Red Wing West Fire Station & Training Facility Prepared by Flaherty & Hood, P.A. for the City of Red Wing, 2/18/13 Request Details $2.6 million for pre-design, final design and construction City has purchased 2.6 acres of land for project for $357,000 City will provide $2.6 million match Design elements will incorporate sustainable and LEED practices Training Facility Will Benefit Regional Fire Departments City and surrounding firefighting organizations lack adequate operational training facilities Site will reduce travel costs and time commitments for local departments New Facility Could Spur Economic Development and Decrease Costs Meeting ISO 5 mile standard will make the Western Gateway Industrial Park, River Bluffs Development Park and Energy Business Park more attractive to investors Will likely attract participants from Wisconsin who will spend money on food, fuel and more. Economic benefit for the region and sales tax benefit for state! Red Wing Needs a Second Fire Facility 2008 study by Emergency Services Consulting, Inc. concluded a second station was needed to meet current and projected service demand Similarly-sized communities typically have two fire stations Western Service Region is expansive: Commercial, industrial, and residential portions of Red Wing Prairie Island Tribal Community Prairie Island Nuclear Generating Station USACE Lock & Dam Number 3 Adjoining Townships Much of the region that will be served is currentlylocated outside the 5 mile ISO standard for emergency services Cut fire and EMS response time to Xcel’s Prairie Island Nuclear Facility and Treasure Island Resort and Casino by at least 50%

Transcript of Red Wing West Fire Station & Training Facility

Page 1: Red Wing West Fire Station & Training Facility

Red Wing West Fire Station & Training Facility

Prepared by Flaherty & Hood, P.A. for the City of Red Wing, 2/18/13

Request Details

$2.6 million for pre-design, final design • and constructionCity has purchased 2.6 acres of land for • project for $357,000City will provide $2.6 million match• Design elements will incorporate • sustainable and LEED practices

Training Facility Will Benefit Regional Fire Departments

City and surrounding firefighting • organizations lack adequate operational training facilitiesSite will reduce travel costs and time • commitments for local departments

New Facility Could Spur Economic Development and Decrease Costs

Meeting ISO 5 mile standard will make • the Western Gateway Industrial Park, River Bluffs Development Park and Energy Business Park more attractive to investorsWill likely attract participants from • Wisconsin who will spend money on food, fuel and more. Economic benefit for the region and sales tax benefit for state!

Red Wing Needs a Second Fire Facility

2008 study by Emergency Services • Consulting, Inc. concluded a second station was needed to meet current and projected service demandSimilarly-sized communities typically • have two fire stations Western Service Region is expansive: •

Commercial, industrial, and ◊ residential portions of Red Wing

Prairie Island Tribal Community◊ Prairie Island Nuclear Generating Station ◊ USACE Lock & Dam Number 3◊ Adjoining Townships◊

Much of the region that will be served • is currentlylocated outside the 5 mile ISO standard for emergency servicesCut fire and EMS response time to • Xcel’s Prairie Island Nuclear Facility and Treasure Island Resort and Casino by at least 50%