IPS PVC SXS EA 6 25.00 150.00 24.80 148.80 25.31 151.86
28 10"x8" IPS PVC SXS EA 7 40.00 280.00 33.83 236.81 38.68 270.76
29 12"x6" IPS PVC SXS EA 2 100.00 200.00 85.02 170.04 97.36 194.72
30 12"x10" IPS PVC SXS EA 4 58.00 232.00 49.44 197.76 56.32 225.28
31 15"x10" PIP x IPS GXS EA 2 113.00 226.00 111.90 223.80 110.22 220.44
32 15"x12" PIP x IPS GXS EA 2 120.00 240.00 104.57 209.14 117.46 234.92
33 21"x15" PIP PVC GXG EA 1 410.00 410.00 323.13 323.13 403.33 403.33
34 24"x21" PIP PVC GXG EA 1 545.00 545.00 483.42 483.42 531.66 531.66
35 27"x10" PIP x IPS GXS EA 2 703.00 1,406.00 692.14 1,384.28 685.22 1,370.44
36 30"x8" PIP x IPS GXS EA 1 900.00 900.00 890.57 890.57 881.66 881.66
37 30"x27" C905xPIP GXG EA 1 1,395.00 1,395.00 1,371.33 1,371.33 1,357.62 1,357.62
38 6"X4" IPS PVC SXS EA 80 8.00 640.00 8.01 640.80 15.86 1,268.80
39 6"x4" IPS PVC SXT EA 20 7.80 156.00 7.55 151.00 9.87 197.40
40 6"x2" IPS PVC SXS EA 60 8.00 480.00 8.01 480.60 8.18 490.80
41 4" IPS PVC SXT EA 40 3.08 123.20 3.05 122.00 2.44 97.60
42 4"x4"x4" Tee IPS PVC SxS EA 10 8.00 80.00 8.00 80.00 7.34 73.40
43 6"X6"X6" Tee IPS PVC SxS EA 32 27.00 864.00 26.93 861.76 23.65 756.80
44 8"x8"x6" Tee IPS PVC SxS EA 30 49.00 1,470.00 31.91 957.30 61.21 1,836.30
Bid Proposal - Schedule C Continued (IPS, PIP & C905 PVC Fittings)
CONCENTRIC REDUCERS
TEE'S
FEMALE ADAPTER
REDUCER BUSHINGS
Units QntyHD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
Item Size Specification Material Type
4
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
45 8"x8"x8" Tee IPS PVC SXS EA 2 49.00 98.00 43.78 87.56 43.74 87.48
46 10"x10"x6" Tee IPS PVC SxS EA 45 205.00 9,225.00 73.69 3,316.05 199.36 8,971.20
47 12"x12"x6" Tee IPS PVC SxS EA 32 145.00 4,640.00 93.20 2,982.40 140.00 4,480.00
48 12"x12"x12" Tee IPS PVC SxS EA 1 290.00 290.00 146.79 146.79 289.95 289.95
49 15"x15"x6" Tee PIPxIPS GxS EA 20 170.00 3,400.00 140.88 2,817.60 168.03 3,360.60
50 15"x15"x8" Tee PIPxIPS GxS EA 2 180.00 360.00 146.24 292.48 175.82 351.64
51 21"x21"x6" Tee PIPxIPS GxS EA 15 435.00 6,525.00 285.60 4,284.00 427.38 6,410.70
52 24"x24"x6" Tee PIPxIPS GxS EA 18 730.00 13,140.00 720.30 12,965.40 711.66 12,809.88
53 24"x24"x8" Tee PIPxIPS GxS EA 1 738.00 738.00 730.96 730.96 720.00 720.00
54 27"x27"x4" Tee PIPxIPS GxS EA 3 790.00 2,370.00 781.73 2,345.19 770.00 2,310.00
55 27"x27"x6" Tee PIPxIPS GxS EA 15 800.00 12,000.00 795.26 11,928.90 783.33 11,749.95
56 27"x27"x24" Tee PIP PVC GxG EA 1 980.00 980.00 969.54 969.54 955.00 955.00
57 27"x27"x27" Tee PIP PVC GxG EA 1 1,045.00 1,045.00 1,035.53 1,035.53 1,020.00 1,020.00
58 30"x30"x6" Tee C905xIPS GxS EA 20 1,585.00 31,700.00 1,044.80 20,896.00 1,547.00 30,940.00
59 30"x30"x30" Tee C905 GxG EA 1 1,855.00 1,855.00 1,672.99 1,672.99 1,811.93 1,811.93
60 2" Van Stone Flange IPS (SxF) EA 150 5.00 750.00 5.83 874.50 3.90 585.00
61 3" Van Stone Flange IPS (SxF) EA 50 9.00 450.00 9.95 497.50 6.74 337.00
62 4" Van Stone Flange IPS (SxF) EA 30 11.00 330.00 10.64 319.20 8.96 268.80
63 6" Van Stone Flange IPS (SxF) EA 20 17.00 340.00 16.73 334.60 13.26 265.20
64 8" Van Stone Flange IPS (SxF) EA 12 31.00 372.00 27.27 327.24 21.72 260.64
65 12" Van Stone Flange IPS (SxF) EA 4 45.00 180.00 30.44 121.76 44.08 176.32
66 15"x14" Van Stone Flange PIP (SxF) EA 4 210.00 840.00 228.27 913.08 223.70 894.80
67 6" IPS PVC GXG EA 4 29.00 116.00 26.41 105.64 28.00 112.00
68 8" IPS PVC GXG EA 4 39.00 156.00 36.92 147.68 38.00 152.00
69 10" IPS PVC GXG EA 4 49.00 196.00 48.98 195.92 48.00 192.00
70 12" IPS PVC GXG EA 4 60.00 240.00 59.18 236.72 58.00 232.00
Bid Proposal - Schedule C Continued (IPS, PIP & C905 PVC Fittings)
PVC FLANGES (VAN STONE)
REPAIR COUPLERS
Units QntyHD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
Item Size Specification Material Type
5
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
71 15" PIP PVC GXG EA 2 124.00 248.00 114.67 229.34 121.02 242.04
72 21" PIP PVC GXG EA 2 190.00 380.00 190.47 380.94 186.66 373.32
73 24" PIP PVC GXG EA 2 305.00 610.00 306.12 612.24 300.00 600.00
74 27" PIP PVC GXG EA 2 475.00 950.00 472.79 945.58 463.33 926.66
75 30" PIP PVC GXG EA 2 770.00 1,540.00 757.58 1,515.16 750.00 1,500.00
76 24" PVC Cap PIP S EA 60 200.00 12,000.00 194.22 11,653.20 198.28 11,896.80
CAPS
Bid Proposal - Schedule C Continued (IPS, PIP & C905 PVC Fittings)
Total Bid Amount 167,870.93 142,872.10 165,893.99
Subtotal (Items 1-76) 155,580.10 132,411.59 153,747.91
Sales tax @ 7.9% 12,290.83 10,460.51 12,146.08
Units QntyHD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
Item Size Specification Material Type
6
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 2"x6' Sch 40 Steel Galv Thread EA 20 25.63 512.60 40.36 807.20
2 4"x6' Sch 40 Steel Galv Thread EA 60 75.63 4,537.80 126.13 7,567.80
3 4"x5' Sch 40 Steel (bollards)Un-Galv Butt-End EA 480 40.00 19,200.00 60.13 28,862.40
Sales tax @ 7.9% 1,915.78 2,941.75
Total Bid Amount No Bid 26,166.18 40,179.15
Subtotal (Items 1-3) 24,250.40 37,237.40
Bid Proposal - Schedule D (Steel Pipe)
Units QntyHD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
Item Size Specification Material Type
7
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 1" Type II Steel #50.97 EA 180 49.00 8,820.00 72.45 13,041.00 51.04 9,187.20
2 2" Nut Operated Steel Buried EA 60 112.00 6,720.00 132.09 7,925.40 233.35 14,001.00
3 1" Wheel Operated Steel Thread EA 120 7.50 900.00 7.02 842.40 44.85 5,382.00
4 2" Wheel Operated Steel Thread EA 180 19.00 3,420.00 19.09 3,436.20 103.54 18,637.20
5 4" Wheel Operated Steel Thread EA 35 86.00 3,010.00 74.95 2,623.25 96.35 3,372.25
6 2" Wheel Operated Steel/DI Exposed EA 65 105.00 6,825.00 110.55 7,185.75 103.28 6,713.20
7 3" Wheel Operated Steel/DI Exposed EA 115 120.00 13,800.00 70.24 8,077.60 110.13 12,664.95
8 4" Wheel Operated Steel/DI Exposed EA 65 135.00 8,775.00 91.35 5,937.75 117.98 7,668.70
9 6" Wheel Operated Steel/DI Exposed EA 60 175.00 10,500.00 128.59 7,715.40 155.21 9,312.60
10 8" Nut Operated Steel/DI Buried EA 1 974.00 974.00 316.26 316.26 637.23 637.23
11 12" Nut Operated Steel/DI Buried EA 1 1,000.00 1,000.00 555.31 555.31 1,046.81 1,046.81
12 14" Nut Operated Steel/DI Buried EA 2 1,650.00 3,300.00 836.13 1,672.26 1,654.26 3,308.52
13 2" Pressure Relief Valve Steel 90psi EA 120 98.00 11,760.00 84.92 10,190.40 547.70 65,724.00
14 2" Air Vent Aluminum EA 260 19.80 5,148.00 14.33 3,725.80 20.83 5,415.80
15 4" Air Vent Aluminum EA 35 82.00 2,870.00 71.11 2,488.85 72.92 2,552.20
16 1/4" Ball Valve Steel EA 180 3.70 666.00 2.13 383.40 5.51 991.80
17 4" Pipe Restrainer Steel EA 100 53.00 5,300.00 52.36 5,236.00 52.90 5,290.00
PIPE RESTRAINER (WITH BOLT PACK)
BALL VALVE
AIR VENT
PRESSURE RELIEF VALVE
FLANGED BUTTERFLY VALVE
WAFER BUTTERFLY VALVE
BRASS GATE VALVE
RESILIENT SEAT GATE VALVE
HD Supply - Pasco Ferguson - PascoItem Size Specification Material Type Units Qnty
HD Fowler - Yakima
Bid Proposal - Schedule E (Valves, Vents, and Fittings)
8
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
18 6" Pipe Restrainer Steel EA 30 56.00 1,680.00 55.70 1,671.00 56.28 1,688.40
19 8" Pipe Restrainer Steel EA 15 78.00 1,170.00 76.70 1,150.50 77.33 1,159.95
20 10" Pipe Restrainer Steel EA 6 112.00 672.00 110.43 662.58 111.34 668.04
21 12" Pipe Restrainer Steel EA 6
22 15" Pipe Restrainer Steel EA 4
23 21" Pipe Restrainer Steel EA 2
24 24" Pipe Restrainer Steel EA 2
25 27" Pipe Restrainer Steel EA 2
26 30" Pipe Restrainer Steel EA 2
27 4" Lg Bodied Comp. Coupl Steel EA 100 70.00 7,000.00 68.80 6,880.00 77.08 7,708.00
28 6" Lg Bodied Comp. Coupl Steel EA 30 90.00 2,700.00 91.27 2,738.10 102.08 3,062.40
29 8" Lg Bodied Comp. Coupl Steel EA 15 129.00 1,935.00 124.63 1,869.45 125.00 1,875.00
30 10" Lg Bodied Comp. Coupl Steel EA 6 160.00 960.00 151.95 911.70 151.04 906.24
31 12" Lg Bodied Comp. Coupl Steel EA 6 205.00 1,230.00 234.40 1,406.40 239.58 1,437.48
32 15" Lg Bodied Comp. Coupl Steel EA 4 325.00 1,300.00 335.19 1,340.76 388.54 1,554.16
33 21" Lg Bodied Comp. Coupl Steel EA 2 805.00 1,610.00 628.76 1,257.52 645.83 1,291.66
34 24" Lg Bodied Comp. Coupl Steel EA 2 950.00 1,900.00 895.45 1,790.90 920.83 1,841.66
35 27" Lg Bodied Comp. Coupl Steel EA 2 1,090.00 2,180.00 1,104.26 2,208.52 1,135.42 2,270.84
36 30" Lg Bodied Comp. Coupl Steel EA 2 1,175.00 2,350.00 1,494.73 2,989.46 4,161.46 8,322.92
37 1"x1"x1" Female Galv Thread EA 180 2.90 522.00 1.68 302.40 2.50 450.00
38 2"x2"x1" Female Galv Thread EA 20 9.60 192.00 5.53 110.60 7.42 148.40
39 4"x4"x1" Female Galv Thread EA 60 51.00 3,060.00 51.20 3,072.00 60.80 3,648.00
TEE'S
COMPRESSION COUPLER
Bid Proposal - Schedule E Continued (Valves, Vents, and Fittings)
Item Size Specification Material Type Units QntyHD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
9
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
40 1"x1/4" Female Galv Thread EA 180 2.25 405.00 1.30 234.00 1.87 336.60
41 1"x2" Female Galv Thread EA 120 5.35 642.00 3.08 369.60 4.81 577.20
42 1/4"x2" Male Galv Thread EA 180 0.75 135.00 0.42 75.60 0.57 102.60
43 1"x3" Male Galv Thread EA 420 0.95 399.00 0.67 281.40 0.92 386.40
44 1"x4" Male Galv Thread EA 60 1.10 66.00 0.80 48.00 1.10 66.00
45 2"x3 1/2" Male Galv Thread EA 450 1.60 720.00 1.58 711.00 2.16 972.00
46 2"x3" Male Galv Thread EA 40 1.90 76.00 1.30 52.00 1.79 71.60
47 4"x3" Male Galv Thread EA 120 10.00 1,200.00 6.21 745.20 8.57 1,028.40
48 1/2" 90 deg (MxF) Galv Thread EA 240 1.90 456.00 1.07 256.80 1.68 403.20
49 2500 ft reel #14 AWG, blue insul.Solid Copp. EA 25 175.00 4,375.00 181.71 4,542.75 160.53 4,013.25
50 3" Standon Pipe Support Galv EA 70 72.00 5,040.00 65.55 4,588.50 76.34 5,343.80
51 4" Standon Pipe Support Galv EA 25 85.00 2,125.00 79.73 1,993.25 82.10 2,052.50
52 6" Standon Pipe Support Galv EA 20 85.00 1,700.00 79.73 1,594.60 84.23 1,684.60
53 8" Standon Pipe Support Galv EA 10 85.00 850.00 79.73 797.30 84.23 842.30
54 27-XL GAL EA 100 9.00 900.00 32.25 3,225.00 10.12 1,012.00
55 VALVE BOX COVER CAST IRON EA 60 10.00 600.00 9.57 574.20 15.54 932.40
56 VALVE BOX TOP CAST IRON EA 60 25.00 1,500.00 18.69 1,121.40 27.55 1,653.00
57 VALVE BOX BOTTOMCAST IRON EA 60 26.00 1,560.00 34.50 2,070.00 28.76 1,725.60
SADDLE SUPPORT
PIPE LUBRICANT
VALVE BOX
CONCENTRIC BELL REDUCER
Bid Proposal - Schedule E Continued (Valves, Vents, and Fittings)
NIPPLE
STREET ELBOW
TRACE WIRE
Units QntyHD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
Item Size Specification Material Type
10
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Unit Price Total Price Unit Price Total Price Unit Price Total Price
58 2" Gasket RUBBER EA 130 0.90 117.00 1.56 202.80 0.38 49.40
59 3" Gasket RUBBER EA 10 1.35 13.50 1.06 10.60 0.67 6.70
60 4" Gasket RUBBER EA 20 1.55 31.00 1.23 24.60 0.99 19.80
61 6" Gasket RUBBER EA 10 2.40 24.00 1.90 19.00 1.55 15.50
62 8" Gasket RUBBER EA 10 2.95 29.50 2.31 23.10 2.10 21.00
63 10" Gasket RUBBER EA 10 3.50 35.00 3.26 32.60 4.59 45.90
64 12" Gasket RUBBER EA 10 4.80 48.00 4.48 44.80 5.15 51.50
Bid Proposal - Schedule E Continued (Valves, Vents, and Fittings)
Total Bid Amount 158,932.38 146,045.91 251,786.66
Subtotal (Items 1-64) 147,296.00 135,353.02 233,351.86
Sales tax @ 7.9% 11,636.38 10,692.89 18,434.80
Units QntyHD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
Item Size Specification Material Type
11
Summer 2015
Enclosed Lateral Improvement Project
Schedule of Prices Sunnyside Division Board of Control
2015-2016 Pipe Bid
Bid Proposal Schedule Totals
11,636.38 10,692.89 18,434.80
158,932.38 146,045.91 251,786.66
No Bid 26,166.18 40,179.15
147,296.00 135,353.02 233,351.86
24,250.40 37,237.40
1,915.78 2,941.75
12,290.83 10,460.51 12,146.08
167,870.93 142,872.10 165,893.99
26,359.30
361,108.93 369,533.76 360,021.30
155,580.10 132,411.59 153,747.91
Sales tax @ 7.9%
Total Bid Amount
58,465.00 58,646.00 57,822.00
4,618.74 4,633.03 4,567.94
63,083.74 63,279.03 62,389.94
334,670.00 342,478.00 333,662.00
26,438.93 27,055.76
Total Bid Amount
Subtotal (Items 1-3)
Sales tax @ 7.9%
Total Bid Amount
Subtotal (Items 1-64)
Subtotal (Items 1-5)
Sales tax @ 7.9%
Total Bid Amount
Subtotal (Items 1-76)
Sales tax @ 7.9%
HD Fowler - Yakima HD Supply - Pasco Ferguson - Pasco
Schedule E
Schedule D
Schedule C
Schedule B
Schedule A
Subtotal (Items 1-5)
Sales tax @ 7.9%
Total Bid Amount
12