The Navi Mumbai Airport
Influence Notified Area
(NAINA)
7thAUGUST 2014
9/16/2014
-
5/20/2018 Revised NAINA Presentation
2/69
2
AGENDA
9/16/2014
Project Background Planning Approach
Vision
Strategy
Phasing
Interim Development Plan preparation Time-lines for IDP
Pilot Project
NAINA Scheme
Non-participants in NAINA Scheme
Gaothans
Areas upto 200m around Gaothan
Special Township policy
Rental Housing
-
5/20/2018 Revised NAINA Presentation
3/69
3
BACKGROUND
9/16/2014
-
5/20/2018 Revised NAINA Presentation
4/69
APPOINTMENTOFCIDCO
Special Planning Authority (SPA) vide Govt.
Notification dated 10.1.2013 u/s 40.1 (b) of
MR&TP Act, 1966
Total project area @ 600 Sq. KM
256 villages in Raigad District
14 villages in Thane District
-
5/20/2018 Revised NAINA Presentation
5/69
NAINA VILLAGES
Name ofDistrict Name ofTahsil No. Of Villages RemarksEntire Part Total
Raigad
Uran 5 0 5
Panvel 74 37 11137 Villages partly in Matheran
Eco-sensitive Zone (MESZ)
Karjat 3 3 6Area of 3 Villages east of Karjat-Khopoli Rail line excluded
Khalapur 41 15 56
10 Villages partly within MESZ
Area of 5 Villages east of Karjat-
Khopoli Rail line excluded
Pen 78 0 78Thane Thane 14 0 14
Total 215 55 270
-
5/20/2018 Revised NAINA Presentation
6/69
NMMC
AREA
NAVI MUMBAI
JNPT
Proposal to
include part
of AKBSNA inNAINA under
consideration
of GoM MATHERANECOSENSITIVE
ZONE
-
5/20/2018 Revised NAINA Presentation
7/69
7
PLANNING APPROACH
9/16/2014
-
5/20/2018 Revised NAINA Presentation
8/69
8
VISION
NAINA a Economic Powerhouse of MMR,
an Inclusive City and
a Sustainable City
-
5/20/2018 Revised NAINA Presentation
9/69
STRATEGY
9
Synergize growth impulses of national and regional infra.
NMIA, JNPT, DFC (Mumbai Delhi and Mumbai Bengaluru) MTHL, Multi-modal corridor, MumbaiVadodra Expressway
(SPUR)
Promote diversified economic base by developing local infra.
Planned, regulated and smart urbanism for inclusive city
Efficient public transportation,
World-class infrastructure for all and
Recourse to inclusionary housing for low income
Sustainable city
Financial sustainability through minimum land acquisition andadopting growth pays for growth principle
Environmental sustainability by conservation of the unique
landscape, comprising coastal and terrestrial environments,
natural and cultural heritage, and fertile agriculture
-
5/20/2018 Revised NAINA Presentation
10/69
1
0
Development Plan: Shall be prepared for entire notified area and
shall have two Phases. Out of 600 sqkm. Of NAINA ,about
160.04 sqkm area has been identified for Phase-I development
Phase-I (Areas with potential for development)
Areas witnessing developments and contiguous to Panvel and
supported by major existing & prop. transportation links
Detailed Development Plan indicating reservations for roads,
social facility , public utilities and Growth Centre
Phase-II Areas not experiencing pressure of development
Dumping ground, road widening connecting PhaseI with the
hinterland, etc
To be reviewed every five years for bringing under
DEVELOPMENTPLAN
-
5/20/2018 Revised NAINA Presentation
11/69
Phase I
Description Zone -1 Zone - 3
Developable
Lands
Irrigated Agri. land 0 0
Non- Irrig Agri. Land 785 5975
Barren Land 1011 401
Non-
Developable
Lands
Built-up Land 284 875
Creeks 0 5
Forests 303 3129
Hill 0 818
Industrial 0 0
National Park/Sanctuary 0 0Quarry 0 47
Village Settlement 21 132
Water Bodies 0 83
Others 0 2135
Total 2404 13600
Zone 1 Zone 3 Total
Area (Ha) 2404 13600 16004
Developable Area
(Ha)1796 6376 8172
% 74.7 46.9 51.1
Zone - I
Zone - 3
-
5/20/2018 Revised NAINA Presentation
12/69
12
BASIC PRINCIPLES OF NAINA SCHEME
Participatory Approach
Minimise compulsory acquisition
Incentivise Land Assembly
Inclusionary housing
-
5/20/2018 Revised NAINA Presentation
13/69
13
Project success depends on NAINA Scheme
Necessary to demonstrate NAINA Scheme on
smaller scale
Area close to Panvel experiencing developmental
pressures, where existing infrastructure of CIDCOcan be extended and where land aggregations of
more than 10ha. are probable considered suitable
for demo
3770 ha. broadly equal to size of two self-contained townships been indentified for Pilot
project
Interim Development Plan preparation of Pilot
project
INTERIMDEVELOPMENTPLAN
-
5/20/2018 Revised NAINA Presentation
14/69
14
Area of IDP is categorized as
Gaothan
Congested Areas/Urban Village -200 m around gaothan
Land assembly > 10 ha
Other areas
DCRs will cover for above categories
Permissible uses
FSI
Ground coverage and building heights Assembly regulationsland to be contributed for roads,
city-scale infrastructure and land bank
Layout and sub-division regulations including means of
access, local open spaces and amenities
INTERIMDEVELOPMENTPLAN
-
5/20/2018 Revised NAINA Presentation
15/69
15
MAP OF IDP AREA
Slno. Village names
1 Nevali
2 Adai
3 Akurli
4 Koproli
5 Nere
6 Palidevad
7 Shilottar Raichur
8 Chipale
9 Bonshet
10 Vihighar
11 Devad
12 Vichumbe
13 Shivkar
14 Moho
15 Pali kh
16 Usarli Kh
17 Chikhale18 Kolkhe
19 Palaspe
20 Derawali
21 Kon
22 Borle
23 Sangade
24 Balavali
-
5/20/2018 Revised NAINA Presentation
16/69
16
-
5/20/2018 Revised NAINA Presentation
17/69
17
TIME LINES FOR SUBMISSION OF IDP
Task Target Remarks
Preparation of ELU 15.7.2014 Not required to be published
Prepare Draft IDP 15.8.2014 Submit to CIDCO Board
Publish IDP (U/S -26)Invite Suggestions
30.8.2014 to30.9.2014
30 Days
Hearing1.10.2014
31.10.2014
3 Members of SPA +
4 by Dir. Town Plg.
Submission of PC Report to SPA 30-11-2014 One Month
Incorporating PC Report 31-12-2014 One Month
Approval by CIDCO Board 31-1-2015 One month
Submission of Draft IDP to Govt 31.1.2015 -
-
5/20/2018 Revised NAINA Presentation
18/69
18
9/16/2014
PILOT PROJECT
-
5/20/2018 Revised NAINA Presentation
19/69
Plan preparation for area of 3770 ha.
Broad land-use distribution shall be as below:
Roads 10%
Open Space 10%
Social Facilities 5%
Growth Centre 15%
Land for development 60%
Land under reservations (Roads, Open Space, Social
Facilities) including Growth Centre proposed to
be acquired by LARR Act, 20131
9
IMPLEMENTATIONOFPILOTPROJECT
-
5/20/2018 Revised NAINA Presentation
20/69
2
0
IMPLEMENTATIONOFPILOTPROJECT
Intention for acquisition u/s 11 of LARR Act,2013to be served for all lands under reservations and
Growth Centres
Such land Owners affected by LARR Act, 2013 have
option to participate in NAINA Scheme.
Land owners participating in scheme shall
surrender land through consent agreement
without monetary compensation to Authority. NAINA Scheme to remain open for four months
Reservation lands shall be acquired as per LARR
Act, 2013 ; if owners do not participate in NAINA
scheme
-
5/20/2018 Revised NAINA Presentation
21/69
To participate in NAINA Scheme, minimum landaggregation of 10 ha. is required
Scheme involves surrendering 40% land to Authority
free of cost and retaining balance 60% land . 40%
land to be surrendered shall be inclusive of roads,
open spaces, amenities, growth centre
FSI of 1.7 on balance 60% land
Additional, 20% BUA over & above BUA generated on
60% land shall necessarily be constructed for
EWS/LIG housing that shall be handed over to CIDCO
at a pre-determined rates ( as per MHADA formula)
2
1
NAINA SCHEME( >10 HA.)
-
5/20/2018 Revised NAINA Presentation
22/69
In no case, shall land owner lose more 40% of land
Land owner surrendering more than 40% land can be
compensated by
Equivalent land with 1.7 FSI
Monetary Compensation for equivalent land
TDR for equivalent land
Development Charges as per 124 (B) of MR&TP Act
(equivalent to Rs 500/m2) shall only be charged.
OSDCshall not be made applicable for participants in NAINA
Scheme
CIDCO shall bear cost of provision of City & Peripheral level
Infrastructure2
2
NAINA SCHEME( >10 HA.)
-
5/20/2018 Revised NAINA Presentation
23/69
2
3
NAINA SCHEME( >10 HA.)
Reservations within NAINA Cluster shall be flexible
(excluding roads) and will be allowed to move in the
cluster (for those who participate in the scheme)
FSI incentive for larger land pooling
CIDCO to frame DCR that shall include permissibleuses, minim. & max. permissibility of
commercial/other uses etc,
Deemed NA status proposed to be granted for the
participants
Environmental clearances proposed to be granted by
CIDCO
-
5/20/2018 Revised NAINA Presentation
24/69
2
4
FSI calculation for 10 ha. (60/40 model)
Land owner = 6.0ha.
Land owner to surrender ( for roads, open
spaces, amenities, growth centre) = 4.0 ha.
Owner
- FSI is 1.70 ( 10.00 ha. available for sale)
- Residential, Comm., R+C, Hotels, Offices,
etc. permitted- 10.00 ha. bua includes FSI for layout
Amenities
- Internal roads and layout open spaces to be
provided as per norms without losing FSI
NAINASCHEME( >10 HA.)
-
5/20/2018 Revised NAINA Presentation
25/69
2
5
FSI calculation for 10 ha. (60/40 model)
Owner
- Proposed to have graded percentage of
Amenities in proportion to size of holding
- Amenities along with scheme roads & OS
necessarily to be developed (in a fixed time-
frame) and maintained by the owner
- In case, owner surrenders developed
Amenity to the Authority 'FSI equivalent to
amenity land area plus construction value based
FSI of developed amenity' to be given
NAINASCHEME( >10 HA.)
-
5/20/2018 Revised NAINA Presentation
26/69
2
6
Free FSI - EWS/LIG Component
- 20% of saleable component to be developed
(BuA = 2.0 ha.)
- Hand over constructed tenements to CIDCO at
pre-determined rates ( as per MHADA formula)
CIDCO component (Growth Centre)
- FSI1.70 (BuA = 2.51ha.)
- No amenities, only internal roads and layout
open spaces
City level Amenities :
- FSI of amenities to vary from 0.5 to 2.0
- 5% amenities with avg. 1.0 FSI (5000 sqm.)
NAINASCHEME( >10 HA.)
-
5/20/2018 Revised NAINA Presentation
27/69
2
7
Total BuA generated on Scheme
=> 10.00 ha. + 2.0 ha. + 2.51 ha. + 0.5ha. = 15.01
ha.
Gross FSI (on 10 ha. Land) = 1.50
Net FSI ( on 7.5 ha.(6 +1.5 + 0.5) Land) = 2.00
NAINASCHEME( >10 HA.)
-
5/20/2018 Revised NAINA Presentation
28/69
2
8
CIDCOs share of 15% land (Growth Centre)
To be main source of revenue for funding City &
Peripheral level infrastructure Not to be used for EWS/LIG/MIG housing
Not to be used for Social facilities
Not to be allotted for any request of land by
Govt./Semi-Govt. Agency.
GROWTHCENTRE
-
5/20/2018 Revised NAINA Presentation
29/69
2
9
Obtaining lands for Growth Centre
CIDCO to acquire lands reserved for Growth
Centre
Taking up NAINA Scheme within Growth Centrewill not be permissible
NAINA Scheme lands lying partially in Growth
Centre will be adjusted against their 40% contri.
In such cases, CIDCO need not acquire theselands
GROWTHCENTRES
-
5/20/2018 Revised NAINA Presentation
30/69
Lands under reservations shall be acquired thro
LARR, 2013 (monetary + land compensation)
Balance private Lands not under reservation and
not participating in NAINA scheme shall continue
to have base FSI of 0.5
NO provision to increase FSI on payment of
additional premium for such lands
D.C. as per Section 124(B) (equivalent to
Rs. 500/m2) + Off-site Service Delivery Charges
(OSDC)* (Rs 3234 /sqm minus DC paid) to be
paid
3
0
NONPARTICIPANTSINNAINASCHEME
* - OSDC shall be worked out every year
-
5/20/2018 Revised NAINA Presentation
31/69
For lands given to land owners as per
requirements of LARR, 2013 , base FSI will be
0.50
OSDC shall be charged in phases (25% at CC,25% at OC and 50% at the time of seeking
connection to infra.)
City Level & Peripheral infrastructure to be
provided by CIDCO
3
1
NONPARTICIPANTSINNAINASCHEME
-
5/20/2018 Revised NAINA Presentation
32/69
Layout amenities + Int roads + int Open spacesto be provided as per DCR provisions
Lands above 4000m2 shall attract norms of 20%
of BUA for EWS/LIG. EWS/LIG housing stock to
be returned to CIDCO at pre-determined rates
(as per MHADA formula)
3
2
NONPARTICIPANTSINNAINASCHEME
-
5/20/2018 Revised NAINA Presentation
33/69
3
3
COMPARISON
NAINA SCHEME NONNAINA SCHEME
Max. Permissible FSI : 1.70 Max. Permissible fsi- 0.5
OSDC not payable OSDC applicable
40% contribution towardsinfra.
Infra. Land to beacquired under LARR Act
Proposed to given
deemed NA status
NA permission required
>40% voluntary surrenderto be compensated by
giving additional land with
same FSI potential
Land to be acquiredunder LARR Act
-
5/20/2018 Revised NAINA Presentation
34/69
34
9/16/2014
OTHER ASPECTSOF
PILOT PROJECT
-
5/20/2018 Revised NAINA Presentation
35/69
3
5
Capital Expenditure ( for 1000 ha.)
Total cost = Rs. 3234.0 crores*
Cost of City level infrastructure : Rs. 2311/ sqm
-Water Supply, Sewerage, Power, Open Spaces, SocialFacilities Amenities, Metro
Cost of peripheral infrastructure : Rs. 851/ sqm
Local level infrastructure : Rs. 72 /sqm
DEVELOPMENTCOSTCALCULATIONS
Above calculations are as per CSR FY 2013-14.OSDC shall be worked out every
year
-
5/20/2018 Revised NAINA Presentation
36/69
3
6
Recovery of Expenditure
Sale of land under Growth Centre
Dev. charges as per MR&TP Act sec 124B
Collection of Off-site Service Delivery Charges
DEVELOPMENTCOSTCALCULATIONS
LIST OF RESERVATIONS TO BE SHOWN ON DP AT
-
5/20/2018 Revised NAINA Presentation
37/69
3
7
1. School (limited
reservations. Rest to be
obtained through layout
Permission)
2. Degree College
3. General Hospital
4. Primary Health Centre
5. Community Centre
6. Hawkers Market/ Daily
Bazaar
LISTOFRESERVATIONSTOBESHOWNONDP AT
TOWNSHIPLEVEL
1. Police station
2. Fire station
3. Post Office
4. Burial Ground5. Receiving station
6. Sub-station
7. ESR/GSR
8. Pumping Station
9. Sewage Treatment Plant10. Sewage Pumping House
11. Petrol Pump
12. LPG / godown
SOCIAL FACILITIES PUBLIC UTILITIES
Utilities viz. Solid waste disposal sites, etc. to be shown in PhaseII
Norms adopted for Reservations shall be as per Navi Mumbai Std.
-
5/20/2018 Revised NAINA Presentation
38/69
3
8
AMENITIESATLAYOUTLEVEL
Layout Size Optional permissible
upto 20ha School and Community Centre
20 ha. - 90 ha. School, Comm. Centre, Nursing Home
>90 ha. School, Comm. Centre, Nursing Home, College,
Hospital, Hostel
MANDATORY
Balwadi
Crche
Multipurpose Halls
Library
Health Club & Gymnasium
Clinic, Nursing Homes
For Layouts above 10 ha. , min. size of Garden/PG shall not be less than 3000 sqm each
For layouts; 2 ha. To 10 ha.Min. size of open space at each location not less than 2000sqm.
-
5/20/2018 Revised NAINA Presentation
39/69
3
9
DEVELOPMENTOFRESERVATIONS
Reservation such as School, College, Gen Hospital,
Super Specialty Hospital shall have base FSI of 1.0.
Addl. FSI can be granted on payment of addl. LeasePremium to be worked out by CIDCO. ONLY for
participants of 10 ha plus (NAINA Scheme)
FSI of other reservations shall be indicated in the DCRs
-
5/20/2018 Revised NAINA Presentation
40/69
40
9/16/2014
GAOTHANS
-
5/20/2018 Revised NAINA Presentation
41/69
41
For developments in Gaothan following
options onsidered :
Urban Renewal Scheme for Gaothans
similar to one in Navi Mumbai Regulations about height, ground
coverage, access width
DEVELOPMENTOFGAOTHANS
-
5/20/2018 Revised NAINA Presentation
42/69
42
9/16/2014
AREASAROUND
200MOFGAOTHAN
CONGESTEDAREAS
/URBANVILLAGES
-
5/20/2018 Revised NAINA Presentation
43/69
MMR provisions
Permit FSI of 1.00 within and upto 200m of
Gaothans
Height is restricted to 13.50m.
Incentive FSI of 0.2 on land so surrendered free of
cost for main roads, SF, PU, amenities
Standardized DCRs for RP in Maharashtra
10% Open Spaces for plots > 4000sqm
5% amenities for layout >2.0ha. 43
AREASUPTO200MAROUNDGAOTHANS
A 200
-
5/20/2018 Revised NAINA Presentation
44/69
PROPOSAL
Areas @ Gaothans upto 200m earmarked asCongested Areas
Layout plans for congested areas to be prepared
showing proposals for road widening, new
roads, reservations for social facilities & open
spaces
These reservations shall include Hospital,
Dispensary, School, Nhood market, Gardens,
Playgrounds, etc. 44
AREASUPTO200MAROUNDGAOTHANS
-
5/20/2018 Revised NAINA Presentation
45/69
PROPOSAL
FSI permissible is 1.0
Permissible height of 15.0m as against present
provision of 13.5m
Plots abutting on 12m wide existing roads or roads
possible for widening upto 12.0m permitted
heights upto 24.0m subject to fire fighting and
aviation clearances
No relaxations in marginal open spaces or in
parking norms permitted under hardship cases4
5
AREASUPTO200MAROUNDGAOTHANS
-
5/20/2018 Revised NAINA Presentation
46/69
PROPOSAL
Incentive FSI of 1.0 (presently 0.2 FSI) on land so
surrendered free of cost for main roads, PU,
amenities
Authority may acquire these reservations if the
owners not willing to accept incentive FSI, under
LARR, 2013
Lands above 4000m2 shall attract norms of 20%
of BUA for EWS/LIG . Constructed housing stockto be returned to CIDCO at pre-determined rates
(as per MHADA formula)4
6
AREASUPTO200MAROUNDGAOTHANS
AREAS UPTO 200M AROUND GAOTHANS
-
5/20/2018 Revised NAINA Presentation
47/69
PROPOSAL
D.C. as per {Section 124(B)} (equivalent to Rs of
Rs. 500/sqm)
PLUS
Off-site Service Delivery Charges (OSDC) *(Rs.3234/sqm to be paid minus DC received
OSDC shall be charged in phases (25% at CC,
25% at OC and 50% at the time of seekingconnection to infra.)
* - OSDC shall be worked out every year4
7
AREASUPTO200MAROUNDGAOTHANS
AREAS UPTO 200M AROUND GAOTHANS
-
5/20/2018 Revised NAINA Presentation
48/69
HOLDING SIZE AMENITIES OPEN SPACES
For plots upto
4000sqm
- -
4000sqm1ha - 10%
1ha. -2ha 3% 10%
2ha. - 10ha. 5% 10%
>10ha. NAINA scheme shall be applicable
Provision for OS and Amenities
4
8
Layout amenities necessarily to be developed (in a fixed time-
frame) and maintained by the owner
Development of amenities shall be on pro-rata basis and linkedwith O.C.
In case, owner surrenders developed Amenity to the Authority
FSI equivalent to amenity land area plus construction value
based FSI of developed Amenityto be given
Amenities shall include: Balwadi, Creche, Multipurpose Hall,
Library, Primary Health Centre, Health Club & Gymnasium
AREASUPTO200MAROUNDGAOTHANS
-
5/20/2018 Revised NAINA Presentation
49/69
49
9/16/2014
Special Township Proposals
CASESFORINTEGRATION
SPECIAL TOWNSHIP PROPOSALS
-
5/20/2018 Revised NAINA Presentation
50/69
Location Clearance Granted
Surrender of 15% developed land, at one location, above
12m wide road OR Payment of eqvt. OSDC* {(Rs.
2311/sqm (Cost of city level infra.) }minus {D.C. of
Rs.500/sqm.) }
OSDC shall be charged in phases (25% at CC, 25% at OCand 50% at the time of seeking connection to infra.)
D.C. as per {Section 124(B)} (eqvt. to Rs. 500/sqm)
Constructed EWS/LIG hsg. handed over to CIDCO at
predetermined rates
Applicable premiums on optional FSI of 0.3 (in case of
schemes in U1 & U2) payable to CIDCO and not MMRDA
(requires Govt. consent)
Consultation from Jt. Director, Konkan Division, shall NOT
be required
5
0
SPECIALTOWNSHIPPROPOSALS
* - OSDC to be worked out every year
SPECIAL TOWNSHIP PROPOSALS
-
5/20/2018 Revised NAINA Presentation
51/69
5
1
SPECIALTOWNSHIPPROPOSALS
Location Clearance yet to be granted
Surrender of 15% developed land, at one location,selected by the SPA, above 12m wide road
D.C. as per {Section 124(B)} (eqvt. to Rs. 500/sqm)
Constructed EWS/LIG hsg. handed over to CIDCO at
predetermined rates Applicable premiums on optional FSI of 0.3 (in case
of schemes in U1 & U2) payable to CIDCO and not
MMRDA (requires Govt. consent)
Consultation from Jt. Director, Konkan Division, shallNOT be required
* - OSDC to be worked out every year
-
5/20/2018 Revised NAINA Presentation
52/69
52
9/16/2014
Rental Housing Proposals
CASESFORINTEGRATION
-
5/20/2018 Revised NAINA Presentation
53/69
5
3
Dev. Charges as per 124 B (eqvt. Rs.500/sqm) Developer to provide all reqd. infra. within the
scheme
Transfer of amount collected by MMRDA for
improvement of infrastructure to CIDCO
Payment of Off-site Service Delivery Charges*
(OSDC) by the Developer. (OSDC being 2 X {(Rs.
2311/sqm (Cost of city level infra.)}minus {D.C. paid
& amount transferred by MMRDA to CIDCO }
OSDC shall be charged in phases (25% at CC, 25%
at OC and 50% at time of seeking connection to
infra.)
RENTALHOUSINGPROPOSALS
* - OSDC to be worked out every year
-
5/20/2018 Revised NAINA Presentation
54/69
THANKYOU
5
4
-
5/20/2018 Revised NAINA Presentation
55/69
THANE DISTRICT
-
5/20/2018 Revised NAINA Presentation
56/69
PANVELADJ. MIDC AREA
-
5/20/2018 Revised NAINA Presentation
57/69
PANVEL
-
5/20/2018 Revised NAINA Presentation
58/69
URAN ANDPANVEL
-
5/20/2018 Revised NAINA Presentation
59/69
KHALAPUR
-
5/20/2018 Revised NAINA Presentation
60/69
PEN
-
5/20/2018 Revised NAINA Presentation
61/69
KHOPTA
P
-
5/20/2018 Revised NAINA Presentation
62/69
6
2
Calculation of Open Space
Total notified area = 600 sqkm.
Gross area identified for PhaseI = 160.04 sqkm.
Passive recreational spaces = 43.85 sqkm.
(Forest, Hill Slopes ,Water Bodies & Irrigated/Multi-crop lands)
Net Developable Area for PhaseI = 81.72 sqkm.
Active Open Spaces (From D.P.) = 8.17 sqkm.
(10% of net developable area )
Layout Open Spaces = 6.13( 10% of (75% of net developable area in 60/40 model))
% of active OS on net PH-I area = 17.5%
% of active & passive OS on Gross PH-I area = 36.3%
PHASE- I
P
-
5/20/2018 Revised NAINA Presentation
63/69
6
3
Calculation of Amenities
Total notified area = 600 sqkm.
Gross area identified for PhaseI = 160.04 sqkm.
Net Developable Area for PhaseI = 81.72 sqkm.
Amenities (From D.P.) = 4.09 sqkm.(5 % of net developable area )
Amenities = 3.06 sqkm
( 5% of (75 % of net developable area in 60/40 model))
Total amenities = 7.15 sqkm.
% of Amenities on net PH-I area = 8.7%
PHASE- I
-
5/20/2018 Revised NAINA Presentation
64/69
NATURAL PROPENSITY FOR DEVELOPMENT IN NEXT 5-10 YEARS
Current Development Trends within the Area
Surrounding Development Context
Locational advantage in MMR
TRANSPORT CONNECTIVITY
Existing National and State Highways
Proposed Transport Connectivity in MMR
Proposed Transport Connectivity with Potential Planning UnitI
Proposed DFC and BMEC
PROXIMITY TO NAVI MUMBAI
Proximity to Developed Areas in Navi Mumbai
Potential Synergy between NMIA, JNPT and Belapur CBD
Existing Public Transport Corridors
CRITERIAFORIDENTIFICATIONOFPHASE-I
C FO I C O O P S I
-
5/20/2018 Revised NAINA Presentation
65/69
DEVELOPMENT PROVISIONS IN THE REGIONAL PLAN-2011 MMR
Areas marked for U-1 and U-2
Areas marked for G-1 and G-2
Proposed Transport Connectivity
PROTECTED ENVIRONMENTAL AND NATURAL AREAS
Forests, Hills, Water Bodies
CRZ Areas
Gaothans
AVAILABILITY OF DEVELOPABLE LAND
Adequate Developable Land
Contiguity of Developable Land
PROXIMITY TO EXISTING AND FUTURE ECONOMIC NODES IN MMR
NMIA, JNPT, Belapur CBD
CRITERIAFORIDENTIFICATIONOFPHASE-I
LAND AVAILABLE FOR DEVELOPMENT
-
5/20/2018 Revised NAINA Presentation
66/69
66
Zone-1 Zone-2 Zone-3 Zone-4 Zone-5 NAINA KNT Total
Developable Lands
Irrigated Agri. land 0 0 0 145 18 163 0 163
Non - Irrig Agri. Land 785 434 5975 8459 930 16583 4487 21070
Barren Land 1011 148 401 637 0 2197 588 2785
Sub Total 1796 582 6376 9241 948 18943 5075 24018
Non-Developable
Lands
Built-up Land 284 182 875 782 280 2403 581 2984
Creeks 0 5 0 652 657 191 848
Forests 303 807 3129 5525 888 10652 2052 12704
Hill 0 187 818 0 347 1352 0 1352
Industrial 0 55 0 97 0 152 0 152
National
Park/Sanctuary0 0 0 148 0 148 62 210
Quarry 0 26 47 90 153 316 23 339
Village Settlement 21 67 132 235 218 673 59 732
Water Bodies 0 137 83 1373 0 1593 13 1606
Others 0 4956 2135 1417 10863 19370 1238 20608
Sub Total 608 6417 7224 9667 13401 37316 4221 41538
Total 2404 6999 13600 18908 14350 56260 9296 65556
SUMMARY OF LAND AVAILABLE
-
5/20/2018 Revised NAINA Presentation
67/69
67
Z 1 Z 2 Z 3 Z 4 Z 5NAINA
TotalKNT
Zone Area (Ha) 2404 6999 13600 18908 14350 56260 9296
Jurisdiction NAINA KNT
Area Available
for Development(Ha)
1796 582 6376 9241 948 18943 5075
% Area Available
for Development
to the Zone Area
75% 8% 47% 49% 7% 33% 55%
NAINA : 33% of area is developable(18381 Ha)
KNT : 55% of area is developable (5076 Ha)
-
5/20/2018 Revised NAINA Presentation