Transcript of PRoMPt Proactive Human Response to wildfires outbreak: Measure and Prepare for it Mrs Natassa...
PRoMPtProactive Human Response to
wildfires outbreak: Measure and Prepare for it
Mrs Natassa PyrgakiRegion of Western Greece
European UnionEuropean Regional Development Fund
PROVINCE OF MACERATA2nd-3rd April 2009
MACERATA
2nd-3rd April 2009European UnionEuropean Regional Development Fund
PRoMPt
Contents
• PROFILE OF THE REGION OF WESTERN GREECE
• WILDFIRES IN GREECE
• REVIEW 1st WORKING PERIOD
• 2nd WORKING PERIOD -1st SEMESTER 2009
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
Profile of the Region of Western Greece
Area 11.350 km2,
Population 723.000 people, making it the fourth
largest (in population) region in
Greece.
Administration
Three Prefects, namely Achaia, Ilia
and Aetoloakarnania, which are
further divided to 72 Municipalities
and 2 Communities. The largest
Municipality is Patras, with a
population of about 160.000
inhabitants.
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
The biggest part of the terrain is mountainous (45,3%) or hilly (25,6%),
while only 29,1% consists of plains
Variety of landscapes, from alpine meadows to sandy beaches and a
unique network of rivers and wetlands that support a wide range of
wildlife (including golden eagles and vultures)
WGR is a modern communications and transport hub that connects Greece
with the rest of Europe (country’s main gateway to Western Europe)
Profile of the Region of Western Greece
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
Wildfires in GreeceAssessment for the country after the fires of summertime
of 2007
63 persons lost their lives
268.834 hectares of land and forests affected
1.500 houses were burned
6.000 persons remained homeless
4,5 millions olive trees
200.000 animals (sheep, goats, etc).
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
REVIEW 1st WORKING PERIOD
Constitution of working Co-ordination structure
KICK-OFF MEETING IN DECEMBER 2008
First opportunity for networking and exchange of
experiences enabled the initiation of intensive
experiences’ exchange between the project partners.
Establishment of PROMPT’s working structure the
necessary management.
Communication documents signed and delivered to the
partners
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
REVIEW 1st WORKING PERIOD
A strong potential for successful running of
its activities and implementation of
objectives and achieving a long-term impact.
The intensity of collaboration between the
partners of the project is certainly the
fundamental driver for the project’s success.
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
2nd WORKING PERIOD -1st SEMESTER 2009
“WILDFIRES RESPONSE-
SHORT TERRITORIAL STATUS REPORT”
Planning and acting of Civil Protection related to forest fires
Brief description of the area
‘Wildfires’ potential risks.
Prediction, Prevention and Fire fighting activities, tools and
systems against wildfires
Losses and Costs from previous cases
Policies to reconstruct the affected areas along with
incentives to boost development are pinpointed.
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
2nd WORKING PERIOD -1st SEMESTER 2009
WORKING GROUP 1 (WG1)Correct and on-time information and preparation of citizens
to confront the outbreak of a fire risk assessment
the applied monitoring system
activities concerning the dissemination of information on the wildfires fighting activities organization
awareness raising actions aimed at citizens in order to spread a culture of adequate prevention and to inform about behaviour rules, prohibitions and restrictions – information campaigns in schools of all levels, meetings between students and operators
simulations at the local level and involvement of the population
2nd WORKING PERIOD -1st SEMESTER 2009
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
WORKING GROUP 2 (WG2)After crisis emergency actions regarding effective civil protection
Organization of emergency programme/plan (local, regional,
national)
Policies / regulations (local, regional, national)
Interrelations among national, regional and local level
Actors and institutions involved (e.g., local government, local
authorities, regional administrations, civil protection
directions, fire brigade, water supply service, police, army,
non-governmental organisations, voluntary associations,
private sector, etc.)
2nd WORKING PERIOD -1st SEMESTER 2009
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
WORKING GROUP 2 (WG2)After crisis emergency actions regarding effective civil protection
Decision-making structure and responsibilities (who does
what)
Actions related to fire fighting (i.e., reconnaissance,
surveillance, warning, alarm, extinguishing, etc.)
Consistency and location of equipment, tools and human
resources and the procedures for the active fire fighting
against wildfires
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
2nd WORKING PERIOD -1st SEMESTER 2009
WORKING GROUP 3 (WG3)Response strategy of the regional/local authorities to achieve rapid
regeneration of the affected areas
Recovery programmes and plans of the areas covered
by fire
Policies employed in the past and present and goals
achieved
Existing incentives for investments in reconstruction
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
2nd WORKING PERIOD -1st SEMESTER 2009
KEYNOTE SPEECHES
- Mr Roberto Oreficini, Head of Department for
Integrated Securit andCivil Protection Policies- Marche
Region
- Mr Giuseppe Bordoni, National Corps Forest
Rangers-
Head of Macerata Command
- Mr. Carlo Iammarino, Macerata Fire Brigade.
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
2nd WORKING PERIOD -1st SEMESTER 2009
CROSS THEMATIC MEETING
Next Actions will be defined
Discussions on the conclusions of the 3
WGs WORKSHOPS (the responsible
person of each Working Group will
participat
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
2nd WORKING PERIOD -1st SEMESTER 2009
OVERVIEW OF ACTIVITIES TO BE
IMPLEMENTED IN THE FOLLOWING
MONTHS
Tasks
Responsibilities
Deadlines
Staff exchange schedule
2nd day: Friday 3 April 2009
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
2nd WORKING PERIOD -1st SEMESTER 2009
FINANCIAL AND ADMINISTRATIVE
ISSUES
STEERING COMMITTEE ISSUES
2nd day: Friday 3 April 2009
MACERATA2nd-3rd April 2009 European Union
European Regional Development Fund
PRoMPt
2nd WORKING PERIOD -1st SEMESTER 2009
Thank you very much for your attention
Natassa PyrgakiCivil Engineer M.Sc.
Project Manager
Region of Western [email protected]
Tel:+302610465839Fax: +302610465887