Sap Implementation of Fi Co Reallife Project

download Sap Implementation of Fi Co Reallife Project

of 193

Transcript of Sap Implementation of Fi Co Reallife Project

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    1/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    2/193

    ACKNOWLEDGEMENT

    I first thank my Almighty God and my parents for their sustained blessings

    and grace at all stages of my training.

    I render my unfathomable gratitude and special institute to P.Saravanan,

    Asst.Prof. (Sr.G) for his valuable guidance, remedial encouragement, timely

    suggestions and his deference shown during the preparation of this dissertation.

    I render my special thanks to our College Management and to our beloved Dean

    Dr.Jayshree Suresh, for giving me this opportunity to carry out this Project.

    Last but not the least, I thank my friends and well wisher for their good

    cooperation while I am doing my project.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    3/193

    BONAFIDE CERTIFICATE

    Certified that this project report titled IMPLEMENTING SAP ERP IN ABP Ltd

    is the bonafide work of Balasubramanian.L who carried out the research under my

    supervision.

    Certified further, that to the best of my knowledge the work reported here in doesnot form part of any other Project report or dissertation on the basis of which a

    degree or award was conferred on an earlier occasion on this or any other

    candidate.

    Date:

    Place: Student signature

    PROJECT GUIDE HEAD OF THE MBA

    P.Saravanan . Asst.Prof.(Sr.G) DR.JAYSHREE SURESH

    . ..

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    4/193

    SAP Implementation of

    FI, CO, MM, PP

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    5/193

    Table of Contents1. INTRODUCTION ............................................................................................................................................ 6

    1.1SAPLANDSCAPE.............................................................................................................. 6

    1.2SAPR/3OVERVIEW......................................................................................................... 8

    1.3OBJECTIVE OF THE PROJECT......................................................................................... 10

    2. ASAP METHODOLOGY .............................................................................................................................. 11

    2.1PROJECT PREPARATION................................................................................................. 12

    2.2BUSINESS BLUEPRINT..................................................................................................... 12

    BUSINESS BLUEPRINT ................................................................................................................................... 13

    2.2.1 Requirements ............................................................................................................................... 102.2.2 Existing Organisation Structure ................................................................................................ 112.2.3 Overview of Organizational Structure ...................................................................................... 12

    REALIZATION .................................................................................................................................................. 18

    2.3 REALIZATION.......................................................................................................... 142.3.1 Configuration of FI ..................................................................................................................... 152.3.2 CO ............................................................................................................................................... 163

    2.3.3 MM ..................................................................................................................................................................................170

    2.3.4 PP..................................................................................................................................................182

    3.CONCLUSION...188

    4.BIBLIOGRAPHY.189

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    6/193

    1. Introduction

    SAP Implementation is the whole of processes that defines a complete method to

    implement the Enterprise Resource Planning SAP ERP software in an organization. The SAP

    implementation method described in this entry is a generic method and not a specific

    implementation method as such. It is based on best practices and case studies from various

    literature sources and presents a collection of processes and products that make up a complete

    implementation method to allow any organization to plan and execute the implementation of

    SAP software

    The Generic methods consist of the following steps:

    Phases

    Delivery Group

    Activities

    Task

    The implementation of SAP software, such as SAP R/3 is almost always a massive operation that

    brings a lot of changes in the organization. The whole process can take up to several years.

    1.1 SAP Landscape

    Landscape is like a server system or like a layout of the servers or some may even call it

    the architecture of the servers viz. SAP is divided into three different landscapes Development,

    Quality and Production.

    - Development (DEV)is where the consultants do the customization as per the company's

    requirement. It would have multiple clients for ex: 190- Sandbox, 100- Golden, and 180- Unit

    Test.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    7/193

    - Qualityis where the core team members and other members test the customization. Quality

    may again have multiple clients for ex: 300- Integration Test, 700 to 710 Training.

    - Productionis where the live data of the company is recorded. It may have something like a

    200 Production.

    These names and numbers are the implementer's discreet on how they want it or they

    have been using in their previous implementations or how are the client's business scenario.

    Now whatever we do in the Sandbox doesn't affect the other servers or clients. Whenever

    we are satisfied with our configuration and we can use it moving forward, we RE-DO it in the

    golden client (this is a very neat and clean client and we cannot use it for rough usage). As we re-

    do everything that we thought was important and usable, we get a transport request pop up upon

    saving every time. we save it under a transport request and give our description to it. Thus the

    configuration is transported to the Unit Test client (180 in this example).

    Now upon a successful transport by the Basis guy, we have the entire configuration in the

    Testing client, just as it is in the Golden client. The configuration remains in sync between these

    two clients.

    But in the Testing client we can not even access SPRO (Display IMG) screen. It's a transaction

    only client where you perform the unit test. Upon a satisfactory unit test, we can move the good

    configuration to the next Server (DEV). The incorrect or unsatisfactory configuration is

    corrected in Golden (may again as well be practiced in the sandbox prior to Golden) and

    accordingly transported back to 180 (Unit Test) until the unit test affected by that particular

    configuration is satisfactory.

    The Golden client remains the 'database' or we may rather call it the 'ultimate' reference client forthe entire good, complete and final configuration that is being used in the implementation.

    These three are landscape of any Company. They organized their office in these three ways.

    Developer develops their program in Development server and then transports it to test server. In

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    8/193

    testing server tester check/test the program and then transport it to Production Server. Later it

    will deploy to client from production server.

    1.2 SAP R/3 Overview

    SAP R/3 is SAP's integrated software solution for client/server and distributed open

    systems. SAP's R/3 is the world's most-used standard business software for client/server

    computing. R/3 meets the needs of a customer from the small grocer with 3 users to the multi-

    billion dollar companies The software is highly customizable using SAP's proprietary

    programming language, ABAP/4. R/3 is scalable and highly suited for many types and sizes of

    organizations.

    R/3 stands for real-time three tier architecture. This is the kind of architecture SAP R/3 systemhas.

    R/3 means three layers are installed in Different system/server and they are connected with each

    other.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    9/193

    Web-enabled

    A p p l i c a t i o n

    P r e s e n t a t i o n

    I n t e r n e t

    T r a n s a c t i o n

    Se r v ic e / W e b

    S e r v i c e

    D a t a b a s e

    Presentation Layer

    The presentation server is actually a program named sapgui.exe. It is usually installed on

    a user's workstation. To start it, the user double-clicks on an icon on the desktop or chooses a

    menu path. When started, the presentation server displays the R/3 menus within a window. This

    window is commonly known as the SAPGUI, or the user interface (or simply, the interface). The

    interface accepts input from the user in the form of keystrokes, mouse-clicks, and function keys,

    and sends these requests to the application server to be processed. The application server sends

    the results back to the SAPGUI which then formats the output for display to the user.

    Application Layer

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    10/193

    An application server is a set of executables that collectively interpret the ABAP/4

    programs and manage the input and output for them. When an application server is started, these

    executables all start at the same time. When an application server is stopped, they all shut down

    together. The number of processes that start up when you bring up the application server is

    defined in a single configuration file called the application server profile. Each application server

    has a profile that specifies its characteristics when it starts up and while it is running.

    Database Layer

    The database layer consists of a central database system containing all of the data in the

    R/3 System. The database system has two components - the database management system

    (DBMS), and the database itself. SAP does not manufacture its own database. Instead, the R/3

    System supports the following database systems from other suppliers: ADABAS D, DB2/400

    (on AS/400), DB2/Common Server, DB2/MVS, INFORMIX, Microsoft SQL Server, ORACLE,

    and ORACLE Parallel Server.

    1.3Objective of the project

    Primary Objective

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    11/193

    To explain about the end to end process of implementation of SAP

    To do the configuration part in FI & CO for ABP Ltd

    Secondary objective

    To study the concepts of preparing business blueprint

    To explain about phases of ASAP Methodology

    To brief about step by step Realization part of FI , CO & SD

    To discuss about the Testing methodologies

    To explain about the requirements of ABP Ltd limited

    2. ASAP Methodology

    Project

    preparation BlueprintingRealization

    Final

    preparation Go-live

    Definition Requirements Design Build Test Implementclose-out

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    12/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    13/193

    BUSINESS BLUEPRINT

    2.2.1 Requirements

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    14/193

    ABP Ltd manufactures and distributes Tyres and tubes. It has operations in India. The products

    are sold throughout India. The company has four manufacturing plants located at Tamilnadu,Kerala,Karnataka, and Andhrapradesh in India.

    Tamilnadu plant produces Three stone Tyres, Karnataka plant produces Tubes, Kerala Plant

    produces Tubeless tyres, and AP plant produces Radial tyres.The purchasing organization at each plant looks after the material needs of the plants

    respectively. Each purchasing organization is managed by their respective purchasing groups. 2

    purchasing groups are assigned to each purchasing organization VG (Vendor ProcurementGroups) and LG (Local Procurement Groups).

    Each plant has two types of storage locations (one for parts, semi-finished materials and the otherfor finished products). Each manufacturing plant has its own shipping point.

    The company has one sales organization which is responsible for Pricing, Selling and other Sales

    related activities in India. Therefore, price of the products provided through the sales

    organization should be the same in all the different states in India. There are two Distributionchannels assigned to the sales organization, Retail and Wholesale. All the grinders are sold to

    both retailers and wholesalers by the sales organization. The sales area is divided into 4 Salesdistricts based on geographical region TN, KL, KA and AP. The Sales districts could use

    different marketing strategies and promotion methods. Each sales district has 2 sales offices in

    their area and sales offices are divided into sales groups based on geographical region- EastSuburb, West Suburb, South Suburb, North Suburb and other regional areas.

    Sales Representatives or Sales persons, the responsible persons for sales are belong to salesgroups and report to sales office about the sales activity of customers. Each Sales Personnel has

    own Sales employee ID. These are maintained in Customer master data as partner function andused in sales orders in SAP ERP.

    ABP Ltd uses 2 business areas one for Tilting grinders division and the other for Tabletop

    division. Thus, the financial statements including Profit and loss statement are generatedseparately for each division. 2 cost centres are assigned to each business areas based on product.

    As the company manufactures 4 different types of products, each cost centre calculates all the

    related costs for each product. A work centre is assigned to each cost centre based on the type ofthe grinders.

    2.2.2 Existing Organisation Structure

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    15/193

    ABP Ltd.

    TN

    ABP Ltd.

    KL

    ABP Ltd.

    KA

    ABP Ltd.

    AP

    ABP Limited

    2.2.3 Overview of Organizational Structure

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    16/193

    2. 2.3.1 FI & CO

    BA55

    BA55

    ABP Ltd

    BA77

    Tyres

    BA88

    Tubes

    BA01

    Tyres

    Contr

    ngArea

    Compa

    Cod

    Busin

    Area

    Cos

    Cent

    BA11

    Productionof radial tyres

    BA02

    Tubes

    BA22

    Tubeless Tyres

    CONTROLLING AREA

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    17/193

    A Controlling area structures the internal accounting operations of an organization within

    Controlling. They represent closed units that are used to calculate costs. All internal allocationsrelate solely to objects that belong to the same controlling area. ABP Ltd is under a controlling

    area of the following:

    Controlling Area DescriptionBA55 Controlling Area for ABP Limited

    COMPANY CODE

    A company code is the smallest organizational unit for which a complete self-contained set ofaccounts can be drawn up for the purposes of external reporting. As shown in the above diagram,

    the following company code will be defined for ABP Ltd:

    Company Code DescriptionBA55 ABP Limited

    BUSINESS AREA

    Business areas provide an additional evaluation level for the purpose of segment reporting. InFinancial Accounting (FI), internal balance sheets and profit and loss statements area generated

    on the basis ofbusiness areas. ABP Ltd has 2 business areas for each division.

    Business Area DescriptionBA77 Tyres

    BA88 Tubes

    COST CENTRE

    Cost centres are used to collects related costs. There are 4 cost centres used for DG Ltd:

    Cost Centre DescriptionBA01 TYRES

    BA11 RADIAL TYRES

    BA02 TUBELESS TYRES

    BA22 TUBES

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    18/193

    REALIZATION

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    19/193

    2.3

    Realization

    In this phase, configure the requirements contained in the Business Blueprint. Baseline

    configuration (major scope) is followed by final configuration (remaining scope), which can

    consist of up to four cycles. Other key focal areas of this phase are conducting integration tests

    and drawing up end user documentation.

    2.3.1 Configuration of FI

    2.3.1.1 To create an IMG Project:

    Tools -> Customizing ->IMG ->Project Administration

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    20/193

    click on the Create Project icon at the top of the screen.

    Move on to scope, which is the next tab

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    21/193

    Save it. Click on project team member

    Change the project name as Dinesh and move on to status vals and select status and move into

    right as shown below

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    22/193

    Save the project and come back to the following screen

    Then select SAP reference IMG in the top of the screen to do the configuration part.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    23/193

    2.3.1.2 Define a company

    Enterprise Structure -> Definition -> Financial Accounting -> Define Company

    Click on New Entries and Enter the following:

    Company: BA55Company Name: BA55

    City: CHENNAI

    Country: INLanguage Key: EN

    Currency: INR

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    24/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    25/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    26/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    27/193

    2.3.1.4 Assign Company Code to Company

    Enterprise Structure -> Assignment -> Financial Accounting -> Assign Company Code to

    Company

    Enter CC05 against the company code CC05

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    28/193

    2.3.1.5 Define Business area

    Enterprise Structure -> Definition -> Financial Accounting -> Define Business Area

    Click on New entries icon and enter the followings:

    BA77 Tilting GrindersBA88 Tabletop Grinders

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    29/193

    2.3.1.6 Define functional area

    Enterprise Structure> Definition> Financial Accounting> Define Functional Area

    Click on New entries icon and enter the followings:

    FA55 ABP Manufacturing

    FA66 ABP Sales

    FA77 ABP General AdminFA88 ABP Financial Expenses

    FA33 ABP AUC

    FA99 ABP Sales Revenue

    FA44 ABP Cost of Goods Sold

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    30/193

    2.3.1.7 Define credit control area

    Enterprise Structure > Definition > Financial Accounting > Define credit control area

    Click on New entries and enter the following:

    Credit Control Area: BA55 Credit control area ABP Ltd

    Currency: INRUpdate: 000012 (Open order value on time axis, delivery and bill.doct value)

    Fiscal Year Variant: K4

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    31/193

    2.3.1.8 Assign company code to credit control area

    Enterprise Structure > Assignment > Financial Accounting > Assign company code to credit

    control area

    Assign company code BA55 to Credit Control area BA55.

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    32/193

    2.3.1.9 Define Chart of Accounts

    Financial Accounting > General Ledger Accounting > G/L Accounts > Master Data >Preparations > Edit Chart of Accounts List

    Click on New entries icon.Enter the followings:

    Chart of Accounts: BA56Description: Chart of Accounts_ABP Ltd

    Controlling integration: as manual creation of cost elements

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    33/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    34/193

    2.3.1.10 Assign Company Code to Chart of Accounts

    Financial Accounting > General Ledger Accounting > G/L Accounts > Master Data >Preparations > Assign Company Code to Chart of Accounts

    Find company code BA55 and assign chart of account BA56 for both chart of account field andcountry chart of account field.

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    35/193

    2.3.1.11 Copy G/L Accounts

    Financial Accounting > General Ledger Accounting > G/L Accounts > Master Data > G/LAccount Creation and Processing> Create G/L Accounts with Reference

    Enter company code BA55 and reference company code 1000 which you want to copy from.Save.

    Click on Details icon.

    Click on Accounts from reference icon and enter the accounts you want to copy from.

    Click on G/L accounts creation icon.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    36/193

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    37/193

    2.3.1.12 FINANCIAL ACCOUNTING GLOBAL SETTINGS

    Enter Global Parameters

    Enter Global Parameters

    Financial Accounting > Financial Accounting Global Settings > Company code > EnterGlobal Parameters

    Enter as follows:

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    38/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    39/193

    Active Cost of Sales Accounting

    Financial Accounting > Financial Accounting Global Settings> Company Code> Cost of

    Sales Accounting> Activate Cost of Sales Accounting

    Find the company code BA55 and Set to Active.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    40/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    41/193

    Set Up Ledger for Cost of Sales Accounting

    Financial Accounting > Financial Accounting Global Settings> Company Code> Cost of

    Sales Accounting>Set Up Ledger for Cost of Sales Accounting

    Double click on Ledger 0F, Cost of Sales Accountng Ledger.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    42/193

    Click on Assign company code/ Company.

    On the bottom area, find the company code (BA55) and click on ASSIGN.

    Click Continue to accept pop up message.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    43/193

    Find the company code (BA55) on the upper side and click on Assign Activity.Click on Choose Activity

    Copy all the activity and Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    44/193

    Enable business area Balance Sheet

    Financial Accounting > Financial Accounting Global Settings> Business area> Enable

    business area balance sheet

    Find company code and tick on the Company code (BA55)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    45/193

    Fiscal Year

    Maintain Fiscal Year Variant

    Financial Accounting > Financial Accounting Global Settings > Fiscal Year > Maintain

    Fiscal Year Variant (Maintain shortened Fisc. Year)

    Click on new entries and create fiscal year variant Z1.

    Make 12 as ordinary posting period and 4 as special period.

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    46/193

    Assign Company code to a Fiscal Year Variant

    Financial Accounting > Financial Accounting Global Settings > Fiscal Year > Assign

    Company code to a Fiscal Year Variant

    Assign the company code BA55 to the fiscal year variant Z1

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    47/193

    Posting Periods

    Define Variants for Open Posting Periods

    Financial Accounting > Financial Accounting Global Settings > Document> Posting period>

    Define Variants for Open Posting Periods

    Click on New entries and enter the following:

    BA00 Variant for ABP Ltd

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    48/193

    Open and Close Posting Periods

    Financial Accounting > Financial Accounting Global Settings > Document> Posting period >

    Open and Close Posting Periods

    Click on New entries and enter periods for each account type A, D, K, M, S.

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    49/193

    Assign Variants to Company Code

    Financial Accounting > Financial Accounting Global Settings > Document> Posting period >

    Assign Variants to Company Code

    Assign the variant BA00 to the company code CC05

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    50/193

    Document Number Ranges

    Define Document Number Ranges

    Financial Accounting > Financial Accounting Global Settings > Document> Document

    Number Ranges > Define Document Number Ranges

    Enter the company code BA55 and Define number ranges.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    51/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    52/193

    Document Header

    Define Document types

    Financial Accounting > Financial Accounting Global Settings > Document > Document

    header > Define Document Types

    As document types are pre-defined in SAP, just make sure that Document types are correctly

    exist which will be used for the FI process

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    53/193

    Document Item

    Define Posting keys

    Financial Accounting > Financial Accounting Global Settings > Document> Line Item>

    Controls> Define Posting Keys

    Check posting keys which will be used for the FI process

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    54/193

    Maintain Field Status Variants

    Financial Accounting > Financial Accounting Global Settings > Document> Line Item>

    Controls> Define Field Status Variants

    Click on New entries and name field status variant as BA00

    Click on Field Status groups folder on the left side of the screen.

    Check the followings as field status groups:

    BPS1 Direct Postings for FI: REV, B/S inc WBS

    BPS2 Direct Postings for FI: COSTS incl WBS

    G001 General (with text, allocation)G003 Material consumption accounts

    G004 Cost accounts

    G005 Bank accounts (obligatory value date)

    G006 Material accounts

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    55/193

    G007 Asset accts (w/o accumulated depreciatn)

    G008 Assets area clearing accountsG009 Bank accounts (obligatory due date)

    G011 Clearing accounts (with settlement per.)

    G012 Receivables/payables clearing

    G013 General (obligatory text)G014 MM adjustment accounts

    G017 Freight/customs provisions/clearing (MM)

    G018 Scrapping (MM)G019 Other receivables/payables

    G023 Plant maintenance accounts

    G025 Inventory adjustment accountsG026 Accounts for down payments made

    G029 Revenue accounts

    G030 Change in stock accounts

    G031 Accounts for down payments received

    G032 Bank accounts (obligat.value/due dates)G033 Cost accounts for external services

    G036 Revenue accts (with profit center)G039 Accts for pmnts on acct made for assets

    G040 Personnel clearing accounts

    G041 Tax office clearing accountsG045 Goods/invoice received clearing accounts

    G049 Manufacturing costs accounts

    G050 Customer commission clearing accountsG052 Accounts for fixed asset retirement

    G056 Amortization accountsG059 Inventory accounting material stock acct

    G062 Investment support accounts

    G064 Other cost accounts (obligatory text)

    G067 Reconciliation accountsG068 Reconciliatn accts (payables - Austria)

    G069 Cost accounts (travel expenses)

    G070 Clearing accounts (travel expenses)G071 Reconcil.accts (KIDNO/foreign payment)

    ICCF CO FI reconciliation posting

    Z001 Reserves subsequent settlementZ002 Balance Sheet w. Profit Centre

    ZFUN Client Funds

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    56/193

    Assign Company Code to Field Status Variants

    Financial Accounting > Financial Accounting Global Settings > Document> Line Item>

    Controls> Assign Company Code to Field Status Variants

    Assign the company code BA55 to field status variant just created BA00

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    57/193

    Define Screen Variants for Document Entry

    Financial Accounting > Financial Accounting Global Settings > Document> Line Item>

    Controls> Screen Variants for Document Entry

    Find the company code and proper variants. If withholding tax is used for document entry, clickon 2. This removes withholding tax field when document is entered.

    If not used, leave it to standard version.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    58/193

    Define Tolerance Groups for Employees

    Financial Accounting > Financial Accounting Global Settings > Document> Line Item >

    Define Tolerance Groups for Employees

    Click on new entry and enter the followings:

    Tolerance group: BA55

    Amount per document : 90000000000Amount per open item account: 90000000000

    Cash discount per line item: 5%

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    59/193

    Assign to the tolerance group just created BA55 to the company code BA55

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    60/193

    Document default values

    Enable Fiscal Year Default

    Financial Accounting > Financial Accounting Global Settings > Document>Default Valuesfor Document Processing> Enable Fiscal Year Default

    Choose the company code BA55 and tick on propose fiscal year

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    61/193

    Default Value Date

    Financial Accounting > Financial Accounting Global Settings > Document>Default Values

    for Document Processing> Default Value Date

    Choose the company code and tick on propose value date

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    62/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    63/193

    Define Run dates

    Financial Accounting > Financial Accounting Global Settings > Document>Recurring

    Entries> Enter Run Dates

    Choose Run Schedule BA55 and enter the dates

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    64/193

    Tax

    Check Calculation Procedure

    Financial Accounting > Financial Accounting Global Settings> Tax on Sales/Purchases>

    Basic Settings> Check Calculation Procedure

    Choose Define process

    Choose TAXIN

    Double click Control data folder on the left side of the screen

    Check Condition types. If not exists as followings, create new entries

    BASB Base Amount

    MWAS Output TaxMWVZ Non-deduct.Input Tax

    MWVS Input Tax

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    65/193

    Click on Go back icon.

    Choose Define Condition types

    Find the condition types defined above. Double click on MWVS

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    66/193

    Check its Access Sequence whether it is MWST

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    67/193

    Click on Go back icon.

    Choose Access Sequences

    Find the Access sequence checked above. Double click on MWST

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    68/193

    Double click Field folder on the left side and check the fields.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    69/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    70/193

    Assign Country to Calculation Procedure

    Financial Accounting > Financial Accounting Global Settings> Tax on Sales/Purchases>

    Basic Settings> Assign Country to Calculation Procedure

    Find the country IN and assign TAXIN to IN

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    71/193

    Define Tax Codes for Sales and Purchases

    Financial Accounting > Financial Accounting Global Settings > Tax on Sales/Purchases >

    Calculation > Define Tax Codes for Sales and Purchases

    Find the country key IN and enter new entry D1- Input tax_ABP Ltd

    Choose V for tax type which is input tax.

    Press Enter.

    Enter 10% for Input tax as tax percentage rate

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    72/193

    Click on Tax accounts icon on the menu bar and choose Chart of accounts BA56

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    73/193

    Assign G/L account 154000 (Input tax) to transaction VST

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    74/193

    Define Tax Accounts

    Financial Accounting > Financial Accounting Global Settings>Tax on Sales/Purchases>

    Posting> Define Tax Accounts

    Find VST (Input tax) and click on details

    Enter chart of Account (BA56)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    75/193

    Enter Input tax account 154000

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    76/193

    Find MWS (Output tax) and click on details

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    77/193

    Enter chart of Account (BA56)Enter Output tax account 175000

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    78/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    79/193

    Enable Business Area Balance Sheet

    Financial Accounting> Financial Accounting Global Settings> Business Area> Enable

    Business Area Balance Sheet

    Find the company code BA55 and tick on Business area FS

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    80/193

    2.3.1.13 GENERAL LEDGER ACCOUNTING

    G/L Master

    Define Accounts Group

    Financial Accounting > General Ledger Accounting > G/L Accounts > Master Data >

    Preparations > Define Accounts Group

    Find company code BA55 and define account groups as follows:

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    81/193

    Financial Accounting > General Ledger Accounting > G/L Accounts > Master Records >Preparations > Define Retained Earnings Accounts

    Under Chart of Account BA55, Transaction: BIL Balance Carry Forward, enter retained

    earnings account from the chart of account

    P&L Statement Account type Account

    X 900000 (Inappropriate retained earnings from previous yr)

    Y 10900000 (AR60/Unapp.retained earnings from previous yr)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    82/193

    G/L Line items

    Define Line Layout

    Financial Accounting > General Ledger Accounting > G/L Accounts > Line Items > Display

    Line Item > Define Line Layout

    Double click on the line layout and click onInsert after. Choose needed fields and save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    83/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    84/193

    Choose Additional fields

    Financial Accounting > General Ledger Accounting > G/L Accounts > Line Items > Line

    Item Display > Choose Additional Fields

    Enter account type as D (Customer) and click onInsert after. Choose needed fields and save.Repeat the above step for K (Vendor) and S (G/L account) if needed.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    85/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    86/193

    Adjustment Posting Reversal

    Permit Negative Posting

    Financial Accounting > General Ledger Accounting > Business Transactions > Adjustment

    Posting/Reversal > Permit Negative Posting

    Find company code BA55 and tick on Negative postings allowed

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    87/193

    Define Reasons of Reversal

    Financial Accounting > General Ledger Accounting > Business Transactions > AdjustmentPosting/Reversal > Define Reasons of Reversal

    Check reason codes and add reasons if needed.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    88/193

    G/L Closing

    Prepare Automatic Postings for Foreign Currency Valuation

    Financial Accounting > General Ledger Accounting > Business Transactions > Closing >Valuating > Foreign Currency Valuation > Prepare Automatic Posting for Foreign CurrencyValuation

    Double click on Exch. Rate Diff. using Exch. Rate Key, Transaction KDB.

    Enter the Chart of Account CA05 and enter the followings:

    230000 280000DEM 230000 280000

    FRF 230000 280000USD 230000 280000

    230000: Foreign currency Revaluation losses

    280000: Foreign Currency Revaluation Gains

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    89/193

    Save.

    Go back to the previous screen and double click on Exchange Rate Dif.: Open Items/GL Acct,Transaction KDF

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    90/193

    Click on G/L Account 420000

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    91/193

    Enter the followings:

    Exchange Rate Difference Realised:

    Loss: 230000 (Foreign currency revaluation losses)Gain: 280000 (Foreign currency revaluation gains)

    Valuation:Val. Loss 1: 230010 (Expense from currency revaluation)

    Val. Gain 1: 280010 (Income from currency revaluation)Bal. Sheet adj: 144099 (Accounts Receivable- other companies (adj acct.))

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    92/193

    Repeat the above the steps for the following accounts:

    44000 46000 86100 86200 86300 99000 100009 102009 110002 110005 110009 113101

    Go back to the previous screen and double click on Payment difference for altern.currency,

    Transaction KDW.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    93/193

    Enter the followings:

    Debit Credit

    230030 (Translation differences - foreign currency) 280000(Foreign Currency RevaluationGains)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    94/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    95/193

    Define Adjustment Accounts for GR/IR Clearing

    Financial Accounting > General Ledger Accounting > Business Transactions > Closing >

    Reclassify > Define Adjustment Accounts for GR/IR Clearing

    Double click on Invoiced but not yet delivered (BNG) and enter the chart of account CA05.

    Enter the followings:

    Reconciliation account: 191000, 191100 (Goods Rcvd/Invoice Rcvd)Adjustment account: 191099 (Adjustment GR/IR clearing)

    Target account: 191101 (GR/IR: Goods/services not yet delivered)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    96/193

    Go back to the previous screen.

    Double click on Delivered but not yet invoiced (GNB).

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    97/193

    Enter the followings:

    Reconciliation account: 191000, 191100 (Goods Rcvd/Invoice Rcvd)

    Adjustment account: 191099 (Adjustment GR/IR clearing)Target account: 191102 (GR/IR: Goods and services not yet invoiced)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    98/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    99/193

    Define Financial Statement Versions

    Financial Accounting > General Ledger Accounting > Business Transactions > Closing >

    Document > Define Financial Statement Versions

    Click on New entries and enter the followings:

    Financial Statement Version: BA55

    Name: Balance sheet ABP LtdMaintain Language: EN

    Chart of Account: BA56

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    100/193

    G/L Integration

    Define Accounts for Materials Management

    Financial Accounting > General Ledger Accounting > Business Transactions > Integration >Materials Management > Define Accounts for Materials Management

    Double click on Expense/revenue from consign.mat.consum.(Transaction: AKO)

    Enter the followings:

    Valuation Class Account

    3000 236000 Losses - consumption for consignmentsale

    3001 236000 Losses - consumption for consignmentsale3030 236000 Losses - consumption for consignment

    sale

    3040 236000 Losses - consumption for consignmentsale

    3050 236000 Losses - consumption for consignment

    sale

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    101/193

    3100 236000 Losses - consumption for consignment

    sale7900 236000 Losses - consumption for consignment

    sale

    7920 236000 Losses - consumption for consignment

    sale

    Double click on Expense/revenue from Expense/revenue from stock transfer (Transaction:AUM)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    102/193

    Enter the followings:

    Valuation Class Account

    3000 235000 Losses - inventory transfer3001 235000 Losses - inventory transfer

    3030 235000 Losses - inventory transfer

    3040 235000 Losses - inventory transfer3050 235000 Losses - inventory transfer

    3100 235000 Losses - inventory transfer

    7900 235000 Losses - inventory transfer7920 235000 Losses - inventory transfer

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    103/193

    Double click on Subsequent settlement of provisions (Transaction: B01)

    Debit Credit

    192700 Bonus provisions (MM) 192700 Bonus provisions (MM)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    104/193

    Double click on Subsequent settlement of revenues (Transaction B02) and enter the accounts to

    repeat the above steps.

    Debit Credit

    281200 Contribution bonus differences 281200 Contribution bonusdifferences

    Double click on Change in stock account (Transaction BSV)

    Valuation

    class

    Account

    3000 400020 Material Consumed3001 400020 Material Consumed

    3002 400020 Material Consumed3030 400020 Material Consumed3040 400020 Material Consumed

    3050 400020 Material Consumed

    3100 400020 Material Consumed7900 893010 Cost of goods sold without cost element

    7920 893010 Cost of goods sold without cost element

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    105/193

    Double click on Inventory posting (Transaction BSX)

    Val.

    Class Account

    3000 300000 Inventory - Raw Material 13001 300010 Inventory - Raw Material 2

    3002 300010 Inventory - Raw Material 2

    3030 303000 Operating supplies3040 304000 Spare Parts

    3050 305000 Packaging material

    3100 310000 Trading Goods3200 300000 Inventory - Raw Material 1

    7900 790000 Unfinished products

    7910

    790010 Work in process from external

    procurement

    7920 792000 Finished goods inventory7925 792500 Finished goods inventory

    Double click on Revaluation of other consumables (Transaction COC)

    Val.

    Class Debit Credit

    0001

    231099 ML PRD

    consumption

    231099 ML PRD

    consumption

    Double click on Materials management small differences (Transaction DIF)

    Debit Credit231900 Small price loss - invoice receipt

    (MM)

    281900 Small price gains - recepit of

    invoice (MM)

    Double click on Purchasing account (Transaction EIN)Val.

    Modif

    Valuation

    class

    Account

    0001 3000 379998 Purchaseaccount

    0001 3001 379998 Purchase

    account0001 3030 379998 Purchase

    account

    0001 3040 379998 Purchaseaccount

    0001 3050 379998 Purchase

    account

    0001 3100 379998 Purchaseaccount

    0001 7910 379998 Purchase

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    106/193

    account

    Double click on Purchase offsetting account (Transaction EKG)

    Val.

    Modif

    Valuation

    class

    Account

    0001 3000 379999 Purchase offset account0001 3001 379999 Purchase offset account

    0001 3030 379999 Purchase offset account

    0001 3040 379999 Purchase offset account0001 3050 379999 Purchase offset account

    0001 3100 379999 Purchase offset account

    0001 7910 379999 Purchase offset account

    Double click on Freight clearing (Transaction FR1)

    192100 Freight Clearing Account (MM)

    Double click on Freight provisions (Transaction FR2)86100 Freight provision (MM)

    Double click on Customs clearing (Transaction FR3)

    192300 Customs Duty Clearing Account (MM)

    Double click on Customs provisions (Transaction FR4)

    86200 Customs provision (MM)

    Double click on Purchasing freight account (Transaction FRE)379998 Purchase account

    Double click on External activity (Transaction FRL)

    Val.

    Class Account1210 417001 Purchased services

    3000 417001 Purchased services

    3001 417001 Purchased services3002 417001 Purchased services

    3003 417001 Purchased services

    3030 417001 Purchased services3040 417001 Purchased services

    3050 417001 Purchased services

    3100 417001 Purchased services3200 417001 Purchased services

    3300 417001 Purchased services

    7900 417001 Purchased services

    7910 417001 Purchased services7920 417001 Purchased services

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    107/193

    Double click on Incidental costs of external activities (Transaction FRN)

    415000 External procurement costs

    Double click on Offsetting entry for inventory posting (Transaction GBB)

    Val. Gen. Val.

    Modif Modif Class Account0001 AUA 7900 895000 Factory output of production orders

    0001 AUA 7910 895000

    0001 AUA 7920 8950000001 AUF 3040 895000

    0001 AUF 7900 895000

    0001 AUF 7920 8950000001 AUF 7925 895000

    0001 BSA 3100 799999 Inventory (own goods)

    0001 BSA 7900 799999

    0001 BSA 7920 799999

    0001 BSA 7925 7999990001 INV 3000 233000 Losses - inventory variance

    0001 INV 3001 2330000001 INV 3030 233000

    0001 INV 3040 233000

    0001 INV 3050 2330000001 INV 3100 233000

    0001 INV 7900 233000

    0001 INV 7920 2330000001 INV 7925 233000

    0001 VAX 3000 400000 Consumption, raw material 10001 VAX 3001 400020 Materials consumed

    0001 VAX 3030 400020

    0001 VAX 3040 400020

    0001 VAX 3050 4000200001 VAX 3100 893010 Cost of goods sold (without cost element)

    0001 VAX 7900 893010

    0001 VAX 7910 8930100001 VAX 7920 892000 Change in finished products inventory

    0001 VAX 7925 892000

    0001 VAY 3000 894025 Inventory change - foreign prod.sale w.cost elemnt0001 VAY 3001 894025

    0001 VAY 3030 894025

    0001 VAY 3040 8940250001 VAY 3050 894025

    0001 VAY 3100 894025

    0001 VAY 7900 894025

    0001 VAY 7910 8940250001 VAY 7920 893015 Cost of goods sold (with cost element)

    0001 VAY 7925 893015

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    108/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    109/193

    0001 VNG 7920 890001

    0001 VQP 3000 237000 Losses - consumption of quality control0001 VQP 3001 237000

    0001 VQP 3030 237000

    0001 VQP 3040 237000

    0001 VQP 3050 2370000001 VQP 3100 237000

    0001 VQP 7900 237000

    0001 VQP 7910 2370000001 VQP 7920 237000

    0001 VQP 7925 237000

    0001 VQY 3000 400001 Raw materials scrapped0001 VQY 3001 400001

    0001 VQY 3030 400001

    0001 VQY 3040 400001

    0001 VQY 3050 400001

    0001 VQY 3100 4000010001 VQY 7900 890001 Scrapped material - own production

    0001 VQY 7920 8900010001 VQY 7925 890001

    0001 ZOB 3000 400020 Materials consumed

    0001 ZOB 3001 4000200001 ZOB 3002 400020

    0001 ZOB 3030 400020

    0001 ZOB 3040 4000200001 ZOB 3050 400020

    0001 ZOB 3100 4000200001 ZOB 7900 893025 Inventory change - additions to co. produced goods

    0001 ZOB 7910 893025

    0001 ZOB 7920 893025

    0001 ZOF 3000 895000 Factory output of production orders0001 ZOF 7900 895000

    0001 ZOF 7910 895000

    0001 ZOF 7920 895000

    Double click on Account-assigned purchase order (Transaction KBS)

    Debit 81Credit 91

    Double click on Materials management exch.rate diffs (Transaction KDM)Debit Credit

    230000 280000

    Double click on MM exchange rate rounding differences (Transaction KDR)Debit Credit

    230000 280000

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    110/193

    Double click on Material ledger frm low.levels E/R diff. (Transaction KDV)Debit Credit

    230050 280050

    Double click on Consignment payables KONGen.

    Modif Account

    PIP 169900 Accounts Payable - consigment sale

    Double click on Accruals and defer.acct(material ledger) (Transaction LKW)

    3000 231050

    3001 231050

    3030 231050

    3040 231050

    3050 2310503100 231050

    7900 2310507920 231050 Reconciliation Material ledger

    Double click on Price Differences from W/Off WIP (Transaction PRA)231001 Material ldg single-level price differences (loss)

    Double click on Cost (price) differences (Transaction PRD)

    General modification Valuation class Account3000 231000 Loss - price variances

    3001 231000

    3030 231000

    3040 2310003050 231000

    3100 231000

    7900 231500 Expense from price difference of own goods7910 231500

    7920 231500

    PRA 3000 231000PRA 3001 231000

    PRA 3030 231000

    PRA 3040 231000PRA 3050 231000

    PRA 3100 231000

    PRA 7900 231500

    PRA 7910 231500PRA 7920 231500

    PRF 3000 231000

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    111/193

    PRF 3001 231000

    PRF 3030 231000PRF 3040 231000

    PRF 3050 231000

    PRF 3100 231000

    PRF 7900 231500PRF 7910 231500

    PRF 7920 231500

    Double click on Price Diff. from WIP Written Off (Mat.) (Transaction PRM)

    231002 Material ldg single-level price differences (loss)

    Double click on Material ledger fr.low.levels price dif. PRV

    231520 281520

    Double click on Cost (price) differences (mater.ledger) (Transaction PRY)

    0001 231520 2815200001 231099 231099 ML PRD consumption

    Double click on Expense/revenue from revaluation (Transaction RAP)

    231080 281080

    Double click on Inv.reductions from log.inv.verification (Transaction RKA)

    191120 Clearing-invoice reduction

    Double click on Neutral provisions (Transaction RUE)

    86300 Delivery costs provision (MM)

    Double click on Unplanned delivery costs (Transaction UPF)

    231600 Unplanned delivery costs

    Double click on Input tax (Transaction VST)

    154000 Input tax (See account assignment text)

    Double click on WIP from Price Differences (Int. Acty) (Transaction WPA)

    791000 Products being processed

    Double click on WIP from Price Differences (Material) (Transaction WPM)

    791000 Products being processed

    Double click on GR/IR clearing account (Transaction WRX)

    191100 Goods Rcvd/Invoice Rcvd (third party)

    Double click on GR/IR clearing acct (mat. ledger) (old) (Transaction WRY)0001 191110

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    112/193

    Integration Sales & Distribution and Financial Accounting (for billing)

    Financial Accounting > General Ledger Accounting > Business Transaction > Integration >

    Sales and Distribution > Prepare revenue account determination

    Choose CustGrp/ MaterialGrp/ AcctKey

    Enter the following in the table:

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    113/193

    Save and go back to the previous screen.

    Repeat the above steps for custgrp/account and matgrp/accout.Save.

    Go back to the previous screen and choose general.

    Define the following for sales organization BA01.Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    114/193

    Go back to the previous screen.Choose Account key and enter the followings:

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    115/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    116/193

    2.3.1.14 ACCOUNTS RECEIVABLE & ACCOUNTS PAYABLE

    Customer Master

    Define Account Groups with Screen Layout

    Financial Accounting > Accounts Receivable and Accounts Payable > Customer Account >

    Master Data >Preparation for creating customer master > Define Account Groups with

    Screen Layout (Customers)

    Click on New entries and enter the followings:

    Account Group: BA01

    Name: Wholesale customer

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    117/193

    Maintain field status if needed by double clicking.

    Choose Address and click on Details icon.Make necessary changes.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    118/193

    Assign Number Ranges to Customer Account Groups

    Financial Accounting > Accounts Receivable and Accounts Payable > Customer Account >

    Master Record >Preparation for creating customer master > Assign Number Ranges toCustomer Account Groups

    Acct

    Group Name No Ranges

    BA02 Wholesale customer ...XX

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    119/193

    Vendor Master

    Define Account Groups with Screen Layout

    Financial Accounting > Accounts Receivable and Accounts Payable > Vendor Account >

    Master Data> >Preparation for creating Vendor master > Define Account Groups with ScreenLayout (Vendors)

    Click on New entries and enter the followings:

    Account Group: BA02

    Name: VendorMaintain field status if needed by double clicking.

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    120/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    121/193

    Assign Number Ranges to Vendor Account Groups

    Financial Accounting > Accounts Receivable and Accounts Payable > Vendor Account >

    Master Data > >Preparation for creating Vendor master > Assign Number Ranges to VendorAccount Groups

    Acct

    Group Name No Ranges

    BA02 Vendor XX

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    122/193

    Outgoing Payment

    Define Accounts for Overpayments/Underpayments

    Financial Accounting > Accounts Receivable and Accounts Payable > Business Transactions> Outgoing Payment > Outgoing Payments Global Settings > Define Accounts forOverpayments/Underpayments

    Enter the followings:

    Chart of Accounts BA56 Chart of accounts_ABP LtdTransaction ZDI Payment differences by reason

    Account 881000 (Unallowed customer discounts)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    123/193

    Define Accounts for Exchange Rate Differences

    Financial Accounting > Accounts Receivable and Accounts Payable > Business Transactions> Outgoing Payment > Outgoing Payments Global Settings > Define Accounts for Exchange

    Rate Differences

    Enter the Chart of Account BA56 and enter the accounts for exchange rate differences.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    124/193

    Define Tolerances (Vendors)

    Financial Accounting > Accounts Receivable and Accounts Payable > Business Transactions

    > Outgoing Payment > Manual Outgoing Payments > Define Tolerances (Vendors)

    Enter the company code BA55 and make new entries.

    Tolerance Group: BA55

    Assign the tolerance group to the company code.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    125/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    126/193

    Define Accounts for Payment Differences (Manual OutgoingPayment)

    Financial Accounting > Accounts Receivable and Accounts Payable > Business Transactions> Outgoing Payment > Manual Outgoing Payments > Overpayment/Underpayment > Define

    Accounts for Payment Differences (Manual Outgoing Payment)

    Chart of Accounts BA56 Chart of accounts ABP Ltd

    Transaction ZDI Payment differences by reasonAccount 881000 Unallowed customer discounts

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    127/193

    A/R & A/P Payment Program

    Set Up All Company Codes for Payment Transactions

    Financial Accounting > Accounts Receivable and Accounts Payable > Business Transactions

    > Outgoing Payment > Automatic Outgoing Payments > Payment Method/Bank Selection forPayment Program > Set Up All Company Codes for Payment Transactions

    Find the company code BA55 and set up cash discount and tolerance group.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    128/193

    Set Up Paying Company Codes for Payment Transactions

    Financial Accounting > Accounts Receivable and Accounts Payable > Business Transactions

    > Outgoing Payment > Automatic Outgoing Payments > Payment Method/Bank Selection forPayment Program > Set Up Paying Company Codes for Payment Transactions

    Find the company code BA55 and set up minimum amount for incoming /outgoing payments.

    Decide how Bill of Exchange can be created choose one bill of exchange per due date option.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    129/193

    Set Up Payment Methods per Country for Payment Transactions

    Financial Accounting > Accounts Receivable and Accounts Payable > Business Transactions> Outing Payment > Automatic Outgoing Payments > Payment Method/Bank Selection for

    Payment Program > Set Up Payment Methods per Country for Payment Transactions

    Check payment methods for country code IN that it has C (Check), I (Bank transfer- incoming),

    O (Overseas payments) and T (Bank transfer).

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    130/193

    Set Up Payment Methods per Company Code for Payment Transactions

    Financial Accounting > Accounts Receivable and Accounts Payable > Business transactions >Outgoing Payment > Automatic Outgoing Payments > Payment Method/Bank Selection for

    Payment Program > Set Up Payment Methods per Company Codes for Payment Transactions

    Find the company code CC05 and check payment methods for the company code which has been

    checked the above C, I, O and T.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    131/193

    Set Up Bank Determination for Payment Transactions

    Financial Accounting > Accounts Receivable and Accounts Payable > Business transactions >Outgoing Payment > Automatic Outgoing Payments > Payment Method/Bank Selection for

    Payment Program > Set Up Bank Determination for Payment Transactions

    Find the paying company code CC05 and enter ranking order and bank accounts for payment

    methods which are C, I, T and O.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    132/193

    Incoming Payment

    Define Accounts for Overpayments/Underpayments

    Financial Accounting > Accounts Receivable and Accounts Payable >Business transactions >

    Incoming Payment>Incoming Payments Global Settings > Define Accounts forOverpayments/Underpayments

    Enter the chart of account CA05 and enter the followings:

    Chart of Accounts BA56 Chart of accounts ABP Ltd

    Transaction ZDI Payment differences by reasonAccount 881000 Unallowed customer discounts

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    133/193

    Define Accounts for Exchange Rate Differences

    Financial Accounting > Accounts Receivable and Accounts Payable > Business transactions >

    Incoming Payment > Incoming Payments Global Settings > Define Accounts for ExchangeRate Differences

    Enter the chart of account BA56 and enter the accounts for exchange rate differences in the chart

    of account.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    134/193

    Define Tolerance Groups for Employees

    Financial Accounting > Accounts Receivable and Accounts Payable > Business transactions >

    Incoming Payment > Manual Incoming Payments > Define Tolerance Groups for Employees

    Check if the tolerance group is correctly assigned to the company code CC05 which is created inearlier stage of the implementation.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    135/193

    Define Tolerances (Customers)

    Financial Accounting > Accounts Receivable and Accounts Payable > Business transactions >

    Incoming Payment > Manual Incoming Payments > Define Tolerances (Customers)

    Check if the tolerance group is correctly assigned to the company code BA55 which is createdpreviously. The company code should have 2 tolerance group assigned. One to the tolerance

    group, which applies tolerance and the other which does not apply tolerance group.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    136/193

    Down Payment

    Define Reconciliation Account for Customer Down Payments

    Financial Accounting > Accounts Receivable and Accounts Payable > Business transactions >

    Down Payment Received > Define Reconciliation Account for Customer Down Payments

    Choose the chart of account BA55 and enter reconciliation accounts for down payment received

    and down payment request.

    Account type D (Customer)

    Special G/L indicator F (Down payment Request)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    137/193

    Click on Details icon.

    Chart of Accounts BA56

    Recon. SpecialAccount Account

    140000(Trade Receivables-domestic) 196000 (Payment requests customers)

    140010 (Trade Receivables - domestic one-time) 196000 (Payment requests customers)141000(Trade Receivables foreign) 196000 (Payment requests customers)

    141010(Trade Receivables - foreign one-time) 196000 (Payment requests customers)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    138/193

    Chart of Accounts BA56

    Account type D (Customer)Special G/L indicator A (Down Payment)

    Recon. Special

    Account Account

    140000(Trade Receivables-domestic) 170000 (Advanced Customer Payments)140010 (Trade Receivables - domestic one-time) 170000 (Advanced Customer Payments)

    141000(Trade Receivables foreign) 170000 (Advanced Customer Payments)

    141010(Trade Receivables - foreign one-time) 170000 (Advanced Customer Payments)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    139/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    140/193

    Financial Accounting > Accounts Receivable and Accounts Payable > Business transactions >Down Payment Made > Define Alternative Reconciliation Account for Down Payments

    Choose the chart of account CA05 and enter reconciliation accounts for down payment made and

    down payment request.

    Chart of Accounts BA56

    Account type K (Vendor)

    Special G/L indicator F (Down payment Request)

    Recon. Special

    Account Account

    160000(Trade Payable-domestic) 196300 (Payment requests Vendors)

    160010 (Trade Payable -domestic one-time) 196300 (Payment requests Vendors)161000(Trade Payable- foreign) 196300 (Payment requests Vendors)

    161010(Trade Payable- foreign one-time) 196300 (Payment requests Vendors)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    141/193

    Repeat the above step for down payment current asset, tangible, intangible assets

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    142/193

    Reconciliation Account

    Define Alternative Reconciliation Account for Customers

    Financial Accounting > Accounts Receivable and Accounts Payable > Business transactions >

    Postings with Alternative Reconciliation account > Other Special G/L Transactions > DefineAlternative Reconciliation Account for Customers

    Account type D (Customer)Special G/L indicator E (Reserve for bad debt)

    Click on details icon

    Chart of Accounts BA56

    Recon. Special

    Account Account140000(Trade Receivables-domestic) 142000 (Allowance for doubtful accounts)140010 (Trade Receivables - domestic one-time) 142000 (Allowance for doubtful accounts)

    141000(Trade Receivables foreign) 142000 (Allowance for doubtful accounts)

    141010(Trade Receivables - foreign one-time) 142000 (Allowance for doubtful accounts)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    143/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    144/193

    Account type D (Customer)

    Special G/L indicator H (Security Deposit)

    Chart of Accounts BA56

    Recon. Special

    Account Account140000(Trade Receivables-domestic) 197000 (Accounts Receivable - payment

    withheld)

    140010 (Trade Receivables - domestic one-time) 197000 (Accounts Receivable - paymentwithheld)

    141000(Trade Receivables foreign) 197000 (Accounts Receivable - payment

    withheld)

    141010(Trade Receivables - foreign one-time) 197000 (Accounts Receivable - paymentwithheld)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    145/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    146/193

    Define Alternative Reconciliation Account for Vendors

    Financial Accounting > Accounts Receivable and Accounts Payable > Business transactions >

    Postings with Alternative Reconciliation account > Other Special G/L Transactions > DefineAlternative Reconciliation Account for Vendors

    Account type K (Vendor)

    Special G/L indicator G (Guarantee Received)

    Click on details icon.Chart of Accounts BA56

    Recon. Special

    Account Account160000(Trade Payable-domestic) 196400 (Guarantees vendors)

    160010 (Trade Payable -domestic one-time) 196400 (Guarantees vendors)161000(Trade Payable- foreign) 196400 (Guarantees vendors)161010(Trade Payable- foreign one-time) 196400 (Guarantees vendors)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    147/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    148/193

    Chart of Accounts BA56

    Account type D (Customer)Special G/L indicator H (Security Deposit)

    160000(Trade Payable-domestic) 197100 (Accounts Payable - payment withheld)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    149/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    150/193

    2.3.1.15 BANK ACCOUNTING

    House Bank

    Define Housebank

    Financial Accounting > Bank Accounting > Bank Accounts > Define House Banks

    Define/ Check House banks and its accounts. If needed, add new entries.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    151/193

    Bill of Exchange

    Define Alternative Reconcil. Acct Bills/Exch. Receivable

    Financial Accounting > Bank Accounting > Business transactions > Bill of Exchange

    Transactions > Bill of Exchange Receivable > Post Bill of Exchange Receivable > DefineAlternative Reconcil. Acct Bills/Exch. Receivable

    Account type D (Customer)Special G/L ind. B (Bill of exchange received)

    Chart of Accounts BA56

    Recon. SpecialAccount Account140000(Trade Receivables-domestic) 126000 (Bills of exchange receivable)

    140010 (Trade Receivables - domestic one-time) 126000 (Bills of exchange receivable)

    141000(Trade Receivables foreign) 126000 (Bills of exchange receivable)141010(Trade Receivables - foreign one-time) 126000 (Bills of exchange receivable)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    152/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    153/193

    Account type D (Customer)

    Special G/L ind. S (Check/ Bill of exchang)

    Chart of Accounts BA56

    Recon. Special

    Account Account140000(Trade Receivables-domestic) 196200 (Contingent claim for bills of

    exchange)

    140010 (Trade Receivables - domestic one-time) 196200(Contingent claim for bills of exchange)141000(Trade Receivables foreign) 196200 (Contingent claim for bills of

    exchange)

    141010(Trade Receivables - foreign one-time) 196200(Contingent claim for bills of exchange)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    154/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    155/193

    Define Alternative Reconciliation. Account Bills of Exchange Payable

    Financial Accounting > Bank Accounting > Business transactions > Bill of Exchange

    Transactions > Bill of Exchange Payable > Create Bill of Exchange Payable > DefineAlternative Reconcil. Acct Bills/Exch. Receivable

    Account type K (Vendor)

    Special G/L ind. S (Check/ Bill of exchange)

    Chart of Accounts BA56

    Recon. Special

    Account Account

    160000(Trade Payable-domestic) 196200 (Contingent claim for bills of exchange)160010 (Trade Payable -domestic one-time) 196200 (Contingent claim for bills of exchange)

    161000(Trade Payable- foreign) 196200 (Contingent claim for bills of exchange)161010(Trade Payable- foreign one-time) 196200 (Contingent claim for bills ofexchange)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    156/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    157/193

    Define Alternative Reconcil. Account for Reverse Bill/Exch

    Financial Accounting > Bank Accounting > Business transactions > Bill of Exchange

    Transactions > Check/Bill of Exchange > Check/Bill of Exchange Transactions Issued >Define Alternative Reconcil. Account for Reverse Bill/Exch.

    Account type K (Vendor)

    Special G/L ind. S (Check/ Bill of exchange)

    Chart of Accounts BA56

    Recon. Special

    Account Account

    160000(Trade Payable-domestic) 196200 (Contingent claim for bills of exchange)160010 (Trade Payable -domestic one-time) 196200 (Contingent claim for bills of exchange)

    161000(Trade Payable- foreign) 196200 (Contingent claim for bills of exchange)161010(Trade Payable- foreign one-time) 196200 (Contingent claim for bills ofexchange)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    158/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    159/193

    Define Alternative Reconcil. Account for Reverse Bill/Exch

    Financial Accounting > Bank Accounting > Business transactions > Bill of ExchangeTransactions > Check/Bill of Exchange > Check/Bill of Exchange Transactions Received >

    Define Alternative Reconcil. Account for Reverse Bill/Exch.

    Account type D (Customer)

    Special G/L ind. B (Bill of exchange receivable)

    Chart of Accounts BA56

    Recon. Special

    Account Account140000(Trade Receivables-domestic) 126000 (Bills of exchange receivable)

    140010 (Trade Receivables - domestic one-time) 126000 (Bills of exchange receivable)141000(Trade Receivables foreign) 126000 (Bills of exchange receivable)141010(Trade Receivables - foreign one-time) 126000 (Bills of exchange receivable)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    160/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    161/193

    Account type D (Customer)

    Special G/L ind. S (Check/ Bill of exchange)

    Chart of Accounts BA56

    Recon. Special

    Account Account140000(Trade Receivables-domestic) 196200 (Contingent claim for bills of

    exchange)

    140010 (Trade Receivables - domestic one-time) 196200(Contingent claim for bills of exchange)141000(Trade Receivables foreign) 196200 (Contingent claim for bills of

    exchange)

    141010(Trade Receivables - foreign one-time) 196200(Contingent claim for bills of exchange)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    162/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    163/193

    2.3.2 CO

    2.3.2.1 CONTROLLING AREA

    Maintain controlling area.

    Create controlling area to establish cost centre standard hierarchy

    Enterprise Structure -> Definition-> Controlling-> Maintain controlling area-> MaintainControlling Area

    Click onNew Entries:

    Controlling Area: BA55(CO Area = CCode)Name:ABP Ltd

    Assignment Control: Controlling area same as company code

    Currency type: 10Currency:INR

    Chart of Accounts:BA56

    Fiscal Year Variant:Z1

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    164/193

    Assign company code to controlling area

    Enterprise Structure -> Assignment -> Controlling-> Assign company code to controlling area

    Highlight oncontrolling area BA55. Click onAssignment of company code BA55. Click on

    New entries. EnterBA55.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    165/193

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    166/193

    2.3.2.2 COST CENTRE ACCOUNTING

    Activate cost centre accounting in controlling area

    Controlling -> Cost centre accounting -> Activate cost centre accounting in controlling area

    Highlight oncontrolling area CC05. Click onActivate components/control indicators. Click

    onNew entries. Enter the following:

    Fiscal year:2010Cost centres: Component active

    Order Mgt: Component active

    Commit Mgt: Component activeActivity Based costing: Component active for parallel and integrated calculation

    Insert tick (activate) onall components

    Insert tick onAll currencies and Variances

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    167/193

    2.3.2.3 STANDARD HIERARCHY

    Enter Standard Hierarchy

    Controlling -> Cost centre accounting -> Activate cost centre accounting in controlling area

    Highlight oncontrolling area BA55. Click onDetails

    You will notice an additional item called CCtr Std Hierarchy under other settings. Insert the

    valueBA55and enter. Click on Yesto a message Should system CC05 be created as a standardhierarchy?

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    168/193

    2.3.2.4 COST CENTRE

    Create cost centre standard hierarchy

    Controlling -> Cost center accounting-> Master Data-> Cost center-> Define standardhierarchy.

    Normally your standard hierarchy is selected by default. If it is different, to choose your standard

    hierarchy for the controlling area BA55, use the following menu path:

    Extras => Transport standard Hierarchy

    Enter thecontrolling area BA55. Enter.

    In your standard hierarchy/controlling Area, choose CreateCost centre. Enter basic data.

    Cost Centre:BA01

    Name:Production Centre 1

    Description: Tyres

    Person Responsible:51038-01

    Cost Centre Category: 1 (Production)

    In the next screen, Enter

    Business Area:BA01Functional Area:BA55 (ABP Ltd Manufacturing)

    Currency:INR

    Repeat the above steps for other Cost Centres and Make 4 cost centres BM01, BM02, BM11,

    BM22

    Cost Centre:BA11Name:Production Centre 2

    Description:Productioncentre for radial tyres

    Person Responsible:51038-01

    Cost Centre Category: 1(Production)Business Area:BA01

    Functional Area:BA55 (ABP Ltd Manufacturing)Currency:INR

    Cost Centre:BA02Name:Production Centre 1

    Description: Tubes

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    169/193

    Person Responsible:51038-01

    Cost Centre Category: 1 (Production)

    Business Area:BA02

    Functional Area:BA55 (ABP Ltd Manufacturing)

    Currency:INR

    Cost Centre:BA22

    Name:Production Centre 1

    Description: Tubeless tyres

    Person Responsible:51038-01

    Cost Centre Category: 1 (Production)

    Business Area:BA02Functional Area:BA55ABP Ltd Manufacturing)

    Currency:INR

    Save to activate the cost centres created. If you still see the status as red, move back and come

    back to see the standard hierarchy. You will notice the status being active (green).

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    170/193

    2.3.2.5 COST ELEMENTS

    Define Cost Elements

    Controlling -> Cost Element accounting-> Master Data-> Cost Elements -> Create CostElements

    Choose Create Primary Cost Element

    Enter Controlling Are BA55

    Enter

    Enter Cost Element 890000 and validate date.

    Choose Cost Element Category > Choose 1 (Primary costs/Cost-reducing Revenues)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    171/193

    Save.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    172/193

    2.3.2.6 NUMBER RANGES FOR CO DOCUMENTS

    Set Number Ranges for CO documents

    Controlling -> General Controlling -> Organization -> Maintain Number Ranges forControlling Documents

    Enter Controlling Area BA55 and click Copy icon.Copy from Co Area 1000 to BA55.

    Accept a message. Enter.

    Click Display Interval to check the number ranges

    Your screen will be the following:

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    173/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    174/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    175/193

    CopyFrom plant: 1000To plant: BA01

    The above process is repeated for the second plant (BA02), the third plant (BA03) and the fourth

    plant (BM04).

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    176/193

    Maintain Storage Location

    Enterprise Structure -> Definition -> Materials Management -> Maintain Storage Location

    Enter Work Area:BA01

    All storage locations will have been copied from plant 1000 to plant BM01. Select all and then

    deselect the first 2 storage locations. Delete the selected storage locations.

    Modify as follows:

    0011 Semi Finished

    0012 Finished

    Repeat the above process for maintaining storage locations (Semi-Finished and Finished) forWork Area: Plant BA02, BA03, BA04.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    177/193

    Maintain Purchasing Organization

    Enterprise Structure -> Definition -> Materials Management -> Maintain PurchasingOrganization

    New Entries defined for Purchasing Organisations:

    BA01 CN Purchasing OrganisationBA02 KL Purchasing Organisation

    BA03 KA Purchasing Organisation

    BA04 AP Purchasing Organisation

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    178/193

    Assign Plant to Company Code

    Enterprise Structure -> Assignment -> Logistics General -> Assign Plant to Company Code

    Click on Assign to assign the plants BA01, BA02, BA03, BA04 to the company code BM02.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    179/193

    Create Purchasing Groups

    Materials Management -> Purchasing -> Create Purchasing Groups

    Create purchasing groups:

    VPG: Vendor Proc Grp

    LPG: Local Proc Grp

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    180/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    181/193

    Maintain company code for Materials Management

    Logistics-General -> Material Master -> Basic Settings -> Maintain Company Codes for

    Materials Management

    Against the company code BA55, change the period to current period (current year and currentmonth) i.e. June, 2010.

    Note: Before you start creating any material master in your plant/company code, you need to

    perform the above step to initialize the accounting period to the current period. Otherwise, once

    material master is created, and if the accounting period is in the past, then you need to close all

    the periods by closing one month at a time to move forward to the current period. To close one

    month at a time, you can use the following menu path:

    (To know the current period of your material master (MM), you need to check the Accounting

    view of your material master and note down the period.)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    182/193

    To close the period:

    Logistics -> Materials Management -> Material Master -> Other -> Close Period (Transaction

    Code: MMPV)

    From Company Code:BA55To Company Code:BA55Period:Next monthFiscal Year: Suitable year

    Execute.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    183/193

    1.5.2 ACCOUNT GROUP-VENDOR

    Logistic-General ->Business Partner ->Vendor ->Control ->Define Account Groups and Field

    Selection(Vendor)

    If this is done in FI module, the account groups should exist.Check the followings.

    BA01 VendorsBA02 Vendors-others

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    184/193

    1.5.3 PARTNER FUNCTION

    Material Management -> Purchasing->Partner Determination->Partner Roles->Define

    Permissible Partner Roles per Account Group

    Enter the followings:

    VN Vendor BA01 Vendors

    VN Vendor BA02 Vendors-others

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    185/193

    1.5.4 VALUATION AREA

    Materials Management> Valuation and Account Assignment> Account Determination>

    Account Determination Without Wizard> Group Together Valuation Areas

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    186/193

    2.

    1. 6 PP

    2.6.1 ENTERPRISE STURCTURE

    Create work centre

    Logistics => Production => Master Data => work centre => work centre => Create

    (transaction Code: CR01)

    Plant: BA55

    Work centre: BA01

    Work centre category: 0003 (labour)

    Enter

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    187/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    188/193

    2.6.2 MASTER DATA

    Create a standard routing for the finished product A-IPBW

    Logistics => Production => Master Data => Routings => Routings => Standard Routings =>

    Create (transaction Code: CA01)

    Material: A-IPBW_01

    Plant: BA01

    In the next screen, enter:

    Usage: 1 (Production)

    Status: 4 (General Released)

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    189/193

    Create a Bill of Material (BOM) for A-IPBW_01

    Logistics => Production => Master Data => Bills of Materials => Bill of Material =>

    Material BOM => Create (transaction Code: CS01)

    Material: Tyres & Tubes

    Plant: BA01

    BOM usage: 3

    Alternative BOM: 1

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    190/193

    Activate MRP

    Material Requirements Planning> Planning File Entries> Activate MRP and Set Up Planning

    File

    Click on MRP

    Find plants BA01, BA02, BA03 and BA04 and tick on Activate Requirements planning.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    191/193

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    192/193

    Conclusion

    Thus The Implementation of SAP ERP for ABP Limited has been done through

    various phases of ASAP Methodologies and it is configured based upon the

    companys requirements. Also the requirements could be satisfied with reference to

    testing Sales and distribution processes. Unit Testing has been done for various

    business transactions.

  • 7/25/2019 Sap Implementation of Fi Co Reallife Project

    193/193

    BIBLIOGRAPHY

    WWW.SAPHELP.COM

    WWW.SAPLIBRARY.COM

    WWW.UAC.SAP.COM

    WWW.WIKIPEDIA.COM

    WWW.ONESTOPSAP.COM

    http://www.saphelp.com/http://www.saphelp.com/http://www.saplibrary.com/http://www.saplibrary.com/http://www.uac.sap.com/http://www.uac.sap.com/http://www.wikipedia.com/http://www.wikipedia.com/http://www.onestopsap.com/http://www.onestopsap.com/http://www.onestopsap.com/http://www.wikipedia.com/http://www.uac.sap.com/http://www.saplibrary.com/http://www.saphelp.com/