Relocation and shielding activities Status and roadmap
description
Transcript of Relocation and shielding activities Status and roadmap
Relocation and shielding activitiesStatus and roadmap
R2E project meeting, 7th April 2011A. L. Perrot
R2E shielding activities
Integration- all shielding walls = integrated; agreed by LHC integration team- official approval process to be launched through ICLDeadlines:Points 8: 13 AprilPoint 1: 20 AprilPoint 5: 4 May- simplified models still needed afterwards for implementation in CATIA models
Ordersall blocks are now ordered- Point 1 RBs special shape ‘frites’: 18th/19th April technical reception in Austria of the first 2 blocks by M. Lazzaroni and C. Saint Jal -pre-series of blocks 4x4 x2, 6x3x3: check by June in Bulgary by M. Lazzaroni and C. Saint Jal
LogisticsCleaning and painting of the ‘old’ blocks = finished yesterdayStorage place: blg 157 implementation storage area under progress
1
R2E shielding activitiesplanning
Blocks deliveryall @ CERN in November 2011- 4x4x2 & 6x3x3 : all delivered @cern in November 2011;- ‘frites’: all delivered @cern in June 2011- bricks: order sent yesterday - all delivered @cern end of June 2011
2011-2012 Xmas activities goals- Point 1:UJs & RBs,- be ready for Point US85
Courtesy M. Lazzaroni
LHC tunnel
IP1
Courtesy A. Tursun, J.- M. Bianco, F. Delsaux
US85
2
UJ17/16 - RB 16UJ13/14 - RB 14
R2E relocation activitiesIntegration studies- Point 8: finished- Point 5: see the end of the tunnel; finished by the end of April- Point 1: new proposal under check; need to know the exact position of the area
to empty -> CE input.- Point 7: need the ‘Safe room’ study conclusions to go ahead
Approval through ICL- deadlines- Point 8: 20th April;- Point 5: 4th May;- Point 1: 8th June;- Point 7: ?
2011-2012 Xmas shutdown goalsanticipate possible relocations – list of activities by Junemark on floor all the future equipment locations;- Point 8: valves positionners(t.b.c), cooling cabinet in UJ87-> UA87;- Point 1: fire detectors; - Point 5: survey GGPSO installation in by-pass 3
TODAY
UJ16
UL16Courtesy A. Tursun, Y. Muttoni
R2E relocation study in Point 1
A. L. Perrot, 2nd March 2011
Point 1- Relocation
4
“LHC Performance Workshop”, 25 January 2011, A. L. Perrot
2 Power Converters
RYCA 01RYCA 02
RYMCB 01-04
RYLB 01
RYLC 01
DYPG 02
DYPG 01CYCIP 01
QYC 02QYC 01
(additional rack)
TYCFL 01
DYXA 01
Fire detectors
Situation in UL14/16 after relocation(present study)
area to be reconsidered
additional rack
RYSC 01
Courtesy A. Tursun, Y. Muttoni
2 Power Converters
RYCA 01RYCA 02RYMCB 01-04
RYLB 01
RYLC 01
DYPG 02
DYPG 01CYCIP 01
QYC 02QYC 01
(additional rack)
TYCFL 01 to be relocated in US15 level 2 close to TYCCR01 rackDYXA 01Fire detectors
Situation in UL14/16 after relocation(new proposal)
area to be reconsidered
RYSC 01
A
B
C
distance A-B= 18.5mdistance A-C= 25m