RBS 6102 - Configuration

34
S444 configuration: We have only 1 DUG and 3 RUS that are installed in the cabinet, they should be configured with the local OMT as shown in the below figures:

description

DATA SHEET

Transcript of RBS 6102 - Configuration

Page 1: RBS 6102 - Configuration

S444 configuration:

We have only 1 DUG and 3 RUS that are installed in the cabinet, they should be configured with

the local OMT as shown in the below figures:

Page 2: RBS 6102 - Configuration
Page 3: RBS 6102 - Configuration
Page 4: RBS 6102 - Configuration

And the cabinet should look at the end defined as below:

Page 5: RBS 6102 - Configuration

E1 connection in the DUG:

As shown in the figure below we have 2 ports for E1 connection, ETA and ETB, so the 1st E1 should be

connected to ETA and the 2nd E1 should be connected to ETB.

Page 6: RBS 6102 - Configuration

Please make sure to tell the BSC to define port A and port C as the E1 input.

Each E1 should be connected to one OVP, so the connection will be as follow:

1st E1 should be connected to first OVP on the left and from that OVP we have an RG45

connected to port ETA in the DUG.

2nd E1 should be connected to the second OVP and another RG45 should be connected between

the mentioned OVP and the port ETB in the DUG.

Node Parameters:

The node parameters should be like the below figure:

Page 7: RBS 6102 - Configuration

And the TEI value should be all the time for the first DUG 62 as showing the below figure

Page 8: RBS 6102 - Configuration

S666 Configuration:

In the mentioned configuration we should have 2 DUG and 6 RUS installed is the cabinet, , they should

be configured with the local OMT as shown in the below figures:

1. For the first DUG:

Page 9: RBS 6102 - Configuration
Page 10: RBS 6102 - Configuration
Page 11: RBS 6102 - Configuration

And the TEI value should be all the time for the first DUG 62 as showing the below figure

Node Parameters:

Page 12: RBS 6102 - Configuration
Page 13: RBS 6102 - Configuration

And the cabinet should look at the end defined

as below:

2. For the second DUG:

Page 14: RBS 6102 - Configuration
Page 15: RBS 6102 - Configuration
Page 16: RBS 6102 - Configuration

Node Parameters:

Page 17: RBS 6102 - Configuration

And the TEI value should be all the time for the second DUG 61 as showing the below figure

It is important to define the delay in the second DUG 4600 as shown in the figure below:

Page 18: RBS 6102 - Configuration

And the cabinet should look at the end defined as below:

E1 connection in the DUG:

As shown in the figure below we have 2 ports for E1 connection, ETA and ETB, so the 1st E1 should be

connected to ETA in the first DUG and the 2nd E1 should be connected to ETA in the second DUG.

Page 19: RBS 6102 - Configuration

Please make sure to tell the BSC to define port A in both DUGs as the E1 input.

Each E1 should be connected to one OVP, so the connection will be as follow:

1st E1 should be connected to first OVP on the left and from that OVP we have an RG45

connected to port ETA in the first DUG.

2nd E1 should be connected to the second OVP and another RG45 should be connected between

the mentioned OVP and the port ETA in the second DUG.

Page 20: RBS 6102 - Configuration

S888 Configuration:

In the mentioned configuration we should have 2 DUG and 6 RUS installed is the cabinet, they should be

configured with the local OMT as shown in the below figures:

1 for the first DGU:

Page 21: RBS 6102 - Configuration
Page 22: RBS 6102 - Configuration
Page 23: RBS 6102 - Configuration

Node Parameters:

Page 24: RBS 6102 - Configuration

And the TEI value should be all the time for the first DUG 62 as showing the below figure

And the cabinet should look at the end defined as below:

Page 25: RBS 6102 - Configuration

Transmission configuration:

Page 26: RBS 6102 - Configuration

2 for the second DUG:

Page 27: RBS 6102 - Configuration
Page 28: RBS 6102 - Configuration
Page 29: RBS 6102 - Configuration

Node Parameters:

Page 30: RBS 6102 - Configuration
Page 31: RBS 6102 - Configuration

And the TEI value should be all the time for the second DUG 61 as showing the below figure

It is important to define the delay in the second DUG 4600 as shown in the figure below:

Page 32: RBS 6102 - Configuration

And the cabinet should look at the end defined as below:

Page 33: RBS 6102 - Configuration

E1 connection in the DUG:

As shown in the figure below we have 2 ports for E1 connection, ETA and ETB, so the 1st E1 should be

connected to ETA in the first DUG and the 2nd E1 should be connected to ETA in the second DUG and the

third E1 should be connected to the port ETB in the first DUG.

Page 34: RBS 6102 - Configuration

Please make sure to tell the BSC to define port A in both DUGs and port C in the first DUG as the E1

input.

Each E1 should be connected to one OVP, so the connection will be as follow:

1st E1 should be connected to first OVP on the left and from that OVP we have an RG45

connected to port ETA in the first DUG.

2nd E1 should be connected to the second OVP and another RG45 should be connected between

the mentioned OVP and the port ETA in the second DUG.

3rd E1 should be connected to the third OVP and another RG45 should be connected between

the mentioned OVP and the port ETB in the first DUG.