My warmest felicitations to the people of Davao del Norte! Our Provincial Road Network Development Plan (PRNDP) is finally complete. We are
now ready to embark on another journey towards the establishment of our own Provincial Road Management Facility (PRMF) that shall open windows of opportunities for us to rev up good governance and fast track sustainable development. The formulation of our PRNDP went through a difficult process. As in our Provincial Road Network Development Strategy (PRNDS), this five-year Plan is also refined by fire after undergoing series of brainstorming activities and painstaking reviews. I commend the productive participation of various stakeholders coming from key government agencies, business sector and civil society in the completion of our PRNDP. I also commend the technical working group for taking the extra mile to put the Plan together, while keeping up with your respective official duties. Our PRNDP is designed to complement our six-point development agenda called P.E.O.P.L.E. As our P.E.O.P.L.E. continues to accelerate growth and reforms to achieve high quality of life, I expect this Plan would contribute significantly to the attainment of that vision especially in areas where our identified core road networks pass through.
I thank the Government of Australia through the Australian Agency for International Development (AusAID) for making Davao del Norte one among the only ten provinces in the country to benefit the program. Again, I have high hopes that PRMF would not only be a testament to the success of our P.E.O.P.L.E.’s public-private partnership thrust. It shall also be an effective catalyst for the continued growth of Davao del Norte along tuwid na daan.
Mabuhay!
RODOLFO P. DEL ROSARIO Governor
Provincial Road Network Development Plan, 2014-2018 Page ii
Message
The Provincial Road Network Development Plan speaks so much of how our
concerted efforts will help improve the living condition of the people. Providing our people
with the best road services will definitely expedite development. This will not only afford a
trouble-free transport of people and goods and easy access to public facilities but also
promotes healthy exchange of culture among tourists and local people. Furthermore, it
speeds up the growth of small, medium and large enterprises as major services can be
delivered with ease.
Through the PRNDP, we can delineate our plans and priorities thus maximizing
development outcomes while minimizing cost and controlling possible deviations. Through
this, we can have a complete picture of sustainability.
The Provincial Government of Davao Del Norte will never cease to give the best for the
Dabaonons because you also never stop in believing that we can achieve our goal to have an
improved life for all if we work hand in hand. Our solidarity has gained the trust of
stakeholders to transform our plans into strategic actions. We are also thankful of that trust
and we promise our sincere dedication and commitment to provide what the good people
of this province deserve.
Provincial Road Network Development Plan, 2014-2018 Page iii
Acknowledgment The Provincial Road Network Development Plan (PRNDP), 2014-2018 was formulated out of several consultations, feedbacking and review and enhancement sessions involving the participation of various stakeholders, NGOs and CSOs, at different levels of governance. The draft took a series of reviews and revisions before it was finally approved by the Provincial Development Council. The following organizations, agencies, departments of the provincial and city/municipal government units are acknowledged and recognized for their valuable contribution in the formulation of the PRNDP, viz:
The Provincial Development Council (PDC), for the review, approval and adoption of the plan;
The AusAID-PRMF thru the Provincial Coordinator, Ms. Gemma C. Borreros for financing and
facilitating the capacity development activities and the series of workshops, consultations and writeshops towards the formulation of the document;
The Urban Rural Consulting Services (URCS) and the National Center for Transportation Studies (NCTS) of the University of the Philippines for providing technical inputs/assistance thus enabling the PRNDP-TWG to formulate the first draft plan;
The Provincial/city/municipal partners particularly the offices of the Planning and Development and Engineering for the valuable inputs and data provided during the consultation and data generation processes;
The National Government Agencies who stood as active partners in the formulation of plan targets and strategies;
The Private Sector, CSOs, NGOs and the Academe who provided the private sector perspectives of the plan particularly in the road safety component and the prioritization and ranking of the Core Roads; and
The PRNDP-TWG members headed by Engr. Josie Jean R. Rabanoz and Engr. Raul G. Mabanglo, who did the analysis and write-ups and ensured that the Plan reaches its completion.
Provincial Road Network Development Plan, 2014-2018 Page iv
EXCERPTS FROM THE MINUTES OF THE PROVINCIAL DEVELOPMENT COUNCIL MEETING HELD OCTOBER 23, 2013 AT THE BULWAGAN NG LALAWIGAN, CAPITOL COMPOUND,
MANKILAM, TAGUM CITY
PRESENT : Hon. Rodolfo P. del Rosario - Provincial Governor (Presiding) Hon. Victorio R. Suaybaguio, Jr. - Vice Governor/ PDC Vice-Chair Hon. Antonio Rafael G. del Rosario - Congressman, 1st District, Rep. by Mr. Cesar A. Granada Hon. Antonio F. Lagdameo,Jr. - Congressman, Dist. II, Rep. by Mr. Ronie
Giovanni Israel, Political Officer Hon. Alfredo R. Pagdilao - SP Member /Pres. Fed. Of the Asso. Of Brgy. Capt.
Rep. by Mr. Cloyd A. Manceras,SAA III Hon. Joseph Nilo F. Parreñas - Municipal Mayor, Asuncion Hon. Lolita A. Moral - Municipal Mayor, BE Dujali Hon. Edgardo L. Timbol - Municipal Mayor, Kapalong Hon. Nestor L.Alcoran - Municipal Mayor, New Corella, Rep. by Mr. Alex Marino
Paña, Admin. Officer Hon. Marcelino A. Perandos - Municipal Mayor, Carmen, Rep. Mr. Alfredo Uy Hon. Aniano P. Antalan - City Mayor, IGaCoS, Rep. by Ms. Bernardita C. Bunhayag, Planning Officer III Mr. Arnel H. Sitoy - Municipal Mayor, San Isidro, Rep. by Ms. Maria Fe
M. Oniasa, Data Controller Hon. Allan L.Rellon - City Mayor,Tagum City, Rep. by Mr. William B. Cuyacot,
Executive Assistant Mr. Urbano B. Budtan, CESO IV - Provincial Director, Technical Education Skills Dev’t Authority (TESDA) Mr. Orly T. Cariazo - OIC, PENR Officer, Dept. of Environment and Natural Resources (DENR), Rep. by Ms. Maritess D. Jocson,
Planning Officer Engr. Edwin O. Banquerigo - Provincial Director, Dept. of Trade and Industry,
(DTI) Rep. by Atty. Zerline T. Balleque, Atty. III/Acting Chief CWER Division
Mr. Alex C. Roldan - Provincial Director, Dept. of Interior and Local Government (DILG) Engr. Lorna T. Ricardo - District Engineer, Dept. of Public Works and Highways (DPWH) Ms. Josephine Fadul,Ed.D. - OIC, Schs, Div. Superintendent, Department of Educ.,
Provincial Road Network Development Plan, 2014-2018 Page v
Ms. Milagros V. Guttierez - Prov’l Manager, Dept. of Labor and Employment (DOLE) Rep. by Ms. Derma Fe Obiso, Sr. Employment Officer Engr. Rogelio B. Corcino - Prov’l Science & Tech. Officer, Dept. of Science and
Technology (DOST) Ms. Jocelyn C. Seno - Prov’l Agrarian Reform Officer, Dept. of Agrarian Reform
(DAR) Rep. by Carmelita A. Quindad , AO IV Ms. Luz T. Pereyras - President, Girl Scout of the Phils., Davao del Norte Chapter Rep. by Ms. Marilou Damiles Mr. Cristito M. Calig-onan - Chief Executive Officer, Tribal Educ. On Ecological System (TREES) Rep. by Mr. Danilo A. Quidato Mr. Pedro B. San Jose - President, Tagum Friends of the Home Foundation, Inc. Mr. Saturnino D. Simbajon - President, Davao del Norte (Dist. I&II)
Federation of Irrigator’s Association (DDNFIA), Inc. Mr. Perecto P. Urdaneta - Managing Director, Davao Provinces Rural
Dev’t. Institute Inc. Engr. Arlene Adlawan King - Secretary, Phil..Institute of Civil Engineers (PICE) North Davao Chapter ABSENT: Hon. Janet G. Gavina - SP Member/ Chairman of the Committee on
Budget, Finance and Appropriation Hon. Jose L.Silvosa - Mayor, City of Panabo Hon. Benigno Andamon - Mayor, Sto. Tomas Hon. Basilio A. Libayao - Mayor, Talaingod Ms. Marilyn L. Enriquez - OIC Prov’l Officer, Nat’l Commission on
Indigenous People (NCIP) Dr. Maribeth Juarez - President, Rotary Club of Tagum L.A.C.E.S. Ms. Araceli Ayuste - President, Provincial Tourism Council Engr. Dexter Coquilla - President, Kiwanis Club of Tagum, Inc. Ms. Nenita R. Malbas - President, Tagum City Chamber of Commerce &
Industry, Inc. Ms. Maricar M. Momo - President, Phil. Institute of Certified Public Accountants Mr. Epifanio Loyola - President, Prov’l Agriculture & Fisheries Council OTHERS PRESENT: Ms. Regina C. Ricafort - PG Dept. Head, PTO Engr. Raul G. Mabanglo - PG Dept. Head, PEO Ms. Arlene M. Semblante - PG Dept. Head, PSWDO Dr. Agapito B. Hornido - PG Dept. Head, PHO Mr. Samson Sanchez - PG Dept. Head, PGSO Dr. Renato R. Embate - PG Dept. Head, PVO Ms. Brigida Q. Cudal - OIC, PG Dept. Head, PENRO-LGU Dr. Anastacia G. Notarte - OIC, PG Dept. Head, PAGRO,
Rep by Jeannie P. Celo, CDS II Ms. Gemma C. Borreros - PC- PRMF Ms. Editha G.Montilde - Engr.III, DPWH Mr. Nelson F. Plata - Planning Officer IV. PPDO Ms. Araceli N. Cajes - Planning Officer III, PPDO Ms. Ma. Hazel C. Zafra - Planning Officer II, PPDO Ms. Mary Jean T. Hermo - Planning Officer II, PPDO
Provincial Road Network Development Plan, 2014-2018 Page vi
PDC RESOLUTION NO. 06, SERIES OF 2013 A RESOLUTION APPROVING AND ENDORSING THE THREE (3) STRATEGIC PLANS OF DAVAO DEL NORTE, NAMELY, STRATEGIC FINANACIAL MANAGEMENT PLAN (SFMP), PROVINCIAL ROAD NETWORK DEVELOPMENT PLAN (PRNDP), AND INFORMATION SYSTEM STRATEGIC PLAN (ISSP) TO THE SANGGUNIANG PANLALAWIGAN FOR THEIR CONSIDERATION AND APPROPRIATE ACTION WHEREAS, the Province of Davao del Norte is one of the partner provinces of the Provincial Road Management Facility (PRMF) an AusAid funded five-year governance and institutional reform program that focuses on road rehabilitation and maintenance as an entry point for provincial government reform activities; WHEREAS, PRMF and the provincial government of Davao del Norte collaborated to be able to come up with strategic plans to introduce and achieve reforms on a) sustainable road management, b) transparent and accountable budget and expenditure management, c) functioning internal control system and internal audit, d) transparent procurement process, and e) human resource development and capability development; WHEREAS, the province has prepared and formulated three (3) strategic plans namely, 1) Strategic Financial Management Plan (SFMP), that shows the direction of the provincial government in terms of the generation and utilization of its financial resources for the next five year period; 2) Provincial Road Network Development Plan (PRNDP), which provides a framework for sustainable road development and management; 3) Information System Strategic Plan (ISSP) that shall serve as a guiding tool in setting the goals and objectives of the province in so far as the management of information technology is concerned; WHEREAS, after the plan presentation the Council finds that the plan is anchored on the objectives and strategic direction of the province as well as the goals and objectives of PRMF to increase local economic activity and improve public access to infrastructure and services for the betterment of the constituents of Davao del Norte; WHEREFORE, upon the motion of Mr. Perfecto P. Urdaneta, Managing Director of Davao Provinces Rural Development Institute, Inc. (DPRDII) and unanimously seconded, be it RESOLVED, as it is hereby resolved to approve and endorse the three (3) strategic plans of Davao del Norte to the Sangguniang Panlalawigan for their consideration and appropriate action namely: 1. Strategic Financial Management Plan (SFMP) 2. Provincial Road Network Development Plan (PRNDP) 3. Information System Strategic Plan (ISSP) RESOLVED FURTHER, that copies of this resolution be furnished to the members of the Sangguniang Panlalawigan for their consideration and appropriate action and to the Local Finance Committee for their information and guidance.
Provincial Road Network Development Plan, 2014-2018 Page vii
CARRIED UNANIMOUSLY. I HEREBY CERTIFY to the correctness of the above-quoted resolution. JOSIE JEAN R. RABANOZ, CE MPA PG Department Head PDC Secretary Approved: RODOLFO P. DEL ROSARIO Governor PDC Chairman
Provincial Road Network Development Plan, 2014-2018 Page viii
TABLE OF CONTENTS
Chapter No. Title Page No.
Message of the Governor i
Message of the Vice Governor ii
Acknowledgment iii
PDC Resolution No. __, series of 2013 vii
List of Tables x
List of Figures xi
List of Acronyms xii
Executive Summary xiv
1 Introduction 1
1.1 Context and Rationale 1
1.2 PRNDP Formulation Process 2
1.3 Planning Framework 2
1.4 Scope of the PRNDP 3
1.5 Limitations and Assumptions 3
2 Provincial Development Directions 5
2.1 Long-term vision 5
2.2 Current Administration’s Development Thrusts 5
2.3 Infrastructure as a Resource under the 5
P.E.O.P.L.E Agenda
2.4 Growth Center Development Strategy 6
3 Assessment of the Provincial Road Network 9
3.1 Location and political subdivision 9
3.2 Population and settlements 10
3.3 Physical Resources 11
3.4 Economic Sector 17
3.5 Social Services 18
3.6 Existing land Use 20
3.7 External Linkages 24
3.8 Internal Circulation 25
3.9 Road Systems 28
3.10 Road Density 30
3.11 Provincial Roads Condition 31
3.12 Traffic Characteristics 33
3.13 Average Travel Time 34
Provincial Road Network Development Plan, 2014-2018 Page ix
TABLE OF CONTENTS
Chapter No. Title Page No.
3.14 Road Investment 36
3.15 Dev’t. Issues and Challenges in Road
Sector Planning and Management 39
4 Road Sector Goals, Objectives, Strategies and Targets 42
Over-all Goal 42
Over-all Objectives 42
4.1 Sustainable Road Management 43
Road Planning and Design 43
Road Maintenance 45
Road Rehabilitation 46
Road Administration and Management 47
Road Service Delivery 48
Road Safety 48
4.2 Human Resource Mgt. and Capacity Dev’t. 50
4.3 Cross-cutting Strategies in Road Network
Planning and Management 52
5 Road Investment 54
5.1 Shorlisting/Clustering of Core Road 54
5.2 Prioritization of Core Roads 55
5.3 Projected Funds for Road Investment 57
5.4 Five-Year Road Investment Program 58
6 Plan Monitoring and Evaluation 74
6.1 Monitoring and Evaluation Framework 74
6.2 Monitoring and Evaluation Mechanism 82
6.3 Data Collection System 84
6.4 Data Management 84
6.5 Reports and feedback Mechanisms 84
6.6 M&E Schedules 85
Provincial Road Network Development Plan, 2014-2018 Page x
LIST OF TABLES
Table No. Title Page No.
1 Existing Land Use, Davao del Norte 22
2 Major External Linkages 24
3 Road Length by Type of Roads 28
4 Road Inventory by Administrative Function 30
5 Road Density 30
6 Road Conditions of Provincial Roads 31
7 Traffic Count in the Provincial Core Roads 33
8 Average Travel Time under Major External Routes 34
9 Average Travel Time from Major Urban Centers
to Production Agricultural Areas 35
10 Average Travel Time to Municipalities/Cities
Where Hospitals are located 35
11 Sources of Funds for Road Construction/
Maintenance/Rehabilitation 39
12 Prioritization Criteria in Selecting Core Road 44
13 Clustered Core Roads 54
14 Final Ranking of the Core Roads 57
15 Projected Income and Expenditures 57
16 Estimates for Core Road Funding from
Fixed Local Sources 58
17 Summary of Project Cost of Priority PPAs 59
18 Proposed Programs, Projects and Activities 61
19 PPAs for Road Safety, CapDev and M&E 65
20 Summary of Available Fund Sources for
Rehab., and Impv’t. of Prov’l. Roads 67
21 Projected Funds for Road Safety, CapDev and M&E 69
22 List of Standby Projects with Other Sources 70
23 Logical Framework Matrix: M&E 73
24 Performance Measurement Framework 76
25 Logical Framework Results Chain 84
Provincial Road Network Development Plan, 2014-2018 Page xi
LIST OF FIGURES
Figure No. Title Page No.
1 Road Planning Framework 2
2 P.E.O.P.L.E Strategy Conceptual Framework 6
3 Spatial Development Map 8
4 2010 Population, Davao del Norte 10
5 2020 Population, Davao del Norte 11
6 Land Suitability Map Showing 14
7 Land Sustainability Map 15
8 Environmentally Critical Areas Map 16
9 Estimated Value of Production of Major Crops 18
10 Social Facilities Map 21
11 Land Use Map 23
12 Road Network Map 29
13 Provincial Road Condition Map 32
14 Budget for Road Maintenance 36
15 Budget for Road Rehabilitation from 5% PDRRMF 38
16 Provincial Core Road Map 56
17 Implementation Map 60
18 Provincial M&E Structure, Davao del Norte 79
Provincial Road Network Development Plan, 2014-2018 Page xii
LIST OF ACRONYMS
AIP
Annual Implementation Plan
APP
Annual Procurement Plan BAC
Bids and Awards Committee
BLGU
Barangay Local Government Unit
CADT
Certificate of Ancestral Domain Title
CSC
Civil Service Commission CSOs
Civil Society Organizations
DA
Department of Agriculture DBM
Department of Budget and Management
DED
Detailed Engineering Design
DIDP
Davao Integrated Development Program
DILG
Department of the Interior and Local Government
DPWH
Department of Public Works and Highways
DRRMD
Disaster Risk Reduction Management Division
EMP
Environmental Management Plan
e-RPTS
Electronic Real Property Tax System
FIES
Family Income and Expenditure Survey
GAD
Gender and Development GIS
Geographic Information System
GMAP
Ginintuang Masaganang Ani Program
GPS
Global Positioning System IASD
Internal Audit Services Division
IEC
Information, Education and Communication
IRA
Internal Revenue Allotment IT
Information Technology
LGUs
Local Government Units LTO
Land Transportation Office
MIS
Management Information System
MLGU
Municipal Local Government Unit
MVUC
Motorized Vehicle Users Charges
ODA
Overseas Development Assistance
PDC
Provincial Development Council
PDPFP
Provincial Development and Physical Framework Plan
PENRO-LGU Provincial Environment and Natural Resources Office-LGU
PEO
Provincial Engineer's Office PGO
Provincial Governor's Office
PLGU
Provincial Local Government Unit
Provincial Road Network Development Plan, 2014-2018 Page xiii
LIST OF ACRONYMS
PPDO
Provincial Planning and Development Office
PPMP
Project Procurement Management Plan
PRMF
Provincial Road Management Facility
PRNDP
Provincial Road Network Development Plan
PRNDS
Provincial Road Network Development Strategy
RA
Republic Act SALT
Sloping Agricultural Land Technique
SLRF
Special Local Roads Fund TWG
Technical Working Group
VAW
Violence Against Women
Provincial Road Network Development Plan, 2014-2018 Page xiv
Executive Summary
Road network management has finally settled down in the province of Davao del Norte with the
completion of the Provincial Road Network Development Plan (PRNDP). It is a five-year plan that
shall pave the way of the province to better facilitate sustainable development. It shall serve as a
road map of the Provincial Government to develop and manage its core road networks embracing
high social and economic growth potentials.
PRNDP embodies the spirit of the Provincial Road Network Development Strategy (PRNDS), a
strategic planning document completed in 2012 containing concepts and policies needed to provide
the PRNDP strong legs to stand on. It simplifies the PRNDS through programs, projects and activities
(PPAs). Like the PRNDS, its substance is enhanced with series of workshops, consultations and write-
shops by key personalities and stakeholders coming from the government, business sector and civil
society.
The Plan has six main parts. Chapter One explains further of its context and rationale, shows the
process of its formulation and planning framework, and provides its scope and limitations. Chapter
Two elucidates on the over-all provincial development direction including Davao del Norte’s long-
term vision and development thrusts. Chapter Three covers assessment of the provincial road
network. In point here are various aspects such as the location and political subdivision of the
province, population and settlements, physical resources, economy, social services available, existing
land use, external linkages, internal circulation, road systems and density, road condition, traffic
characteristics and computation of the average travel time under major external routes, road
investment, and development issues and challenges in road sector planning and management.
Chapter Four discusses the road sector goals, objectives, strategies and targets in connection with
sustainable road management, human resource management and capacity development, and road
network planning and management. Chapter Five brings to light the investment program for road
sector planning and management showing core road clusters and priorities, projected funds for road
investments, and the five-year investment program. Chapter Six provides the frameworks,
mechanisms and systems necessary for effective monitoring and evaluation.
PRNDP is a requisite for the establishment of the Provincial Road Management Facility (PRMF)
program forged under the partnership of the Provincial Government of Davao del Norte and
Australian Agency for International Development (AusAID). The Plan shall occupy a significant
Provincial Road Network Development Plan, 2014-2018 Page xv
portion of the Provincial Development and Physical Framework Plan (PDPFP) and is expected to
support the enhancement of the economic and social undertakings of the province.
Provincial Development Direction
The Provincial Government of Davao del Norte vigorously embraces the unique PRMF development
scheme in upholding its long-term vision of making Davao del Norte a premier province in
agriculture and become the banana capital of the Philippines that is globally competitive with
empowered people living in harmony, social equity, safe environment, and high quality of life under
a committed and responsive leadership.
Anchored on the vision is the human development priority of the current administration known as
P.E.O.P.L.E. It is an acronym for People Empowerment, Education, Optimum health and social
services, Public-private partnership, Link to the world, and Employment and livelihood opportunities.
This pro-people brand of governance is putting human face to development. With the PRMF, the
road transport sector is placed at the forefront as it facilitates mobility of other resources and inputs
thereby contributing to the improvement of the province’s status in the human development index.
To this, the PRNDP is crucial being the necessary document that shall lead PRMF achieve its desired
outcomes.
Road Network
Davao del Norte has a total road network of 3,852.23 kilometers with almost one-fourth classified as
provincial roads (841.94 km). Other road network are classified as national, city, municipal and
barangay roads that serve as access to the 223 barangays of the province. Gravel roads account for
60.50% of the total type of pavement of the provincial roads while the remaining 23.6% and 9.4%
are earth and concrete roads, respectively.
Data shows that 42.43 kilometers of the provincial road are in good condition, 622.38 kms are fair,
42.64 kms are poor, and 133.99 kms are in bad condition. These are affected by a number of factors
such as prolonged heavy rain and soil erosion. These happen often now that Davao del Norte is no
longer typhoon-free. Road sections with poor and bad surface condition shall undergo rehabilitation
first as herein provided.
Provincial Road Network Development Plan, 2014-2018 Page xvi
In terms of linkage, the province is connected to national roads leading to Davao City, and to the
provinces of Compostela Valley and Bukidnon. Internal circulation is characterized by both land and
sea transportation.
Road Development Processes, Challenges and Goal
The issues raised in the PRNDS affecting the road development processes, namely, road planning
and design, road maintenance, road rehabilitation and construction, and road administration are
sufficiently discussed here along with road service delivery, road safety and human resource
development (see Section 3.15, Ch. 3). Over-all, financial capacity remains to be a concern. Apart
from that, various consultations and workshops proved to be effective in indentifying more
challenges that should be addressed in the course of the Plan’s implementation.
The identified issues and challenges taken into consideration, the road development processes are
substantiated with general and specific objectives with corresponding strategies and targets to the
end that the inter and intra provincial road linkages be enhanced in support to the attainment of the
P.E.O.P.L.E. agenda. This is the all-encompassing goal of the PRNDP which the PPAs are geared
towards.
Road Investment
Road network development entails huge cost. As such, decision has to be made as to which road
section should be given priority. In coming up with the criteria, Goals Achievement Matrix (GAM)
and Ranking by Perceived Urgency were used. Also, funds available for investment have to be
determined. In so doing, the linear regression and average growth rate (AGR) methods were
employed based on the five-year projection on the income and expenditure of the province. These
form part of the five-year road investment program, which reveals the need to seek for other
sources of funds to meet all the requirements for the development of the core roads.
Monitoring and Evaluation
Imperative in every PPA is to know the progress of its implementation in order to also assess its
impact to its end-users. Logical Framework Matrix and Results Chain are utilized. Systems on data
collection and management are strategically identified with Reports and Feedback Mechanisms.
Provincial Road Network Development Plan, 2014-2018 Page 1
1.1 Context and Rationale
The Provincial Road Network Development Plan (PRNDP) is a five year plan that outlines the overall
directions and investments of the province with regard to road network management. It illustrates
how the province will develop and manage its road network in the context of its development
agenda through implementable programs, projects and activities (PPAs). The development of a
PRNDP is primarily anchored on the need to have a road map to pursue sustainable road
management.
As one of its sub-sector plans, the PRNDP will directly support one of the infrastructure development
objectives laid out in the Provincial Development and Physical Framework Plan (PDPFP). As it
addresses the challenges in improving external links and internal circulation, the PRNDP supports the
over-all spatial framework of Davao Del Norte, where the transportation network is considered as
one of the factors that would boost economic activities in the province’s cluster of cities and
municipalities.
In identifying road management programs, projects and activities needed to achieve the goals and
objectives of the province, the PRNDP takes off from the Provincial Road Network Development
Strategy (PRNDS) which was formulated and approved in 2012. The PRNDS is a strategic planning
document that initially determines the direction Davao del Norte is going to take given the
challenges that plague the road sector. While PRNDS spells the road network development and
management strategies of the provincial government, the PRNDP translates these strategies into
actions. The strategic options articulated in the PRNDS are transformed into operational plans that
are more specific in terms of targets, budgets and implementation mechanism in the PRNDP.
Chapter 1. Introduction
Provincial Road Network Development Plan, 2014-2018 Page 2
1.2 PRNDP Formulation Process
As in the PRNDS, the PRNDP was developed through a participatory process involving various
stakeholders from private and business sectors, municipal planners and engineers, national
government agencies, academe as well as key provincial road related departments and the PRNDP
technical working group1.The
Provincial Technical Working
Group for PRNDP was organized to
move this process forward, from
the formulation of the strategy
until it secures the approval of the
Provincial Development Council
(PDC).The major activities which
commenced as early as June 2012
include gathering of data as basis
for road network planning,
Capacity Building and writeshops
for the PRNDP Technical Working
Group and Multi-stakeholders
consultations and workshop were
also conducted.
1.3 Planning Framework
As illustrated in Figure 1, strategizing for the road transport sector considers the long-term and
short-term development direction of Davao del Norte. The strategy setting for the road network
development in the province starts with the assessment of the road network. This includes doing
road inventories and assessing road conditions that local governments normally undertake for
planning purposes. Road management issues and concerns were also considered. The outcomes
from the road assessment become the baseline for improvement that need to be done to improve
road service delivery in Davao del Norte. In turn, the PPAs will have fiscal support under a road
investment program. Successful PPAs implementation is expected to improve road service delivery,
operationalizing the spatial strategy of the province and realizing its long-and-short-term
development thrusts. There is a new perspective that will work to the advantage of the road
transport sector. The strategy setting for the road network development is accompanied by similar
strategy-setting initiatives in related processes and mechanisms in the province that directly support
1 Created based on Executive Order – Series of 2013
Road Network Development
Plan
Road Network Assessment
Road Network Development
Strategy
Road Investment
Program
Figure 1. Planning
Framework Provincial Spatial
Strategy
P.E.O.P.L.E. Agenda
Road Network Development Plan
Road Network Assessment
Road Network Development Strategy
Road Investment Program
Sustainable Road
Management
Road
Safety
Capacity
Development
Figure 1. The Planning Framework
Provincial Road Network Development Plan, 2014-2018 Page 3
the initiatives for sustainable road management. These are along the areas of (a) sustainable road
management; (b) road safety; and (c) human resource management and capacity development.
1.4 Scope of the PRNDP
The PRNDP contains the following:
1. Broad elements of the development directions of Davao del Norte – this covers the vision
of the province for the long-term period and the PEOPLE Agenda3 which is being pursued by
the current Administration.
2. Situational Analysis of the Road Sector – this section is an assessment of the condition of
the road network of Davao del Norte, the existing land use , the spatial development
strategy of the Province, road inventory, road density and traffic survey. It briefly describes
the development issues and challenges in the province that contribute to the gaps in road
sector planning and management.
3. Road Sector goals, objectives and targets –corresponding goals, objectives and targets for
the road sector is presented to better situate the strategy for road network development in
Davao del Norte.
4. Road Network Development strategies – this section contains the realistic strategies to
reinforce the desired spatial framework of Davao del Norte and support sustainable road
network management particularly in the areas of road planning and management,
rehabilitation and maintenance, road safety, capability development and cross-cutting
themes .
5. Investment program for road sector planning and management - based on the road
network development strategies, this section identifies the priority programs, projects and
activities which put emphasis on Road rehab. and maintenance, road service delivery, Local
Road Safety, Capacity Building and Human development, Environmental Management and
other cross-cutting themes.
6. Monitoring and Evaluation Plan– presents the Logical framework for measuring the
progress of the implementation of provincial road network development programs, projects
and activities. It also contains the M&E strategies and mechanism.
1.5 Limitations and Assumptions
1. The analysis of the road situation is limited to the provincial core road network using
primary data like traffic survey and road conditions.
2. The use of GPS in generating data on road condition is limited to the provincial roads.
Provincial Road Network Development Plan, 2014-2018 Page 4
3. In most of the analysis of the planning environment, secondary data was taken from the
PDPFP and SEEP.
4. Integration and analysis of cross-cutting themes such as DRR-CCA, gender and social
inclusion, environmental management are limited to the areas traversed by the core roads.
5. PRNDP is prepared with substantial inputs from road-related plans and strategies such as
SFMP, Road Safety, EMP and cross-cutting themes such as gender, social inclusion and DRR-
CCA.
Provincial Road Network Development Plan, 2014-2018 Page 5
2.1 VISION
“Davao del Norte, a premier province in agriculture, the banana capital of the Philippines, globally
competitive with empowered people living in harmony, social equity, safe environment and high
quality of life under a committed and responsive leadership”
2.2 Current Administration’s Development Thrusts
The P.E.O.P.L.E. Agenda encapsulates the direction
and priorities of the province. It values the
participation and contribution of people in driving
local development. Further, it encourages the
province to go beyond geographical limits to take
advantage of global integration and prepare its
people, resources and institutions to seize cross-
border opportunities.
2.3 Infrastructure as a resource under the P.E.O.P.L.E Agenda
The spatial strategy of the transport sector is articulated in the Provincial Development and Physical
Framework Plan. Since 1998, the Provincial Government successfully carried out a practice of
targeting and achieving its three-year development thrusts (except in 2004-2007). Under the current
administration (2010-2016), the development agenda bears the tag “P.E.O.P.L.E.” Agenda, which
P.E.O.P.L.E as a development agenda of
the present administration enjoys the full
support of the entire province-from the
provincial staff, LGUs, the private sector
and the civil society. It unites the
Dabaonons where to go- but it also serves
as the barometer of the provincial
government’s performance.
Chapter 2. Provincial
Development Direction
Provincial Road Network Development Plan, 2014-2018 Page 6
stands for People Empowerment;
Education; Optimum Health and
Social Services; Public-Private
Partnership; Link to the World; and,
Employment and Livelihood
Opportunities. PEOPLE recognizes
“infrastructure” as a resource
(together with finance, policy,
manpower and technology) that
will be used to implement
programs and projects with the
assistance of various
development partners (refer to
Figure 2). Thus, the road transport is a critical sector that facilitates mobility of other
resources/inputs, contributing to the improvement of the human development index (e.g.
health, education, income opportunity) of the province.
2.4 Growth Center Development Strategy
Davao del Norte adopts the nodal or growth center concept of development anchored on a
hierarchy of functions among the service areas. Tagum City, Panabo City and the Municipality of Sto.
Tomas are the major growth centers while the Island Garden City of Samal, Kapalong and Carmen
are the emerging growth centers. The remaining municipalities serve as the nodes supporting major
growth centers and providing neighborhood support facilities and services within its area of
influence.
Davao del Norte’s spatial strategy is the distillation of the current and planned spatial developments
within the province based on its vision, development goals, and objectives. To operationalize the
provincial spatial strategy, the transport sector strategies are envisioned to promote internal
circulation and external linkages. Internal circulation provides direct access to land and mobility of
people and goods within the province. External linkages, on the other hand, are the land, air and
water access routes to the province and key transport facilities. These linkages vary depending on
the role and function played by the province in pursuit of development. Population and settlement
trends, locational importance of physical resources, protection zones and production areas are
factors that dictate external linkages and internal circulation.
Figure 2. P.E.O.P.L.E Strategy Conceptual Framework
Feedback Mechanism
Provincial Road Network Development Plan, 2014-2018 Page 7
Spatial strategies relevant to the road sector, as discussed in the infrastructure plan of the PDPFP,
which directly contributes to the attainment of the provincial spatial framework and its development
thrusts include:
1. Maintain and provide new infrastructure facilities in production and settlement areas to
facilitate socio-economic activities.
2. Upgrade and/or provide new infrastructure facilities in rural areas to facilitate development
and encourage investment outside of the major growth centers.
3. Enhance inter-provincial and intra-provincial linkage by upgrading the existing transport
facilities.
4. Enhance development of tourism industry in the Island Garden City of Samal. Improvement
of accessibility of going to and within the island should be given priority. Improved
telecommunication and infrastructure facilities and utilities should be in place within the
planning period.
Provincial Road Network Development Plan, 2014-2018 Page 8
Figure 3. Spatial Development Map
Provincial Road Network Development Plan, 2014-2018 Page 9
3.1 Location and political subdivision
Davao del Norte is strategically located in
the southeastern part of Region XI,
bounded by Agusan del Sur on the North,
Bukidnon on the Northwest, Davao City on
the Southwest, Davao Gulf on the South
and the Province of Compostela Valley on
the East. A total of 13 municipalities
composed the province upon its creation on
May 8, 19672. In 1996, the province had 22
municipalities. In 1998, Compostela Valley
Province was created from Davao del
Norte3. At present, Davao del Norte has
eight (8) municipalities and three (3) cities
with 223 barangays sub-divided into two (2)
congressional districts.
2 R.A. 4867
3 R.A. 8470
Chapter 3. Assessment of the
Provincial Road Network
Provincial Road Network Development Plan, 2014-2018 Page 10
Asuncion
BE Dujali
Carmen IGACOS Kapalo
ng New
Corella Panabo
City San
Isidro Sto.
Tomas Tagum
City Talaing
od
Population 55844 28339 69199 95874 68261 50699 174364 25548 109269 242801 25566
0
50000
100000
150000
200000
250000
300000
Figure 4. 2010 Population, Davao del Norte
3.2 Population and settlements
The 2010 census reported a total population of 945,764 and a density of 273 persons/sq km. land
area. Annual Population Growth Rate (APGR) from year 2000 to 2010 is recorded at 4.07. Tagum
City, the seat of the provincial government, accounted for the largest population at 242,801, while
San Isidro is the least populated with 25,548 (Figure 4).
By year 2020, the projected population of Davao del Norte would have reached to 1,426,606. Still
Tagum City would be the most populated followed by Panabo City and the municipality of Sto.
Tomas. The three LGUs are the major growth centers of the province. Figure5 presents the projected
population by year 2020.
The pattern of settlements in the province falls under three (3) categories. The cities of Tagum and
Panabo both have high density population with fast-growing settlements. The Island Garden City of
Samal and the municipalities of Sto. Tomas and B.E Dujali, though with low density population, have
fast-growing settlements. The rest of the municipalities have low density population and slow-
growing settlements.
Provincial Road Network Development Plan, 2014-2018 Page 11
371,712
271,780
119,248
67,193
167,176
28,902
70,463
98,209
105,286
45,455
79,182
2020
Figure 5. 2020 Population, Davao del Norte
Asuncion
B.E Dujali
Carmen
Kapalong
New Corella
San Isidro
Sto. Tomas
Talaingod
Island Garden City of Samal
Panabo City
Tagum City
3.3 Physical Resources
Land resources
Davao del Norte has a total land area of
346,280 hectares distributed as follows:
(a) protected area4, 80%; and (b) urban
and rural settlements and various
productive activities, 20%. The province
occupies about 18.3 % of the total area
of Region XI.
Topography
The topography of the province is
described as rugged, mountainous and
moderately to steeply sloping areas on
the western part and a wide alluvial
plain on the central lowland area. A
major portion of the alluvial plain is a
4 Includes NIPAs, SAFDZ, marine protected areas, Non-NIPAs including second growth forest with over 1000 msl or 50%
slope, mangrove forest, watershed area and buffer strips or easements along rivers and escarpments.
Quick Facts About Davao del Norte
Coverage
8 municipalities 3 cities 223 barangays
Capital/Seat of Government
Tagum City
Population 945,764 (in 2010) 273 persons/km2
Land Area 346,280 hectares
Environmentally Critical Areas
40,726 has. are prone to flooding, particularly along Tagum Libuganon River
Water Resources
15 major rivers with Lasang, Tagum/Libuganon, Saug and Tuganay as the bigger rivers
Economy Agriculture-based
Mineral Resources
44.8 million MT of non-metallic minerals
Climate and Rainfall
Type IV with rainfall evenly distributed with no pronounced rainy season and dry season
Provincial Road Network Development Plan, 2014-2018 Page 12
flat tract of land while, some places are gently undulating and rolling.
Elevation
Some 37% of the total land areas in the province are lowlands with less than 100 meters elevation.
The highest elevation from 1000-2000 meters accounts for three (3) percent of the total land area is
found in the municipalities of Kapalong and Talaingod.
Slope
More than half of the total land area (53.60%) in the province has a slope range of 0-18 percent,
while the remaining areas have slopes ranging from 18 percent to more than 50 percent. Areas with
slopes of 0-18 percent are classified as Alienable and Disposable (A&D) and are used for agriculture,
industries and settlements. Areas with slopes of 18 to more than 50 percent are classified forest land
and declared for forestry purposes.
Land Suitability
Land suitability analysis indicates that the resources in the province are distributed as: 33% suitable
for production forest; 18% suitable for perennial tree crops; 16% suitable for cultivated annual
crops; 14% for rice paddy; and 13% for forestry plantations.
With respect to land suitability, majority of the core roads, about 168.65 kms., are located in areas
suitable for agriculture production such as: rice paddy, perennial tree crops and cultivated annual
crops, while about 47.52 kms. are located in areas suitable for production forest. Figure 6 shows the
location of the core roads with respect to land suitability.
Land Sustainability
Based on the land sustainability analysis, 66.7 % of the land in the province are under-used or
classified with opportunity for development, while 31.7 % are sustainable land use; and 1.6 % not
sustainable land use.
Figure 7 indicates that the provincial core roads of about 140.40 kms. are located in areas which still
has potential for development or those that classified as under-used lands in terms of sustainability.
The remaining 75.77 kms. traverses areas classified under sustainable land use.
Environmentally Critical Areas
Flooding affects about 40,726 hectares of agriculture and settlement areas in areas along the
Tagum-Libuganon Rivers. Eight (8) of the 11 LGUs are prone to flooding, namely: Asuncion, B.E
Dujali, Carmen, Kapalong, New Corella, Sto. Tomas, Panabo City and Tagum City.
Provincial Road Network Development Plan, 2014-2018 Page 13
Two (2) major active fault lines traverse Davao del Norte. The first extends from Mati, Davao
Oriental to the municipalities of New Corella and Asuncion. The second major fault line is located
between the City of Tagum and Laak in the province of Compostela Valley.
Areas with severe erosion are part of the production land that needs to be protected from further
degradation. These areas are observable mostly in the mountainous parts of Kapalong, San Isidro,
Talaingod, New Corella and the eastern part of Asuncion and the Island Garden City of Samal. Area
affected by severe erosion is approximately 159,000 hectares.
There are provincial core roads of about 83.35 kms. located in areas affected by flooding. These are
in the municipalities of Carmen, B.E. Dujali, Asuncion and part of Kapalong. Moreover, about 47.52
kms. of the core roads traverses areas affected by severe erosion (Figure 8).
Water resources
The province has abundant water supply both from surface and groundwater resources. A total of 15
rivers and creeks traverse the province. The bigger rivers such as the Lasang, Tagum/Libuganon,
Saug and Tuganay drain the broad plain west and north into Davao Gulf. These major rivers are part
of the watersheds of the same name.
Soil characteristics and fertility
There are seven (7) types of soil in the province, namely: hydrosol, camansa sandy clay loam,
cabangan clay loam, san manuel silty clay loam, mountain soils (Undifferentiated), bolinao clay, and
cabantian clay. The soil fertility of the province is highly categorized under medium acid that is
within the range of 5.6-6.0. About 43.98 percent or 167,698 hectares of the total land area are
medium acidic.
Mineral resources
Davao del Norte has an estimated total reserve of 44,845,283 MT of non-metallic minerals and an
abundant source of high grade quality sand and gravel.
Climate and rainfall
The province has Type IV climate with rainfall more or less evenly distributed throughout the year
with no pronounced rainy season and dry season. The province is less vulnerable to typhoon and
droughts.
Provincial Road Network Development Plan, 2014-2018 Page 14
Figure 6. Land Sustainability Map Showing the Provincial Core Roads
Provincial Road Network Development Plan, 2014-2018 Page 15
Figure 7. Land Sustainability Map Showing the Provincial Core Roads
Provincial Road Network Development Plan, 2014-2018 Page 16
Figure 8. Environmentally Critical Areas Map
Provincial Road Network Development Plan, 2014-2018 Page 17
3.4 Economy
The provincial economy derives its income from six (6) major sectors, namely; agriculture, industries,
services, wood industry, quarrying and tourism. Based on the data generated from the Bureau of
Agricultural Statistics (BAS) and National Statistics Office (NSO) in 2012, the estimated value of
production of major agricultural crops is placed at 20.18 Billion of which 10.45 Billion or 52 percent
attributed to production of export-oriented Cavendish banana. Agricultural land use accounted for
47.40% of the total land area with production area devoted to staple, commercial and industrial
crops. The other major crops that have greater contribution to income in agriculture in the province
are rice, corn, local banana and coconut.
Cavendish banana as one of the major crops is extensively grown in all but one municipality in the
province. Around 46,950 hectares are used for the production of banana both for local and export
market. Production of this commodity contributes considerably to the income of the Province. On
the other hand, production areas for rice are the municipalities of New Corella, Asuncion, Sto.
Tomas, Kapalong, Carmen and B.E Dujali. Paddy rice cultivation is undertaken in 19,769 hectares of
land.
Mono-crop cultivation of corn is around 17,221 hectares which are usually planted with the white
variety. Corn is produced in sizeable areas in New Corella, Asuncion, Kapalong, Talaingod, Sto. Tomas
and the Island Garden City of Samal (IGACOS). There are also areas grown with corn and being
intercropped with other commodities like local banana and under coconut.
Coconut is grown in 39,650 hectares of land. The Island Garden City of Samal has the largest area
devoted to production of coconut at 16,488 hectares, contributing almost half of the provincial total
area devoted to production of this crop. Estimated value of production of these major crops is
presented in Figure 9.
Other major contributors to the provincial economy are the services sector, industries, tourism,
wood and quarry industry. Among the local government units, the top four (4) income generators
across sectors are Panabo City, Sto. Tomas, Tagum City and Kapalong. These local government units
are the identified growth centers of the province with mostly large areas devoted to agriculture, and
with substantial contribution from the service sectors (as in the case of Tagum and Panabo Cities).
Provincial Road Network Development Plan, 2014-2018 Page 18
Asuncion
B.E Dujali
Carmen
IGACOS
Kapalong
New Corella
Panabo City
San Isidro
Sto. Tomas
Tagum City
Talaingod
Coconut 887.2 15.3 831.3 2905.8 281.4 432.3 841 211.7 120.7 887.2 86
Local Banana 40.2 1.5 48.9 38.8 32 122.4 60.4 117.9 15.9 3.14 16.9
Cavendish Banana 362.6 593.5 1084 0 1139 302.2 2892.9 1.5 2657.9 1372.4 39.9
Corn 82.8 0 0.8 34.1 38.4 34.4 2 11.4 8 33.61 22.1
Rice 341.9 259.9 261.8 15.7 199.4 309.4 58.73 26.2 440.9 49.51 18.4
0 500
1000 1500 2000 2500 3000 3500 4000 4500
Val
ue
in M
illio
n P
eo
sos
Figure 9. Estimated Value of Production of Major Crops
Source: Primary data as computed from BAS, NSO and AMAD-DA XI data
3.5 Social Services
Health Facilities
There are 26 hospitals in Davao del
Norte, four (4) of which are
government-owned and operated
such as the Davao Regional
Hospital, a DOH tertiary hospital
located in Tagum City and the
three (3) district hospitals located
in the municipalities of Kapalong
and Carmen and the Island Garden
City of Samal. In other areas where
hospitals are not available, basic
health care services are provided
by the health personnel stationed
in 14 municipal/city health centers
and 218 barangay health stations.
Quick Facts About Social Facilities and Utilities
Health facilities 26 hospitals (public and private, including 1 regional hospital), 14 city/mun. health stations and 218 barangay health stations
Education Facilities 386 elementary schools 107 high schools 22 tertiary schools
Subdivisions 194 subdivision/housing
Security Generally peaceful 15 police stations 7 fire stations 1 Prov’l. Disaster Center
Welfare Services With welfare programs for the disadvantage children, women, youth, elderly, IPs and persons with disability
Day Care Center 489 Day Care Centers
Power Utilities Davao Light and Power Company DANECO
Water System 5 Water District
Telecommunications Available provincewide
Provincial Road Network Development Plan, 2014-2018 Page 19
Educational Facilities
There are 386 schools in the elementary level classified as public schools (296) and private schools
(90). Access to elementary education is available in all barangays in the province. On the other hand,
there are 107 secondary schools (public, 71 and privately-operated, 36). Tagum City and Panabo City
have the most number of secondary schools. Of the 22 tertiary schools, 11 are in Tagum City, four (4)
in Sto. Tomas, three (3) each in Panabo City and Island Garden City of Samal and one (1) in
Kapalong.
Housing The total number of housing units in the province is 149,9895. From 1990 to 2000, there is an
increase of 35 % in housing units in the province, an indication of increased affordability of people in
acquiring decent shelters for the past 10 years. Based on CY 2012 inventory of subdivisions and
resettlement areas, there are 194 subdivisions in the province. Panabo City has the most
subdivisions with 98, followed by Tagum City with 82, while Sto. Tomas has 12 subdivisions.
Subdivisions that cater to the middle class of society are located in Tagum City. These are Filinvest
and Camella Homes, just to name a few.
Security Peace and order condition is a vital component of economic growth and also a basic attribute to
poverty. Davao del Norte is generally peaceful, but is not spared from criminalities/atrocities and
terrorist-related incidents. Tagum City registered the highest number of index crime cases with 254,
in 2012, while Talaingod posted the lowest reported of five (5) cases. In terms of non-index crimes,
the highest reported cases happened in Tagum City, while San Isidro reported the lowest cases.
Based on women’s and children’s desk statistics, wife battering has the highest reported cases
followed by physical injuries. The reported cases were usually committed inside the house, thus
Violence Against Women (VAW) cases are domestic in nature.
Social Welfare Services In its effort to alleviate poverty, Davao del Norte continuous to provide social welfare programs for
the disadvantaged children, youth, elderly, indigenous peoples and persons with disability and other
disadvantage groups.
5 Based on 2000 data which is the latest available when the PDPFP was formulated.
Provincial Road Network Development Plan, 2014-2018 Page 20
The development of pre-schoolers is catered by 489 Day Care Centers provincewide. These centers
are duly accredited with DSWD. Tagum City has the most number of Day Care Centers with 84, while
San Isidro has the least with 19 DCCs.
3.6 Existing Land Use
Existing land use is the way that an area of land is actually being put to use, namely: to grow rice, to
build houses on, to put up industry; this is the impact of people and structure upon land resources.
Existing land use in the province is categorized as production areas, protection areas, built-
up/settlement areas, and infrastructure (including road networks) and utilities (Table No.1) .
The Province is basically an agriculture province endowed with rich and fertile soil, and favorable
climate suited for agriculture production. About 48.04 percent or 166,505.63 hectares are devoted
to agriculture and aquaculture production. Major crops planted in the province are rice, coconut,
Cavendish and local banana, corn, mango and cacao.
Davao del Norte has an approximate production forestland area of 132,115.93 hectares. Out of the
total area classified for production forest, approximately 24,658.63 hectares or 18.6 percent are
residual forest or those that have been logged-over. These areas are found in the municipalities of
Kapalong and Talaingod. Tree plantation is about 9,035.57 hectares or 9.3 percent of the total
production forest. These areas were covered under the Integrated Social Forestry Program which
were devolved to the LGU, and the Community-Based Forest Management Program of the DENR.
Production forest are those areas where harvesting is allowed
Grassland and open areas comprise about 59,323.03 hectares or 45 percent, while brushland is
about 32,340.07 hectares or 9.3 percent. These areas are available for plantation development.
Cultivated or areas utilized for crop production comprise 6,798.43 hectares or 2 percent of the total
production forest areas. These areas are mostly planted with agro-forestry products.
Brush and grasses dominate the landscape of the production forest areas in the municipalities of
Kapalong and Talaingod. Open access areas are also found in the mountain ridges of New Corella,
Asuncion, Sto. Tomas, and Island Garden City of Samal. Forestland in these areas is partly
encroached upon by upland dwellers/communities.
Provincial Road Network Development Plan, 2014-2018 Page 21
Figure 10. Social Facilities Map
Provincial Road Network Development Plan, 2014-2018 Page 22
Areas with potential for tourism development are found in the Island Garden City of Samal as well as
in the mainland. Samal boast of its white sand beaches and islets that is excellent for scuba diving
and snorkeling, while springs, caves and other inland resorts are some of the attractions found in the
mainland. An area of 670.56 is devoted for tourism. Also, a mariculture park in the Island Garden
City of Samal and Panabo City is being promoted as one of the agri-tourism sites in the province.
Tourism potential in the mainland includes the vast banana plantations, highland journey in nature
and culture to include waterfalls, springs, caves at the municipalities of Kapalong, New Corella and
San Isidro and the Ata-Manobo cultural village in the municipality of Talaingod. Inland resorts also
sprout in the mainland that mostly caters domestic tourists.
Protection land use involves a concept of protection that enhances not only those that have to be
protected from human occupation because of the destructive effect such occupation will have on
the resource, but also due to the hazard posed by the area to the human occupants. Hence, dual
objective of maintaining protection land is to protect sensitive and critical ecosystem from human
intrusion so as to preserve their integrity, and at the same time allow degraded areas to regenerate
as well as to protect human population from environmental hazards.
Davao del Norte’s protection lands include the Mangrove Swamp Forest Reserve in Babak, Non-
NIPAS, network of Protected Areas for Agricultural Development/Strategic Agriculture and Fisheries
Development Zone (NPAAD/SAFDZ), Flood Prone areas and areas affected by severe erosion.
Table 1. Existing Land Use (in hectares), Province of Davao del Norte, 2007
Land Use Area, in Hectares Percent to Total (%)
Built-up areas 14,195.57 4.10
Agriculture 163,932.94 47.30
Residual Forest 33,694.20 9.73
Protection Forest 27,722.84 8.00
Brushland 32,340.07 9.33
Grassland 59,323.03 17.13
Tourism 670.56 0.19
Fishpond 2,572.69 0.74
Cultivated area (within forestland) 6,798.43 1.96
Infrastructure and utilities 4,978.76 1.44
Total 346,280.00 100.00 Source: Davao del Norte Provincial Development and Physical Framework Plan: 2008-2022
Provincial Road Network Development Plan, 2014-2018 Page 23
Figure 11. Land Use Map Showing the Provincial Road Conditions
Provincial Road Network Development Plan, 2014-2018 Page 24
3.7 External Linkages
The external linkages of the province are
mainly land-based. The major external
linkages consist of national roads connecting
Davao del Norte to adjacent provinces of
Compostela Valley and Bukidnon and to the
City of Davao. These roads are the Davao-
Agusan Road, Kapalong-Talaingod-Bukidnon
Road, Km.Zero-Doña Andrea-Bdry. Laak and
the Surigao-Davao Coastal Road. Physical
condition of these road sections is presented
in Table below.
Table 2. Major External Linkages
Davao del Norte, 2013
Road Name Length (km.)* % paved
Agusan-Davao Road 37.98 100
Surigao-Davao Coastal Road 6.848 100
Kapalong-Talaingod-Bukidnon Road 55.985 48.8
Km. Zero-Doña Andrea-Bdry. Laak 19.345 47.25
The Agusan-Davao road extends from Compostela Valley in the north to Davao City in the south,
while the Surigao-Davao Coastal road connects the province of Davao Oriental and southern parts
of Compostela Valley to the province of Davao del Norte. While Davao City serves as the main center
for economic and social activities in Region XI, these routes serve as the main trunkline for the flow
of trade and the delivery of basic social services across Davao del Norte, as well as, the northern
provinces in the region. Davao del Norte, especially Tagum City plays an important role as a
converging point of these two road sections. This puts the province as potential trading hub for
Agusan del Sur, Compostela Valley and Davao Oriental. The Agusan-Davao road also connects to the
poblacion of Carmen and Panabo City.
The Kapalong-Talaingod-Bukidnon road is not yet fully operational though a four-wheel drive
vehicle and motorcycle can already pass through it. This arterial road connects Davao del Norte to
Provincial Road Network Development Plan, 2014-2018 Page 25
the province of Bukidnon via Talaingod and Kapalong in Davao del Norte, and San Fernando and
Valencia City in Bukidnon. With the full operationalization of Tagum-Kapalong-Talaingod-Bukidnon
road, accessibility between these areas will be greatly improved. Opening of this road will result to
better economic opportunities and trade-offs between the two provinces; as well as the deployment
of basic social services and security enforcements in its tributary areas.
There are also other provincial and city roads that serves as collector roads, that link Davao del
Norte to Compostela Valley and Davao City, however, these roads are gravel and earth roads and
some portions are in poor condition. These are the following:
Igangon-Soop provincial road – This road connects the municipality of San Isidro to Compostela
Valley via Laak. The five-kilometer road is gravel paved.
Sawata-Laak provincial road – This three-kilometer gravel paved road also connects the municipality
of San Isidro to Compostela Valley via Laak.
Sonlon-Longanapan provincial road – The road is in mountainous terrain and connects the eastern
barangays of Asuncion and northern barangays of New Corella to Compostela Valley via Longanapan,
Laak. The road length is 10 kilometers of gravel paved and earth road.
Limbaan-Sta. Fe-El Salvador provincial road – Connects the municipality of New Corella to
Compostela Valley via Nabunturan. The road is 16.2 kilometers of gravel road and some portions
traverse in mountainous area.
Feeder Road 2, Sto. Tomas-Magwawa provincial road – This road has 11.57 kilometers of gravel-
paved and 0.43 kilometer of concrete road. It connects from Poblacion Sto. Tomas to the
mountainous areas of Pakibato District which is part of Davao City.
Katualan-Callawa and Malativas-Binowang Roads – These three-kilometer gravel -paved city road,
connect Panabo City to the remote districts of Davao City.
Kiotoy-Sta. Cruz road – This five-kilometer gravel-paved road connect Panabo City to Davao City via
Sta. Cruz and Bunawan.
3.8 Internal Circulation
The internal circulation of the province is characterized by land and sea transportation. Except for
the Island Garden City of Samal, all other municipalities and cities are interconnected to each other
by national, provincial and city roads. IGaCoS is connected to the mainland by passenger and RORO
ferry services via Davao City.
Provincial Road Network Development Plan, 2014-2018 Page 26
Main Internal Circulation Routes
Tagum-Asuncion-Kapalong-Sto.Tomas-DAPECOL-Panabo-Circumferential Road (TAKSDP )
The TAKSDP circumferential road is a feeder for the Agusan-Davao national road. It is an arterial
road that connects the poblacion areas of Sto. Tomas, Kapalong and Asuncion to the centers of
Tagum and Panabo cities. Its influence area includes the municipalities of Sto. Tomas, Kapalong,
Asuncion, and also Talaingod, San Isidro and B.E. Dujali. There are several roads tributary to the
TAKSDP that connects to the municipalities of Talaingod, San Isidro and to the center of B.E. Dujali.
Other provincial and city roads also connect to the inner barangays and banana plantation areas in
Sto. Tomas, Carmen, Kapalong, Asuncion and Panabo City. The TAKSDP road is vital for the export
banana production which is the main economic feature in its influence area. This road is the main
route for transport of bananas for export in going to the points of disposal in Panabo City and Davao
City wharves.
Carmen-DAPECOL-Road
The Carmen-DAPECOL Compound road is a arterial road that connects the municipality of Sto. Tomas
to the municipality of Carmen. It is the alternate transport route for agricultural products, such as,
bananas coming from areas between Sto. Tomas and Carmen. This is also a main route of goods and
commodities, and passenger traffic between Panabo City, Carmen and Sto. Tomas.
Boundary Tagum, Baka-New Corella Provincial Road
The Tagum-New Corella road is the main and the shortest route that links Tagum City and the
poblacion of New Corella. This collector road connects Tagum City to the production areas of New
Corella and the eastern barangays of Asuncion or KAMADI District. It is the main route for the
transport of goods and commodities, and basic social services in its influence area. Agricultural
products, such as, rice, corn, bananas, coconuts; and forestry products, such as, falcata are among
the commodities transported in this route.
Asuncion-San Isidro Roads
This arterial road serves as the link between Compostela Valley and Davao del Norte. This road is a
tributary to the TAKSDP circumferential road. This road section traverses through the rice and
banana production areas between San Isidro and Asuncion. This route is also vital for the wood
processing industries in Tagum City, Panabo City, Asuncion and Carmen with raw material sources
from the production forestlands in San Isidro, Kapalong and Compostela Valley.
Provincial Road Network Development Plan, 2014-2018 Page 27
San Isidro-Kapalong Road
This is a collector road that connects to the arterial road that is the TAKSDP circumferential road.
This road section consisting two road clusters which is the the Pamacaun-Linao-Sawata Road (cluster
4 of the core road) and Kapalong-Mabantao-Florida road (cluster 2 of the core road) serves as an
alternate route in going to San Isidro from Asuncion and Kapalong. Its influence area is planted with
Cavendish banana which has expanded in the area, and production forestlands in the hinterlands of
San Isidro and Kapalong
Tagum City-Sto. Tomas Road
The road section composed of Magupising-Salvacion-Kinamayan and Kinamayan-Sto. This collector
road is the shortest route between Tagum City and the municipality of Sto. Tomas. This road
traverses through the rice and banana production areas in Sto. Tomas. Several connecting roads that
serve as a local roads also link to the other barangays of Sto. Tomas, B.E. Dujali, and to some urban
barangays and banana plantation areas in Kapalong.
Tuganay-Dujali Roads
The Tuganay-Dujali road is part of cluster 7 that connects cluster 6 of the provincial core road thru
Tuganay-Anibongan-San Isidro road section. It connects B.E. Dujali to the Agusan-Davao Road at
Tuganay, Carmen. These roads are important for the thriving banana production and emerging
inland fishery production in B.E. Dujali. Data on traffic count conducted on July 2012 indicate an
AADT (in vehicle units) of 2,906.
Babak-Samal-Kaputian Circumferential Road
The Babak-Samal-Kaputian road is located within the Island Garden City of Samal connecting the
three districts of the city. This road is the main trunkline for the circulation of basic goods and
commodities, as well as, basic social services, trade, and security services within the island. It plays a
major role for tourism in the island. It provides access through land transport to the different areas
of tourism destination. The road is also vital for the transport of perennial crop products, such as,
mango and coconut.
Several city roads and barangay roads serve as tributary roads to the circumferential road. These
local roads lead to the inner barangays, as well as, to the inland and coastal areas of the island with
tourism significance.
Provincial Road Network Development Plan, 2014-2018 Page 28
3.9 Road Systems
Table 3 indicates that the Provincial Government of Davao del Norte has a total road network of
3,831.56 kilometers with almost one-fourth of these classified as provincial roads (841.44 kms.).
National roads is about 6.3 %, while city and municipal roads accounts for 20.6 %. Barangay roads
that serve as access to the 223 barangays of the Province are accounted at 51.2%. The municipality
of New Corella has the longest provincial road at 165.68 km., while Municipality of Talaingod
accounted for the shortest length at 54.70 km.
Table 3. Road Length by Type of Roads, as of CY 2013 Province of Davao del Norte
Road Category Road Length (in km) Share (in %)
National Roads 238.38 6.3%
Provincial Roads 841.94 21.9%
City Roads 540.85 14.2%
Municipal Roads 220.74 5.7%
Barangay Roads 1,988.85 51.9%
TOTAL 3,852.23 100%
Source: Provincial Planning and Development Office 2011 Inventory
The Provincial Government sealed6 27.56 kilometers of provincial roads out of 841.44 kilometers of
the total provincial road length. National roads have the highest percentage of paved roads with
74.1 %. Most of the local roads are gravel paved with surface conditions that ranges from fair to bad.
Graveled barangay roads comprise the majority under this classification with 69.3 percent. Road
inventory by administrative function is presented in Table 4.
6 Refers to the overlaying of gravel road with concrete
Provincial Road Network Development Plan, 2014-2018 Page 29
Figure 12. Road Network Map
Provincial Road Network Development Plan, 2014-2018 Page 30
Table 4. Road Inventory by Administrative Function
Davao del Norte, 2013
3.10 Road Density
The road density is determined using the refined standard of 1.90 km road per sq. km. of alienable
and disposable lands. After determining the ratio of A&D against the total land area of the province,
it turn out that the province has enough roads with a density of 2.07 km. per sq. km. of A&D. Further
analysing the road network by LGU level, the result indicates that the cities of Panabo and Island
Garden City of Samal are still underserved in terms of road network, and so are the municipalities of
Kapalong, Sto. Tomas and B.E Dujali. Details on road density is presented in Table 5.
Table 5. Road Density in km2/km2 A&D
Davao del Norte, 2013
Municipal/City Total Road Network (km)
Area of A&D Land (km2)
Road Density (km/km2)
Road Gap (km)
Tagum City 569.15 181.32 3.14 -
Panabo City 431.84 248.23 1.74 39.80
IGACOS 433.66 252.09 1.72 45.31
Asuncion 384.41 179.32 2.14 -
New Corella 522.13 206.14 2.53 -
Kapalong 305.79 219.45 1.39 111.16
San Isidro 176.63 74.37 2.38 -
Administrative Level
Concrete (kms)
Asphalt (kms.)
Gravel (kms.)
Earth (kms.) Total (kms.)
National Road 176.64 11.84 49.90 0 238.38
Provincial Road 21.96 0 621.96 198.02 841.44
Municipal Road 20.88 0.38 102.35 97.13 220.74
City Road 89.64 37.75 210.00 204.55 541.94
Barangay Road 49.55 201.76 1,347.97 410.24 1,988.85
Total 358.67 251.73 2,332.18 909.95 3,852.23
% Distribution 9.4 6.5 60.5 23.6 100
Source: PEO, PPDO and LGU’s
Provincial Road Network Development Plan, 2014-2018 Page 31
Talaingod 209.18 38.92 5.37 -
Sto. Tomas 348.02 195.56 1.78 23.54
Carmen 353.77 166.25 2.13 -
B.E Dujali 129.56 91.00 1.42 43.34
Davao del Norte 3,852.23 1,852.65 2.08
Source: PPDO
3.11 Provincial Roads Condition
Data generated from the Provincial Engineers Office indicates that of the 841.44 kms. of provincial
roads, 273.61 kms or 32.5 % are in good condition, 456.60 kms. or 54.3 % are fair, 15.92 kms. or
1.9% are in poor condition while 95.31 kms. or 11.3 % are in bad conditions. Based on the criteria
stipulated in the Special Local Roads Fund (SLRF)-Local Roads Inventory Form 2 of the Department of
the Interior and Local Government (DILG) “Fair” means the road is smooth riding even if there are
visible potholes and cracks. On the other, hand “Poor” means uneven riding, large percentage
patching or potholes, cracking and edge damage, while “Bad” means very rough riding, extensive
damage and potholes, badly broken edges, poor drainage
Improvement and rehabilitation of road sections with poor and bad surface condition shall be given
priority to enhance accessibility and mobility.
Table 6. Road Conditions of Provincial Roads Davao del Norte, August 2013
Municipality Surface Road Condition Length (km.) Length (km.) Good Fair Poor Bad
Dis
tric
t 1
Asuncion 46.99 66.89 2.00 115.88
Kapalong 51.09 37.83 1.62 2.77 93.31
New Corella 75.35 97.43 14.30 - 187.07
San Isidro 5.03 67.99 - - 73.02
Talaingod 25.10 0.63 - 26.72 52.45
Dis
tric
t 2
Carmen 98.77 26.73 125.50
B.E. Dujali 6.75 36.12 - 12.62 55.49
Sto. Tomas 63.30 50.94 - 24.47 138.71
TOTAL 273.61 456.60 15.92 95.31 841.44
% Distribution 32.50 54.30 11.30 1.90 100 Source: PPDO and PEO
Provincial Road Network Development Plan, 2014-2018 Page 32
Figure 13. Provincial Road Condition Map
Provincial Road Network Development Plan, 2014-2018 Page 33
3.12 Traffic Characteristics The traffic survey conducted in July 2012 in the provincial core roads indicate that the largest traffic
volume was observed in the core roads under group/cluster 6 with recorded AADT (in all vehicle
units) of 7,729. Road sections under group 6 are: a) Dujali-Tanglaw, b) Dujali-Balisong-Magupising, c)
Prk Narafil-Brgy Site Magupising, d) Jct. Highway-Tanglaw, e) Dujali-Sitio Pawas, f) Purok 1-Purok 2
Sitio Pawas, g) Dujali-Pawas-San Vicente, h) Jct. Salvacion-San Vicente-Cabay-angan, and i) Prk 5-Prk
1 Pawas-Dujali. These road sections serve as collector road for the vast banana production areas in
Sto. Tomas, B.E Dujali and Carmen. Volume of vehicle traffic along cluster 1 and cluster 7 core roads
is also high as indicated in the survey. Although it is worth noting that majority or a large number of
vehicles passing these routes are motorcycles. Detail of traffic survey on the provincial core roads is
presented in Table 7.
Table 7. Traffic Count of the Provincial Core Roads Davao del Norte, July 2012
Road ID/Road Name AADT (in vehicle
units)
AADT (in PCU)
Cluster 1 - Semong-Palma Gil - Sto.Nino-Palma Gil-Jct Opao - Jct Highway Gabuyan-Semong-Dagohoy - Dagohoy-Daligdigon - Angelo-Dagohoy - Jct Gabuyan-Katipunan-Bucana
100 694
1,896 333 518
1,947
55
574 1,150
194 331
1,250
Cluster 2 - Kapalong-Mabantao-Florida - Florida-Sua-on-Jct. Gupitan - Jct. Suaon-Libuton - Monte Dujali-Gupitan
1,216
399 462 190
814 271 298 116
Cluster 3 - Jct. Highway Magatos-New Bantayan - Magatos-Bdry. Pagsabangan - Ilog-New Bantayan - Jct. Highway-Canatan-Jct. Highway Magatos - San Vicente-Butay
837 370 814 563 680
574 245 504 363 401
Cluster 4 - Jct. Highway Dna Andrea-Capungagan - Pamacaun-Lasang Banate - Capungagan-Mabuhay-Pandulian - Km.9 Sagayen-Sawata - Igangon-Sawata - Jct. Sawata-Brgy. Binasbas
406 544 237 508
1,003 554
223 287 147 339 740 374
Cluster 5 - New Katipunan-Pantaron - Feeder Road 3-San Jose - Feeder Road 3-Kimamon-Luna
930 848
1,951
968 643
1,590
Provincial Road Network Development Plan, 2014-2018 Page 34
Cluster 6 - Dujali-Tanglaw - Dujali-Balisong-Magupising - Prk Narafil-Brgy. Site Magupising - Jct. Highway-Tanglaw - Dujali-Sitio Pawas - Purok 1-Purok 2 Sitio Pawas - Dujali-Pawas-San Vicente - Jct. Salvacion-San Vicente-Cabay-angan - Purok 5-Purok 1 Pawas-Dujali
633
1,268 892
2,718 389 270
1,024 535
592
1,072 522
2,653 345 204 784 345
Cluster 7 - Jct. Highway Ising-Magsaysay - Maligaya-New Camiling - Anahaw-Maligaya - Tuganay-Anibongan-San Isidro
518 382 314
2,906
469 316 187
1,868 Source: Provincial Engineers Office, Davao del Norte
3.13 Average Travel Time
Table 8. Average Travel Time from the Province to Davao City,
Under Major External Routes
City/Municipality Travel Time
Talaingod 2hrs-15mins
Kapalong 1hr-45mins
Asuncion 1hr-15mins
San Isidro 2hrs-15mins
New Corella 1hr-30mins
Sto. Tomas 1hr
Be Dujali 45mins
Carmen 30mins
IGaCoS 1hr
Panabo City 15mins
Tagum City 1hr
Source: PEO- Davao del Norte
The average travel time from the different cities and municipalities in the province to Davao City, the
regional center is shown in Table No. 9. Talaingod and San Isidro are the farthest municipalities with
respect to Davao City. Travel time from Tagum City is on average while Panabo City has the least
time of travel.
Provincial Road Network Development Plan, 2014-2018 Page 35
Table 9. Average Travel Time from Major Provincial Urban Centers to
Production Agricultural Areas, Province of Davao del Norte
Major Urban Production Areas
Centers Talaingod Kapalong Asuncion San
Isidro New
Corella Sto.
Tomas BE
Dujali Carmen IGaCoS
Tagum City
1hr-20mins 45mins 30mins
1hr-20mins 30mins 45mins 20mins 30mins
1hr-30mins
Panabo City
1hr-45mins
1hr-20mins
1hr-10mins 2hrs
1hr-10mins 1hr 45mins 15mins 45mins
Source: PEO-Davao del Norte
Reflected in table 9 is the average time of travel from the production areas in different
municipalities to the two major urban centers of the province; Tagum and Panabo City. Tagum and
Panabo City are categorized under small/medium city (Primary Urban Center A). Most of the
agricultural and production areas are located in the municipalities. Carmen and IGaCoS are nearer in
terms of time travel to Panabo City, while the rest of the municipalities take lesser time to travel to
Tagum City.
Table 10. Average Travel Time to Municipalities/Cities where Government and Private Hospitals are Located, Province of Davao del Norte
Hospital Municipalities/Districts
Locations Talaingod Asuncion San Isidro New Corella
Sto. Tomas
B.E. Dujali
Babak District
(IGaCoS)
Kaputian District
(IGaCoS)
Tagum City 1hr-20mins 30mins
1hr-20mins 30mins 45mins 20mins
Panabo City 1hr-45mins
1hr-10mins 2hrs
1hr-10mins 1hr 45mins
Kapalong 20mins 20mins 45mins 1hr-15mins 25mins 50mins
Carmen 1hr-30mins 1hr
1hr-45mins 1hr 45mins 25mins
Samal District (IGaCoS) 15mins 30mins
Source: PEO-Province of Davao del Norte
Private and government hospitals are located in Tagum City, Panabo City, Kapalong, Carmen and
Island garden City of Samal. Talaingod, Asuncion, San Isidro and Sto. Tomas take lesser time to travel
to Kapalong but larger hospitals are located in Tagum City. New Corella and B.E. Dujali take the least
Provincial Road Network Development Plan, 2014-2018 Page 36
time to travel to Tagum City. Talaingod and San Isidro have the largest travel time to any of the
hospital facilities in the province. In Island Garden City of Samal, Kaputian District takes more time to
travel to a hospital in Samal District as compared to Babak District which, on the other hand, also is
nearer to Davao City than the other two districts.
Generally, schools and health centers are located in the center of barangay or municipality. In
remote barangays, barangay centers are usually located near the larger clusters of settlements. In
some cases, smaller clusters in sitios travel to the barangay center as far as five (5) kilometers or
more.
3.14 Road Investment
Road Maintenance
There are two (2) sources of funds for road construction, maintenance and rehabilitation, namely
the General Fund and 20% Development Fund. Between 2008 and 2009, the budget for road
maintenance grew by 23.61% from P44.90 million to P55.50 million, on account of the 63.13%
increase in the price level of gasoline. Although increased price levels of gasoline, oil and lubricants
were posted for 2010 and 2011, corresponding reduction in the Internal Revenue Allotment (IRA)
took place. This resulted to a decreasing trend for the budget for road maintenance from P 51.50
million (2010) to P51.45 million (2011) and eventually to P41.10 million in 2012. In 2013 the budget
increased to 55.2 million. Comparative expenditures for road maintenance activities are presented in
Figure 14.
2008 2009 2010 2011 2012 2013
Budget for Road Maintenance 44.9 55.5 51.5 51.45 41.6 51.6
Gasol, Oil & Lubricantsine 23.6 38.5 32.6 29.75 17 26.9
Materials 2.3 2.3 2.3 2.6 3 2.4
Labor/Overhead 19 14.7 16.6 19.1 21.6 22.3
0
10
20
30
40
50
60 Figure 14. Budget for Road Maintenance (in PhP Million)
Provincial Road Network Development Plan, 2014-2018 Page 37
Maintenance Activity
There are two (2) types of road maintenance work, namely: the routine maintenance work and
periodic maintenance work.
1. Routine Maintenance Works
Routine maintenance works are those maintenance activities regularly done by maintenance crew
throughout the year to prevent deterioration and to maintain the good condition of road surface,
bridges and cross drains. The maintenance works for unpaved roads includes: (a) Grading and
smoothing road surface; (b) Patching and filling of potholes, (c) Cleaning of cross drainage, ditches
and canal; (d)Removal of debris and fallen trees; and (e)Vegetation control.
For paved roads, maintenance works consist of (a) Grading and smoothing of road shoulder; (b)
Cleaning of cross drains and canal; and (c) Vegetation control. Maintenance works for bridges and
cross drainage are limited to the following activities: (a) Minor repair on abutment’s slope
protection; (b) Vegetation from bridge structure; (c) Minor re-paintings on railing and wing wall; (d)
Cleaning of waterway; and, (e) Cleaning and sweeping on bridge deck and sidewalk.
2. Periodic Maintenance Works
Periodic maintenance requires extensive work and covers a larger scale than the routine
maintenance works. The purpose of periodic maintenance is to restore the deteriorating condition
of roads, bridges and cross drainage to their original condition. For unpaved roads, periodic
maintenance involves (a) Re-graveling, reshaping and compacting; (b) Re-grading of silted ditches;
(c) Replacing and /or upgrading of damaged cross drains when necessary; and (d) Replacing road
signs.
Paved roads maintenance works comprise the following: (a) Resurfacing road shoulders; (b)
Upgrading of cross drainage, when necessary; (c) Reblocking of pavement, when necessary; and (d)
Vegetation pruning. Periodic maintenance works for bridges includes (a) Repair of scoured ripraps;
(b) Repainting of railings, railing posts and wing walls of bridges; and, (c) Replacement of bailey
bridge running boards.
Provincial Road Network Development Plan, 2014-2018 Page 38
0
10.7
4.11 4.3
12.45
21.53
2008 2009 2010 2011 2012 2013
Figure 15. Budget for Road Rehabilitation from 5% PDRRM Fund (in Million pesos)
Road Rehabilitation
Prior to 2008, there was no funding allocation from the Provincial LGU Calamity Fund for road
rehabilitation. However, from 2009 to 2012, there was funding from the National Government
through SLRF and from the Davao Integrated Development Project (DIDP) funded by the Department
of Agriculture (DA). Due to the occurrence of natural calamities like heavy downpour/prolonged
rainfall that result to flash floods and soil erosion, the Calamity Fund of the province for road
rehabilitation amounted to P 10.70 million in 2009, P 12.45 million in 2012 and P 21.53 million in
2013. For 2010 and 2011, the budget for road rehabilitation was at the vicinity of P 4 million (Figure
15).
The Motorized Vehicle Users
Charges (MVUC)/SLRF
financed the upgrading of
provincial roads in 2008, 2010
and 2012. In 2011 and 2013,
MRDP funded the
construction/ rehabilitation of
farm- to- market roads in
almost all municipalities of the
province with a minimal
counterpart from the Provincial LGU and implementation was done by contract. Other provincial
investments for road construction and rehabilitation were from the DIDP, Tourism Projects and
Ginintuang Masaganang Ani Program (GMAP).
Road rehabilitation works include the following: a) Resurfacing and grading of heavily damaged road
sections; b) Compacting of surfacing materials; c) Upgrading of cross-drainage materials; d) Re-
installation of dilapidated reinforced concrete pipe; e) Major repair/rehabilitation of the damaged
substructure and superstructure of existing bridges; f) Slope protection on the areas prone to
landslide; g) Installation of grouted ripraps using concrete blocks; and h) Excavation works of excess
materials.
Provincial Road Network Development Plan, 2014-2018 Page 39
Table 11. Sources of Funds for Road Construction/ Maintenance/ Rehabilitation (PhP Million)
Year Maintenance of Roads
Construction / Rehabilitation
MVUC / SLRF
MRDP LGU World Bank
Other Provincial Investment (DIDP, Tourism Project and GMAP)
TOTAL
2008 44.9 0 5.7 0 0 15.2 65.8
2009 55.5 10.7 0 0 0 15.3 81.5
2010 51.5 4.11 5.4 0 0 5.14 66.15
2011 51.4 4.3 0 9.5 213 25.14 303.34
2012 41.6 12.45 10.3 0 0 14.78 79.13
2013 51.6 21.53 153.569 15.737 242.436
TOTAL 296.5 53.09 21.4 9.5 366.569 91.297 838.356
Source: Provincial Engineer’s Office/ Provincial Planning and Development Office
3.15 Development Issues and Challenges in Road Sector Planning and Management
The analysis of primary and secondary data as well as in consultation with various stakeholders on
the status and conditions of the road network of the province yielded the following issues and
challenges on different stages of road development and management:
Road Development Processes Issues and Challenges
Road Planning and Design
a. There is the need to upgrade the competencies of planners and designers in analysing and integrating issues and concerns on gender, environment and social inclusion, in road planning and designs.
b. The existing road design is no longer applicable to some provincial roads because of the current traffic volume, i.e., more and/or heavily/over loaded vehicles.
c. Cross-cutting themes (i.e gender, environment, DRR-CCA, etc.) are not yet considered in local road design.
Road Maintenance
a. Insufficient allocation for road maintenance activities. b. Incidence of soil erosion and landslides in upland areas that
further deteriorates road conditions. c. There is lack of vegetation control activity. Part of the
Provincial Road Network Development Plan, 2014-2018 Page 40
design roadway is also planted with bananas and other temporary crops. This results to the loosening of the onsite materials which are not the ideal road surface.
d. Inadequate installation and capacity of cross drainage causing the run-off water to overflow or spill on the roadway consequently loosening the compacted road materials
e. PEO lacks material testing equipment like the Calibration bearing ratio (CBR) apparatus to determine fitness of materials to be used in the road projects and characteristics of the subgrade soil.
f. About 62% of the maintenance equipments are aged or outdated.
g. Lack of workforce competency in material testing particularly in load bearing capacity of soil and toughness/abrasion of aggregates.
h. Lack of community participation in road maintenance. i. Limited and poor road condition in rural areas.
Road Rehabilitation
a. Limited budget allocation for road rehabilitation and improvement
b. Need to acquire new technique and methodologies on road rehabilitation and construction;
c. Non-availability of material testing apparatus- these are needed for field density test and other material testing activities;
d. Absence of manuals on quality control and assurance, contract management, construction supervision and management; and
e. Need to develop concrete tools and strategies to mainstream and integrate gender, environmental and social inclusion issues and concerns in road rehabilitation and construction systems and processes
Road Administration
a. Truck overloading hastens road deterioration, shortens the service life of the road network, and poses risks to lives and properties. It is considered as both a road maintenance concern and a road safety issue.
b. Laxity in the enforcement of the law on truck overloading and the enforcement of the newly approved ordinance on public safety is seen as a challenge in road administration.
c. A system of road safety audit is not in place and road safety information is available to the general public only through temporary warning signs erected during road construction.
Road Service Delivery
a. Delay in project completion due to escalation of the market price of materials, dependency on the availability of resources like equipment and manpower and absence of all-risk insurance to cover damages incurred during calamities.
b. Limited allocations for road maintenance that also limits the scope of works and the frequency of maintenance activities of the provincial roads.
Road Safety a. Lack of traffic facilities and appropriate road furniture.
Provincial Road Network Development Plan, 2014-2018 Page 41
b. Inadequate road maintenance activities. c. Absence of Road Safety Council in all levels of the local
government units. d. Lack of properly trained responders to handle post-crash
response. e. Inadequate medical response equipments in public hospitals
and trauma centers. f. Laxity in the imposition of existing rules and regulations (i.e
truck overloading) related to road safety. g. Unskilled/reckless drivers. h. Poorly maintained/ageing vehicles (unroadworthy vehicles). i. None provision of lane usage for road users with special
needs. j. Limited transport/mobilization for the responders. k. Poor coordination between PNP, DPWH and other line
agencies. l. Poor quality of post-crash response. m. Non enforcement of road safety policies-wearing of safety
gears and other protection gadgets are not implemented on various activities
n. Absence of functional inter-agency mechanism to lead and a committee to anchor road safety administration.
Human Resource
Development
There is an inadequate competence of the workforce in the following areas:
a. Material testing – absence of laboratory testing using California Bearing Ratio (CBR) and Los Angeles Abrasion Machine.
b. Driving and operating of road maintenance equipment such as road graders, dump trucks, pay loaders, road excavators and road compactors.
c. Technical skills for road maintenance particularly in the conduct of road and bridge condition survey.
d. Supervisory and management skills for Engineers and Construction and Maintenance Foreman.
e. Need to increase knowledge and skills on a) road inventory and traffic survey; b) road network development planning; c) tools and guidelines on gender-responsive infrastructure projects.
f. Crosscutting themes are not considered in local road design g. Need of new technique and information technology-thus
there is a delay in the implementation of road rehabilitation and construction projects
h. Inadequate skills in road safety audit and planning; thus explaining the absence of a road safety plan
i. Non-enforcement of road transport administration policies (ordinances and measures)
j. Inadequate competency in designing and planning an IEC campaign on road safety awareness; as well as lack of funding and an implementing mechanism
Provincial Road Network Development Plan, 2014-2018 Page 42
Over-all Goal
To enhance inter and intra – provincial road linkages in support to the attainment of the
“P.E.O.P.L.E.” agenda.
Over-all Objectives
1. To improve linkages among national, provincial, city, municipal and barangay road network
that connects to the urban/growth centers to provide easy access to production and
settlement areas.
2. To ensure the rehabilitation and proper maintenance of provincial core road network that
would link to production areas, market and growth centers and strengthen people access to
social and economic services and infrastructure utilities and facilities.
3. To ensure mainstreaming of gender, environment and social inclusion issues and concerns in
road network development planning, design and implementation.
4. To implement cost effective road service delivery arrangement in partnership with various
stakeholders.
5. To capacitate the provincial government in terms of resource mobilization and allocation
and human resource development in relation to road network development.
Chapter 4. Road Sector Goals,
Objectives, Strategies and Targets
Provincial Road Network Development Plan, 2014-2018 Page 43
6. To ensure that rules and policies and other infrastructure requirements relative to road
safety are properly observed and implemented.
7. To strengthen CSOs and community participation in road network development planning,
implementation and monitoring.
8. To enhance transport access and connectivity of Island Garden City of Samal to the mainland
Davao del Norte.
4.1 Sustainable Road Management
4.1.1 Road Planning and Design
Objective: - To develop and implement a provincial road network development plan based on
participatory road network assessment, environmental and gender concerns.
Specific Objectives:
1. To develop and implement systems and processes in road network development planning,
and management.
2. To enhance the knowledge, skills and attitude of technical personnel of Provincial Engineers
Office (PEO) and Provincial Planning and Development Office (PPDO) on the standard
practice of road planning and design;
3. To ensure an efficient, accurate and timely preparation of engineering design using latest
engineering technology;
4. To ensure a timely and accurate road inventory for better road management.
Strategies
1. Utilize participatory approaches in road network development planning and implementation
particularly in PRNDP formulation and implementation and road planning and engineering
design preparation.
2. Adoption of selection criteria in choosing the core road network. (Table 12)
3. Implement national road planning and design guidelines and ensure that cross-cutting
themes such as gender, environmental management, DRR-CCA and social inclusion are
considered in the design of local roads.
4. Incorporate the road safety strategies and hardware in road planning, design and POW
preparations.
5. Implement the road safety audit and inventory to ensure compliance to existing rules and
regulations relative to road safety.
Provincial Road Network Development Plan, 2014-2018 Page 44
6. Strengthening of Provincial Road inventory Team to conduct an annual road inventory and
traffic survey.
7. Prioritize the implementation of the major external, internal and other access routes that
link Davao del Norte to adjacent provinces of Compostela Valley, Bukidnon, Agusan del Sur
and Davao City.
8. Ensure the development, implementation and monitoring of the Provincial EMPs, and
specific EMPs for road and bridge projects.
Targets
1. The PLGU has developed and implemented a Provincial Road Network Development Plan
and integrated this to the PDPFP, AIP and Annual Budget of the PLGU by end of 2014.
2. Road design are DRR-CCA compliant by 2014.
3. Formulate a gender-responsive, cost efficient and effective road planning and design
guideline by 2014.
4. Establish a sex-disaggregated MIS relating to road planning and design by end of 2014.
5. Optimized capability development activities and training programs to sustain PEO
knowledge and skills to do road design, engineering investigations and survey of roads
compliant to national standards.
6. Require EMPs as a component in planning and design for every locally and externally funded
road projects by 2014.
Table 12. Prioritization Criteria in Selecting Core Road Network
Davao del Norte
Criteria Weight
1. CONNECTIVITY 29
1.1 Link to two or more cities/municipalities 10
1.2 Link to provincial road 9
1.3 Link to national road 10
2. ECONOMIC 37
2.1 Provides direct link to tourist sites 12
2.2 Provides access to areas utilized for agriculture and fisheries
13
2.3 Provides direct link to processing/ industrial Centers
12
3. SOCIAL SERVICES 13
3.1 Provides direct link to hospitals/ health centers 7
3.2 Provides direct link to schools 6
Provincial Road Network Development Plan, 2014-2018 Page 45
4. ENVIRONMENT 21
4.1 Does not lead to watershed/ protected areas 7
4.2 It is not located nor nearby a geo-hazard area 7
4.3 It does not traverse flood prone areas 7
TOTAL 100
4.1.2 Road Maintenance
Objective - To ensure that the core road network is maintained in good condition to enable the safe,
convenient and economical movement of people, goods and services.
Strategies
1. Prioritization of roads for maintenance in terms of traffic volume and those that serve as
main roads in availing the road maintenance activities to maximize budget
allocation/resources.
2. Gradual shifting of mode of implementation of maintenance activities from by
administration to contracting out to cover the average efficiency of equipment. This can be
applied for both locally and externally funded road maintenance operations.
3. Requiring the submission of an Annual Provincial Road Maintenance Plan before any funding
request may be considered.
4. Improve the existing routines and procedures, and institutionalize the scheduling system in
road maintenance. This will cover proper management of resources like equipment,
manpower and materials.
5. Enhancing the regular vegetation control as part of the routine maintenance activity through
consistent advocacy on community participation in road maintenance in coordination with
the MLGUs and BLGUs .
6. Gradual transfer of 10% of the allocated budget for road maintenance program from 20%
development t fund to general fund from 2016 onwards.
Targets
1. By CY 2018, 100% of the Provincial Core Road Network will be in good/fair condition.
2. Increase budget allocation for road maintenance by 10% annually.
3. Sustained implementation of capacity building plan to strengthen PEO capacities on road
maintenance.
4. Contract out at least 15 % of the budget for CY 2014 road maintenance projects and increase
the level of contracting out by at least 5% from 2015-2018.
Provincial Road Network Development Plan, 2014-2018 Page 46
5. Implement a Community-based road maintenance project through partnership and
collaboration with various stakeholders by 2014.
6. Conversion of some arterial provincial roads to national roads and also, some municipal
roads to provincial roads.
7. Enhanced system and procedure in road maintenance activities in place and adapted by
2014.
4.1.3 Road Rehabilitation
Objective- To strengthen and institutionalize road rehabilitation and construction as an important
function of the provincial government in order to have a quality, stable and standard road network.
Strategies
1. Ensure annual budget allocation for road rehabilitation and construction activities. This can
be done by ensuring that the PRNDP, which contains the road rehabilitation and
construction priorities will be used as a basis in the formulation of Annual Investment Plan
and Annual Budget. Resource mobilization through partnership with other resource
institutions will also be done to augment PLGU internal resources.
2. Develop and implement systematic process of identifying and prioritizing road rehabilitation
and construction projects to maximize limited resources. This will involve developing clear
policies and guidelines in road prioritization.
3. Regular updating of construction techniques and technologies to help reduce construction
time while enhancing and maintaining safety and quality of road rehabilitation and
construction.
4. Strengthen PLGU road rehabilitation systems and processes such as: construction
supervision and management, contract management, quality assurance and quality control.
5. Development and implementation of Environmental Management Plans for locally funded
road rehabilitation projects.
6. Develop and adopt guidelines to ensure that gender, environmental and social inclusion
issues and concerns are considered in planning, implementing and monitoring road
rehabilitation projects.
7. Upgrading of alternate routes that will enhance inter and intra connectivity of Davao del
Norte to other provinces in the region.
8. Regular appropriation of budget from the General Fund and other local sources for
rehabilitation/improvement activities of provincial core roads.
Provincial Road Network Development Plan, 2014-2018 Page 47
Targets
1. Rehabilitate/improve 216.17 kms. of core roads by 2018 using local and external funds.
2. Contracting out 100% of the rehabilitation activities of the core road network as well as all
ODA and nationally funded road related projects.
3. Upgrading of alternate route from Panabo City to Davao City passing through Kiotoy-Sta.
Cruz-Bunawan roads to decongest the traffic in the major Maharlika road particularly
Panabo to Davao City section.
4. Opening of Davao del Norte-Agusan Road via Loreto with 3 bridge component.
5. Development and implementation of EMPs for locally funded road rehabilitation projects.
4.1.4 Road Administration and Management
Road Vehicle Size and Load Weight Regulation
Objective: To maximize service life of provincial roads by regulating truck load weight in the province
through development and enforcement of laws and policies.
Strategies:
1. Strengthen linkages among national, provincial and municipal agencies for the
implementation of national/local ordinances/policies in relation to truck overloading.
Working with the local LGUs and other national agencies will augment the labor and
financial resources of the provincial government and widen its monitoring coverage.
2. Enhance public awareness on RA 8794 and other local policies in relation to truck
overloading. Proper information must be disseminated by the provincial government
through appropriate channels to the general public to gain their cooperation in the
prohibition of truck overloading in provincial roads.
3. Strengthen provincial capacity to sustain and improve the road management through
improve resource mobilization and allocation, systems improvement, human resource
development and community involvement.
Target:
1. By 2016, the provincial government must have preserved stability of its provincial roads and
reduced frequency of road maintenance work in areas plied by overloaded trucks.
Provincial Road Network Development Plan, 2014-2018 Page 48
4.1.5 Road Service Delivery
Objective: To fully understand the benefits of delivering road rehabilitation and maintenance by
administration vis-à-vis contracting out to enable the PLGU come-up with an informed decision on
the most appropriate service delivery program.
Strategies:
1. Conduct an independent assessment on the merits of contracting out and by administration
in delivering road maintenance and rehabilitation projects.
2. Improve, adopt and institutionalize a scheduling system in road maintenance. This will cover
proper management of resources like equipment, manpower, materials and time. This will
also involve upgrading of existing routines and procedure in road maintenance so that it
would help in the development of expertise in the future.
3. Enhance the existing system of monitoring and evaluation of road projects relative to quality
control. The PEO will upgrade its system of monitoring and evaluation in all stages of road
project implementation by strictly abiding by the minimum materials testing and
construction method requirements set by the DPWH to improve the quality of its road
projects
4. Adopt road service delivery by contracting for all ODA and nationally-funded road projects.
When funds have been augmented, the province will adopt a contracting scheme for all road
construction and road rehabilitation projects.
4.1.6 Road Safety
Goal
To reduce vehicular crashes and pedestrian accidents by at least 10% of the previous year of the
total crashes/accidents in Davao del Norte.
Over-all Objective: To maintain a safe and stable provincial road network that facilitates and ensures
the efficient flow of people, goods and services through enforcement of road safety procedures and
measures.
Specific Objectives
1. To promote and strengthen inter-agency coordination for improved road safety
management.
2. To design, develop and maintain safer provincial road network.
Provincial Road Network Development Plan, 2014-2018 Page 49
3. To regulate the use of indigenous mode of transport in the province.
4. To ensure responsible and safety-conscious motor vehicles drivers and mechanics.
5. To enhance road users’ awareness on road safety.
6. To improve the quality of post-crash response.
Strategies
1. Promotion of a road safety awareness program and strengthen inter-agency linkage.
Through this, road safety Information, Education and Communication (IEC) campaign efforts
of DPWH and Land Transportation Office (LTO) will be harmonized to achieve greater
impact.
2. Incorporation of road safety audit in road condition monitoring. As a component of the road
safety plan, regular monitoring of the state of the provincial roads will be conducted to
identify and prioritize maintenance of accident-prone areas.
3. Creation of a sub-committee on road safety management under the Response Committee of
the PDRRMC.
4. Forge partnership with various stakeholders, including tri-media for road safety advocacy.
5. Review and propose amendment to the Public Safety and Security Code of the province to
include important provisions on road safety.
6. Provision of appropriate equipments and facilities and enhance capability building activities
for emergency responders.
7. Formulate provisions for lane usage and identifying appropriate facilities for PWDs, women,
children and elderly.
8. Establishment of an emergency response center in LGUs with no public hospital.
Targets
Road Safety Management
1. Creation of Road Safety Management Committee by March 2014
2. Formation Partnership for Road Safety Advocacy
3. Immediate enforcement of the Ordinance on Public Safety and Security Code.
4. Information Education Campaign of Road Safety Ordinance thru Barangay Information Drive
5. Adaption of TARAS form Crash Data System at RSMC
Provincial Road Network Development Plan, 2014-2018 Page 50
6. Reduction of road accidents by 50% from 2012 baseline data.
Safer Roads
1. 100% of the core road network has appropriate road furniture by 2018.
2. Establishment of Road Condition Database for Road Planning and Design by the end of 2014.
3. Ensuring Road Safety Facilities for Vehicles, Pedestrians and Cyclist during road planning,
construction and operation.
4. Construction and Maintenance of quality and hazard-free roads.
Safer Vehicles
1. Strengthen linkages among Government Entities in Implementation of Existing Laws
2. Public awareness of local policies in relation to existing laws
3. To capacitate Motor Vehicle drivers and mechanics
Safer Road Users
1. Organized Road Safety Trainers by 2014.
2. Conduct Forum, Conferences, Symposium on Road Safety
3. Information dessimination using Tri-media & Social Media
4. Maximum deployment of Traffic Police & Law Enforcer
Post-Crash Response
1. Training on search and rescue operation, first aid and basic life support
2. Conduct training on Intensive Care Program
3. Procurement of equipment and facilities
4. Information Education Campaign thru trimedia
4.2 Human Resource Management and Capacity Development
Objective: To strengthen PLGU competencies, systems and processes to support the effective
delivery of road services.
STRATEGIES
To achieve the objectives and address the challenges, the Province shall employ a combination of
strategies that cut across organisational, staffing and system level concerns.
Provincial Road Network Development Plan, 2014-2018 Page 51
1. The province shall design and implement in-house capacity enhancement initiatives such as
trainings, workshops and benchmarking that are responsive to the identified competency
requirements; as well as participate in relevant trainings and workshops offered by
government agencies and other resource institutions.
2. Encourage coaching and mentoring to strengthen workforce competence in the
performance of functions in the workplace and ensure adequate management support.
3. Develop, install and/or strengthen systems in road planning and design, construction,
maintenance, administration and revenue generation to enhance the performance of
functions and strategies, and achievement of results and objectives in road network
development. These shall be done by mobilising experts through technical assistance, as
well as through learning-by-doing, and hand-holding approaches.
4. Acquire appropriate equipment in support of materials testing, GIS support.
5. Harness information communication technologies such as geographic information systems
(GIS) and automate/computerise processes (e.g. Civil 3D) in support of road planning and
design, and real property assessment and collection.
6. Conduct a dialogical process in formulating joint guidelines on social inclusion, GAD,
environmental sustainability and disaster risk reduction and management
7. Regular updating of construction techniques and technologies to help reduce construction
time while enhancing and maintaining safety and quality of road rehabilitation and
construction.
8. Development and implementation of Environmental Management Plans for locally funded
road rehabilitation projects.
9. Develop and adopt guidelines to ensure that gender issues and concerns are considered in
planning, implementing and monitoring road rehabilitation projects.
Targets
1. Personnel complement is adequate and appropriate for efficient implementation of road
planning and design, road maintenance and rehabilitation activities.
2. The provincial workforce are competent7 in specific areas/functions and apply these in the
workplace:
a. Road planning and design by 2014.
b. Road construction (new construction techniques and methodologies) by 2014.
7 Referring to cognitive/knowledge sets; psychomotor/skill sets and aspiration/attitude sets
Provincial Road Network Development Plan, 2014-2018 Page 52
c. Road maintenance (laboratory testing, road maintenance technical skills, laboratory
testing) by 2014.
d. Integrating crosscutting themes (gender equality, social inclusion, environmental
sustainability, and disaster risk reduction) by 2014.
3. Equipment support for the following areas is adequate and appropriate to the requirements
of the workforce, specifically in the areas of:
a. Road inventory and traffic survey
b. Materials testing
c. Road Engineering design
4. Crosscutting themes (gender equality, social inclusion, environmental sustainability, and
disaster risk reduction) are integrated and operationalised in the implementation of road
network development projects by 2016
4.3 Cross-Cutting Strategies in Road Network Planning and Management
1. Strengthen CSOs and community participation in road network development planning
implementation and monitoring.
2. Ensure mainstreaming of gender, environmental and social inclusion issues and concerns in
road network development planning design and implementation. Making road
infrastructures gender responsive, through the availability of areas for walking and
intermediate modes of transport in addition to areas for motorized vehicles, will enable
women to perform their multiple roles and, therefore, satisfy their practical gender needs.
3. Accelerate the participation and equitable representation of women in all spheres of society
particularly in the decision-making and policy- making processes in government to fully
realize their role as agents and beneficiaries of development.
4. Implement road infrastructure projects that are designed to promote equal access of
women and men to employment and basic services. Equal opportunity to participate in
governance structures will help women address their strategic gender interests.
5. Information and education campaign on disaster preparedness shall be incorporated
within the community particularly in the flood, landslides prone areas and other
disasters that affects road conditions.
6. Observe and consider sensitivity issues involving women, men, children and people with
disability and elderly in road constructions, rehabilitations and maintenance activities.
Provincial Road Network Development Plan, 2014-2018 Page 53
Targets
1. Restoring vegetation and forest cover initiatives through implementation of slope protection
activities and forest rehabilitation projects by 2018.
2. Installation of rain gauge in all cities and municipalities to monitor the extent of water
volume during the occurrence of storm or heavy rains by 2018.
3. Conduct of improvement, rehabilitation and maintenance activities of the existing farm to
market road in the far flung barangays particularly in the areas inhabited with Indigenous
People (IPs).
4. Provision of road furniture and facilities like ramps, guard rails and signage for pedestrians,
persons with disability and the elderly by 2018.
Provincial Road Network Development Plan, 2014-2018 Page 54
5.1 Shortlisting/Clustering of Core Road
A Core road is the minimum road network required to support the economic and social development
of the Province by providing good quality road linkages between the population centers, ecotourism,
industrial and economically valuable locations in the Province. The Core Road Network which most
influences the economic well-being of the province has to be maintained at all times using the
available budget provisions from the Province.
Considering the limited resources available for rehabilitation of the provincial roads, a participatory
process of identification and prioritization of core roads has been employed. Using the criteria in
selecting the core road network (Table 12) the prioritization yielded the result presented in Table 14.
Table 13. Clustered Core Roads
Davao del Norte, 2013
Cluster Name of Road Section Road Length (km.)
1 Semong-Palma Gil Sto. Nino-Palma Gil-Jct.Opao Jct. Highway Gabuyan-Semong-Dagohoy Dagohoy-Daligdigon Angelo-Dagohoy Jct. Gabuyan-Katipunan-Bucana Sub-total
2.73 5.99 5.89 3.34 2.19 6.97
27.11
Chapter 5. Road Investment
Provincial Road Network Development Plan, 2014-2018 Page 55
2 Kapalong-Mabantao-Florida Florida-Suaon-Jct. Gupitan Jct. Suaon-Libuton Monte Dujali-Gupitan Sub-total
12.13 15.57 7.26 4.58
39.54
3 Jct. Highway Magatos-New Bantayan Magatos-Bdry. Pagsabangan Ilog-New Bantayan Jct. Highway-Canatan-Jct. Highway Magatos San Vicente-Butay Sub-total
7.10 8.33 2.68 4.85 7.52
30.48
4 Jct. Highway Dona Andrea-Capungagan Pamacaun-Lasang Banate Capungagan-Mabuhay-Pandulian Km.9 Sagayen-Sawata Igangon-Sawata Jct. Sawata-Bdry. Binasbas Sub-total
8.70 4.11 5.57
19.40 9.66 0.46
47.90
5 New Katipunan-Pantaron Feeder Road 3-San Jose Feeder Road 3-Kimamon-Luna Sub-total
1.96 4.55
11.76 18.27
6 Dujali-Tanglaw Dujali-Balisong-Magupising Prk. Narrafil-Brgy. Site Magupising Jct. Highway-Tanglaw Dujali-Sitio Pawas Purok 1-Purok 2 Sitio Pawas Dujali-Pawas-San Vicente Jct. Salvacion-San Vicente-Cabay-angan Purok 5-Purok 1 Pawas-Dujali Sub-total
3.60 5.52 2.08 3.98 1.25 1.40 4.42 3.45 2.18
27.88
7 Jct. Highway Ising-Magsaysay Maligaya-New Camiling Anahaw-Maligaya Tuganay-Anibongan-San Isidro Sub-total
10.84 2.13 4.80 7.22
24.99
Total 216.17
5.2 Prioritization of Core Roads
The TWG together with key stakeholders set out the evaluation process and criteria in prioritizing
the core road using the Goals Achievement Matrix (GAM) and Ranking by Perceived Urgency. The
province’s investible funds for roads and the advantages of each road project over the others were
also considered in the final ranking of the core roads (Table 14).
Provincial Road Network Development Plan, 2014-2018 Page 56
Figure 16. Provincial Core Road Map
Provincial Road Network Development Plan, 2014-2018 Page 57
Table 14. Final Ranking of the Core Roads Davao del Norte, 2013
RANK CORE ROAD CLUSTER/GROUP COST (PhP)
1 Cluster 2 168,772,000.00
2 Cluster 5 38,195,000.00
3 Cluster 6 67,000,000.00
4 Cluster 4 84,211,000.00
5 Cluster 7 21,640,000.00
6 Cluster 3 46,421,932.00
7 Cluster 1 17,816,365.00
TOTAL 444,056,297.00
5.3 Projected funds for road investments
The investible funds for roads were determined based on the five-year projections on income and
expenditures8. The linear regression method was applied in forecasting the income from regular
sources while for non-tax revenues the average growth rate (AGR) method was used. By studying
the projections shown in table 15 taken from the Strategic Financial Management Plan, the available
fixed locals sources of funds for road investments was computed.
Table 15. Projected Income and Expenditures
Davao del Norte
2013 2014 2015 2016 2017
PROJECTED INCOME 991,497,763 1,086,242,000 1,188,379,400 1,300,813,100 1,435,516,910
TOTAL LOCAL SOURCES 136,285,000 145,508,000 153,572,000 162,525,000 172,400,000
IRA 855,212,763 940,734,000 1,034,807,400 1,138,288,000 1,251,116,910
PROJECTED EXPENDITURES 1,099,809,213 1,178,278,013 1,236,366,521 1,258,297,371 1,309,423,648
Sub-total Statutory and Mandatory Obligations
501,202,742
505,083,857
499,778,984
506,465,654
523,751,650
Sub-total 20% Development Fund
170,308,121
187,338,933
206,072,826
226,680,109
249,348,120
TOTAL SPECIAL EDUCATION FUND
31,697,904
32,268,494
40,232,229
34,174,764
36,325,178
Source: Provincial Treasurer’s Office as reflected in the SFMP
8 As described in the Strategic Financial Management Plan of Davao del Norte
Provincial Road Network Development Plan, 2014-2018 Page 58
The provincial government has been funding road maintenance activities using the General Fund and
the 20% Development Fund. On the other hand, Road Rehabilitation projects have been undertaken
only through programs funded by national agencies like the SLRF and DIDP. However beginning in
2009, in the aftermath of disasters, the Calamity Fund, now known as the DRRM Fund, has been
made available for road rehabilitation projects.
Table 16 shows the projected local funds for road investments. Beginning on year 2014, 28.5 % of
the DRRM fund will be available for road rehabilitation project projected to increase by 10% every
year. Meanwhile, as targeted in the PRNDS, 6 million of the annual budget will be allocated for road
rehabilitation project also projected to increase by 10% every year. The Special Local Road Fund
annually provided by the DILG as the provincial share for MVUC collection has also been identified as
a source of fund for road investments.
Table 16. Estimates for Core Road Funding from Fixed Local Sources (in PhP Millions) Davao del Norte, 2013
AIP Year DRRM Fund Local Rehab Maint. Fund to
Road Rehab/
Impvt.*
Total
2014 17.09 6.00 - 23.09
2015 18.80 6.60 - 25.40
2016 20.68 7.26 6.47 34.41
2017 22.75 7.99 7.12 37.86
2018 25.02 8.78 7.83 41.63
Total 162.39
Note: * based on the strategy of gradual shifting of the 10% of the Maintenance fund to General Fund starting on CY 2016.
5.4 Five –Year Road Investment Program
Presented in the table 17 is the summary of five-year investment program for road maintenance
and improvement. The specific PPAs and the corresponding scope of works and activities is outlined
in table 18. The prioritization of projects are based on its rank using tools for project prioritization,
it’s indicative cost and level of urgency for all cluster activity components which can be allocated
given the projected funds of a given year.
Provincial Road Network Development Plan, 2014-2018 Page 59
Capacity development activities for local road safety, road planning and design, road management
and monitoring and evaluation are presented in table 19. Table 21 presents the identified fund
source and the corresponding year of implementation for various capacity development activities.
Given the limited resources of the province it can be seen that not all activity components of some
core road network cluster can be funded thus requiring the province to look for sources of additional
funds for road development. Table 20 shows the summary of the identified sources of funds that
can reinforce road development projects, its probable amount and the year it will most likely be
available. Specific details on local fund sources is presented in table 20-A.
Table 17. Summary of Project Cost of Priority PPAs Davao del Norte, 2014-2018
PPAs Amount (PhP) Local Source External Source
Amount (Php) Amount (Php)
1. Repair/Maintenance of Provincial Roads
343,705,588.27 326,435,588.27 17,270,000.00
2. Rehabilitation and Improvement of Provincial Core Roads
444,056,296.57 55,498,496.57 388,557,800.00
3. Rehabilitation and improvement of provincial roads not identified as core
201,801,919.16 64,557,119.16 137,244,800.00
4. Mitigation of risks along rivers and creeks
61,051,000.00 61,051,000.00 -
5. Improvement of external linkage
360,000,000.00 - 360,000,000.00
6. Local Road Safety 2,010,000.00
1,760,000.00 250,000.00
7. Capacity Development
1,515,000.00
415,000.00 1,100,000.00
8. Monitoring and Evaluation
725,000.00
375,000.00 350,000.00
TOTAL 1,414,864,804.00 510,092,204.00 904,772,600.00
Provincial Road Network Development Plan, 2014-2018 Page 60
Figure 17. Implementation Map
Provincial Road Network Development Plan, 2014-2018 Page 61
Table 18. Proposed Programs, Projects and Activities, 2014-2018
Davao del Norte
I.REPAIR AND MAINTENANCE OF PROVINCIAL ROADS
YEAR 2014 2015 2016 2017 2018
LENGTH 845 845 845 845 845 Local Sources PRMF
Equivalent Maintenance
Cost per kiloleter (EMK)63,277.31 69,605.04 76,565.55 84,222.10 92,644.31
District I - 525.30 kms
District II - 319.70 kms
b.) Maintenace of Selected Provincial
Roads (from PRMF fund) 10,898,000 6,372,000 17,270,000.00 17,270,000.00
TOTAL ANNUAL PROJECT COST 64,367,327 65,188,260 64,697,886 71,167,674 78,284,442 343,705,588.27
Note: Repair/Maintenance of Provincial Roads and Bridges Cost Projections are based on the following assumptions below
1. Maintenance Cost is 10% increasing with starting amount of 53,469,327 taken from 2014 approved AIP, accounting inflation rate of services, goods, and increase frequency ofmaintenance activities due
to unpredictable weather conditions
TOTAL COST 343,705,588
a.)Repair/Maintenance of Provincial
Roads and Bridges - District I and II
(from Local funds)
53,469,327 58,816,260 64,697,886 71,167,674 78,284,442
ANNUAL COST(PhP)TOTAL PROJECT
COST (PhP)
SOURCE FINANCING (PhP)
326,435,588.27 326,435,588.27
Provincial Road Network Development Plan, 2014-2018 Page 62
2014 2015 2016 2017 2018 Local Sources SLRF
DOT
Convergence PRMF FMRDP PRDP
Rank 1 : CLUSTER 2 ( Kapalong-San
Isidro)
1.a) 2 units 10 ln.m. Flat Slab along Monte
Dujali- Gupitan Section 4,572,000 4,572,000
Kapalong-Mabantao-Florida 12.13km1.b) Slope Protection along Dujali-Gupitan
Road Section 6,000,000 6,000,000
Florida Suaon - Jct Gupitan 15.57 km1.c Rehab/Impvt. of 3.25 km Kapalong
Mabantao - Florida Road 4,000,000 4,000,000
Jct Suaon - libuton 7.26 km1.d) Concreting of Jct Suaon-Libuton 7.26 km
Phase I50,000,000
50,000,000
Monte Dujali - Gupitan 4.58km1.e) Concreting of Jct Suaon-Libuton 7.26 km
Phase II50,000,000
50,000,000
1.f) Concreting of Jct Suaon-Libuton 7.26 km
Phase III50,000,000
50,000,000
1.g) Installation of Guardrail 4,200,000 4,200,000
Sub-Total 39.54 kms 15.09 60,572,000 50,000,000 50,000,000 8,200,000 - 168,772,000 4,200,000 4,000,000 150,000,000 - - 10,572,000
Rank 2: CLUSTER 5 (Sto Tomas-
Kapalong)
2.a) 300m PCCP( Bridge approach) along
Fdr. Rd. 3 -Kimamon -Luna2,564,000
2,564,000
New Katipunan - Pantaron 1.96 km2.b) Rehabilitation of 6.90Km Road (Fdr. Rd. 3
- Kimamon - Luna) Phase I10,000,000
10,000,000
2.c) Rehabilitation of 4.80Km Road (Fdr. Rd. 3
- Kimamon - Luna) Phase II6,935,000
6,935,000
Fd Rd 3 - San Jose 4.55 km 2.d) Slope Protection Fdr. Rd. 3 - San Jose 810,000 810,000
Fd Rd 3 - Kimamon - Luna 11.76 kms2.e) Drainage Improvement along Fdr. Rd. 3 -
San Jose 940,000 940,000
2.f) Disilting Fdr. Rd. 3 - San Jose 660,000 660,000
2.g) Rehabilitation of 4.55kms of Road in Fd
Rd 3 - San Jose Road Sections 11,233,957 11,233,957
2.h) Rehabilitation of 1.96kms of Road in
New Katipunan - Pantaron Road 5,052,043 5,052,043
Sub-Total 18.27 kms 18.27 - - 5,052,043 14,314,000 18,828,957.00 38,195,000 21,260,000 16,935,000 - -
Rank 3 : CLUSTER 6 (BE Dujali - Sto
Tomas)
3.a) Impvt of 3.6 kms in Dujali-Tanglaw Prov'l
Road 6,000,000 6,000,000
Dujali - Tanglaw 3.6 kms3.b Upgrading of 4 kms Magupising - Cabay-
angan (FMRDP) 40,000,000 40,000,000
Dujali - Balisong - Magupising 5.km523.c) 5.52 Kms of Road Rehabilitation in Dujali -
Balisong-Magupising 10,000,000 10,000,000
Prk Narafil - Brgy Site Magupising 2.083.d Rehabilitation of 7.07kms along Dujali -
Sitio Pawas; Purok 1-Purok 2 Sitio Pawas;
Dujali-Pawas-San Vicente 11,000,000 11,000,000
Jct Highway - Tanglaw
Dujali - Sitio Pawas 1.25 km
Purok 1 - Purok 2 Sitio Pawas 1.4 km
Dujali - Pawas - San Vicente 4.42 km
Jct Salvacion-San Vicente-Cabayangan
Purok 5-Purok 1 Pawas-Dujali
Sub-Total 27.88 kms 20.19 50,000,000 11,000,000 - - 6,000,000 67,000,000 - 27,000,000 - - 40,000,000
SOURCE FINANCING (PhP)ANNUAL COST(PhP)
SCOPE OF WORKS
38,195,000
TOTAL PROJECT
COST (PhP)
168,772,000
67,000,000
II. REHABILITATION AND IMPROVEMENT OF PROVINCIAL CORE ROADS
Provincial Road Network Development Plan, 2014-2018 Page 63
2014 2015 2016 2017 2018 Local Sources SLRF
DOT
Convergence PRMF FMRDP PRDP
Rank 4: CLUSTER 4(Asuncion-San
Isidro)
4.a) Improvement of 19 Kms of Km 9-Sagayen-
Sawata 1
38,800,000 4,656,000 34,144,000
Jct Highway Dona Andrea-
Capungagan 8.70km
4.b) Improvement of 9.66 Kms of Road in
Igangon-Sawata 10,000,000 10,000,000
Pamacaun - Lasang Banate 4.11
4.c) Rehabilitation of 4.11 Kms of Road in
Pamacaun-Lasang Banate2
12,000,000 1,000,000 11,000,000
Capungagan-Mabuhay-Pandulian 5.57 4.d) Improvement of 460 m of Road in Jct
Sawata-Bdry Binasbas 936,000 936,000
Km9 Sagayen - Sawata 19.40 km 4.e) Rehabilitation of 5.57Kms of Road in
Capungagan-Mabuhay- Pandulian Phase I
22,475,000
22,475,000
Igangon - Sawata 9.66
Jct Sawata - Bdry Binasbas 0.46 km
Sub-Total 47.90 kms 33.794 49,736,000 12,000,000 22,475,000 - - 84,211,000 6,592,000 43,475,000 - 34,144,000 - -
Rank 5 : CLUSTER 7 ( Carmen)
Jct Highway Ising - Magsaysay 10.84km5.a) Rehabilitation of 7.22 Kms Tuganay-
Anibongan-San Isidro Rd1
14,440,000 1,732,800 12,707,200
Maligaya - New Camiling 2.13km
5.b) 12 ln.m. Single Lane Bridge Construction
along Maligaya - New Camiling 7,200,000 7,200,000
Anahaw - Maligaya 4.8 km
Tuganay-Anibongan -San Isidro 7.22
km
Sub-Total 24.99 kms 17.02 - 14,440,000.00 7,200,000.00 - - 21,640,000 8,932,800 - - 12,707,200 - -
Rank 6 : CLUSTER 3 ( Asuncion) 6.a) Construction of 10 ln.m. flat slab along Jct
Highway -Canatan - Jct Highway Magatos 2,500,000 2,500,000
Jct Highway Magatos-New Bantayan6.b.)Rehabilitation of 2.68kms along Ilog-New
Bantayan 1
5,360,000 643,200 4,716,800
Magatos-Bdry Pagsabangan 8.33 kms6.c) Rehabilitation and minor improvement of
8.33 kms Magatos - Pagsabangan Road1 16,660,000
1,999,200 14,660,800
Ilog-New Bantayan 2.68 km6.d) Rehabilitation of 4.85 Kms along Jct
Highway-Canatan-Jct Highway Magatos 12,000,000 12,000,000
Jct Highway-Canatan-Jct Hiway
Magatos
6.e Rehabilitation of 7.52 kms San Vicente -
Butay Road 9,901,932 9,901,932
San Vicente - Butay 7.52 kms
Sub-Total 30.48 kms 20.7 - 22,020,000 - 14,500,000 9,901,932 46,421,932 5,142,400 21,901,932 - 19,377,600 - -
Rank 7: Group 1: CLUSTER 1 ( Talaingod) 7.a) Rehabilitation and Improvement of
3.34Kms at Dagohoy-Daligdigon Road
Section 2,000,000 2,000,000
Semong-Palma Gil 2.73kms
7.b) Road Rehabilitation of 9.7 Kms along
Semong- Palma Gil, Jct Gabuyan-Katipunan-
Bucana
6,445,068
6,445,068
Sto. Nino-Palma Gil - Jct Opao 5.99
kms7.c) Road Rehabilitation of 5.89 Kms along
Jct Highway-Gabuyan-Semong Dagohoy 3,913,551 3,913,551
Jct Hiway-Gabuyan-Semong-Dagohoy
5.89 kms
7.d) Road Rehabilitation of 2.19Kms along
Angelo-Dagohoy 1,477,746 1,477,746
Dagohoy-Daligdigon 3.34 kms
7.e) Road Rehabilitation of 5.99 Kms along
Sto Nino-Palma Gil-Jct Opao 3,980,000 3,980,000
Angelo-Dagohoy 2.19 km
Jct Gabuyan - Katipunan - Bucana
6.97km
Sub-Total 27.11 kms 27.11 - 2,000,000.00 1,477,745.57 3,913,551.00 10,425,068.00 17,816,365 9,371,297 6,445,068 2,000,000 - - -
TOTAL COST 160,308,000 111,460,000 86,204,789 40,927,551 45,155,957 444,056,297 55,498,497 119,757,000 152,000,000 66,228,800 40,000,000 10,572,000
SOURCE FINANCING (PhP)ANNUAL COST(PhP)
SCOPE OF WORKSTOTAL PROJECT
COST (PhP)
84,211,000
21,640,000
46,421,932
17,816,365
Provincial Road Network Development Plan, 2014-2018 Page 64
III. REHABILITATION AND IMPROVEMENT OF PROVINCIAL ROAD NOT IDENTIFIED AS CORE
IV. MITIGATION OF RISK ALONG RIVERS AND CREEKS
2014 2015 2016 2017 2018 Local Sources SLRF
DOT
Convergence PRMF FMRDP PRDP
PDRRM Mitigation -Improvement of Roads
and Drainage 7,499,680 9,025,648 8,580,933 9,618,243 11,117,416 45,841,919
Rehabilitation of 5.89 kms Jct Gabuyan-
Katipunan - Bucana Road3
11,780,000 1,413,600 10,366,400
Rehabilitation of 5.58kms Pandulain-Jct. San
Miguel3
11,160,000 1,339,200 9,820,800
Rehabilitation of 6.93 kms Km. 15 Kipalili-
New Loon Road3
13,860,000 1,663,200 12,196,800
Rehabilitation of 12.52 kms New Corella-
Saug Road3
25,040,000 3,004,800 22,035,200
Rehabilitation of 3 kms Dujali - San Isidro Road3
6,000,000 720,000 5,280,000
Rehablitation of 3.2 kms Dujali - New Casay
Road3
6,400,000 768,000 5,632,000
Rehabilitation of 3.95kms Dujali-New San
Miguel3
7,900,000 948,000 6,952,000.00
Rehabilitation of 2.18kms New Casay -
Bugtong Talisay Road3
4,360,000 523,200 3,836,800.00
Rehabilitation of 5.37kms Cabay-angan -
Esperanza Road3
10,740,000 1,288,800 9,451,200.00
Rehabilitation of 5.68 kms Ising-Sappodon-
Taba-Diladila Road3
11,360,000 1,363,200 9,996,800.00
Rehabilitation of 2.09 kms Jct.Highway Sto
Nino-Cebulano Road3
4,180,000 501,600 3,678,400.00
Rehabilitation of 4.17 kms Cebulano -
Mangalcal Road3
8,340,000 1,000,800 7,339,200.00
Rehabilitation of 11.34 kms Jct Highway
Carmen - Mangalcal - Tubod Road3
22,680,000 2,721,600 19,958,400.00
Rehabilitation of Jct. Sto. Nino-La Paz - San
Vicente3
12,160,000 1,459,200 10,700,800.00
TOTAL COST 7,499,680 164,985,648 8,580,933 9,618,243 11,117,416 201,801,919 64,557,119 137,244,800
201,801,919
SOURCE FINANCING (PhP)ANNUAL COST(PhP)
SCOPE OF WORKSTOTAL PROJECT
COST (PhP)
2014 2015 2016 2017 2018 Local Sources SLRF
DOT
Convergence PRMF FMRDP PRDP
Disiltation/Excavation 5,000,000 5,500,000 6,050,000 6,655,000 7,320,500 30,525,500 30,525,500
Revetment of dike and slope protection 5,000,000 5,500,000 6,050,000 6,655,000 7,320,500 30,525,500
30,525,500
TOTAL COST 10,000,000 11,000,000 12,100,000 13,310,000 14,641,000 61,051,000 61,051,000
SOURCE FINANCING (PhP)ANNUAL COST(PhP)
SCOPE OF WORKSTOTAL PROJECT
COST (PhP)
Provincial Road Network Development Plan, 2014-2018 Page 65
V. ALNERNATE EXTERNAL LINKAGES
2014 2015 2016 2017 2018 Local Sources SLRF
DOT
Convergence PRMF FMRDP PRDP
Opening of 40 kms. Davao del Norte
Agusan Road via Kapalong - Loreto
with bridge component 200,000,000 360,000,000 200,000,000
Improvement of 15kms Kiotoy - Sta
Cruz - Bunawan ( Panabo City - Davao
city) Concreting Works 160,000,000 160,000,000
Sub-Total 40 kms - - 360,000,000 - - 360,000,000 - - 160,000,000 - - 200,000,000
TOTAL COST 360,000,000 360,000,000 200,000,000
SOURCE FINANCING (PhP)ANNUAL COST(PhP)
SCOPE OF WORKSTOTAL PROJECT
COST (PhP)
Provincial Road Network Development Plan, 2014-2018 Page 66
Table 19. PPAs for Road Safety, CapDev and M&E Davao del Norte, 2014-2018 ROAD SAFETY
Source
1Convene various stakeholders forum for road
safety50,000.00 10,000.00 10,000.00 10,000.00 10,000.00 90,000.00 PDRRM Fund/PRMF 50,000.00
2
Conduct capability development by the PDRRM
road safety management committee on the
Proper fi l l ing-up of TARAS form and efficient
data gathering and data processing for adoption
by PLGU.
5,000.00 5,000.00 PDRRM Fund
3
Organize and conduct road safety trainors'
training among the PDRRMC Road Safety
Management Committee
50,000.00 20,000.00 20,000.00 20,000.00 20,000.00 130,000.00 PDRRM Fund 50,000.00
4Inter-agency consultation (implementation
of existing laws)10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 50,000.00 PPDO
5Confer with the target funding agencies,
business sectors, CSOs and other LGUs5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 25,000.00 PPDO
6Conduct of symposium on road safety on
schools and barangays50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 250,000.00 PDRRM Fund
7Conduct of fora/symposia (Public
awareness of local policies) 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 50,000.00 PDRRM Fund
8Information dissemination using tri-media
and social media through the PIO
9Conduct consultation with the SP
Committee on Public Safety
10Conduct Road Inventory & Traffic Count,
Road Safety Audit and Black spot Analysis50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 250,000.00 PEO
11
Improvement of pedestrian lanes and
pavement markings, installation of road
signage and guardrails
SAFER ROADS
ROAD SAFETY MANAGEMENT
Item
No.Activities
Annual CostTotal Project
Cost (PhP)
VI. LOCAL ROAD SAFETY
SOURCE FINANCING (PhP)
2014 2015 2016 2017 2018Local Sources
PRMF TESDA
Provincial Road Network Development Plan, 2014-2018 Page 67
Source
12Conduct trainings and seminars for drivers
and mechanics50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 250,000.00 PEO 150,000.00
13
Coordination with DepED for the
integration of road safety awareness in
school curricula
14 Training on search and rescue operation 130,000.00 70,000.00 70,000.00 70,000.00 70,000.00 410,000.00 PDRRM Fund
15 Training on first aid application 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 250,000.00 PDRRM Fund
16 Training on Basic Life support 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 250,000.00 PDRRM Fund
TOTAL 510,000.00 375,000.00 375,000.00 375,000.00 375,000.00 2,010,000.00
SAFER VEHICLES
SAFER ROAD USERS
POST CRASH RESPONSE
Item
No.Activities
Annual CostTotal Project
Cost (PhP)
VI. LOCAL ROAD SAFETY
SOURCE FINANCING (PhP)
2014 2015 2016 2017 2018Local Sources
PRMF TESDA
= Local Funds = Local Funds and Other Sources = From Other Sources
Provincial Road Network Development Plan, 2014-2018 Page 68
CAPACITY DEVELOPMENT
Source
a. Road Planning and Design
17Advance GIS, POST-GRE, POST GIS and WEB
APPLICATION training.115,000.00 15,000.00 15,000.00 15,000.00 15,000.00 175,000.00 PPDO 100,000.00
19
Mainstreaming of cross-cutting themes
such as gender equity, social inclusion,
environmental management and public
participation in road planning and
management
100,000.00 100,000.00 100,000.00
20 Environmental Planning and Management 100,000.00 100,000.00 100,000.00
b. Road Construction/Rehabilitation
21 Quality control and assurance 70,000.00 70,000.00 20,000.00 20,000.00 20,000.00 200,000.00 PEO 100,000.00
22Construction supervision and contract
management300,000.00 300,000.00 30,000.00 30,000.00 30,000.00 690,000.00 PEO 600,000.00
23Training on Constructors Performance
Evaluation System50,000.00 50,000.00 20,000.00 20,000.00 20,000.00 160,000.00 PEO 100,000.00
c. Road Maintenance
24 Training on heavy equipment operation 30,000.00 30,000.00 30,000.00 90,000.00 PEO
TOTAL 765,000.00 465,000.00 115,000.00 85,000.00 85,000.00 1,515,000.00
Item
No.Activities
Annual CostTotal Project
Cost (PhP)
SOURCE FINANCING (PhP)
2014 2015 2016 2017 2018Local Sources
PRMF TESDA
= Local Funds = Local Funds and Other Sources = From Other Sources
Provincial Road Network Development Plan, 2014-2018 Page 69
MONITORING AND EVALUATION
Source
25
Conduct of regular quality control,
monitoring and supervision of on-going
construction/rahabilitation and
50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 250,000.00 PEO 50,000.00
26
Conduct of training on monitoring and
evaluation of all Programs, Projects and
Activities of Road Sector
125,000.00 125,000.00 25,000.00 25,000.00 25,000.00 325,000.00 PPDO 200,000.00
27
Conduct of data gathering on Community
Impact Monitoring and Evaluation System
(CIMES)
50,000.00 50,000.00 25,000.00 25,000.00 150,000.00 PPDO 100,000.00
TOTAL 225,000.00 225,000.00 75,000.00 100,000.00 100,000.00 725,000.00
Item
No.Activities
Annual CostTotal Project
Cost (PhP)
SOURCE FINANCING (PhP)
2014 2015 2016 2017 2018Local Sources
PRMF TESDA
= Local Funds = Local Funds and Other Sources = From Other Sources
Provincial Road Network Development Plan, 2014-2018 Page 70
Table 20. Annual Summary of Investment of Identified PPAs
PPAs 2014 2015 2016 2017 2018 TOTAL
I.
REPAIR/MAINTENANCE OF PROVINCIAL ROADS
64,367,327.00
65,188,259.70
64,697,885.67
71,167,674.24
78,284,441.66
343,705,588.27
II.
REHABILITATION AND IMPROVEMENT OF PROVINCIAL CORE ROADS
160,308,000.00
111,460,000.00
86,204,788.57
40,927,551.00
45,155,957.00
444,056,296.57
III.
REHABILITATION AND IMPROVEMENT OF PROVINCIAL ROADS NOT IDENTIFIED AS CORE
7,499,680.00
164,985,648.00
8,580,932.80
9,618,242.50
11,117,415.86 201,801,919.16
IV. RISK MITIGATION
10,000,000.00
11,000,000.00
12,100,000.00
13,310,000.00
14,641,000.00 61,051,000.00
V.
IMPROVEMENT OF EXTERNAL LINKAGES -
360,000,000.00 - - -
360,000,000.00
VI. LOCAL ROAD SAFETY
510,000.00
375,000.00
375,000.00
375,000.00
375,000.00 2,010,000.00
VII. CAPACITY DEVELOPMENT
765,000.00
465,000.00
115,000.00
85,000.00
85,000.00 1,515,000.00
VIII.
MONITORING AND EVALUATION
225,000.00
225,000.00
75,000.00
100,000.00
100,000.00
725,000.00
TOTAL
243,675,007.00
713,698,907.70
172,148,607.04
135,583,467.74
149,758,814.52
1,414,864,804.00
Provincial Road Network Development Plan, 2014-2018 Page 71
Table 21. Projected Source of Funds for Rehabilitation and Improvement of Provincial Roads, Mitigation of Risks along Rivers and Creeks and External Linkages Davao del Norte
I. PROJECTED FUNDS FOR REHABILITATION AND IMPROVEMENT OF PROVINCIAL ROADS:
A. LOCAL SOURCES
2014 2015 2016 2017 2018
1. Impvt. Of Roads and Drainage 7.09 7.80 8.58 9.439 10.383 43.30
2. DIsiltation/excavation 5 5.5 6.05 6.655 7.3205 30.53
3.Slope protection 5 5.5 6.05 6.655 7.3205 30.5255
PRNDS Target 6 6.6 7.26 7.99 8.78
Strategy Target x x 6.47 7.12 7.83
23.09168 25.400848 34.41072137 37.8557935 41.63237285 162.39
B. OTHER IDENTIFIED FUND SOURCES
2014 2015 2016 2017 2018
PRDP 10.572 UNDETERMINED 200 UNDETERMINED UNDETERMINED 210.572
FMRDP 40 UNDETERMINED UNDETERMINED UNDETERMINED UNDETERMINED 40
Special Local Road Fund
(SLRF)20 22 24.2 26.62 29.282
122.102AusAid -Provinvial Road
Management Facility
(PRMF)34.14 169.3296
END OF
PROGRAM
END OF
PROGRAM
END OF
PROGRAM203.4736
DOT-DPWH Convergence
Program50 52 210
312
154.72 243.33 434.2 26.62 29.282 888.1476
TOTAL (million
PhP)
TOTAL (million
PhP)
Fund SourcePROJECTED AMOUNT PERYEAR
LOCAL REHABILITATION* 58.05
PDRRM**
TOTAL (millionPhP)888.1476
TOTAL (millionPhP)162.39
Fund SourcePROJECTED AMOUNT PER YEAR
TOTAL (A+B)1050.539
Provincial Road Network Development Plan, 2014-2018 Page 72
Table 22. Projected Funds for Road Safety, CapDev and M&E PPAs
A. LOCAL SOURCE
2014 2015 2016 2017 2018
PDRRM 295,000.00 260,000.00 260,000.00 260,000.00 260,000.00 1,335,000.00
PPDO/GIS 55,000.00 55,000.00 55,000.00 55,000.00 55,000.00 275,000.00
PEO 100,000.00 150,000.00 200,000.00 245,000.00 245,000.00 940,000.00
450,000.00 465,000.00 515,000.00 560,000.00 560,000.00 2,550,000.00
B. OTHER IDENTIFIED FUND SOURCES
2014 2015 2016 2017 2018
PRMF 1,000,000.00 550,000.00 x x x 1,550,000.00
TESDA 50,000.00 50,000.00 50,000.00 150,000.00
TOTAL (PhP) 1,050,000.00 600,000.00 50,000.00 - - 1,700,000.00
Fund SourcePROJECTED AMOUNT PER YEAR
TOTAL
Fund SourcePROJECTED AMOUNT PER YEAR
TOTAL
TOTAL (PhP)
Provincial Road Network Development Plan, 2014-2018 Page 73
RANK / CLUSTER SCOPE OF WORKS TOTAL (PhP)
REHABILITATION AND IMPROVEMENT OF PROVINCIAL CORE ROADS AND EXTERNAL LINKAGE
Rank 1 : CLUSTER 2 ( Kapalong-San Isidro) 1. Slope Protection along Dujali-Gupitan Road Section 10,427,000
Kapalong-Mabantao-Florida 12.13km Florida Suaon - Jct Gupitan 15.57 km Jct Suaon - libuton 7.26 km
Monte Dujali - Gupitan 4.58km
Rank 5 : CLUSTER 7 ( Carmen) Jct Highway Ising - Magsaysay 10.84km
1.) Embankment and Disilting of Jct Highway Ising-Magsaysay (5 kms), Anahaw-Maligaya Rd(4.80 kms) kms total= 9.80
50,000,000
Maligaya - New Camiling 2.13km Anahaw - Maligaya 4.8 km Tuganay-Anibongan -San Isidro 7.22 km Rank 6 : CLUSTER 3 ( Asuncion)
Jct Highway Magatos-New Bantayan 1. Rehabilitation of 18.11 kms of road along Jct Highway Magatos-New Bantayan, Ilog-New Bantayan Rd
101,416,000
Magatos-Bdry Pagsabangan 8.33 kms 2. Slope Protection (18.11 Kms) 48,897,000
Ilog-New Bantayan 2.68 km Jct Highway-Canatan-Jct Hiway Magatos
San Vicente - Butay 7.52 kms
SUB-TOTAL
210,740,000
Table 23. List of Standby Projects for Fund Sourcing
Provincial Road Network Development Plan, 2014-2018 Page 74
Monitoring and evaluation (M&E) is built into the Provincial Road Network Development Plan,
whose focus is on the plan implementation. This section outlines the monitoring and evaluation
system of the PRNDP.
The objectives of M&E are:
1. To enable the province to assess the progress of PRNDP, vis-à-vis, its targets, objectives and
goals, with an established and operationalized systems and structures;
2. To utilize the PRNDP achievements not only for reporting to other project stakeholders but
also for understanding the factors that influence performance and for using the lessons
learned in future planning and programming; and
3. To promote the culture of performance among project implementers and stakeholders as
part of the effort to introduce institutional reforms in the provincial government.
6.1 Monitoring and Evaluation Framework
M&E will look into PRNDP’s accomplishments in relation to its contribution in the achievement of
the goal of the transport sector component of the Provincial Development and Physical Framework
Plan (PDPFP) of the province. PDPFP goals in the road sector states that the development of the
sector is to support the enhancement of the economic and social undertaking of the province. This is
measured in the improvement of access and linkages within and outside the province, reduction of
road crashes, and enhanced provincial capacity in road planning and project implementation. The
Chapter 6. Plan Monitoring
and Evaluation
Provincial Road Network Development Plan, 2014-2018 Page 75
relationship of the goal, outcomes and outputs is presented in the Logical Framework Matrix (LFM)
of PRNDP in table 23. This relationship is further articulated in the Results Chain presented in Figure
9, to aid in assessing the progress of implementation by showing the links and relationship in the
attainment of objectives as inputs and activities are provided and/or implemented.
The Performance Measurement Framework in Table 24 derived from the Logical Framework Matrix
will serve as to guide in the conduct of monitoring and evaluation processes. The framework
suggests that monitoring and evaluation is dependent on the following:
• Availability of baseline information of the condition in the project areas; among others, on
the economic, social and physical aspects;
• Functionalization of an effective and efficient data collection systems and procedures with
the involvement of project implementers, partners and stakeholders;
• Efficient information sharing among project implementers, partners and stakeholders for
appropriate action.
Provincial Road Network Development Plan, 2014-2018 Page 76
Table 23. Logical Framework Matrix: Monitoring and Evaluation
Results and Activities Objectively Verifiable Indicators Means of Verification Assumptions and Risks
Goal:
Economic and social undertakings enhanced
__% increase in household income by 2018 Community Base Monitoring Systems (CBMS), Community Impact Monitoring and Evaluation Survey (CIMES)
R: Unstable peace and order R: Climate Change A: Presence of Public-Private Partnership support mechanisms A: Political will of local officials
__% increase in business income by 2018 City/ Municipal Treasurer’s Business Income Report, BIR
__% reduction in transport costs for goods and services by 2018
CBMS, CIMES
No. of individuals able to access job opportunities by 2018
CBMS, CIMES, DTI & DOLE reports
Developmental Objectives:
1. Access and linkages
within and outside the province improved
At least __% (in terms of kms.) of provincial roads in good condition by 2018
PEO Road Condition Survey R: Climate Change R: Reduction in IRA resulting to reduced budget allocation for road projects R: Unstable peace and order condition A: Stronger community support and cooperation
___% of households accessing health services by 2018
MHO/ PHO reports, CIMES
___% of households accessing education facilities by 2018
CIMES, DepEd Division reports
___% of households accessing public and private facilities by 2018
CIMES
___% of households accessing security and police services by 2018
CIMES, PNP reports
___% of households accessing market and trading posts by 2018
CIMES
___% reduction in average travel time by 2018
Travel time survey (PEO)
Provincial Road Network Development Plan, 2014-2018 Page 77
Results and Activities Objectively Verifiable Indicators Means of Verification Assumptions and Risks
2. Road crashes reduced
___% reduction in road accidents by 2018 Provincial Traffic Engineering/ PNP reports/ TARAS
R: Undisciplined road users A: Presence and enforcement of road safety measures
___% reduction in incidence of traffic violations by 2018
Provincial Traffic Engineering/ PNP reports/ TARAS
3. Provincial capacity on road planning and project implementation enhanced
___% of provincial staff have improved skills and competencies on road planning, design, implementation, monitoring and evaluation by 2018
HRMO report R: Limited resources to support innovations A: Presence of Competency Assessment Framework A: Work environment that is supportive of innovations
Present quality of planning and implementation systems and processes
Capacity Assessment Report
Outputs by Components
A. Road Infrastructures
A1. Develop Criteria for Road Prioritization
1 set of prioritization criteria/tool developed with stakeholders participation
PRNDP R: Climate change R: Reduced in IRA resulting to reduce budget allocation for road projects R: Unstable peace and order condition A: Sustained financial support from other sources A: Increase in local revenues
A2. Strategic provincial roads and bridges maintained/ rehabilitated and upgraded
___kms of provincial roads maintained PEO Annual Accomplishment Report
___kms of provincial roads rehabilitated PEO Annual Accomplishment Report
___ln.m. of bridges constructed / upgraded PEO Annual Accomplishment Report
A3. Funds allocation for road projects increased in yearly budgeting
___% annual increase in fund allocation for priority road projects from P______ of 2013, as included in the AIPs
Annual Budget
Provincial Road Network Development Plan, 2014-2018 Page 78
Results and Activities Objectively Verifiable Indicators Means of Verification Assumptions and Risks
B. Road Safety
1. Road Safety mechanisms and systems in place
Presence of a functional sub-committee on Road Safety Management under PDRRMC Response Committee
Executive Order and Committee Report
R: Limited resources A: Presence of a functional road safety sub-committee A: Annual budget allocation for road safety provided
___No. and types of road safety policies and measures enforced by 2018
PEO/ Traffic Management Office Report
___No. of road safety audit and analysis conducted
Road Safety Audit Report
C. Capacity Development
1. Provincial staff trained on road planning, design and project implementation
___no. of provincial staff trained on road planning, design and project implementation
Attendance records to trainings, Training Reports
R: High turn-over of trained staff A: Availability of personnel A: Sustained financial support from other sources
Inputs and Activities (c/o work and financial plan )
Provincial Road Network Development Plan, 2014-2018 Page 79
Table 24. Performance Measurement Framework:
Results and Activities
Objectively Verifiable Indicators Means of Verification Collection Method Frequency Responsible Office
Goal:
Economic and social undertakings enhanced
__% increase in household income by 2018 Community Base Monitoring Systems (CBMS), Community Impact Monitoring and Evaluation Survey (CIMES)
Survey, focus group discussions (FGD), key informants interviews (KII)
Every three (3) years
PPDO, M/BLGUs concerned
__% increase in business income by 2018 City/ Municipal Treasurer’s Business Income Report, BIR
Report request Annual PTO, MTO
__% reduction in transport costs for goods and services by 2081
CBMS, CIMES Survey, FGDs, KII Every three (3) years
PPDO, M/BLGUs concerned
No. of individuals able to access job opportunities by 2018
CBMS, CIMES, DTI & DOLE reports
Survey, FGDs, KII Every three (3) years
PPDO, M/BLGUs concerned
Developmental Objectives
Access and linkages within and outside the province improved
At least __% (in terms of kms.) of provincial roads in good condition by 2018
PEO Road Condition Survey Survey Annual
PEO, PPDO
___% of households accessing health services by 2018
MHO/ PHO reports, CIMES Survey, report Annual
PHO, PPDO, M/BLGUs
___% of households accessing education facilities by 2018
CIMES, DepEd Division reports Survey, report Annual
PPDO
___% of households accessing public and private facilities by 2018
CIMES Survey Annual
PPDO
___% of households accessing security and police services by 2018
CIMES, PNP reports Survey, report Annual
PPDO, PNP
___% of households accessing market and trading posts by 2018
CIMES Survey Annual
PPDO
___% reduction in average travel time by 2018 Travel time survey (PEO) Survey Annual
PEO, PPDO
Provincial Road Network Development Plan, 2014-2018 Page 80
Results and Activities
Objectively Verifiable Indicators Means of Verification Collection Method Frequency Responsible Office
2. Road crashes
reduced
___% reduction in road accidents by 2018 Provincial Traffic Engineering/ PNP reports/ TARAS
Survey, report Annual PEO, PPDO
___% reduction in incidence of traffic violations by 2018
Provincial Traffic Engineering/ PNP reports/ TARAS
Survey, report Annual PEO, PPDO
3. Provincial capacity on road planning & project implementation enhanced
___% of provincial staff have improved skills and competencies on road planning, design, implementation, monitoring and evaluation by 2018
HRMO report FGD Annual PHRMO
Present quality of planning and implementation systems and processes
Capacity Assessment Report FGD Annual PHRMO
Outputs by components
A. Road infrastructure
1. Developed Criteria for Road Prioritization
1 set of prioritization criteria/tool developed with stakeholders participation
PRNDP Report, Review of the PRNDP
PPDO
2. Strategic provincial roads and bridges maintained/ rehabilitated and upgraded
___kms of provincial roads maintained PEO Annual Accomplishment Report
Inspection and report
Annual PEO
___kms of provincial roads rehabilitated PEO Annual Accomplishment Report
Inspection and report
Annual PEO
___ln.m. of bridges constructed / upgraded PEO Annual Accomplishment Report
Inspection and report
Annual PEO
3. Fund allocation for road projects increased in yearly allocations
___% annual increase in fund allocation for priority road projects from P______ of 2013, as included in the AIPs
Annual Budget Reports Annual PBO, PPDO
Provincial Road Network Development Plan, 2014-2018 Page 81
Results and Activities
Objectively Verifiable Indicators Means of Verification Collection Method Frequency Responsible Office
B. Road Safety
Road Safety mechanisms and systems in place
Presence of a functional sub-committee on Road Safety Management under PDRRMC Response Committee
Executive Order and Committee Report
Review of Committee Report
Annual PDRRMC
___No. and types of road safety policies and measures enforced by 2018
PEO/ Traffic Management Office Report
Reports Annual
PEO
___No. of road safety audit and analysis conducted
Road Safety Audit Report Reports
Annual PEO
C. Capacity Development
Provincial staff trained on road planning, design and project implementation
___no. of provincial staff trained on road planning, design and project implementation
Attendance records to trainings, Training Reports
Review of training reports
Annual
PHRMO
Provincial Road Network Development Plan, 2014-2018 Page 82
6.2 Monitoring and Evaluation Mechanism
The monitoring and evaluation system shall make use of the existing Provincial Project Monitoring
Committee (PMC). Monitoring and evaluation will continue to be the responsibility of the PPMC,
with the technical support of the PPDO as the Secretariat. To assist PPMC attain its function, a
Provincial Monitoring Group (PMG) shall be constituted through an Executive Order. PMG is a
grouping of sectors composed of the representatives from various departments of the Provincial
Governments; the economic, social, infrastructure and finance sectors.
The PMG shall facilitate the field level monitoring in agreement with the PPMC. Monitoring
templates shall be developed to capture needed information and data at the input and output
levels. The PPDO, being the Secretariat of PPMC, shall consolidate the results of field monitoring
conducted by PMG. Concerned departments will be provided with the results of the monitoring, as
submitted to the PPMC. In relation to PRNDP implementation, the PPMC will assess the status,
identify and address areas for improvement, and communicate early gains and lessons learned.
Monitoring and evaluation reports shall be submitted regularly to the Provincial Development
Council which is chaired by the Provincial Governor.
The system is illustrated in Figure 8. The M&E system should also be adopted by the Provincial
Development Council.
Figure 18. Provincial M&E Structure, Davao del Norte
Provincial Development Council
(PDC)
Governor
Provincial Project Monitoring
Committee (PPMC)
Management Committee
(Department Heads)
Provincial Monitoring Group (PMG)
Economic Infrastructure Social Finance
Provincial Road Network Development Plan, 2014-2018 Page 83
The Provincial Project Monitoring Committee is composed of representatives from NGO/CSO
members of the Provincial Development Council and concurrently chaired by the DILG Provincial
Director. The PPMC will report their monitoring and evaluation findings and assessment to the PDC.
The PPMC functions relative to PRNDP M&E are as follows:
1. Monitor and evaluate the execution and implementation of all foreign and nationally-funded
projects, including development projects funded by the IRA share of the LGU or supported
by funds released directly to the Province and projects funded from locally generated
resources implemented within the province.
2. Provide a forum for the regular accounting of progress and accomplishment reports of the
project implementers as often deemed necessary.
3. Identify problems in the course of project implementation and recommend solutions for
review of the PDC.
4. Assist in the swift resolution of issues affecting the implementation of projects within its
area of jurisdiction.
5. Gather feedback on remedial actions and warrant their implementation.
6. Ensure the dissemination of periodic monitoring reports.
The Provincial Project Monitoring Group shall be composed of the representatives from the
provincial office/department in the sector of economic, social, infrastructure and finance. The PMG
shall report to the Management Committee composed of Department Heads from road-related
offices/departments and the PPMC. The PMG shall have but not limited to the following functions:
1. Coordinates with PPDO M&E Division and concerned departments in accessing detailed
reports of PPAs implementation using a uniform and approved format.
2. Assist the PPMC in the conduct of field monitoring to validate/assess projects progresses
and statuses.
3. Transmits to PPMC Secretariat the reports and recommendations as results of the
monitoring activities.
The Monitoring and Evaluation Division of the PPDO shall serve as the Secretariat of the PPMC. The
Secretariat will perform the following functions:
1. Review and consolidate PMG monitoring reports.
2. Submit consolidated PMG monitoring reports to PPMC, copy furnished concerned
implementing offices.
3. Gather, collate, and furnish the PDC and the Regional Project Monitoring Committee the
complied report of the project implementers.
Provincial Road Network Development Plan, 2014-2018 Page 84
4. Arrange and coordinate meetings of the PMC and record proceedings and discussion
thereat.
5. Prepare the monitoring program to be undertaken by the PPMC and PMG.
6.3 Data Collection System
Data will be collected through existing and suggested collection and reporting mechanisms. Some of
which are:
Community Based Monitoring Systems (CBMS)
Community Impact Monitoring and Evaluation Surveys (CIMES)
GIS-based Roads and Bridges Information System (RBIS)/Road condition surveys
Traffic Accident Recording and Analysis System (TARAS)
PLGU Monitoring Reports such as financial reports, annual agency reports, sectoral report on
agriculture, health, education, housing and other sectors; business registry, land assessment,
among others.
Local Government Performance Management System (LGPMS)
Regional Project Monitoring and Evaluation Systems (RPMES) indicators.
For data needs that are not covered with the existing data collection systems or when the frequency
data collection does not fall in time when the data is needed, the province will either expand a data
collection mechanism related to the data needed and/or engage a service provider/s to devise data
collection tool.
Baseline data collection will be initiated once the M&E Framework has been approved.
6.4 Data Management
The Provincial Planning and Development Office will manage PRNDP-related data and information-
ensuring the security, availability, and accessibility of digital (soft) and hard data and reports. The
office will also explore the establishment of a data-based management system to ensure efficiency
in data gathering, processing, analyzing and reporting.
6.5 Reports and Feedback Mechanisms
PRNDP accomplishment reports and performance analysis will be reported and shared to partners
and implementers on a regular basis as part of the feedback and knowledge management processes
of the PLGU. Among the key reports that will be produced are:
Provincial Road Network Development Plan, 2014-2018 Page 85
Provincial Annual Report- the annual report includes information related to PRNDP’s
progress and achievement towards the outputs, outcomes and impacts.
The annual accomplishment and assessment reports will be used by the provincial decision-
makers for management actions on the improvements in the PRNDP processes and for
policy making. The reports will be packaged to form part of the annual report to the public
for transparency and for encouraging community participation and involvement in PRNDP
implementation.
Quarterly Report- the quarterly report will cover the achievements and progress assessment
of PRNDP’s physical and financial outputs.
The quarterly report will be prepared as part of the regular management tool in deciding
PRNDP improvements and adjustments. This report will also be submitted to the PDC,
especially to its Infrastructure Committee.
Activity Report- will include the information on the activities accomplished and the
assessment of progress towards the achievement of targeted activities and inputs. This will
be accomplished on a monthly basis with inputs from the appropriate office and
municipalities concerned.
The activity report will be prepared by the appropriate unit to serve as a tool in decision
making in relation to tracking targets, adjusting resources, focusing of support, defining
specific capacity building requirements and other related activities.
6.6 M& E Schedules
Results Level Monitoring Frequency Evaluation Frequency
Impact Annual Data Gathering Every three years assessment of results
Outcomes Annual data gathering and integration results
Annual assessment of progress towards outcome
Output Monthly data gathering and quarterly consolidation
Quarterly evaluation of progress
Input Monthly and per activity data gathering and monitoring
Monthly evaluation of activities and inputs
Provincial Road Network Development Plan, 2014-2018 Page 86
6.7 Results Chain
The results chain (Table 25) guides in assessing the progress of implementation of PRNDP. The chain
shows the links and relationships in the achievement of the hierarchy of objectives as inputs and
activities are provided and/or implemented.
PRNDP aims to enhance economic and social undertaking with the improvement of public access to
infrastructure and services, in support to the attainment of the P.E.O.P.L.E. development agenda of
the province. The achievement of this aim is indicative by an improved access and linkages within
and outside of the province, reduced road crashes and accidents, and provincial capacity on road
planning and implementation have been enhanced.
Attaining these targets necessitate heightened road infrastructure programs focusing on strategic
provincial roads and bridges ably allocated with funds, installing and operationalizing systems and
mechanisms to ensure road safety at all times, and capability and capacity building measures to
provincial staff to sustain and improve gains in road sector development.
Page | 87
Table 25. Logical Framework Results Chain.
Impact Economic and social undertakings enhanced ˃ Increased in household and business incomes by 2018 ˃ reduced transport costs for goods and services by 2018 ˃ individuals accessing job opportunities by 2018
Outcomes Component I: Access and linkages within and outside the province improved (Road Infra) Maintained in good condition the provincial roads that
contribute most to the economic and social development of the province
Increase in the number of households able to access services and facilities on health, education, public and private facilities, security and police, market and trading post, etc.)
Decreased average travel time on maintained priority roads.
Component II: Road crashes reduced (Road Safety) Reduced road crashes/ accidents by 2018 Reduced incidence of traffic violations
Component III: Enhanced provincial capacity on road planning and project implementation. Improved skills and competencies on
road planning and design, implementation, monitoring and evaluation.
Heightened awareness of the public on road safety
Outputs Criteria of prioritizing road projects formulated with stakeholders participation
Priority provincial roads and bridges identified based on criteria.
Road projects (maintenance, rehabilitation and construction) investment requirements included in the Annual Investment Program
Strategic provincial roads and bridges maintained and/or rehabilitated
Road safety policies, rules and regulations formulated and/or enforced
Road safety measures installed Sub-committee on road safety of PDRRMC Response
Committee functionalized
Capacitated/trained provincial staff on road planning, designs and project implementation
Inputs Maintenance of Provincial roads (__ sections with aggregate length of __ kms)
Rehabilitation of Provincial roads (__sections with aggregate length of ___kms.)
Upgrading of Provincial roads (__ sections with aggregate length 0f __kms.)
Maintenance/upgrading of Provincial bridges (__ bridges with aggregate length of ___ ln.m.)
Provision of funds allocation for priority provincial road projects with increases generated from Special Benefits Assets by way of an enabling ordinance / IRR of the Local Revenue Code
Conduct Road Safety Audit and Black Spot Analysis Conduct road inventory and traffic count Installation of road safety facilities like road signs,
pavement markings, pedestrian lanes, guardrails. Conduct symposium on road safety in schools Conduct inter-agency consultation and Pulong-
pulong sa Barangay on road safety concerns Conduct trainings to law enforcers on TARAS
recording, efficient data gathering and processing. Conduct trainings and seminars for driver and
mechanics.
Conduct of trainings to concerned Provincial staff on road related areas: road safety audit, advance GIS, POST-GRE, Post GIS, web application, project proposal packaging, mainstreaming cross-cutting themes in road planning and management, environmental planning and management, quality control and assurance, supervision and contract management, contractors performance evaluation systems (CPES), heavy equipment operation; search and rescue, first aid applications, basic life support, intensive care program.
Page | 88
COMPOSITION OF THE PRNDP EXPANDED TECHNICAL WORKING GROUP:
Team Leader : Engr. Josie Jean R. Rabanoz - PPDO
Co-Team Leader : Engr. Raul G. Mabanglo - PEO
Members : Engr. Jivellyn B. Co - PEO
Ms. Emelia Palero - PBO
Mr. Nelson F. Plata - PPDO
Engr. Darryl Ayado - PPDO
Ms. Erna Cabebe - PGO-IAS
Engr. Maria Hazel C. Zafra - PPDO
Engr. Crisiel Ann Odtojan - PPDO
Ms. Princess Lyn Nabong - PENRO-LGU
Engr. Ponciano Alconera - PEO
Ms. Michelle Claridad - PHRMO
Ms. Mera Grace Apuya - PIO
Mr. Bernier Mejorada - PADO-IT
Ms.Lilian P. Melendres - PPDO
Ms. Glenda Deli-deli - PGO-PDRRMD
Engr. Lilia C. Edig - PPDO
Mr. Romcel Doroon - PPDO
Ms. Lyni Bones - PEO
Engr. Edwin Misa - PEO
Engr. Arthur Matuguinas - PEO
Engr. Gilbert Mambulao, Jr. - PEO
Engr. Marilou Foronda - PEO
Ms. Mildred Funtilon - PPDO
Ms. Josylene Bentinganan - PTO
Mr. Alex Delola - OSS
Ms. Charlita Delgado - PGO-GAD
Engr. Julius Medalla - PEO
Engr. Dexter Paraguya - PEO
Ms. Marylou Quino - PEO
Ms. Ritchell Niaga - PEO
Mr. Alfredo Sabado - PGSO