    Quality Control/Quality Assurance InConstruction

  • 8/3/2019 QA and Q C - 04.06.09

    3/30

    3rd PQA UIDSSMT Agencies

    Selected through Tendering Process.

    Agencies appointed

    M/s NCPE Hyderabad

    Aarvee Associates.

    M/s DHV Consultants.

  • 8/3/2019 QA and Q C - 04.06.09

    4/30

    APPROVALS

    G.O 487 MA dated23.10.2003 ---CCF

    G.O.Rt No.512 dated1.4.08---- UIDSSMT

    G.O.Rt. No.639 dated 25.4.09- UIDSSMT.

  • 8/3/2019 QA and Q C - 04.06.09

    5/30

    Quality Control wings

    Departmental QC

    one division for two circles.

    Conducting the specified tests in

    accordance with the sampling criteriaat all stages of process to ensure therequired quality parameters.

  • 8/3/2019 QA and Q C - 04.06.09

    6/30

    Quality Assurance (QA)

    Managerial methods designed to plan,monitor and control to assure the Qualityof all the processes such that the end

    product satisfies the desired properties.

    carry out random tests duringpreconstruction, construction and postconstruction stages.

  • 8/3/2019 QA and Q C - 04.06.09

    7/30

    Quality Assurance (QA)

    Eliminates poor services and inducesgreater professionalism in the process,instills public confidence and acceptance.

    Avoids inefficiency and litigation.

    Eliminates the interferiences.

  • 8/3/2019 QA and Q C - 04.06.09

    8/30

    Quality Managementbenifits

    Quality of the design process

    Quality of the construction process

    Quality of the products

    Quality of maintenance.

  • 8/3/2019 QA and Q C - 04.06.09

    9/30

    Frequency of Reporting

    QA Reports to

    1.Executive Engineer.

    2.Supertending Engineer. 3.SLNA.

    At Twice in a month Satisfactory.

    Immediate reporting Adverse reports. Action taken reports monitored by SLNA

  • 8/3/2019 QA and Q C - 04.06.09

    10/30

    Quality Standards -Roads

    IRC: 58 Guidelines for the Design of Plain JointedRigid Pavements for Highways

    IRC 15:2002 Code of practice for construction ofrigid pavements

    IRC SP: 62 Guidelines for the Design andConstruction of CC Pavements for Rural Roads

  • 8/3/2019 QA and Q C - 04.06.09

    11/30

    Frequency of sampling- Concrete

    Test results shall comply with IS: 456-2000

    1-5 cum 1 sample 6-15 cum 2 samples 16-30 cum 3 samples 31-50 cum 4 samples 51 and above 4 +1 addl. sample for addl. 50 m3 or part

    At least one sample shall be taken from each shift

    Core tests to be conducted as per IS: 456 for the purpose of detailedinformation.

  • 8/3/2019 QA and Q C - 04.06.09

    12/30

    Sampling -continue

    SWG..I S 651-2007

    PSCI S 784.2001

    BWRC I S 15155-2002 PVC.I S 4985-2000

    GRP.I S 12709-1994

    Di..I S 8329-2000 HDPEI S4984-1995

  • 8/3/2019 QA and Q C - 04.06.09

    13/30

    Tests-Building Materials

    Bricks---- IS 1077-1992.

    Cement bricks..IS 2185-1979.

    Aggregates---------I S 2386- Part 1to7

  • 8/3/2019 QA and Q C - 04.06.09

    14/30

  • 8/3/2019 QA and Q C - 04.06.09

    15/30

    Test Frequency

    (i) Aggregate Impact Value 1 test per 250 cum or per day

    (ii) Grading of aggregate andscreenings

    2 tests per 250 cum or per day

    (iii) Flakiness Index 1 test per 250 cum or per day

    (iv) Atterberg limits of bindingmaterial, if required

    1 test per 50 cum or per day

    (v) Water absorption 1 test per source (threerepresentative specimens foreach source)

    (vi) Thickness Regularly

    Quality Control Tests

  • 8/3/2019 QA and Q C - 04.06.09

    16/30

    Test Frequency

    (i) Quality of Binder 1 test per lot of 10 tonnes

    (ii) Aggregate Impact Value (or LosAngeles Abrasion Value)

    1 test per 250 cum

    (iii) Flakiness and Elongation Index 1 test per 250 cum or per day

    (iv) Stripping value 1 test per source (three representativespecimens for each source)

    (v) Water absorption 1 test per source (three representativespecimens for each source)

    (vi) Grading 1 test per 100 cum or per day

    (vii) Soundess (Magnesium and SodiumSulphate)

    1 test per source

    (viii) Temperature of binder atapplication

    Regular close intervals

    (ix) Rate of spread of materials (binder

    and stone chips)

    1 test per 1000 sq m or per day

    Quality Control Tests and their frequency

  • 8/3/2019 QA and Q C - 04.06.09

    17/30

    Test Frequency(i) Quality of Binder 1 test per lot of 10 tonnes

    (ii) Aggregate Impact Value (or LosAngeles Abrasion Value)

    1 test per 250 cum or per day

    (iii) Flakiness and Elongation Index 1 test per 250 cum

    (iv) Stripping value 1 test per source (three representativespecimens for each source)

    (v) Water absorption 1 test per source (three representativespecimens for each source)

    (vi) Grading 1 test per 100 cum or per day

    (vii) Soundess (Magnesium and SodiumSulphate)

    1 test per source

    (viii) Temperature of binder at application Regular close intervals

    (ix) Binder content 2 tests per day

    (x) Thickness of BM Layer Regularly

    (xi) Density of compacted layer 1 test per 1000 sq.m. area or per day

    Quality Control Tests and their frequency

  • 8/3/2019 QA and Q C - 04.06.09

    18/30

    Frequency of visits-concrete

    Based on the type and importance of thework.

    1 No---materialpre construction

    1no- Reinforcement for each component

    1no-For concreting of each component.

    1no- Columns at each staging. 2nospost construction.

  • 8/3/2019 QA and Q C - 04.06.09

    19/30

    Frequency of visits-pipelines

    Material testing ------Factory

    Laying &Joiting.

    1no---- 1km upto 200 mm dia 1no----.50Km upto 500 mm dia

    1no----.25 Km beyond 500mm dia.

    Hydraulic test; 1no on Average 5 kms

  • 8/3/2019 QA and Q C - 04.06.09

    20/30

    Testing - Cores

    In case of doubt regarding thecomp.strength tests on cores

    and/or load test shall be carried

    out. Core tests: the ave. equivalent cube

    strength of the cores is equal to at least

    85% of the cube strength of the grade ofconcrete specified for the correspondingage and no individual core has strengthless than 75%

    t it i

  • 8/3/2019 QA and Q C - 04.06.09

    21/30

    cceptance criteria-Roads

    The Test results of the sample variation is morethan + 15% of the average,the test results of thesample are invalid.

    The mean strength results complies with the

    appropriate limits in col.2 of table 11 of IS:456-2000

    Any individual test result complies with theappropriate limits in col.3 of Table 11 of IS:456-

    2000

  • 8/3/2019 QA and Q C - 04.06.09

    22/30

    Payment in case of deficiency in

    thickness CC roads

    Up to 5mm

    6-10mm

    11-15mm

    More than 15mm

    100% of rate

    87% of rate

    81% of rate

    Rejection

    A days work is considered for

    thickness.

    If average deficiency is morethan 15mm identified by cores,such slabs shall be Removed bycontractor.

    Penalties can belevied as per

    agreementconditions fordefective works

  • 8/3/2019 QA and Q C - 04.06.09

    23/30

    Acceptance/Recovery-CC slab

    Mastic pads not used/defective material used- Deductionof twice/equal to cost of mastic pads .

    Joint sealing not done.Deduction of twice/equal to cost ofjoint sealant.

    Failure of CC cubes- payment based on core tests at thecost of contractor @2 cores/150cum of

    Progressive surface damage-Withholding payment untildefects liability period.

  • 8/3/2019 QA and Q C - 04.06.09

    24/30

    Recovery criteria-CC pavements

    Metal exposed- Affected area of CC road tobe rejected

    Water stagnation- Payment to be made after

    rectification.

    Improper curing- deduction of cost of

    pavement for the affected area and paymentbased on core tests at the cost of contractor.

  • 8/3/2019 QA and Q C - 04.06.09

    25/30

    Acceptance criteria-CC (1:4:8)

    Deficient thickness up to 10% of ave. -Proportionate recovery of affected area

    Deficient thickness above 10%-Proportionate

    recovery of twice the cost of affected area

    Improper curing- Deduction of twice the curingcharges and payment based on core tests at the

    cost of contractor.

    Improper compaction-Payment based on cube tests

  • 8/3/2019 QA and Q C - 04.06.09

    26/30

    Acceptance criteria-CC lean concrete

    Oversize metal upto 10%- No recovery

    Oversize metal 10% to 20%- recovery at25% of difference in basic rate of metal andnext higher size metal

    Oversize above 20%- Rejection

  • 8/3/2019 QA and Q C - 04.06.09

    27/30

    Acceptance criteria-WBM roads

    Verify for over size

    Verify density of metal in an area of 0.50 m x0.50 m for each layer

    In respect of thickness and less quantity ingravel and WBM layers, a maximum tolerance of20% may be allowed

    In respect of recoveries upto 10%, estimate cost

    is to be recovered From 11 to 20%, 1 times estimate cost is to

    be recovered

  • 8/3/2019 QA and Q C - 04.06.09

    28/30

    Acceptance criteria-WBM roads-Contd.

    Over size metal upto 10% - no reecovery

    Over size metal 10%to20% - recovery at 25% ofdifference in basic cost of metal and the next

    higher size metal Over size of metal between 30% to 40% - Rate

    of next higher size metal shall be allowed

    Over size metal above 40% - Rejection of metal

  • 8/3/2019 QA and Q C - 04.06.09

    29/30

    Acceptance criteria-Bituminous layers

    A maximum of 10% variation may be allowed inrespect of less thickness and less quantity

    Deficient thickness upto 10%-Estimate cost is to berecovered

    Deficient thickness above 10%- Rejection of thelayer

    Bitumen content deficient upto 0.30%by weight ofthe total mix- Recovery of cost of bitumen for

    reduced quantity Bitumen content deficient by more than 0.30%-

    Rejection of the work.