RESULT-BASED M&E FRAMEWORK FOR THEVIETNAM SEDP 2006-2010
3rd Round Table – Management for Development ResultsHanoi
7 February 2007
Department of National Economic IssuesMINISTRY OF PLANNING AND INVESTMENT
VIETNAM
Vietnam MPI
Process of development Contents Benefits brought about from its
application Challenges
Result-based M&E framework
Vietnam MPI
Process of development
April, 2004 started drafting SEDP 2006 - 2010
June, 2006 the National Assembly approved the SEDP
September 2006 the Government issued the Action Plan for Implementation of SEDP
Vietnam MPI
Process of development
December 2005 started developing the result-based M&E Framework for SEDP ADB, WB and UNDP provided support to
strengthen capacity of Government officials from MPI, line ministries and provinces
Developing the draft framework with inputs from VAMESP to link with ODA monitoring system
Consulting with the line ministries and provinces
Drafting the Decision of MPI Minister to issue the result-based M&E Framework for SEDP
Vietnam MPI
Overall logic of M&E framework
GOAL
PURPOSE
Objective 1Activities/
InputsOutput
Indicators
Outcome/
Impact Indicator
s
Division of work and
assignment for M&E of output and outcome indicators
Vietnam MPI
Economy - accelerate economic growth, increase effectiveness and sustainability of development, bring Vietnam out of under-development
Society - improve physical, cultural and spiritual life of the people
Environment - protect natural resources and environment for sustainable development
Management and execution - strengthen state management and execution, develop coherently and further improve market economy institutions
4 pillars of SEDP
Vietnam MPI
Structure of M&E framework
Goal &Purpose
Activity/Input
IndicatorsAgencies responsible
for M&E
Output Results/Impact Output Outcome/Impact
2.5.1. Reduce poverty and inequality
% PIP budget for targeted hunger eradication and poverty reduction programs (HEPR and Program 135/ SEDEMA)
% PIP budget allocated to poor provinces
Proportion of poor communes being supported with basic infrastructures for 2006-2010
Proportion of communes accessible by cars to commune centers
Proportion of rural population having clean drinking water - by ethnicity and quintile
Proportion of communes/ households accepted as having no poverty
Poverty rate by 2010: (Target is >11%)
Average income of the poor
Income gap between regions and quintile groups
Gini index (inequality index)
Expenditure index between the highest income quintile group and lowest income quintile group
MOF, CEM, MPI, MARD, PPCs
MARD, MOLISA, GSO
Vietnam MPI
Benefits of framework application
Policy – timely response to emerging trends informed by monitoring results and periodic evaluations
Process – clear division of work and responsibilities between ministries, sectors and provinces for monitoring and evaluation tasks
Information – transparent reporting of progress on public investment to meet SEDP targets for citizens and the National Assembly
Vietnam MPI
Challenges MfDR is a new concept in Vietnam. Like
other countries, Vietnam can inherit only a few experiences from advanced countries and as such has to apply “learning by doing” approach and takes lessons learnt for further improvement
Lack of institutions and guidance on result-based M&E in systematic manner
Weakness in data provision and collection
Vietnam MPI
Challenges
The requirement for adjustment of organization, functions and responsibilities of agencies at different level
Proficiency and capacity of government staff
Constraints of resources: most of outcome and impact indicators must be evaluated through surveys in large scale and very costly
Thank you for your attention