PROPOSED BUILDING FOR THE CENTRAL BANK OF THE …2 a3.1 a3.2 a3.2 2 1 1 a4.1 1 a4.1 2 a4.2 2 a4.2 1...

6
225 225 VIEWING TERRACE 3139 SQFT VIEWING TERRACE 3139 SQFT A3.1 2 A3.2 A3.2 A3.1 1 2 1 1 A4.1 1 A4.1 2 A4.2 2 A4.2 1 A4.2 1 A4.2 2 A4.1 2 A4.1 JOB TITLE DRAWN BY DATE SCALE DRAWING NO. PROJEC T NUMBER REVISIONS: 1" = 20' - 0" A1.1 12/17/2019 Author SCHEMATIC DESIGN OPT. 2 - SITE PLAN PROPOSED BUILDING FOR THE CENTRAL BANK OF THE BAHAMAS EAST HILL STREET AND PARLIMENT STREET NASSAU, BAHAMAS 1" = 20'-0" A1.1 SITE PLAN 1 SITE ACCESS/EGRESS SITE ACCESS/EGRESS MULTIPURPOSE THEATHER ART GALLERY PROPOSED BUILDING FOR THE CENTRAL BANK OF THE BAHAMAS SERVICE/UTILITY YARD ACCESS/EGRESS TO UNDERGROUND PARKING

Transcript of PROPOSED BUILDING FOR THE CENTRAL BANK OF THE …2 a3.1 a3.2 a3.2 2 1 1 a4.1 1 a4.1 2 a4.2 2 a4.2 1...

Page 1: PROPOSED BUILDING FOR THE CENTRAL BANK OF THE …2 a3.1 a3.2 a3.2 2 1 1 a4.1 1 a4.1 2 a4.2 2 a4.2 1 a4.2 1 a4.2 2 a4.1 2 a4.1 roof top terrace job title drawn by date scale drawing

225

225

VIEW

ING

TER

RAC

E31

39 S

QFT

VIEW

ING

TER

RAC

E31

39 S

QFT

A3.1

2

A3.2

A3.2

A3.1 1

2

1

1A4

.11A4

.1

2A4

.2

2A4

.2

1A4

.2

1A4

.2

2A4

.1

2A4

.1

JOB TITLE DRAWN BY

DATE

SCALE

DRAWING NO.

PROJECT

NUMBERREVISIONS:

1" = 20'-0"

A1.112/17/2019

AuthorSCHEMATIC DESIGN OPT. 2 -SITE PLAN

PROPOSED BUILDING FOR THECENTRAL BANK OF THE BAHAMASEAST HILL STREET ANDPARLIMENT STREETNASSAU, BAHAMAS

1" = 20'-0"A1.1 SITE PLAN

1

SITE ACCESS/EGRESS

SITE ACCESS/EGRESS

MULTIPURPOSE THEATHER

ART GALLERY

PROPOSED BUILDING FORTHE CENTRAL BANK OF THE BAHAMAS

SERVICE/UTILITYYARD

ACCESS/EGRESS TO UNDERGROUND PARKING

Page 2: PROPOSED BUILDING FOR THE CENTRAL BANK OF THE …2 a3.1 a3.2 a3.2 2 1 1 a4.1 1 a4.1 2 a4.2 2 a4.2 1 a4.2 1 a4.2 2 a4.1 2 a4.1 roof top terrace job title drawn by date scale drawing

225

VIEWING TERRACE3139 SQFT

VIEWING TERRACE3139 SQFT

A3.12

A3.2

A3.2 2

1

1A4.1

1A4.1

2A4.2

2A4.2

1A4.2

1A4.2

2A4.1

2A4.1

ROOF TOP TERRACE

JOB TITLE DRAWN BY

DATE

SCALE

DRAWING NO.

PROJECT

NUMBERREVISIONS:

3/32" = 1'-0"

A2.812/17/2019

JPLSCHEMATIC DESIGN OPT. 2 -ROOF PLAN

PROPOSED BUILDING FOR THECENTRAL BANK OF THE BAHAMASEAST HILL STREET ANDPARLIMENT STREETNASSAU, BAHAMAS

3/32" = 1'-0"A2.81 ROOF PLAN

Page 3: PROPOSED BUILDING FOR THE CENTRAL BANK OF THE …2 a3.1 a3.2 a3.2 2 1 1 a4.1 1 a4.1 2 a4.2 2 a4.2 1 a4.2 1 a4.2 2 a4.1 2 a4.1 roof top terrace job title drawn by date scale drawing

BASEMENT LEVEL 126' - 0"

BASEMENT LEVEL 126' - 0"

LEVEL 261' - 0"

LEVEL 261' - 0"

LEVEL 375' - 0"

LEVEL 375' - 0"

LEVEL 489' - 0"

LEVEL 489' - 0"

LEVEL 5103' - 0"

LEVEL 5103' - 0"

PLAZA, LEVEL 140' - 0"

PLAZA, LEVEL 140' - 0"

BASEMENT LEVEL 126' - 0"

BASEMENT LEVEL 126' - 0"

LEVEL 261' - 0"

LEVEL 261' - 0"

LEVEL 375' - 0"

LEVEL 375' - 0"

LEVEL 489' - 0"

LEVEL 489' - 0"

LEVEL 5103' - 0"

LEVEL 5103' - 0"

PLAZA, LEVEL 140' - 0"

PLAZA, LEVEL 140' - 0"

JOB TITLE DRAWN BY

DATE

SCALE

DRAWING NO.

PROJECT

NUMBERREVISIONS:

3/32" = 1'-0"

A3.112/17/2019

AuthorSCHEMATIC DESIGN OPT. 2 -BUILDING ELEVATIONS

PROPOSED BUILDING FOR THECENTRAL BANK OF THE BAHAMASEAST HILL STREET ANDPARLIMENT STREETNASSAU, BAHAMAS

3/32" = 1'-0"A3.11 NORTH ELEVATION

3/32" = 1'-0"A3.12 EAST ELEVATION

ART GALLERY MULTIPURPOSE THEATER

Page 4: PROPOSED BUILDING FOR THE CENTRAL BANK OF THE …2 a3.1 a3.2 a3.2 2 1 1 a4.1 1 a4.1 2 a4.2 2 a4.2 1 a4.2 1 a4.2 2 a4.1 2 a4.1 roof top terrace job title drawn by date scale drawing

BASEMENT LEVEL 214' - 0"

BASEMENT LEVEL 214' - 0"

BASEMENT LEVEL 126' - 0"

BASEMENT LEVEL 126' - 0"

LEVEL 261' - 0"

LEVEL 261' - 0"

LEVEL 375' - 0"

LEVEL 375' - 0"

LEVEL 489' - 0"

LEVEL 489' - 0"

LEVEL 5103' - 0"

LEVEL 5103' - 0"

PLAZA, LEVEL 140' - 0"

PLAZA, LEVEL 140' - 0"

BASEMENT LEVEL 126' - 0"

BASEMENT LEVEL 126' - 0"

LEVEL 261' - 0"

LEVEL 261' - 0"

LEVEL 375' - 0"

LEVEL 375' - 0"

LEVEL 489' - 0"

LEVEL 489' - 0"

LEVEL 5103' - 0"

LEVEL 5103' - 0"

PLAZA, LEVEL 140' - 0"

PLAZA, LEVEL 140' - 0"

JOB TITLE DRAWN BY

DATE

SCALE

DRAWING NO.

PROJECT

NUMBERREVISIONS:

3/32" = 1'-0"

A3.212/17/2019

AuthorSCHEMATIC DESIGN OPT. 2 -BUILDING ELEVATIONS

PROPOSED BUILDING FOR THECENTRAL BANK OF THE BAHAMASEAST HILL STREET ANDPARLIMENT STREETNASSAU, BAHAMAS

3/32" = 1'-0"A3.21 SOUTH ELEVATION

3/32" = 1'-0"A3.22 WEST ELEVATION

MULTIPURPOSE THEATER ART GALLERY

MULTIPURPOSE THEATER

Page 5: PROPOSED BUILDING FOR THE CENTRAL BANK OF THE …2 a3.1 a3.2 a3.2 2 1 1 a4.1 1 a4.1 2 a4.2 2 a4.2 1 a4.2 1 a4.2 2 a4.1 2 a4.1 roof top terrace job title drawn by date scale drawing

BASEMENT LEVEL 214' - 0"

BASEMENT LEVEL 214' - 0"

BASEMENT LEVEL 126' - 0"

BASEMENT LEVEL 126' - 0"

LEVEL 261' - 0"

LEVEL 261' - 0"

LEVEL 375' - 0"

LEVEL 375' - 0"

LEVEL 489' - 0"

LEVEL 489' - 0"

LEVEL 5103' - 0"

LEVEL 5103' - 0"

PLAZA, LEVEL 140' - 0"

PLAZA, LEVEL 140' - 0"

BASEMENT LEVEL 214' - 0"

BASEMENT LEVEL 214' - 0"

BASEMENT LEVEL 126' - 0"

BASEMENT LEVEL 126' - 0"

LEVEL 261' - 0"

LEVEL 261' - 0"

LEVEL 375' - 0"

LEVEL 375' - 0"

LEVEL 489' - 0"

LEVEL 489' - 0"

LEVEL 5103' - 0"

LEVEL 5103' - 0"

PLAZA, LEVEL 140' - 0"

PLAZA, LEVEL 140' - 0"

JOB TITLE DRAWN BY

DATE

SCALE

DRAWING NO.

PROJECT

NUMBERREVISIONS:

3/32" = 1'-0"

A4.112/17/2019

AuthorSCHEMATIC DESIGN OPT. 2 -BUILDING SECTIONS

PROPOSED BUILDING FOR THECENTRAL BANK OF THE BAHAMASEAST HILL STREET ANDPARLIMENT STREETNASSAU, BAHAMAS

3/32" = 1'-0"A4.11 BUILDING SECTION 1 - SECTION THROUGH MULTIPUROSE THEATER

3/32" = 1'-0"A4.12 BUILDING SECTION 2 - SECTION THROUGH CENTER OF BANK

Page 6: PROPOSED BUILDING FOR THE CENTRAL BANK OF THE …2 a3.1 a3.2 a3.2 2 1 1 a4.1 1 a4.1 2 a4.2 2 a4.2 1 a4.2 1 a4.2 2 a4.1 2 a4.1 roof top terrace job title drawn by date scale drawing

BASEMENT LEVEL 214' - 0"

BASEMENT LEVEL 214' - 0"

BASEMENT LEVEL 126' - 0"

BASEMENT LEVEL 126' - 0"

LEVEL 261' - 0"

LEVEL 261' - 0"

LEVEL 375' - 0"

LEVEL 375' - 0"

LEVEL 489' - 0"

LEVEL 489' - 0"

LEVEL 5103' - 0"

LEVEL 5103' - 0"

PLAZA, LEVEL 140' - 0"

PLAZA, LEVEL 140' - 0"

BASEMENT LEVEL 214' - 0"

BASEMENT LEVEL 214' - 0"

BASEMENT LEVEL 126' - 0"

BASEMENT LEVEL 126' - 0"

LEVEL 261' - 0"

LEVEL 261' - 0"

LEVEL 375' - 0"

LEVEL 375' - 0"

LEVEL 489' - 0"

LEVEL 489' - 0"

LEVEL 5103' - 0"

LEVEL 5103' - 0"

PLAZA, LEVEL 140' - 0"

PLAZA, LEVEL 140' - 0"

JOB TITLE DRAWN BY

DATE

SCALE

DRAWING NO.

PROJECT

NUMBERREVISIONS:

3/32" = 1'-0"

A4.212/17/2019

AuthorSCHEMATIC DESIGN OPT. 2 -BUILDING SECTIONS

PROPOSED BUILDING FOR THECENTRAL BANK OF THE BAHAMASEAST HILL STREET ANDPARLIMENT STREETNASSAU, BAHAMAS

3/32" = 1'-0"A4.21 BUILDING SECTION 3

3/32" = 1'-0"A4.22 BUILDING SECTION 4

MULTIPURPOSE THEATER ART GALLERY

B-1 PARKING

B-2 PARKING