FROM WHERE?
• Only LT lines comes to f block along with solar connections.(we are not considering)
• The line comes from generator 1 (dc set 1) near swimming pool.
2 LT PANELS ARE THERE
• ON RIGHT LT PANEL(taking more load)• MCCB 250 AMP/240sqmm cable is
coming • It is divided into 7 • MCCB 100 AMP/70 sqmm• 7 section includes
• Basement• Gf• Ff• Sf• Tf• Ff• Ff(rics)
• ON left LT PANEL(taking more load)• MCCB 250 AMP / 185 sqmm cable
is coming • It is divided into 6 • MCCB 100 AMP/ 70 sqmm• 6section includes
• Basement• Gf• Ff• Sf• Tf• Ff
TO BUS BAR IN EACH FLOOR
THEN TO MCB’S IN DIFFERENT PARTS
• Each class room is connected seperate