FMP RISK ASSESSMENT
This document is intended as a basic template to assist in the completion of a risk assessment for film production activities.Detailed information is available from a variety of risk management and risk assessment specialists. Useful information can also be obtained from the Health & Safety Executive www.hse.gov.uk
When conducting a risk assessment, consider all the likely hazards; who may be harmed, property which may be damaged, and the controls already in place. Then, for each likely hazard, bearing in mind the controls already in place, record the ‘risk assessment’ level. The further action(s) to be considered will be determined by the level of risk assessment.
HAZARD IN WHICH SCENE IS THIS HAZARD PRESENT?
PERSON WHO MAY BE HARMED
PROPERTY THAT COULD BE DAMAGED
RISK CONTROLS ALREADY IN PLACE
RISK ASSESSMENT*See chart
FURTHER ACTION TO BE TAKEN
Working Alone Ending up without a
direction to work or a necessary helping hand
Patryk or Taylor None Being able to contact with the
work partner through many long distance means as
well as being able to relay work to each
other through cloud sharing services
Moderate/Moderate Develop a plan for a situation when one of us is not present
so that we are always on track
Equipment Lost/Malfunction
Progress being slowed down/lost due to equipment
being lost or malfunctions
Patryk and Taylor Computers, Graphical Tablets,
Computer Accessories, General
Electronics
Replacement equipment and the ability to repair the broken equipment if
it’s all possible
Low/High Regularly check equipment for any wear as to prevent any malfunctions
Data Loss Ending up with lost files that then need to be
Patryk and Taylor Hard Drive and/or Computers
Backups made on several different
hard drives
Moderate/Extreme Use other services to store data such as cloud storage
recreatedStress Overworked, may
cause us to be less efficient as well as create additional problems (such as creating more game bugs due to less concentration)
Patryk and/or Taylor
None Being able to take breaks when
necessary
Moderate/Low Have a plan of how many hours to work
for and when to take breaks
Problem with working
environment (Fire/Building
Structural Failure)
Renders the workspace unusable as well as creates a lot of other problems (serious health hazard, equipment and/or data loss)
Everyone in and around the building
Anything within the building, including
workspaces, electronics, as well
as any other equipment required
to work (pencils, papers, planners
etc.)
Evacuation, Equipment designed to fight the hazard (fire extinguishers
etc.) and being able to call emergency
services in an instant
Low/Extreme Make sure the building and
workspaces are being well
maintained as well as identify and
destroy any hazard that may cause things like fire
Unexpected Game Problems
Progress being slowed down
Patryk and Taylor None Good planning, several backups and version of the game
to go back to
Moderate/High Plan ahead and have several version of the game ready
to back up into
Risk Assessment Chart
Hazard likelihood / Consequences RISK ASSESSMENTVERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES (ie. Someone could get seriously hurt)
EXTREME
Could happen or mild consequences (i.e. someone could suffer a minor injury)
HIGH
Unlikely to happen or minor consequences (i.e. production could be slightly delayed)
MODERATE
Rarely happens and very insignificant consequences LOW