Project Maps & List: Draft 2040 Regional Transportation Plan

18
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! _ _ _ _ _ £ ¤ 27 £ ¤ 41 £ ¤ 27 £ ¤ 11 £ ¤ 127 £ ¤ 11 ¬ « 2 ¬ « 2 ¬ « 58 ¬ « 319 ¬ « 317 ¬ « 151 § ¨ ¦ 75 I-24 I-24 § ¨ ¦ 24 § ¨ ¦ 75 £ ¤ 27 ¬ « 153 ¬ « 153 Hamilton Place Northgate Mall Enterprise South Chattanooga Airport National Military Park U S 129 U S 137 U S 135 U S 153 U S 134 U S 139 U S 130 U S 142 U S 132 U S 141 U S 138 U S 136 SR-153 Silverdale Hwy Apison Pk New Hixson Pk E Brainerd Rd Keith Rd Dayton Blvd Ooletwah-Georgetown Rd Lee Hwy Poe Rd Hixson Pk Snow Hill Rd Bandy Rd Taft Hwy Hunter Rd Boynton Dr Three Notch Rd W Rd. US-11 Bonny Oaks Dr Ringgold Rd Cove Rd Thrasher Pk State Route 2 Shallowford Rd Cummings Hwy Fairview Rd Highway 193 Hamill Rd Crest Rd N E Main St 3RD ST E Middle Valley Rd Jersey Pk Gann Rd Dallas Hollow Rd Mccallie Av Standifer Gap Rd Post Oak Rd Wilcox Blvd Lovell Rd Tallant Rd State Route 151 Igou Gap Rd United States Highway 41 Dayton Pk N Cherokee Valley Rd Corral Rd. Chickamauga Rd Harrison Bay Rd Dayton Pk S Gadd Rd Lakeview Dr State Route 146 Sequoyah Access Rd Suck Creek Rd Dietz Rd James Blvd Proffitt Rd Ooltewah-Ringgold Rd Ely Rd Hickory Valley Rd Market St Mcfarland Ave Salem Rd Dodds Av Crest Rd S Brainered Rd Dayton Pk Mountain Creek Rd Pine Grove Rd Holtzclaw Av Johnson Rd Banks Rd Mission Ridge Rd Airport Rd Sawyer Pk Mount Pisgah Rd Highway 813 Montlake Rd Long Hollow Rd Rossville Blvd Lula Lake Rd Daisy-Dallas Rd Tunnel Blvd State Route 201 Bill Reed Rd State Route 299 Ochs Hwy Riverfront Pkwy. Amnicola Hwy. Sawyer Rd. Stewart Rd Wauhatchie Pk Bailey Av Mcbrien Rd Webb Rd Old Lee Hwy Mccahill Rd N Moore Rd 23RD ST E N Highway 27 Boy Scout Rd Moses Rd Reeds Bridge Rd Osburn Rd Popular Springs Rd Clark Rd N Gunbarrel Rd Wilson Ave. Browns Ferry Rd Central Av Pineville Rd Peavine Rd Talley Rd Norcress Rd Jenkins Rd University Dr Morris Hill Rd Belvoir Av Lytle Rd Broad St St Elmo Av Roberts Mill Rd Bennett Rd Birmingham Pike Dupont Pkwy Hogan Rd Ashland Ter Martin Rd W Schmitt Rd Big Ridge Rd Lower Mill Rd Grubb Rd Mack Smith Rd Riverside Dr Park City Rd 4TH AV Burning Bush Rd Steele Rd Amnicola Hwy Vance Rd N Long Hollow Rd Short Tail Springs Rd Dry Valley Rd Cross St SR-321 Barton Av Lupton Dr Cummings Rd State Route 189 S Seminole Dr Workman Rd Lullwater Rd Moccasin Bend Rd Gold Point Cir N Shepherd Rd Glass St John Ross Rd Edgmon Rd Noah Reid Rd Tva Access Rd Hamby Rd S Moore Rd N Palisades Dr Dallas Rd Woodland Dr Elder Mountain Rd Wilder St Chattanooga Valley Rd Tennessee Av Glenwood Dr Champion Rd Delashmitt Rd N Jenkins Rd 10TH ST E Edwards Point Rd Graysville Rd 28TH ST E James St Red Belt Rd Pine Ridge Rd Harrison Pk Scenic Hwy Browntown Rd E Brow Rd Shackleford Ridge Rd Dodson Av Little Debbie Pkwy N Hickory Valley Rd Lee Ave Spring Creek Rd Clio Av Roanoke Av Signal Mountain Rd Ashmore Av Wilson Rd E Lyndon Av M L King Blvd SR-134 4TH ST E N Bragg Av Lamar Av Ridgeway Av Kings Point Rd Willow St S Tyner Rd N Concord Rd Houston St Appian Dr Front Rd Glover Rd Lindsay St Signal Mountain Blvd W Crabtree Rd College Dr E Crestridge Dr Cassandra Smith Rd Nick-A Jack Rd 38TH ST E Igou Ferry Rd Lee Av N Chamberlain Av 37TH ST E Dyer Rd Hickory St S Maple St Lee-Gordon Mill Rd Ely Ln Page Rd Watauga Ln Bowman Rd Burning Bush Sholar Av Navajo Dr W Nickajack Rd Manufactures Rd. Forrest Rd Alton Park Blvd Green Lakes Rd Carter St 38TH ST W Crittenden Ave Potts Rd Memorial Dr Indian Ave S Crest Rd Poplar Springs Rd Crabtree Rd Nick-A-Jack Rd Timesville Rd N Market St Kelly St Westside Av Germantown Rd State Route 1 United States Highway 27 Glentana St Douglas St Germantown Rd N Altamont Av Hamill Hollow Rd Stephenson Av 40TH ST W Easton Av Wisdom St Bay Shore Rd Campbell St Cain Av Thomas Rd Frazier Av Main St Post Rd 20TH ST. W. State Route 57 Ault Rd 5TH ST E Oak St Wesleyann Rd W Gordon Ave Willow St N W Crest Rd Evitt St Chestnut St Wilder Rd Addison Rd Harrison-Ootlewah Rd E Long Hollow Rd SR-17 Highway 11 Moss Dr Gateway Av Quarles Rd Timesville Av Koa Blvd Gateway Ln W Valley Rd W Main St 20TH ST E Spruce St Greenleaf St Pattentown Rd Exit Ramp S Bragg Av Davis Ridge Rd Burgess Rd W Fleetwood Dr Anderson Pk. Adams Rd Cleveland St Harrison Pk Tennessee Av Standifer Gap Rd Graysville Rd Jenkins Rd Red Belt Rd Sholar Av Broad St E Brow Rd Shallowford Rd Shallowford Rd Market St Wauhatchie Pk Cherokee Valley Rd Old Lee Hwy State Route 2 Lovell Rd Lovell Rd Highway 193 Boy Scout Rd Lytle Rd Park City Rd Bailey Av State Route 151 Lee Hwy 4TH AV 38TH ST E State Route 2 Burning Bush Rd Hogan Rd Wilson Rd Dodds Av Stewart Rd Central Av Standifer Gap Rd Dodson Av United States Highway 27 Funded Transit Projects Legend Funded and constructed by 2020 Funded and constructed by 2030 Funded and constructed by 2040 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! U S 141 U S 153 U S 139 U S 136 U S 138 U S 137 U S 137 U S 153 U S 141 U S 139 U S 138 U S 136 3RD ST E E Main St Market St Holtzclaw Av Mccallie Av Riverfront Pkwy. Central Av Bailey Av Broad St 23RD ST E 10TH ST E 11TH ST E M L King Blvd 4TH ST E Willow St S Houston St Lindsay St US-27 Orchard Knob Av S Georgia Av Carter St Main St W Barton Av Douglas St Hamm Rd 20TH ST. W. 5TH ST E 12TH ST W Orchard Knob Av N Wilcox Blvd Chestnut St Gateway Av Manufactures Rd. 20TH ST W Willow St N W Main St 4TH ST W Rossville Blvd 20TH ST E 6TH ST E Kelly St Gifford St 6TH ST W 2ND ST W Ramp To I124 Washington St 17TH ST E 10TH ST W Riverside Ave. M L King Blvd Broad St Market St Broad St 5TH ST E Chestnut St Transit- Premium Bus, Local Bus Transit- Premium Bus, Local Bus, and Shuttle Bus Transit- Premium Bus, Local Bus Transit- BRT Existing CARTA Corridor Inset 1 Inset 1 ³ _ Landmark Limited Access Roadway Other Roadway 0 1 2 3 4 5 Miles Tennessee-Georgia State Line Study Area County Boundary Water Body Notes: 1. ID numbers correspond to project list tables included as Table 8.1 of the RTP document. 2. Transit projects not shown on the map include: transit general (operations and maintenance of existing CARTA system), frequency improvements on existing CARTA routes, set aside for additional transit capacity, feasibility studies for bus rapid transit and light rail transit lines.

description

List and maps of all transit, bicycle/pedestrian, and roadway projects within the 2040 RTP.

Transcript of Project Maps & List: Draft 2040 Regional Transportation Plan

Page 1: Project Maps & List: Draft 2040 Regional Transportation Plan

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

!

!

!

!!

_

_

_

_

_

£¤27

£¤41

£¤27

£¤11

£¤127

£¤11

¬«2

¬«2

¬«58

¬«319

¬«317

¬«151

§̈¦75

I-24 I-24

§̈¦24

§̈¦75

£¤27

¬«153

¬«153

Hamilton Place

Northgate Mall

Enterprise South

Chattanooga Airport

National Military Park

US129

US137

US135

US153

US134

US139

US130

US142

US132

US141

US138

US136

US-27

SR-153

Silverd

ale Hw

y

SR-60

Birchw

ood Pk

Apison Pk

SR-111

New

Hixso

n Pk

E Brai

nerd

Rd

Keith

Rd

Dayton

Blvd

Ooletw

ah-G

eorge

town R

d

Lee Hwy

Poe Rd

Hixso

n Pk

Snow Hill Rd

Band

y Rd

Taft Hwy

Hunter Rd

Boynton Dr

Tsati Ter

Three

Notch

Rd

W Rd

.

US-11

Bonny Oaks Dr

Ringgold Rd

Cove

Rd

Thrasher Pk

State Route 2

Shallowford Rd

Cummings Hwy

Dolly Po

nd Rd

Fairvie

w Rd

Highw

ay 19

3

Lee Pk

Hamill Rd

Crest R

d N

E Main St

3RD ST E

Middle V

alley R

d

Jerse

y Pk

Gann

Rd

Dalla

s Holl

ow R

d

Mccallie Av

Stand

ifer G

ap Rd

Post

Oak R

d

Wilcox Blvd

Love

ll Rd

Tallant Rd

Hotwater Rd

State

Route

151

Igou Gap Rd

Grasshopper Rd

United States Highway 41

Dayton

Pk N

Chero

kee V

alley

Rd

Corral Rd.

Chick

amau

ga R

d

Harris

on Ba

y Rd

Dayton Pk S

Gadd Rd

Lakeview Dr

State Route 146

Sequoyah Access Rd

Suck Creek Rd

Dietz

Rd

James Blvd

Proffit

t Rd

Oolte

wah-R

inggo

ld Rd

Ely Rd

Hickor

y Valle

y RdMa

rket S

t

Mcfar

land A

ve

Salem Rd

Dodd

s Av

Cres

t Rd S

Brainere

d Rd

Dayto

n Pk

Mountain

Creek R

d

Pine G

rove R

d

Holtzc

law Av

Johnson Rd

Bank

s Rd

Mission

Ridge

Rd

Airport Rd

Sawyer Pk

Mount Pisga

h Rd

Highway 813

Montlak

e Rd

Storm

er Rd

Big So

ddy C

reek

Long

Hollow

Rd

Rossville Blvd

Lula

Lake

Rd

Daisy-Dallas Rd

Tunn

el Blvd

State Route 201

Bill Reed Rd

State Route 299

Ochs

Hwy

Riverfront Pkwy.

Amnic

ola Hw

y.

Sawy

er Rd

.

Armstro

ng Rd

Stewa

rt Rd

Wauhatc

hie Pk

Bailey Av

Mcbri

en Rd

Webb

Rd

Old Lee Hwy

Mcca

hill Rd

N Moo

re Rd

23RD ST E

N Highway 27

Boy Scout Rd

Mayfl

ower

Rd

Moses Rd

Reeds Bridge Rd

Osbu

rn Rd

Popular Springs Rd

Clark

Rd

N Gun

barre

l Rd

Mccallie Ferry Rd

Wilso

n Ave

.

Brown

s Ferr

y Rd

Centr

al Av

Pinev

ille R

d

Peavine Rd

Talle

y Rd

Norcr

ess R

d

Jenkin

s Rd

Unive

rsity

Dr

Morris

Hill R

d

Belvo

ir Av

Lytle Rd

Broad

St

St Elm

o Av

Roberts Mill Rd

Bennett Rd

Birmingham Pike

Dupont Pkwy

Hoga

n Rd

Ashland Ter

Martin

Rd

W Sc

hmitt

Rd

Big Ri

dge Rd

Lower Mill Rd

Grubb Rd

Mack

Smith

Rd

Riverside

Dr

Park City Rd

4TH A

V

Burni

ng Bu

sh Rd

Steele Rd

Amnicola Hwy

Vanc

e Rd

N Long Hollow Rd

Short Tail Springs Rd

Dry Va

lley Rd

Cros

s St

SR-32

1

Barto

n Av

Lupton Dr

Cummings Rd

State R

oute 1

89

S Sem

inole

Dr

Workman Rd

Lullwa

ter Rd

Mocc

asin

Bend

Rd

Gold Point Cir N

Shep

herd

Rd

Glass St

John Ross Rd

Edgm

on Rd

Noah

Reid

Rd

Tva Access Rd

Hamby Rd

S Moo

re Rd

N Palisa

des Dr

Dallas Rd

Woodla

nd Dr

Elder M

ountain

Rd

Wilder St

Chatt

anoo

ga Va

lley Rd

Tenn

esse

e Av

Glenwood Dr

Shiple

y Hollo

w Rd

Champion Rd

Old Dayto

n Pk

Delashmitt Rd

N Je

nkins

Rd

May Rd

10TH ST E

Edward

s Poin

t Rd

Graysville Rd

28TH ST E

James St

Red Belt Rd

Pine Ridge Rd

Harrison

Pk

Sceni

c Hwy

Brown

town R

d

E Brow

Rd

Shack

leford

Ridge

Rd

Dodson A

v

Little

Debb

ie Pk

wy

N Hick

ory Va

lley Rd

Lee Ave

Spring Creek Rd

Clio Av

Roan

oke A

v

Signal Mountain Rd

Ashmore

AvWi

lson R

dE L

yndon

Av

M L King Blvd

SR-134

4TH ST E

N Brag

g Av

Lamar

Av

Ridge

way A

v

Kings Point Rd

Willow

St S

Tyner

Rd

N Con

cord

Rd

Houst

on St

Appian Dr

Front Rd

Glove

r Rd

Linds

ay St

Signal Mountain Blvd

W Crabtree Rd

Spradling Rd

College Dr E

Cres

tridge

Dr

Cass

andra

Smith

Rd

Nick-A Jack Rd

38TH ST E

Igou Ferry Rd

Lee Av

N Cha

mberl

ain Av

37TH ST E

Dyer Rd

Hickor

y St S

Maple St

Lee-Gordon Mill Rd

Ely Ln

Page

Rd

Watauga Ln

Bowman Rd

Burni

ng Bu

sh

Shola

r Av

Navajo Dr

W Nickajack Rd

Manufactures Rd.

Forrest Rd

Alton

Park

Blvd

Gree

n Lak

es R

d

Carte

r St

38TH ST W

Critte

nden

Ave Po

tts R

d

Andy

Thom

as Rd

Memorial Dr

Indian

Ave

S Crest Rd

Poplar Springs Rd

Crabtree Rd

Nick-A

-Jack

Rd

Timesville Rd

N Ma

rket S

t

Kelly

St

Westside Av

Germ

antow

n Rd

State Route 1

Unite

d Stat

es H

ighwa

y 27

Glentana St

Doug

las St

Meadowview Rd

Germ

antow

n Rd N

Altamont Av

Hamill Hollow Rd

Steph

enso

n Av

40TH ST W

Easto

n Av

Wisdom St

Bay S

hore

Rd

Campbell St

Cain A

v

Thomas Rd

Frazier AvMa

in St

Rock Creek Rd

Post Rd

20TH ST. W.

State

Route

57

Ault Rd

Turner Rd

5TH ST E

Oak St

Wesleya

nn Rd

W Gordon Ave

Willow

St N

W Crest Rd

Evitt

St

Chest

nut S

t

Wilder Rd

Gas Ridge Rd

Addison Rd

Harrison-Ootlewah Rd

E Long Hollow Rd

SR-17

Highway 11

Moss

Dr

Gateway Av

Quarles Rd

Timesville Av

Koa Blvd

Gateway Ln

W Valley Rd

W Main St

20TH ST E

Spruce St

Greenleaf St

Patte

ntown

Rd

Exit Ramp

S Bragg Av

Davis Ridge Rd

Burge

ss R

d

W Fleetwood Dr

Anderson Pk.

Adams Rd

Cleveland

St

Retro-Hughes Rd

Harris

on Pk

Tenne

ssee A

v

Standifer Gap Rd

Graysville R

d

Jenk

ins Rd

Red Belt Rd

Sholar

Av

SR-60

Broa

d St

Hixso

n Pk

E Brow

Rd

Shallowford Rd

Shallowford Rd

Marke

t St

Wauhatchie Pk

Chero

kee V

alley

Rd

Old Lee Hwy

State Route 2

Love

ll Rd

Dayto

n Pk

Love

ll Rd

Highw

ay 19

3

Boy Scout Rd

Lytle Rd

Park

City R

d

Bailey Av

State

Route

151

Lee Hwy

4TH A

V

38TH ST E

State Route 2

Burni

ng Bu

sh R

d

Hogan

Rd

Wilso

n Rd

Dodd

s Av

Stewa

rt Rd

Centr

al Av

Standife

r Gap

RdDodso

n Av

Unite

d Stat

es H

ighwa

y 27

³Funded Transit Projects Legend Funded and constructed by 2020

Funded and constructed by 2030

Funded and constructed by 2040

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

US141

US153

US139

US136

US138

US137

US137

US153

US141

US139

US138

US136

3RD ST E

E Main St

Marke

t St

Holtzc

law Av

Mccallie Av

Riverfront Pkwy.

Centr

al Av

Bailey Av

Broad

St

23RD ST E

10TH ST E11TH ST E

M L King Blvd

4TH ST E

Willow

St S

Houst

on St

Lindsa

y St

US-27

Orch

ard Kn

ob Av

S

Georg

ia Av

Carte

r St

Main St W

Barto

n Av

Doug

las St

Hamm Rd

20TH ST. W.

5TH ST E

12TH ST W

Orch

ard Kn

ob Av

N

Wilcox Blvd

Chest

nut S

t

Gateway Av

Manufactures Rd.

20TH ST W

Willow

St N

W Main St

4TH ST W

Rossville Blvd

20TH ST E

6TH ST E

Kelly

St

Gifford St

6TH ST W

2ND ST W

Ramp

To I1

24

Wash

ington

St

17TH ST E

10TH ST W

Rivers

ide Av

e.

M L King Blvd

Broad

St

Marke

t St

Broa

d St

5TH ST E

Chestnut StTransit- Premium Bus, Local Bus

Transit- Premium Bus, Local Bus, and Shuttle Bus

Transit- Premium Bus, Local Bus Transit- BRT

Existing CARTA Corridor

Inset 1

Inset 1

³

_ Landmark

Limited Access RoadwayOther Roadway

0 1 2 3 4 5Miles

Tennessee-Georgia State LineStudy AreaCounty Boundary

Water Body

Notes:1. ID numbers correspond to project list tables included as Table 8.1 of the RTP document.2. Transit projects not shown on the map include: transit general (operations and maintenance of existing CARTA system), frequencyimprovements on existing CARTA routes, set aside for additional transit capacity, feasibility studies for bus rapid transit and light railtransit lines.

Page 2: Project Maps & List: Draft 2040 Regional Transportation Plan

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

_

_

_

_

_

£¤27

£¤41

£¤27

£¤11

£¤127

£¤11

¬«2

¬«2

¬«58

¬«319

¬«151

¬«153

¬«153

§̈¦75

§̈¦24

§̈¦75

UV70

UV77

UV3

UV62

UV28

UV72

UV76

UV43

UV69

UV58

UV61

UV55

UV63

UV64 UV99

UV66

UV68

UV90

UV31

UV6

UV100

UV60

Northgate Mall

Enterprise South

Chattanooga Airport

National Military Park

US163

US156

US169

US184

US33

US163

US159

US172

US174

US176

US180

US183

US170

US181

US32

US36

US35

US34

US37

US176US176

US161

US182

US39

US38

US-27

SR-153

Silverd

ale Hw

y

New Hixson Pk

E Brainerd Rd

Birch

wood

Pk

Dayto

n Blvd

Lee Hwy

Poe Rd

Hixso

n Pk

Snow Hill Rd

Taft Hwy

Hunter Rd

Boynton Dr

Tsati Ter

Three Notch Rd

W Rd

.

US-11

Bonny Oaks Dr

Ringgold Rd

Apison Pk

Thrasher Pk

State Route 2

Shallowford Rd

Cummings Hwy

Fairvie

w Rd

Highw

ay 19

3

Hamill Rd

Cres

t Rd NE Main St

3RD ST E

Middle V

alley R

d

Jerse

y Pk

Gann

Rd

Dalla

s Holl

ow R

d

Mccallie Av

Standifer Gap Rd

Post

Oak R

d

Wilcox Blvd

Love

ll Rd

Hotwater Rd

State

Route

151

Igou Gap Rd

United States Highway 41

Dayton P

k N

Chero

kee V

alley

Rd

Corral Rd.

Chickamauga Rd

Harris

on Ba

y Rd

Dayton Pk S

Gadd Rd

Lakeview Dr

State Route 146

Sequoyah Access Rd

Suck Creek Rd

Dietz

Rd

James Blvd

Proffit

t Rd

Oolte

wah-R

inggo

ld Rd

Ely Rd

Hickor

y Valle

y Rd

Marke

t St

Salem Rd

Dodd

s Av

Cres

t Rd S

Brainered Rd

Dayto

n Pk

Moun

tain C

reek R

d

Pine G

rove R

d

Band

y Rd

Holtzc

law Av

Johnson Rd

Banks

Rd

Mission

Ridge

Rd

Airport Rd

Sawyer Pk

Ooletw

ah-G

eorge

town R

d

Montlake Rd

Rossville Blvd

Lula

Lake

Rd

Lee Pk

Daisy

-Dallas

Rd

Tunn

el Blvd

State Route 201

Bill Reed Rd

Ochs

Hwy

Riverfront Pkwy.

Amnic

ola Hw

y.

Sawyer Rd.

Armstr

ong R

d

Wauhatc

hie Pk

Bailey Av

Mcbrien

Rd

Webb

Rd

Old Lee Hwy

Mcca

hill Rd

N Moo

re Rd

23RD ST E

Alexander Bridge Rd

Boy Scout Rd

Keith Rd

Moses Rd

SR-11

1

Reeds Bridge Rd

Osbu

rn Rd

Popular Springs Rd

Clark

Rd

N Gun

barre

l Rd

Wilso

n Ave

.

Brown

s Ferr

y Rd

Centr

al Av

Pinev

ille R

d

Talley

Rd

Norcr

ess R

d

Jenkin

s Rd

Unive

rsity

Dr

Morris

Hill R

d

Belvo

ir Av

Lytle Rd

State Route 299

Broad

St

St Elm

o Av

Roberts Mill Rd

Highway 813

Bennett Rd

Birmingham Pike

Dupo

nt Pk

wy

Hoga

n Rd

Ashland Ter

Martin Rd

W Sc

hmitt

Rd

Big Ri

dge Rd

Happ

y Valle

y Rd

Lower Mill Rd

Grubb Rd

Mack

Smith

Rd

Riverside

Dr

Park City Rd

4TH A

V

Burnin

g Bush

Rd

Steele Rd

Cove Rd

Amnicola Hwy

Lafay

ette R

d

Vanc

e Rd

N Long Hollow Rd

Short Tail Springs Rd

Timberlinks Dr

Dry V

alley

Rd

Cros

s St

SR-32

1

Barto

n Av

Lupton Dr

Cummings Rd

State R

oute 1

89

S Sem

inole

Dr

Workman Rd

Lullwa

ter Rd

Mocc

asin

Bend

Rd

Gold Point Cir N

Shep

herd

Rd

Glass St

John Ross Rd

Noah

Reid

Rd

Look

out M

tn Sc

enic H

wy

Tva Access Rd

Mowb

ray Rd

Hamby Rd

S Moo

re Rd

N Palisa

des Dr

Cherokee Blvd

Dallas Rd

Wood

land D

r

Elder M

ountain

Rd

Wilder St

Chatt

anoo

ga Va

lley R

d

Tenn

esse

e Av

Glenw

ood D

r

Champion Rd

Delashmitt Rd

N Je

nkins

Rd

Prospect Church Rd

Mahan Gap Rd

10TH ST E

Lightfoot Mill Rd

11TH ST E

Edwards Point Rd

Graysville Rd

28TH ST E

Gree

nwoo

d Rd

James St

Red Belt Rd

Pine Ridge Rd

Harrison

Pk

Scenic

Hwy

Lake

Res

ort D

r

Brown

town R

d

E Brow

Rd

Shack

leford

Ridge

Rd

Dodso

n Av

Little

Debb

ie Pk

wy

Mount Pisgah Rd

N Hick

ory Va

lley Rd

Lee Ave

Spring Creek Rd

Old Dayto

n Pk

Clio Av

Roan

oke A

v

Signa

l Mou

ntain R

d

Ashmore

Av

Wilso

n Rd

E Lynd

on Av

M L King Blvd

4TH ST E

N Brag

g Av

Lamar

Av

Ridge

way A

v

Kings Point Rd

Willow

St S

Tyner

Rd

N Con

cord

Rd

Houst

on St

Appian Dr

Front Rd

Walnut Rd

Glove

r Rd

Lindsa

y St

Signal Mountain Blvd

W Crabtree Rd

Cres

tridge

Dr

Cassa

ndra

Smith

Rd

Nick-A Jack Rd

College Dr E

38TH ST E

Igou Ferry Rd

Lee Av

N Cha

mberl

ain Av

37TH ST E

Dyer Rd

Hickor

y St S

Maple St

Orch

ard Kn

ob Av

S

Lee-Gordon Mill Rd

Ely Ln

Hamm Rd

Page Rd

Watauga L

n

Bowman Rd

Morrison Springs Rd

Burni

ng Bu

sh

Shola

r Av

Navajo Dr

Manufactures Rd.

Forre

st Rd

Alton

Park

Blvd

Georg

ia Av

Gann Store Rd

Gree

n Lak

es Rd

Carte

r St

38TH ST W

Critte

nden

Ave

Potts

Rd

New York Av

Orch

ard Kn

ob Av

N

Memorial Dr

Indian

Ave

Main St W

S Cres

t Rd

Flega

l Ave

Poplar Springs Rd

Crabtree Rd

Long

Holl

ow R

d

Nick-A

-Jack

Rd

Timesville Rd

N Ma

rket S

t

Kelly

St

Hamilton

Place Blvd

Westside Av

Germ

antow

n Rd

State Route 1

Unite

d Stat

es H

ighwa

y 27

Glentana St

Doug

las St

Germ

antow

n Rd N

Altamont Av

Lafayette St

Germ

antow

n Rd S

Hamill Hollow Rd

Steph

enso

n Av

40TH ST W

Easto

n Av

Wisdom St

Bay Shore Rd

Campbell St

Cain A

v

Thomas Rd

Frazier Av

33RD ST W

Main

St

Post Rd

20TH ST. W.

Fleetw

ood D

r

Ault Rd

5TH ST E

12TH ST W

Oak St

W Gordon Ave

Bean St

Willow

St N

Evitt

St

Chestnut St

Wilder Rd

Moun

tain C

reek R

d.

Hampton Rd

Anderson Pk

Addison Rd

Harrison-Ootlewah Rd

SR-17

Highway 11

Moss

Dr

Culver St

Gateway Av

Moss

St

Red Riding Hood Trl

Ochs

Hwy

Ext

W 10Th St

Timesville Av

Greens Lake Rd

Koa Blvd

Gateway Ln

Nick A Jack Ln

20TH ST W

Scen

ic Hw S

r 157

N

Ringg

old D

oltew

ah R

d

Spruce St

Greenleaf St

Patte

ntown

Rd

Exit Ramp

S Brag

g Av

Davis Ridge Rd

N He

rmita

ge R

d

Gifford St

Burge

ss R

d

Waco

nda P

oint R

d

Pine Hill Dr

Missis

sippi A

v

Anderson Pk.

Adams Rd

N Mac

k Smit

h Rd

Mable

St

Mountain View Rd

W Cloud Springs Rd

Burnt

Mill R

d

Sims Dr

Hoyt St

Five P

oints R

d

Riverside Ave.

E Newberry St

2ND ST W

Edgm

on R

d

Lindbergh St

Ramp

To I1

24

Marke

t St

Love

ll Rd

Red Belt Rd

Harris

on Pk

Jenkin

s Rd

State

Route

146

Love

ll Rd

Harrison Pk

State

Route

151

Graysville Rd

Dodso

n Av

Graysville R

d

Highw

ay 19

3

State Route 2

Highway 813

Hixso

n Pk

Dayto

n Pk

Wilder Rd

Shallowford Rd

Davis Ridge Rd

Roanoke

Av

38TH ST E

Tenne

ssee A

v

Kings Point Rd

United States Highway 27

Standife

r Gap

Rd

5TH ST E

Unite

d Stat

es H

ighwa

y 27

Old Lee Hwy

Boy Scout Rd

Hamill Hollow Rd

Broad

St

Shallowford Rd

Bailey Av

Lula

Lake

Rd

Lee Hwy

4TH A

V

Wilso

n Rd

Hoga

n Rd

Chero

kee V

alley

Rd

Chick

amau

ga Rd

State Route 2

Centr

al Av

Burni

ng Bu

sh R

d

Park

City R

d

M L King Blvd

Oolte

wah-R

inggo

ld Rd

Dodd

s Av

Lytle Rd

E Brow

Rd

Standifer Gap Rd

³

Funded Bike/Ped Projects Legend 0 1 2 3

Miles

Notes:1. ID numbers correspond to project list tables included as Table 8.1 of the RTP document.2. Bike/ped projects not shown on the map include a set aside forsidewalk network improvements.

Water Body

State LineStudy AreaCounty Boundary

Limited Access Roadway

_ Landmark

!

!

Funded and constructed by 2020

!

!

Funded and constructed by 2030

!

!

Funded and constructed by 2040

Add Bike Lane

Add Bike Lane

Add Bike Lane

Existing Greenway

Existing Bike Lanes & 2014-2017 TIP Bike Lanes

Fiscally Constrained Roadway Projects

OtherRoadway

Page 3: Project Maps & List: Draft 2040 Regional Transportation Plan

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

%,

#

#

#

#

%,%,

%,

XWXWXW

XW

%,

%,

%,

_

_

_

_

_

£¤27

£¤41

£¤27

£¤11

£¤127

£¤11

¬«2

¬«2

¬«58

¬«319

¬«317

¬«151

¬«153

¬«153

¬«146

National Military Park

§̈¦75

§̈¦24

§̈¦75

UU188

UU189

Hamilton Place

Northgate Mall

Enterprise South

Chattanooga Airport

UU27

UU3

UU6

UU5

UU58

UU63

UU68

UU100

UU60

US113

US29

US30

US70

US48

US77

US57

US62

US122

US69

US61

US99

US31

US112

US56US28

US72

US76

US43

US190

US47

US55

US114

US78

US64

US66

US90US7

22

4

9

8

8383

26

25 24

11

10

193

192

191

US-27

SR-153

Silverd

ale Hw

y

SR-60

Birchw

ood Pk

Apison Pk

SR-111

New

Hixso

n Pk

E Brai

nerd

Rd

Keith

Rd

Dayton

Blvd

Ooletw

ah-G

eorge

town R

d

Lee Hwy

Poe Rd

Hixso

n Pk

Snow Hill Rd

Band

y Rd

Taft Hwy

Hunter Rd

Boynton Dr

Tsati Ter

Three

Notch

Rd

W Rd

.

US-11

Bonny Oaks Dr

Ringgold Rd

Cove

Rd

Thrasher Pk

State Route 2

Shallowford Rd

Cummings Hwy

Dolly Po

nd Rd

Fairvie

w Rd

Highw

ay 19

3

Lee Pk

Hamill Rd

Crest R

d N

E Main St

3RD ST E

Middle V

alley R

d

Jerse

y Pk

Gann

Rd

Dalla

s Holl

ow R

d

Mccallie Av

Stand

ifer G

ap Rd

Post

Oak R

d

Wilcox Blvd

Love

ll Rd

Tallant Rd

Hotwater Rd

State

Route

151

Igou Gap Rd

Grasshopper Rd

United States Highway 41

Dayton

Pk N

Chero

kee V

alley

Rd

Corral Rd.

Chick

amau

ga R

d

Harris

on Ba

y Rd

Dayton Pk S

Gadd Rd

Lakeview Dr

State Route 146

Sequoyah Access Rd

Suck Creek Rd

Dietz

Rd

James Blvd

Proffit

t Rd

Oolte

wah-R

inggo

ld Rd

Ely Rd

Hickor

y Valle

y RdMa

rket S

t

Mcfar

land A

ve

Salem Rd

Dodd

s Av

Cres

t Rd S

Brainere

d Rd

Dayto

n Pk

Mountain

Creek R

d

Pine G

rove R

d

Holtzc

law Av

Johnson Rd

Bank

s Rd

Mission

Ridge

Rd

Airpo

rt Rd

Sawyer Pk

Mount Pisga

h Rd

Highway 813Mont

lake R

d

Storm

er Rd

Big So

ddy C

reek

Long

Hollow

Rd

Rossville Blvd

Lula

Lake

Rd

Daisy-Dallas Rd

Tunn

el Blvd

State Route 201

Bill Reed Rd

State Route 299

Ochs

Hwy

Riverfront Pkwy.

Amnic

ola Hw

y.

Sawy

er Rd

.

Armstro

ng Rd

Stewa

rt Rd

Wauhatc

hie Pk

Bailey Av

Mcbri

en Rd

Webb

Rd

Old Lee Hwy

Mcca

hill Rd

N Moo

re Rd

23RD ST E

N Highway 27

Boy Scout Rd

Mayfl

ower

Rd

Moses Rd

Reeds Bridge Rd

Osbu

rn Rd

Popular Springs Rd

Clark

Rd

N Gun

barre

l Rd

Mccallie Ferry Rd

Wilso

n Ave

.

Brown

s Ferr

y Rd

Centr

al Av

Pinev

ille R

d

Peavine Rd

Talle

y Rd

Norcr

ess R

d

Jenkin

s Rd

Unive

rsity D

r

Morris

Hill R

d

Belvo

ir Av

Lytle Rd

Broad

St

St Elm

o Av

Roberts Mill Rd

Bennett Rd

Birmingham Pike

Dupont Pkwy

Hoga

n Rd

Ashland Ter

Martin

Rd

W Sc

hmitt

Rd

Big Ri

dge Rd

Lower Mill Rd

Grubb Rd

Riverside

Dr

Park City Rd

4TH A

V

Burni

ng Bu

sh Rd

Steele Rd

Amnicola Hwy

Vanc

e Rd

N Long Hollow Rd

Short Tail Springs Rd

Dry Va

lley Rd

Cros

s St

SR-32

1

Barto

n Av

Lupton Dr

Cummings Rd

State R

oute 1

89

S Sem

inole

Dr

Workman Rd

Lullwa

ter Rd

Mocc

asin

Bend

Rd

Gold Point Cir N

Shep

herd

Rd

Glass St

John Ross Rd

Edgm

on Rd

Noah

Reid

Rd

Tva Access Rd

Hamby Rd

S Moo

re Rd

N Palisa

des Dr

Dallas Rd

Woodla

nd Dr

Elder M

ountain

Rd

Wilder St

Chatt

anoo

ga Va

lley Rd

Tenn

esse

e Av

Glenwood Dr

Shiple

y Hollo

w Rd

Old Dayto

n Pk

N Je

nkins

Rd

May Rd

10TH ST E

Edward

s Poin

t Rd

Graysville Rd

28TH ST E

James St

Red Belt Rd

Pine Ridge Rd

Harrison

Pk

Sceni

c Hwy

Brown

town R

d

E Brow

Rd

Shack

leford

Ridge

Rd

Dodson A

v

Little

Debb

ie Pk

wy

N Hick

ory Va

lley Rd

Lee Ave

Spring Creek Rd

Champion Rd

Clio Av

Roan

oke A

v

Signal Mountain Rd

Ashmore

AvWi

lson R

dE L

yndon

Av

M L King Blvd

SR-134

4TH ST E

N Brag

g Av

Lamar

Av

Ridge

way A

v

Kings Point Rd

Willow

St S

Tyner

Rd

N Con

cord

Rd

Houst

on St

Appian Dr

Front Rd

Glove

r Rd

Linds

ay St

Signal Mountain Blvd

W Crabtree Rd

Spradling Rd

College Dr E

Cres

tridge

Dr

Cass

andra

Smith

Rd

Nick-A Jack Rd

38TH ST E

Igou Ferry Rd

Lee Av

N Cha

mberl

ain Av

37TH ST E

Dyer Rd

Hickor

y St S

Maple St

Lee-Gordon Mill Rd

Ely Ln

Page

Rd

Watauga Ln

Bowman Rd

Burni

ng Bu

sh

Shola

r Av

Navajo Dr

W Nickajack Rd

Manufactures Rd.

Forrest Rd

Alton

Park

Blvd

Green Lakes Rd

Carte

r St

38TH ST W

Critte

nden

Ave Po

tts R

d

Andy

Thom

as Rd

Orch

ard Kn

ob Av

N

Memorial Dr

Indian

Ave

S Crest Rd

Poplar Springs Rd

Crabtree Rd

Nick-A

-Jack

Rd

Timesville Rd

N Ma

rket S

t

Kelly

St

Westside Av

Germ

antow

n Rd

State Route 1

Unite

d Stat

es H

ighwa

y 27

Glentana St

Meadowview Rd

Germ

antow

n Rd N

Altamont Av

Hamill Hollow Rd

Steph

enso

n Av

40TH ST W

Easto

n Av

Wisdom St

Bay S

hore

Rd

Campbell St

Cain A

v

Thomas Rd

Frazier Av

Main

St

Rock Creek Rd

Post Rd

20TH ST. W.

State

Route

57

Ault Rd

Turner Rd

5TH ST E

Oak St

Wesleya

nn Rd

W Gordon Ave

Willow

St N

W Crest Rd

Evitt

St

Chest

nut S

t

Wilder Rd

Gas Ridge Rd

Addison Rd

Harrison-Ootlewah Rd

E Long Hollow Rd

SR-17

Highway 11

Moss

Dr

Gateway Av

Quarles Rd

Timesville Av

Greens Lake Rd

Koa Blvd

Gateway Ln

W Valley Rd

W Main St

20TH ST E

Spruce St

Greenleaf St

Patte

ntown

Rd

Exit Ramp

S Bragg Av

Davis Ridge Rd

Burge

ss R

d

W Fleetwood Dr

Anderson Pk.

Adams Rd

Cleveland

St

N Mac

k Smit

h Rd

Mountain View Rd

Retro-Hughes Rd

Sims Dr

Red Belt Rd

Graysville R

d

Dodso

n Av

Boy Scout Rd

Hixso

n Pk

Highw

ay 19

3

Dodd

s Av

State

Route

151

Shallowford Rd

Harris

on Pk

Broa

d St

Dayto

n Pk

Sholar

Av

Shallowford Rd

State Route 2

Bailey Av

Tenne

ssee A

v

Love

ll Rd

Wilso

n Rd

State Route 2

Old Lee Hwy

Unite

d Stat

es H

ighwa

y 27

Jenkins Rd

Park

City R

d

SR-60

Love

ll Rd

Lee Hwy

4TH A

V

Champion Rd

Lytle Rd

38TH ST E

Chero

kee V

alley

Rd

Burni

ng Bu

sh R

d

Hogan

Rd

Marke

t St

Stewa

rt Rd

Centr

al Av

E Brow

Rd

³Funded Roadway Projects Legend

0 1 2 3 4 5Miles

Funded and constructed by 2020

Intersection Improvements,Preventative Maintenance,Safety Improvements,Widening

Funded and constructed by 2030

Intersection Improvements,Preventative Maintenance,Safety Improvements,Widening

Funded and constructed by 2040

Intersection Improvements,Preventative Maintenance,Safety Improvements,Widening

Interchange ModificationIntersection Improvements

New Roadway

New Roadway

Bridges

Intersection Improvement

!

!

XW%

!

!

!

!

!

!

!

!

#

%,

New Roadway!

!

Water Body

Notes:1. ID numbers correspond to project list tables included as Table 8.1 of the RTP document.2. Roadway projects not shown on the map include: pavement maintenance set aside, bridge maintenance set aside, arterial ITS signal upgrades and synchronization set aside, safety set aside.

Tennessee-Georgia State Line

Study AreaCounty Boundary

_ Landmark Limited Access RoadwayOther Roadway

Page 4: Project Maps & List: Draft 2040 Regional Transportation Plan

Table 8.1

State RevenTier

GA  2020 

GA  2020 

GA  2020 

GA  2020 

GA  2020 

GA  2020 

GA  2020 

GA  2020 

GA  2020 

Georgia 2018‐20

GA  2030 

Fiscally C

nue r 

2040 RTP ID 

136  CA

100  CiOg

11  GD

8  GD

10  GD

9  GD

205  Va

206  Va

185  Va

020 Total: 

76  CaCo

Constrained

Project Sponsor  S

ARTA  RTTe

ty of Fort glethorpe 

CaPr

DOT  CaPr

DOT  CaPr

DOT  CaPr

DOT  CaPr

arious  RTTe

arious  RTTe

arious  RTTe

atoosa ounty 

CaPr

Project List

Source  Pro

TP eam 

US 27/S2/Battle

all for rojects 

Fant Drand enh

all for rojects 

CR‐385Bridge 

all for rojects 

US‐41/ 

all for rojects 

US‐41/S

all for rojects 

CR‐553Bridge 

TP eam 

GA PavMainteAside 2

TP eam 

GA PavMainteAside 2

TP eam 

SidewaAside ‐ 

all for rojects 

Dietz R

t

oject Name: 

SR efield Parkway 

rive widening hancements 

/ Keith Rd. 

SR‐3 Bridge 

SR‐2 Bridge 

/ Lakeview Dr. 

ement nance Set 2018‐2020 

ement nance Set 2018‐2020 

lk Network Set GA 2018‐2020 

oad 

Category 

Transit‐Local Bus 

Safety Improvements 

Bridges 

Bridges 

Bridges 

Bridges 

Preventative Maintenance 

Preventative Maintenance 

Complete Streets‐Bike/Ped 

Widening 

Shor

GA portion of nconnecting ForDowntown Cha

City of Fort Oglwiden 0.4‐milefull three‐lane provision of a cAlso includes cimprovements bike lanes, and

Replace CR‐385no added capaTiger Creek nea

Bridge replacemwith added capconsidered in pat Peavine Creeeast of Fort Og

Replace US‐41/added capacityChickamauga Cnear SR‐151/Al

Bridge rehabilit553/Lakeview Dadded capacityin project #44)Branch, betweeRd. 

Funding set asipreventative m

Funding set asipreventative m

Funding set asisidewalks on alarterial roadwa(recommendatBike/Ped Plan)

Widen from 2 t

rt Description 

new local bus servrt Oglethorpe, GA attanooga via US 2

lethorpe proposese‐long Fant Drive incross‐section, inclcenter left‐turn lanulvert work, at three intersect

d sidewalks. 

5/Keith Rd. bridgecity.  Located at  Lar Smith Chapel Rd

ment on US‐41/SRpacity (capacity project #42).  Locaek near Haggard Rglethorpe. 

/SR‐2 bridge with y.  Located at SoutCreek in West Ringlabama Highway.

tation on CR‐Drive bridge with y (capacity conside.  Located at Blacken Steele Rd. and 

ide for pavement maintenance activi

ide for pavement maintenance activi

ide to implement ll federally classifiays within urban ation from 2010 . 

to 4 lanes 

From

vice to 27. 

TN/GA SLine 

s to nto a luding ne.  

tions, 

SR‐146/CSprings R

e with Little d. 

CR‐385/Road at Tiger Cre

R‐3 

ated Rd., 

at PeavinCreek 3.miles EaFort Oglethor

no th ggold 

At SouthChickamCreek in Ringgold

ered k Page 

CR‐553/View DriBlack BraEast of Junction

ties.   

ties.   

ed areas 

  

SR‐146/CSprings R

m:  To

tate  Fort OglethoGA 

Cloud Road 

SR‐2/BattlefieParkway

Keith Little eek 

  

ne 7 st of 

rpe 

  

h auga West 

  

Lake ve at anch 

SR‐1 

  

  

  

  

Cloud Road 

Reeds BRoad/BoDrive 

o: Length (miles)

rpe, 4 

eld y 

0.4 

 

 

 

 

 

 

 

ridge oynton 

2.1 

Project Cost (

$9,274,5

$4,785,8

$2,331,0

$4,495,4

$5,827,6

$1,248,8

$11,511,9

$15,000,0

$1,956,5

$56,431,7

$34,410,9

(YOE) Federal 

Cate

552.06  NationalHighwayPerformProgram

805.96  Surface TranspoProgram

045.62  Surface TranspoProgram

401.95  Surface TranspoProgram

614.06  Surface TranspoProgram

867.46  Surface TranspoProgram

956.00  NationalHighwayPerformProgram

000.00  Surface TranspoProgram

522.00  TranspoAlternat

765.11    

989.63  Surface TranspoProgram

Chattanoog

Funding egory  Fed

l y ance 

rtation m ‐ TPO 

rtation m ‐ State 

rtation m ‐ State 

rtation m ‐ State 

rtation m ‐ State 

l y ance 

$

rtation m ‐ State 

$

rtation ives 

$

rtation m ‐ TPO 

$

ga‐Hamilton Cou

ederal Funds 

$7,419,641.65 

$3,828,644.77 

$1,864,836.50 

$3,596,321.56 

$4,662,091.25 

$999,093.97 

$10,360,760.40 

$12,000,000.00 

$1,565,217.60 

$46,296,607.69 

$27,528,791.70 

unty/North Geo

Percent Federal Funding  S

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

90.00% 

80.00% 

80.00% 

 

80.00% 

orgia 2040 Regio

S

State Funds 

$0.00 

$0.00 

$466,209.12 

$899,080.39 

$1,165,522.81 

$249,773.49 

$1,151,195.60 

$3,000,000.00 

$0.00 

$6,931,781.42 

$0.00 

onal Transporta

Section 8 – Inv

Percent State 

Funding  Lo

0.00%  $

0.00% 

20.00% 

20.00% 

20.00% 

20.00% 

10.00% 

20.00% 

0.00% 

  $

0.00%  $

tion Plan 

vestment Prio

ocal Funds  F

$1,854,910.41 

$957,161.19 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$391,304.40 

$3,203,376.00 

$6,882,197.93 

rities 

145 

Percent Local 

Funding 

20.00% 

20.00% 

0.00% 

0.00% 

0.00% 

0.00% 

0.00% 

0.00% 

20.00% 

 

20.00% 

Page 5: Project Maps & List: Draft 2040 Regional Transportation Plan

Chatt

Section 8 – In

146 

State RevenTier

GA  2030 

GA  2030 

GA  2030 

GA  2030 

GA  2030 

GA  2030 

GA  2030 

GA  2030 

GA  2030 

GA  2030 

Georgia 2021‐20

GA  2040 

anooga‐Hamilto

nvestment Pri

nue r 

2040 RTP ID 

72  CiOg

139  GD

43  GD

47  GD

202  Va

208  Va

207  Va

201  Va

185  Va

176  WCo

030 Total: 

137  CA

on County/Nort

iorities 

Project Sponsor  S

ty of Fort glethorpe 

CaPr

DOT  RTTe

DOT  CaPr

DOT  CaPr

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

Walker ounty 

RTTe

ARTA  RTTe

th Georgia 2040 

Source  Pro

all for rojects 

Mack SWideniEnhanc

TP eam 

I‐75 Exp

all for rojects 

SR‐146/Road 

all for rojects 

I‐75 

TP eam 

GA BridMainteAside 2

TP eam 

GA PavMainteAside 2

TP eam 

GA PavMainteAside 2

TP eam 

GA BridMainteAside 2

TP eam 

SidewaAside ‐ 

TP eam 

SR 2/BaParkwaAve./Ho

TP eam 

US‐41/

Regional Trans

oject Name: 

mith Road ng and cements 

press 

/Cloud Spring 

dge nance Set 2021‐2030 

ement nance Set 2021‐2030 

ement nance Set 2021‐2030 

dge nance Set 2021‐2030 

lk Network Set GA 2021‐2030 

attlefield ay/McFarland ogan Rd. 

Ringgold Road 

sportation Plan 

Category 

Safety Improvements 

Transit‐Premium Bus 

Widening 

Widening 

Preventative Maintenance 

Preventative Maintenance 

Preventative Maintenance 

Preventative Maintenance 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Transit‐Local Bus 

Shor

Widen to a threincluding a cenOther improvestraitening andsegments, consculvert, six inteimprovements,sidewalks. 

New Premium connecting RinDowntown ChaI‐24 

Widen SR‐146/

Widen I‐75 from

Funding set asipreventative m

Funding set asipreventative m

Funding set asipreventative m

Funding set asipreventative m

Funding set asisidewalks on alarterial roadwa(recommendatBike/Ped Plan)

Add bike lanesPlan Primary N

New local bus sRidge, TN to Dovia US 41.  AlsoNorth GA. 

rt Description 

ee‐lane cross‐sectnter left‐turn lane. ments include d elevating selectestructing a large ersection , bicycle lanes and

Bus express routeggold, GA with attanooga via I‐75 

/Cloud Spring Road

m 6 lanes to 8 lane

ide for bridge maintenance activi

ide for pavement maintenance activi

ide for pavement maintenance activi

ide for bridge maintenance activi

ide to implement ll federally classifiays within urban ation from 2010 . 

.  From 2010 Bike/etwork 

service connectingowntown Chattano goes slightly into

From

tion,   

ed 

d wide 

SR‐146 

 and 

Ringgold75/SR‐15Intercha

d  US‐27/SREast 

es.  SR‐146 

ties.   

ties.   

ties.   

ties.   

ed areas 

  

/Ped  SR 193 

g East ooga o 

Downtow

m:  To

US‐41/U76/SR‐8/RinggoRoad 

d (I‐51 nge) 

Downto

R‐1  CR‐553/LakRoad 

TennessState Lin

  

  

  

  

  

US 27/LafayRd. 

wn  Cloud SpRd. ParkRide at I

o: Length (miles)

US‐

old 

2.1 

wn  16.3 

eview 2.19 

ee ne 

1.37 

 

 

 

 

 

yette  

pring k and ‐75 

9.9 

Project Cost (

$20,817,0

$49,217,3

$51,730,0

$31,548,2

$5,066,1

$35,000,0

$38,373,1

$2,533,0

$6,521,7

$6,671,8

$281,889,6

$46,422,5

(YOE) Federal 

Cate

000.36  Surface TranspoProgram

357.09  NationalHighwayPerformProgram

014.25  Surface TranspoProgram

204.35  NationalHighwayPerformProgram

191.00  Surface TranspoProgram

000.00  Surface TranspoProgram

186.00  NationalHighwayPerformProgram

096.00  NationalHighwayPerformProgram

739.00  TranspoAlternat

863.77  CongestMitigatioAir Qual

641.45    

528.01  Surface TranspoProgram

Funding egory  Fed

rtation m ‐ TPO 

$

l y ance 

$

rtation m ‐ State 

$

l y ance 

$

rtation m ‐ State 

rtation m ‐ State 

$

l y ance 

$

l y ance 

rtation ives 

ion on and ity 

$2

rtation m ‐ State 

$

ederal Funds 

$16,653,600.29 

$44,295,621.38 

$41,384,011.40 

$28,393,383.92 

$4,052,952.80 

$28,000,000.00 

$34,535,867.40 

$2,279,786.40 

$5,217,391.20 

$5,337,491.01 

237,678,897.50 

$37,138,022.41 

Percent Federal Funding  S

80.00% 

90.00% 

80.00% 

90.00% 

80.00% 

80.00% 

90.00% 

90.00% 

80.00% 

80.00% 

  $

80.00% 

State Funds 

$0.00 

$4,921,735.71 

$7,759,502.14 

$3,154,820.44 

$1,013,238.20 

$7,000,000.00 

$3,837,318.60 

$253,309.60 

$0.00 

$1,334,372.75 

29,274,297.43 

$4,642,252.80 

Percent State 

Funding  Lo

0.00%  $

10.00% 

15.00%  $

10.00% 

20.00% 

20.00% 

10.00% 

10.00% 

0.00%  $

20.00% 

  $1

10.00%  $

ocal Funds  F

$4,163,400.07 

$0.00 

$2,586,500.71 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$1,304,347.80 

$0.00 

14,936,446.51 

$4,642,252.80 

Percent Local 

Funding 

20.00% 

0.00% 

5.00% 

0.00% 

0.00% 

0.00% 

0.00% 

0.00% 

20.00% 

0.00% 

 

10.00% 

Page 6: Project Maps & List: Draft 2040 Regional Transportation Plan

State RevenTier

GA  2040 

GA  2040 

GA  2040 

GA  2040 

GA  2040 

GA  2040 

GA  2040 

GA  2040 

GA  2040 

GA  2040 

Georgia 2031‐20

Georgia 2018‐20

TN  2020 

TN  2020 

nue r 

2040 RTP ID 

134  CA

135  CA

169  CaCo

31  CaCo

48  GD

204  Va

203  Va

209  Va

210  Va

185  Va

040 Total: 

040 Total: 

14  CA

15  CA

Project Sponsor  S

ARTA  RTTe

ARTA  RTTe

atoosa ounty 

RTTe

atoosa ounty 

CaPr

DOT  CaPr

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

ARTA  CaPr

ARTA  CaPr

Source  Pro

TP eam 

Route 9into N. 

TP eam 

N. GA/ERidge/A

TP eam 

US‐41/2/SR‐3/Rd./OldHighwa

all for rojects 

MineraAccess 

all for rojects 

I‐75 

TP eam 

GA BridMainteAside 2

TP eam 

GA BridMainteAside 2

TP eam 

GA PavMainteAside 2

TP eam 

GA PavMainteAside 2

TP eam 

SidewaAside ‐ 

all for rojects 

CARTA incline replaceadditio

all for rojects 

CARTA Improv2020 

oject Name: 

9 Extension GA 

East Airport 

US‐76/SR‐/Ringgold d Dixie ay/Nashville St. 

l Avenue 

dge nance Set 2031‐2040 

dge nance Set 2031‐2040 

ement nance Set 2031‐2040 

ement nance Set 2031‐2040 

lk Network Set GA 2031‐2040 

bus and car ements and ns 2018‐2020 

Incline Railway ements 2018‐

Category 

Transit‐Local Bus 

Transit‐Local Bus 

Complete Streets‐Bike/Ped 

Safety Improvements 

Widening 

Preventative Maintenance 

Preventative Maintenance 

Preventative Maintenance 

Preventative Maintenance 

Complete Streets‐Bike/Ped 

Transit‐General 

Transit‐General 

Shor

Extend CARTA line down McFEllis Rd. 

GA portion of nthrough N. GA Center and Airp

Add bike lanesPlan Primary N

Widening and ESpring Road to 

Widen I‐75 from

Funding set asipreventative m

Funding set asipreventative m

Funding set asipreventative m

Funding set asipreventative m

Funding set asisidewalks on alarterial roadwa(recommendatBike/Ped Plan)

Vehicle replace

Maintenance/eexisting system

rt Description 

Route 9 across staarland Ave. in GA 

new local bus servto Eastgate Town port 

.  From 2010 Bike/etwork 

Enhancing from ClFort Town Drive.

m 6 lanes to 8 lane

ide for bridge maintenance activi

ide for bridge maintenance activi

ide for pavement maintenance activi

ide for pavement maintenance activi

ide to implement ll federally classifiays within urban ation from 2010 . 

ement, existing se

enhancements form 

From

ate to 

RossvilleBlvd/TN‐State Lin

vice  TN/GA SLine andSmith Rd

/Ped  TN/GA SLine 

loud  SR‐146/CSprings R

es.  SR‐2 

ties.   

ties.   

ties.   

ties.   

ed areas 

  

rvice    

r    

m:  To

e ‐GA ne 

McFarlaAve/Ellis

tate Mack 

d. 

Cloud SpRd./US 2

tate  OoltewaRinggoldRd./Evitt

Cloud Road 

Fort TowDrive 

SR‐146

  

  

  

  

  

  

  

o: Length (miles)

nd s Rd. 

1.5 

prings 27 

4.6 

ah‐d t St. 

7.9 

wn  1.1 

3.63 

 

 

 

 

 

 

 

Project Cost (

$7,034,1

$21,569,6

$15,916,5

$10,782,0

$105,181,3

$11,026,7

$5,513,3

$38,373,1

$75,000,0

$6,521,7

$343,341,3

$681,662,7

$16,956,5

$1,956,5

(YOE) Federal 

Cate

102.63  Surface TranspoProgram

667.89  Surface TranspoProgram

500.32  Surface TranspoProgram

081.00  Surface TranspoProgram

372.05  NationalHighwayPerformProgram

778.00  Surface TranspoProgram

389.00  NationalHighwayPerformProgram

186.00  NationalHighwayPerformProgram

000.00  Surface TranspoProgram

739.00  TranspoAlternat

343.89    

750.45    

522.00  Federal TFunding 5310, 535339) 

522.00  Federal TFunding 5310, 535339) 

Chattanoog

Funding egory  Fed

rtation m ‐ TPO 

rtation m ‐ TPO 

$

rtation m ‐ TPO 

$

rtation m ‐ TPO 

l y ance 

$

rtation m ‐ State 

l y ance 

l y ance 

$

rtation m ‐ State 

$

rtation ives 

$2

$5

Transit (5307, 337, 

$

Transit (5307, 337, 

ga‐Hamilton Cou

ederal Funds 

$5,627,282.11 

$17,255,734.31 

$12,733,200.25 

$8,625,664.80 

$94,663,234.85 

$8,821,422.40 

$4,962,050.10 

$34,535,867.40 

$60,000,000.00 

$5,217,391.20 

289,579,869.82 

573,555,375.01 

$11,021,739.30 

$1,271,739.30 

unty/North Geo

Percent Federal Funding  S

80.00% 

80.00% 

80.00% 

80.00% 

90.00%  $

80.00% 

90.00% 

90.00% 

80.00%  $

80.00% 

  $

  $

65.00% 

65.00% 

orgia 2040 Regio

S

State Funds 

$0.00 

$377,469.19 

$0.00 

$0.00 

$10,518,137.21 

$2,205,355.60 

$551,338.90 

$3,837,318.60 

$15,000,000.00 

$0.00 

37,131,872.29 

73,337,951.15 

$3,391,304.40 

$391,304.40 

onal Transporta

Section 8 – Inv

Percent State 

Funding  Lo

0.00%  $

1.75%  $

0.00%  $

0.00%  $

10.00% 

20.00% 

10.00% 

10.00% 

20.00% 

0.00%  $

  $1

  $3

20.00%  $

20.00% 

tion Plan 

vestment Prio

ocal Funds  F

$1,406,820.53 

$3,936,464.39 

$3,183,300.06 

$2,156,416.20 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$1,304,347.80 

16,629,601.78 

34,769,424.29 

$2,543,478.30 

$293,478.30 

rities 

147 

Percent Local 

Funding 

20.00% 

18.25% 

20.00% 

20.00% 

0.00% 

0.00% 

0.00% 

0.00% 

0.00% 

20.00% 

 

 

15.00% 

15.00% 

Page 7: Project Maps & List: Draft 2040 Regional Transportation Plan

Chatt

Section 8 – In

148 

State RevenTier

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

anooga‐Hamilto

nvestment Pri

nue r 

2040 RTP ID 

16  CA

13  CA

136  CA

19  CA

20  CA

138  CA

143  CA

186  CA

63  CiCh

58  CiCh

60  CiCh

98  CiCh

on County/Nort

iorities 

Project Sponsor  S

ARTA  CaPr

ARTA  CaPr

ARTA  RTTe

ARTA  CaPr

ARTA  CaPr

ARTA  RTTe

ARTA  RTTe

ARTA/RPA  RTTe

ty of hattanooga 

CaPr

ty of hattanooga 

CaPr

ty of hattanooga 

CaPr

ty of hattanooga 

CaPr

th Georgia 2040 

Source  Pro

all for rojects 

CARTA needs 2

all for rojects 

CARTA TranspoSystemimprov2020 

TP eam 

US 27/S2/Battle

all for rojects 

CARTA Route i2018‐20

all for rojects 

CARTA Mainte2020 

TP eam 

Route 4Ext & M

TP eam 

CARTA FrequeImprov2020 

TP eam 

"ChattaFeasibi

all for rojects 

Shallow

all for rojects 

SR‐153 

all for rojects 

GoodwExtensi

all for rojects 

CentralCorrido

Regional Trans

oject Name: 

bus shelter 2018‐2020 

Intelligent ortation  ements 2018‐

SR efield Parkway 

Care a Van ncreases 020 

Preventive nance 2018‐

4/I‐75 Express Mod 

Route ncy ements 2018‐

anooga Way" lity Study 

wford Road 

win Road on 

 Avenue or Study 

sportation Plan 

Category 

Transit‐General 

Transit‐General 

Transit‐Local Bus 

Transit‐General 

Transit‐General 

Transit‐Premium Bus 

Transit‐Frequency Improvements 

Study 

Widening 

Widening 

New Roadway 

Study 

Shor

Maintenance/eshelters 

General technoupgrade 

TN portion of nconnecting ForDowntown Cha

No specific rou

General mainte

Extend CARTA further north o

Increase frequeand 34  to cut h

A study to detepremium transconnecting Dowthe Airport, an

Widening fromcomplete streeSHLWFRDA2J).

Widening from6‐lane section fLane section at

New 4‐lane facGunbarrel RoadBlvd. (TIP ID# G

A corridor planstudy to determapplicable use,improvements,multimodal tracorridor, south

rt Description 

enhancements for

ology maintenance

new local bus servrt Oglethorpe, GA attanooga via US 2

utes defined 

enance 

Express Route 4 on I‐75 to Lee High

ency of CARTA rouheadways in half

ermine the feasibisit ‐ including light wntown Chattanod Enterprise South

m 2 lanes to 4 lanesets (TIP ID#  

m a 4‐lane section tfrom the current 6t Stone Ridge. 

cility (extension) frd to Hamilton PlacGOODWIN) 

nning and feasibilitmine the best , operational ,  and feasibility ofaffic capacity for thh of 3rd Street. 

From

r bus    

e and    

ice to 27. 

DowntowChattano

  

  

hway HamiltonPlace 

utes 1    

lity of rail ‐ 

ooga, h. 

  

s with  Airport R

to a 6‐

Stone Ri

rom ce 

GunbarrRoad 

ty 

f he 

  

m:  To

  

  

wn ooga 

TN/GA SLine 

  

  

n  Lee HighInterchapark‐and

  

  

Road  Jersey P

dge  US‐27 

el  HamiltoPlace Blv

  

o: Length (miles)

 

 

State  5 

 

 

hway nge d‐ride 

 

 

ike  0.9 

0.8 

n vd 

0.5 

 

Project Cost (

$553,0

$1,956,5

$11,593,1

$553,0

$13,043,4

$3,020,0

$25,174,7

$650,0

$22,984,4

$12,992,2

$18,820,5

$436,1

(YOE) Federal 

Cate

004.89  Federal TFunding 5310, 535339) 

522.00  Federal TFunding 5310, 535339) 

189.75  Federal TFunding 5310, 535339) 

004.89  Federal TFunding 5310, 535339) 

478.00  Federal TFunding 5310, 535339) 

032.44  NationalHighwayPerformProgram

783.27  Federal TFunding 5310, 535339) 

000.00  Surface TranspoProgram

473.13  Surface TranspoProgram

236.25  NationalHighwayPerformProgram

512.56  Surface TranspoProgram

163.68  Surface TranspoProgram

Funding egory  Fed

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

l y ance 

Transit (5307, 337, 

rtation m ‐ TPO 

rtation m ‐ TPO 

l y ance 

$

rtation m ‐ TPO 

rtation m ‐ TPO 

ederal Funds 

$359,453.18 

$1,271,739.30 

$1,159,318.97 

$359,453.18 

$8,478,260.70 

$2,718,029.20 

$2,013,982.66 

$520,000.00 

$6,895,341.94 

$10,393,789.00 

$9,410,256.28 

$348,930.94 

Percent Federal Funding  S

65.00% 

65.00% 

10.00% 

65.00% 

65.00% 

90.00% 

8.00% 

80.00% 

30.00% 

80.00% 

50.00% 

80.00% 

State Funds 

$0.00 

$391,304.40 

$3,477,956.92 

$0.00 

$2,608,695.60 

$151,001.62 

$3,020,973.99 

$65,000.00 

$0.00 

$2,598,447.25 

$3,764,102.51 

$0.00 

Percent State 

Funding  Lo

0.00% 

20.00% 

30.00%  $

0.00% 

20.00%  $

5.00% 

12.00%  $2

10.00% 

0.00%  $1

20.00% 

20.00%  $

0.00% 

ocal Funds  F

$193,551.71 

$293,478.30 

$6,955,913.85 

$193,551.71 

$1,956,521.70 

$151,001.62 

20,139,826.62 

$65,000.00 

16,089,131.19 

$0.00 

$5,646,153.77 

$87,232.74 

Percent Local 

Funding 

35.00% 

15.00% 

60.00% 

35.00% 

15.00% 

5.00% 

80.00% 

10.00% 

70.00% 

0.00% 

30.00% 

20.00% 

Page 8: Project Maps & List: Draft 2040 Regional Transportation Plan

State RevenTier

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

nue r 

2040 RTP ID 

161  CiCh

68  CiCh

182  CiCh

193  CiCo

6  CiCo

5  CiCo

192  CiCo

191  CiCo

189  CiCo

188  CiCo

Project Sponsor  S

ty of hattanooga 

RTTe

ty of hattanooga 

CaPr

ty of hattanooga 

RTTe

ty of ollegedale 

CaPr

ty of ollegedale 

CaPr

ty of ollegedale 

CaPr

ty of ollegedale 

CaPr

ty of ollegedale 

CaPr

ty of ollegedale 

CaPr

ty of ollegedale 

CaPr

Source  Pro

TP eam 

SR 58/SHighwaOaks/CSt./GlasAve./OAve. 

all for rojects 

3rd Stre

TP eam 

Browns

all for rojects 

UniversDrive/SRoad/Ointersecrounda

all for rojects 

Tallant Improv

all for rojects 

EdgmonImprov

all for rojects 

Tallant Road/Mintersecrounda

all for rojects 

EdgmonHighwa64/SR‐2signaliz

all for rojects 

Universimprov

all for rojects 

Apison phase 2

oject Name: 

Silverdale ay/Bonny ampbell ss St./Roanoke rchard Knob 

eet/4th Street 

s Ferry Rd. 

sity Standifer Gap Old Camp Road ction bout 

Road ements 

n Road ements 

McDonald Road ction bout 

n Road/Lee ay  (US‐11/US‐2) intersection zation 

sity Drive ements 

Pike (SR‐317) 2 streetscape 

Category 

Complete Streets‐Bike/Ped 

Widening 

Complete Streets‐Bike/Ped 

Intersection Improvements 

Preventative Maintenance 

Preventative Maintenance 

Intersection Improvements 

Intersection Improvements 

Safety Improvements 

Safety Improvements 

Shor

Add bike lanesPlan Primary N

Widening of 3rLindsay Street tfrom 2 lane 

Add bike lanesAnalysis. 

Improve UniveGap Road /Old intersection by

Improve TallanPike (SR‐317) toRoad) by addinsidewalks, curband lighting. 

Improve EdgmoRoad to Lee Hig64/SR‐2) by adsidewalks, curband lighting. 

Improve TallanRoad intersectiroundabout. 

Improve EdgmoHighway (US‐1intersection by

Adding width, cresurfacing UnCollege Drive eRoad/Standifer

A portion of thphase 2 TDOT Iis in the City ofhas a policy of access roads wlighting. 

rt Description 

.  From 2010 Bike/etwork 

rd St/4th St from to Hampton Stree

.  From 2040 RTP G

rsity Drive /Standi Camp Road y adding a roundab

nt Road from Apisoo city limits (McDong lane width, b and gutter, drain

on Road from Tallghway (US‐11/US‐ding lane width, b and gutter, drain

nt Road with McDoion by adding a 

on Road with Lee 1/US‐64/SR‐2) y adding traffic sign

curb and gutters aiversity Drive fromeast to Old Camp r Gap Road. 

e Apison Pike (SR‐Improvements prof Collegedale.  Theimproving its majo

with landscaping an

From

/Ped  McCallie

et Lindsay S

Gap  US 72/UUS 41/CummHighway

ifer 

bout. 

  

on onald 

nage 

SR‐317 

ant ‐

nage 

Tallant R(04132)

onald    

nal. 

  

and m 

College DEast 

‐317) oject e city or nd 

PattentoRoad (CiLimits) 

m:  To

e Ave.  Murray Rd. 

Street  HamptoStreet 

S 64/ 

mings y 

Boydsto

  

McDonaRoad 

Road  US‐11‐64Highway

  

  

Drive  Old Camp/Ster Gap R

own ty 

OoltewaRinggold(SR 321)end of p2 projec

o: Length (miles)

Hills  5.8 

n  1.2 

n Rd.   

 

ald  2.1 

4 (Lee y) 

1.6 

 

 

tandifRoad 

1.5 

ah‐d Road  and hase t. 

Project Cost (

$6,502,9

$19,175,7

$4,834,6

$250,0

$4,297,4

$3,255,6

$250,0

$200,0

$1,300,0

$900,0

(YOE) Federal 

Cate

912.10  CongestMitigatioAir Qual

780.34  NationalHighwayPerformProgram

682.22  CongestMitigatioAir Qual

000.00  CongestMitigatioAir Qual

458.41  Surface TranspoProgram

650.31  Surface TranspoProgram

000.00  CongestMitigatioAir Qual

000.00  Surface TranspoProgram

000.00  Surface TranspoProgram

000.00  Surface TranspoProgram

Chattanoog

Funding egory  Fed

ion on and ity 

l y ance 

$

ion on and ity 

ion on and ity 

rtation m ‐ TPO 

rtation m ‐ TPO 

ion on and ity 

rtation m ‐ State 

rtation m ‐ TPO 

rtation m ‐ State 

ga‐Hamilton Cou

ederal Funds 

$5,202,329.68 

$15,340,624.27 

$3,867,745.77 

$200,000.00 

$3,437,966.73 

$2,604,520.25 

$200,000.00 

$160,000.00 

$1,040,000.00 

$720,000.00 

unty/North Geo

Percent Federal Funding  S

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

orgia 2040 Regio

S

State Funds 

$650,291.21 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

onal Transporta

Section 8 – Inv

Percent State 

Funding  Lo

10.00% 

0.00%  $

0.00% 

0.00% 

0.00% 

0.00% 

0.00% 

0.00% 

0.00% 

0.00% 

tion Plan 

vestment Prio

ocal Funds  F

$650,291.21 

$3,835,156.07 

$966,936.44 

$50,000.00 

$859,491.68 

$651,130.06 

$50,000.00 

$40,000.00 

$260,000.00 

$180,000.00 

rities 

149 

Percent Local 

Funding 

10.00% 

20.00% 

20.00% 

20.00% 

20.00% 

20.00% 

20.00% 

20.00% 

20.00% 

20.00% 

Page 9: Project Maps & List: Draft 2040 Regional Transportation Plan

Chatt

Section 8 – In

150 

State RevenTier

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

anooga‐Hamilto

nvestment Pri

nue r 

2040 RTP ID 

38  CiRi

39  CiRi

28  HaCo

27  HaCo

26  HaCo

25  HaCo

24  HaCo

on County/Nort

iorities 

Project Sponsor  S

ty of East dge 

CaPr

ty of East dge 

CaPr

amilton ounty 

CaPr

amilton ounty 

CaPr

amilton ounty 

CaPr

amilton ounty 

CaPr

amilton ounty 

CaPr

th Georgia 2040 

Source  Pro

all for rojects 

Camp JBike La

all for rojects 

US‐41/8/RinggLane/Si

all for rojects 

OoltewGeorge

all for rojects 

SR‐58 MInterseimprovlanes atintersec

all for rojects 

SR‐58 aRoad/B

all for rojects 

SR‐58 a

all for rojects 

SR‐58 a(Mahan

Regional Trans

oject Name: 

ordan Parkway ne 

US‐76/SR‐gold Rd. Bike idewalks 

wah‐etown Road 

Miscellaneous ction ements:  turn t eight ction 

at Greenwood Bramlett Road 

at Career Lane 

at SR‐312 n Gap Road) 

sportation Plan 

Category 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Safety Improvements 

Intersection Improvements 

Intersection Improvements 

Intersection Improvements 

Intersection Improvements 

Shor

This project wiestablished bikJordan Parkway41), which will phase of the 20Ringgold Road to Camp Jordan

This project wiestablished bik41/Ringgold Rdaddition of siderequired, and ccurrent projectsidewalk interssection. 

Addition of shoturn lanes fromHighway to MoThere will be nlanes and no ad

Installation of tintersections oMonger Lane a

Installation of t

Installation of tat Career Lane 

Traffic signal inSR‐312 

rt Description 

ll continue the alrke lanes on Camp y to Ringgold Roadconnect to a diffe040 Plan (Bike Lanfrom Mack Smith n Parkway). 

ll continue the alrke lanes on US‐d. It will provide thewalks, where coincide with the t of ADA accessiblesections along this

oulder width and lm US‐11/64 Lee ountain View Roado additional travedditional capacity

turn lanes at eighton SR‐58 between and Grasshopper R

traffic signal on SR

traffic signal on SRintersection 

nstallation on SR‐5

From

eady 

d (US‐erent ne on Road 

On CampJordan ParkwayEast RidgStation #Ringgold(US‐41). will connthe CamJordan muse pathconnectiSouth ChickamGreenwaChattanoon the Nend of thpark to tpath aloRinggoldand its 

eady 

he 

e s 

TombrasAvenue

eft 

d. el . 

US‐11/64Highway

Rd. 

Monger 

R‐58  N/A 

R‐58  N/A 

58 at  N/A 

m:  To

 from ge Fire #2 to d Road This nect p multi‐h, ng to 

auga ay in ooga orth he he ng d Road 

  

s  GreenslaRoad 

4 Lee y 

MountaView Ro

Lane  GrasshoRd. 

  

  

  

o: Length (miles)

0.25 

ake  0.856 

in ad 

2.5 

pper   

 

 

 

Project Cost (

$186,2

$984,6

$6,035,0

$2,478,8

$942,4

$942,4

$942,4

(YOE) Federal 

Cate

211.04  TranspoAlternat

683.71  TranspoAlternat

040.50  HighwayImproveProgram

835.40  NationalHighwayPerformProgram

438.93  NationalHighwayPerformProgram

438.93  NationalHighwayPerformProgram

438.93  NationalHighwayPerformProgram

Funding egory  Fed

rtation ives 

rtation ives 

y Safety ement m 

l y ance 

l y ance 

l y ance 

l y ance 

ederal Funds 

$148,968.83 

$787,746.97 

$5,431,536.45 

$1,983,068.32 

$753,951.14 

$753,951.14 

$753,951.14 

Percent Federal Funding  S

80.00% 

80.00% 

90.00% 

80.00% 

80.00% 

80.00% 

80.00% 

State Funds 

$0.00 

$98,468.37 

$0.00 

$247,883.54 

$94,243.89 

$94,243.89 

$94,243.89 

Percent State 

Funding  Lo

0.00% 

10.00% 

0.00% 

10.00% 

10.00% 

10.00% 

10.00% 

ocal Funds  F

$37,242.21 

$98,468.37 

$603,504.05 

$247,883.54 

$94,243.89 

$94,243.89 

$94,243.89 

Percent Local 

Funding 

20.00% 

10.00% 

10.00% 

10.00% 

10.00% 

10.00% 

10.00% 

Page 10: Project Maps & List: Draft 2040 Regional Transportation Plan

State RevenTier

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

TN  2020 

nue r 

2040 RTP ID 

185  StIdPe

83  TD

3  TD

4  TD

84  TD

187  TD

223  Va

218  Va

217  Va

212  Va

211  Va

Project Sponsor  S

taff entified / ending 

RTTe

DOT  CaPr

DOT  CaPr

DOT  CaPr

DOT  CaPr

DOT/RPA  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

Source  Pro

TP eam 

SidewaAside ‐ 

all for rojects 

I‐24 at Broad SInterchModific

all for rojects 

US‐127Mounta

all for rojects 

I‐75 at Mall Int

all for rojects 

I‐75 

TP eam 

SR 153 Line Fe

TP eam 

ArteriaUpgradSynchroAside 2

TP eam 

TN PaveMainteAside 2

TP eam 

TN PaveMainteAside 2

TP eam 

TN BridMainteAside 2

TP eam 

TN BridMainteAside 2

oject Name: 

lk Network Set TN 2018‐2020 

Market & Streets ange cation 

/SR‐ 8/Signal ain Blvd 

Hamilton Place terchange 

Rapid Transit asibility Study 

l ITS Signal des and onization‐ Set 2018‐2020 

ement nance Set 2018‐2020 

ement nance Set 2018‐2020 

dge nance Set 2018‐2020 

dge nance Set 2018‐2020 

Category 

Complete Streets‐Bike/Ped 

Interchange Modification 

Preventative Maintenance 

Interchange Modification 

Interchange Modification 

Study 

ITS 

Preventative Maintenance 

Preventative Maintenance 

Preventative Maintenance 

Preventative Maintenance 

Shor

Funding set asisidewalks on alarterial roadwa(recommendatBike/Ped Plan)

Modify MarketStreet I‐24 intesafety and ope

Preventative mareas includingmodification, rundercut roadwroadway stabil

Add ramps to mfully directiona

Modification o75 and I‐24 

A study to detepremium transtransit (BRT) ‐ icorridor from SNorthgate MalPlace. 

Funding set asiupgrades and s

Funding set asipreventative m

Funding set asipreventative m

Funding set asipreventative m

Funding set asipreventative m

rt Description 

ide to implement ll federally classifiays within urban ation from 2010 . 

t Street and Broaderchanges to improration characteris

maintenance to selg culvert repair, cuock fall mitigationway repairs, and ity repairs. 

make this interchaal 

f the interchange 

ermine the feasibisit ‐ including bus rin the SR‐153/US‐2Soddy‐Daisy to l to Airport to Ham

ide for ITS signal synchronization 

ide for pavement maintenance activi

ide for pavement maintenance activi

ide for bridge maintenance activi

ide for bridge maintenance activi

From

ed areas 

  

d ove stics 

  

ect ulvert n, 

Suck CreRoad 

ange    

of I‐ Interstatat Inters24 in Chattano

lity of rapid 27 

milton 

  

  

ties.   

ties.   

ties.   

ties.   

m:  To

  

  

ek  PalisadeDrive  L.13.96 to17.01  Hamilto

  

te 75 tate 

ooga 

  

  

  

  

  

  

  

o: Length (miles)

 

 

s M. o L.M. 

3.05 

 

 

 

 

 

 

 

Project Cost (

$20,000,0

$10,089,4

$13,283,0

$48,093,3

$26,743,1

$500,0

$5,000,0

$58,853,4

$58,853,4

$12,518,9

$12,518,9

(YOE) Federal 

Cate

000.00  TranspoAlternat

440.04  NationalHighwayPerformProgram

053.27  Surface TranspoProgram

364.49  NationalHighwayPerformProgram

162.76  NationalHighwayPerformProgram

000.00  Surface TranspoProgram

000.00  Surface TranspoProgram

497.00  Surface TranspoProgram

497.00  NationalHighwayPerformProgram

975.00  Surface TranspoProgram

975.00  NationalHighwayPerformProgram

Chattanoog

Funding egory  Fed

rtation ives 

l y ance 

rtation m ‐ State 

$

l y ance 

$

l y ance 

$

rtation m ‐ TPO 

rtation m ‐ State 

rtation m ‐ State 

$

l y ance 

$

rtation m ‐ State 

$

l y ance 

$

ga‐Hamilton Cou

ederal Funds 

$200,000.00 

$9,080,496.03 

$10,626,442.62 

$43,284,028.05 

$24,068,846.48 

$400,000.00 

$4,000,000.00 

$29,426,748.50 

$47,082,797.60 

$10,015,180.00 

$10,015,180.00 

unty/North Geo

Percent Federal Funding  S

1.00% 

90.00% 

80.00% 

90.00% 

90.00% 

80.00% 

80.00% 

50.00% 

80.00% 

80.00% 

80.00% 

orgia 2040 Regio

S

State Funds 

$0.00 

$1,008,944.00 

$2,656,610.65 

$4,809,336.45 

$2,674,316.28 

$50,000.00 

$1,000,000.00 

$5,885,349.70 

$5,885,349.70 

$1,251,897.50 

$1,251,897.50 

onal Transporta

Section 8 – Inv

Percent State 

Funding  Lo

0.00%  $1

10.00% 

20.00% 

10.00% 

10.00% 

10.00% 

20.00% 

10.00%  $2

10.00%  $

10.00%  $

10.00%  $

tion Plan 

vestment Prio

ocal Funds  F

19,800,000.00 

$0.00 

$0.00 

$0.00 

$0.00 

$50,000.00 

$0.00 

23,541,398.80 

$5,885,349.70 

$1,251,897.50 

$1,251,897.50 

rities 

151 

Percent Local 

Funding 

99.00% 

0.00% 

0.00% 

0.00% 

0.00% 

10.00% 

0.00% 

40.00% 

10.00% 

10.00% 

10.00% 

Page 11: Project Maps & List: Draft 2040 Regional Transportation Plan

Chatt

Section 8 – In

152 

State RevenTier

TN  2020 

TN  2020 

TN  2020 

TN  2020 

Tennessee 2018

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

anooga‐Hamilto

nvestment Pri

nue r 

2040 RTP ID 

224  Va

226  Va

228  Va

225  Va

8‐2020 Total: 

15  CA

143  CA

132  CA

141  CA

14  CA

130  CA

on County/Nort

iorities 

Project Sponsor  S

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

ARTA  CaPr

ARTA  RTTe

ARTA  RTTe

ARTA  RTTe

ARTA  CaPr

ARTA  RTTe

th Georgia 2040 

Source  Pro

TP eam 

TN Safe2018‐20

TP eam 

TN Safe2018‐20

TP eam 

TN Tran2018‐20

TP eam 

TN Safe2018‐20

all for rojects 

CARTA Improv2030 

TP eam 

CARTA FrequeImprov2030 

TP eam 

Route 2

TP eam 

DowntoEast/W

all for rojects 

CARTA incline replaceadditio

TP eam 

Route 2

Regional Trans

oject Name: 

ety Set Aside 020 

ety Set Aside 020 

nsit Set Aside 020 

ety Set Aside 020 

Incline Railway ements 2021‐

Route ncy ements 2021‐

28 Extension 

own Shuttle West Route 

bus and car ements and ns 2021‐2030 

2 extension 

sportation Plan 

Category 

Safety Improvements 

Safety Improvements 

Transit‐Local Bus 

Safety Improvements 

Transit‐General 

Transit‐Frequency Improvements 

Transit‐Local Bus 

Transit‐Circulator Shuttle 

Transit‐General 

Transit‐Local Bus 

Shor

Funding set asiimprovements in the future toemphasis areasdeparture, aggintersections. 

Funding set asiimprovements in the future toemphasis areasdeparture, aggintersections. 

Funding set asiadditional trancapacity projecidentified in th

Funding set asiimprovements in the future toemphasis areasdeparture, aggintersections. 

Maintenance/eexisting system

Increase frequeand 10  to cut h

Extend CARTA service betweeCommunity CoMall 

New shuttle robetween AquaHospital; extenline built at Ho

Vehicle replace

Extend CARTA service throughto Northgate M

rt Description 

ide for targeted saas they are identio address safety s of roadway ressive driving, an

ide for targeted saas they are identio address safety s of roadway ressive driving, an

ide for set aside fosit cts as they are e future. 

ide for targeted saas they are identio address safety s of roadway ressive driving, an

enhancements form 

ency of CARTA rouheadways in half

route 28 to providen Chattanooga ollege and Northga

oute downtown rium area and Erland further east if Ltzclaw 

ement, existing se

route 2 to provideh Red Bank conneMall 

From

afety ified 

nd 

  

afety ified 

nd 

  

or    

afety ified 

nd 

  

r    

utes 4    

de 

ate 

Chatt CommunCollege

anger RT 

3rd and Hotzclaw

rvice    

e bus cting 

Market/r 

m:  To

  

  

  

  

  

  

nity NorthgaMall BRTStation

w Shuttle PNorth (3and Broa

  

Sawye NorthgaMall BRTStation

o: Length (miles)

 

 

 

 

 

 

te T 

3.7 

Park 3rd ad) 

5.2 

 

te T 

6.4 

Project Cost (

$1,800,0

$3,500,0

$5,000,0

$4,900,0

$465,822,9

$6,521,7

$83,915,9

$11,172,5

$15,700,8

$56,521,7

$19,325,1

(YOE) Federal 

Cate

000.00  Surface TranspoProgram

000.00  NationalHighwayPerformProgram

000.00  Federal TFunding 5310, 535339) 

000.00  Surface TranspoProgram

980.23    

739.00  Federal TFunding 5310, 535339) 

940.84  Federal TFunding 5310, 535339) 

570.33  Federal TFunding 5310, 535339) 

833.22  Federal TFunding 5310, 535339) 

739.00  Federal TFunding 5310, 535339) 

109.91  Surface TranspoProgram

Funding egory  Fed

rtation m ‐ TPO 

l y ance 

Transit (5307, 337, 

rtation m ‐ State 

$2

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

$

rtation m ‐ TPO 

$

ederal Funds 

$1,440,000.00 

$2,800,000.00 

$250,000.00 

$3,920,000.00 

296,218,113.93 

$4,565,217.30 

$6,713,275.27 

$1,117,257.03 

$1,570,083.32 

$39,565,217.30 

$15,460,087.93 

Percent Federal Funding  S

80.00% 

80.00% 

5.00% 

80.00% 

  $

70.00% 

8.00%  $

10.00% 

10.00% 

70.00%  $

80.00% 

State Funds 

$0.00 

$350,000.00 

$1,500,000.00 

$490,000.00 

49,953,167.68 

$1,304,347.80 

$10,069,912.90 

$0.00 

$0.00 

$11,304,347.80 

$0.00 

Percent State 

Funding  Lo

0.00% 

10.00% 

30.00%  $

10.00% 

  $11

20.00% 

12.00%  $6

0.00%  $1

0.00%  $1

20.00%  $

0.00%  $

ocal Funds  F

$360,000.00 

$350,000.00 

$3,250,000.00 

$490,000.00 

19,651,698.62 

$652,173.90 

67,132,752.67 

10,055,313.30 

14,130,749.90 

$5,652,173.90 

$3,865,021.98 

Percent Local 

Funding 

20.00% 

10.00% 

65.00% 

10.00% 

 

10.00% 

80.00% 

90.00% 

90.00% 

10.00% 

20.00% 

Page 12: Project Maps & List: Draft 2040 Regional Transportation Plan

State RevenTier

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

nue r 

2040 RTP ID 

16  CA

20  CA

13  CA

21  CA

19  CA

142  CA

12  CA

183  CiCh

181  CiCh

180  CiCh

172  CiCh

159  CiCh

Project Sponsor  S

ARTA  CaPr

ARTA  CaPr

ARTA  CaPr

ARTA  CaPr

ARTA  CaPr

ARTA  RTTe

ARTA  CaPr

ty of hattanooga 

RTTe

ty of hattanooga 

RTTe

ty of hattanooga 

RTTe

ty of hattanooga 

RTTe

ty of hattanooga 

RTTe

Source  Pro

all for rojects 

CARTA needs 2

all for rojects 

CARTA Mainte2030 

all for rojects 

CARTA TranspoSystemimprov2030 

all for rojects 

Regionacenter /manage

all for rojects 

CARTA Route i2021‐20

TP eam 

HamiltoCirculat

all for rojects 

CARTA center 

TP eam 

Barton Pike 

TP eam 

4th Ave

TP eam 

W. 33rd

TP eam 

US‐27/SBlvd./LaRd./20t

TP eam 

SR‐319/Pike/M

oject Name: 

bus shelter 2021‐2030 

Preventive nance 2021‐

Intelligent ortation  ements 2021‐

al transit call / mobility ement 

Care a Van ncreases 030 

on Place tor 

transfer 

Ave/Hixson 

e./S Kelly St. 

d St./E 28th St. 

SR‐1/Rossville afayette th/23rd 

/Hixson arket St. 

Category 

Transit‐General 

Transit‐General 

Transit‐General 

Transit‐General 

Transit‐General 

Transit‐Circulator Shuttle 

Transit‐General 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Shor

Maintenance/eshelters 

General mainte

General technoupgrade 

The Regional trserve as a one transportation Mobility managsupport the calcoordination opartners in the

No specific rou

New shuttle roPlace Mall areafrom mall goingBrainerd, etc. 

A centrally locacenter in downthat would serva centralized tr

Add bike lanesAnalysis. 

Add bike lanesAnalysis. 

Add bike lanesAnalysis. 

Add bike lanesPlan Primary N

Add bike lanesPlan Primary N

rt Description 

enhancements for

enance 

ology maintenance

ransit call center wcall location for for the region. gement services wll center and f services with trae region. 

utes defined 

oute in the Hamiltoa; follows circular g down Gunbarrel

ated CARTA transfntown Chattanoogve that would servransfer point 

.  From 2040 RTP G

.  From 2040 RTP G

.  From 2040 RTP G

.  From 2010 Bike/etwork 

.  From 2010 Bike/etwork 

From

r bus    

  

e and    

will 

will 

nsit 

  

  

on route l, E. 

Future HamiltonPlace MaBRT Stat

fer ga ve as 

  

Gap  VeteransBridge 

Gap  Cilio Ave

Gap  Broad St

/Ped  Broad St

/Ped  2nd Stre

m:  To

  

  

  

  

  

n all ion 

Circular (see not

  

s  Fernway

e.  US 76/US4117/SR 8/Main St.

.  US 41/RinggRd. 

.  BattlefiePkwy. 

et  Middle VRoad 

o: Length (miles)

 

 

 

 

 

Route es) 

 

y Rd.   

1/SR / E.  

 

gold  

eld   

Valley   

Project Cost (

$1,843,3

$43,478,2

$6,521,7

$6,000,0

$1,843,3

$3,020,0

$11,793,2

$2,981,7

$2,839,8

$4,329,8

$9,937,3

$13,202,8

(YOE) Federal 

Cate

350.19  Federal TFunding 5310, 535339) 

261.00  Federal TFunding 5310, 535339) 

739.00  Federal TFunding 5310, 535339) 

000.00  Federal TFunding 5310, 535339) 

350.19  Federal TFunding 5310, 535339) 

032.44  Federal TFunding 5310, 535339) 

277.00  Federal TFunding 5310, 535339) 

714.41  CongestMitigatioAir Qual

827.42  CongestMitigatioAir Qual

836.69  CongestMitigatioAir Qual

352.16  CongestMitigatioAir Qual

840.54  Surface TranspoProgram

Chattanoog

Funding egory  Fed

Transit (5307, 337, 

Transit (5307, 337, 

$

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

ion on and ity 

ion on and ity 

ion on and ity 

ion on and ity 

rtation m ‐ State 

$

ga‐Hamilton Cou

ederal Funds 

$1,290,345.14 

$30,434,782.70 

$4,565,217.30 

$2,400,000.00 

$1,290,345.14 

$302,003.24 

$1,179,327.70 

$2,385,371.53 

$2,271,861.94 

$3,463,869.35 

$7,949,881.72 

$10,562,272.44 

unty/North Geo

Percent Federal Funding  S

70.00% 

70.00% 

70.00% 

40.00% 

70.00% 

10.00% 

10.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

orgia 2040 Regio

S

State Funds 

$0.00 

$8,695,652.20 

$1,304,347.80 

$1,200,000.00 

$0.00 

$0.00 

$2,358,655.40 

$0.00 

$0.00 

$0.00 

$0.00 

$1,320,284.05 

onal Transporta

Section 8 – Inv

Percent State 

Funding  Lo

0.00% 

20.00%  $

20.00% 

20.00%  $

0.00% 

0.00%  $

20.00%  $

0.00% 

0.00% 

0.00% 

0.00%  $

10.00%  $

tion Plan 

vestment Prio

ocal Funds  F

$553,005.06 

$4,347,826.10 

$652,173.90 

$2,400,000.00 

$553,005.06 

$2,718,029.20 

$8,255,293.90 

$596,342.88 

$567,965.48 

$865,967.34 

$1,987,470.43 

$1,320,284.05 

rities 

153 

Percent Local 

Funding 

30.00% 

10.00% 

10.00% 

40.00% 

30.00% 

90.00% 

70.00% 

20.00% 

20.00% 

20.00% 

20.00% 

10.00% 

Page 13: Project Maps & List: Draft 2040 Regional Transportation Plan

Chatt

Section 8 – In

154 

State RevenTier

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

anooga‐Hamilto

nvestment Pri

nue r 

2040 RTP ID 

70  CiCh

90  CiCh

56  CiCh

55  CiCh

64  CiCh

66  CiCh

174  CiCh

190  CiCo

35  CiRi

32  CiRi

on County/Nort

iorities 

Project Sponsor  S

ty of hattanooga 

CaPr

ty of hattanooga 

20RT

ty of hattanooga 

CaPr

ty of hattanooga 

CaPr

ty of hattanooga 

CaPr

ty of hattanooga 

CaPr

ty of hattanooga 

RTTe

ty of ollegedale 

CaPr

ty of East dge 

CaPr

ty of East dge 

CaPr

th Georgia 2040 

Source  Pro

all for rojects 

SR317/Drive ‐ 

035 TP 

Shallow

all for rojects 

SR‐153 319/HixSR‐17/S

all for rojects 

Dupont319) Ex

all for rojects 

Wilcox Tunnel 

all for rojects 

Jenkins

TP eam 

SR‐17/BElmo Av

all for rojects 

Prospecimprov

all for rojects 

US‐41/8/RinggLane 

all for rojects 

US‐41/8/RinggLane 

Regional Trans

oject Name: 

/Bonny Oaks PE, ROW 

wford Road 

from SR‐xson Pike to SR‐58 

t Parkway (SR‐xtension 

Boulevard Improvements 

s Road 

Broad St./St. ve. 

ct Church Road ements 

US‐76/SR‐gold Road Bike 

US‐76/SR‐gold Road Bike 

sportation Plan 

Category 

Widening 

Widening 

Widening 

New Roadway 

Widening 

Widening 

Complete Streets‐Bike/Ped 

Safety Improvements 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Shor

Widen from 2 tlanes either dirspecifically fromto I‐75 and fromwest to SR‐17) 

Widen from 2 tRoad to west oRoad or TDOT Project Shallow153‐4 lanes 

Widening fromfrom SR‐317 to

New two lane fHixson Pike 

To provide addon Wilcox BlvdAvenue to Greeon an additionaRidge. 

Widening fromfrom Standifer Shallowford Ro

Add bike lanesPlan Primary N

Improve ProspUniversity Drivadding lane widand gutter, draHamilton CounImprovements Brainerd Road.

This project wiallow for a bikeconnect all of Rin East Ridge asin Chattanooga

This project wiRinggold Road phases in the 2of Ringgold Roaand/or multi‐u

rt Description 

to 4 lanes (alreadyrection of listed tem Silverdale Road m Preservation Dr

to 4 lanes from Airof SR‐153 at PalmeBridge Replacemewford Road over S

m 4‐lanes to 6‐laneo SR‐17/SR‐58 

facility from SR‐15

ditional lanes of tra from N. Chamberenwood Road, basal tube thru Missio

m 2 lanes to 4 lanesGap Road. To oad 

.  From 2010 Bike/etwork 

ect Church Road fe to city limits by dth, sidewalks, cuainage and lightingnty to extend from city limits to. 

ll connect to #39 te lane and sidewalRinggold Road (USs well as to bus traa. 

ll connect bike lan(US‐41) from prev2040 plan to connead with bike lanesse paths 

From

y four ermini east rive 

PreservaDrive 

rport er ent R‐

Airport R

s  SR‐317 HPike to 

53 to  SR‐153 

affic rlain sed onary 

North ChambeAvenue

s,  StandifeRoad 

/Ped  2nd St. 

from 

rb g.   

o East 

UniversitDrive 

to lks to S‐41) ansit 

GreenslaRoad 

nes on vious ect all s 

Mack SmRd. 

m:  To

ation  SilverdaRoad 

Road  North MRoad 

Hixson  SR‐17/ S

SR‐319/Pike 

rlain GreenwoRoad 

r Gap  ShallowfRoad 

TN/GA SLine 

ty  East BraRoad 

ake  South SeminolDrive. 

mith  Georgia Line 

o: Length (miles)

le  5.1 

Moore  0.6 

SR‐58,  5.9 

Hixson  1.2 

ood  0.85 

ford  0.8 

State   

inerd  1.5 

e 0.905 

State  0.723 

Project Cost (

$10,824,5

$12,839,2

$83,459,2

$7,605,3

$59,164,5

$13,526,6

$7,381,9

$3,500,0

$874,3

$761,9

(YOE) Federal 

Cate

599.20  Surface TranspoProgram

228.60  Surface TranspoProgram

290.49  NationalHighwayPerformProgram

384.33  NationalHighwayPerformProgram

551.90  Surface TranspoProgram

608.25  Surface TranspoProgram

994.59  CongestMitigatioAir Qual

000.00  Surface TranspoProgram

316.77  TranspoAlternat

938.95  TranspoAlternat

Funding egory  Fed

rtation m ‐ State 

rtation m ‐ TPO 

$

l y ance 

$

l y ance 

rtation m ‐ TPO 

$

rtation m ‐ TPO 

$

ion on and ity 

rtation m ‐ TPO 

rtation ives 

rtation ives 

ederal Funds 

$8,659,679.36 

$10,271,382.88 

$66,767,432.39 

$6,084,307.47 

$47,331,641.52 

$10,821,286.60 

$5,905,595.67 

$2,800,000.00 

$699,453.42 

$609,551.16 

Percent Federal Funding  S

80.00% 

80.00% 

80.00%  $

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

State Funds 

$2,164,919.84 

$0.00 

$16,691,858.10 

$760,538.43 

$0.00 

$0.00 

$0.00 

$0.00 

$87,431.68 

$76,193.89 

Percent State 

Funding  Lo

20.00% 

0.00%  $

20.00% 

10.00% 

0.00%  $1

0.00%  $

0.00%  $

0.00% 

10.00% 

10.00% 

ocal Funds  F

$0.00 

$2,567,845.72 

$0.00 

$760,538.43 

11,832,910.38 

$2,705,321.65 

$1,476,398.92 

$700,000.00 

$87,431.68 

$76,193.89 

Percent Local 

Funding 

0.00% 

20.00% 

0.00% 

10.00% 

20.00% 

20.00% 

20.00% 

20.00% 

10.00% 

10.00% 

Page 14: Project Maps & List: Draft 2040 Regional Transportation Plan

State RevenTier

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

nue r 

2040 RTP ID 

36  CiRi

37  CiRi

34  CiRi

170  CiRi

7  HaCo

1  HaCo

30  HaCo

2  HaCo

185  StIdPe

78  TD

Project Sponsor  S

ty of East dge 

CaPr

ty of East dge 

CaPr

ty of East dge 

CaPr

ty of East dge 

RTTe

amilton ounty 

CaPr

amilton ounty 

CaPr

amilton ounty 

CaPr

amilton ounty 

CaPr

taff entified / ending 

RTTe

DOT  CaPr

Source  Pro

all for rojects 

Spring CMulti‐U

all for rojects 

McBrieUse Pat

all for rojects 

US‐41/StatelinPath 

TP eam 

US 41/RRd./Do

all for rojects 

Standif"S" CurImprov7900 Bl

all for rojects 

Robertsimprov

all for rojects 

Hunter 

all for rojects 

"W" Roimprov

TP eam 

SidewaAside ‐ 

all for rojects 

SR‐60 

oject Name: 

Creek Road Use Path 

n Road Multi‐th 

US‐76/SR‐8 to ne Multi‐Use 

Ringgold dds Ave. 

er Gap Road ve ement  7800‐lock 

s Mill Road ements 

Road 

oad ements 

lk Network Set TN 2021‐2030 

Category 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Preventative Maintenance 

Preventative Maintenance 

Safety Improvements 

Preventative Maintenance 

Complete Streets‐Bike/Ped 

Widening 

Shor

This project wialong a road thsidewalk acceselementary schRinggold Road area where buslocated. 

This project wipath on a stretsidewalk or bikpedestrians anlocal destinatioto Chattanoogastops are locat

This project wialong a road theither or has veaccess. It has baccess is neederesidents who road have limitRoad. 

Add bike lanesPlan Primary N

Realignment ofhorizontal curv

Preventative MMill Rd. from DCamp Rd./Sawy

Addition of shoturn lanes fromwill be no additno additional c

Preventative M

Funding set asisidewalks on alarterial roadwa(recommendatBike/Ped Plan)

Widen SR‐60 frlanes 

rt Description 

ll add a multi‐use hat has very limites. It will connect ahool and a hospitaand the Chattanos transit stops are 

ll create a multi‐uch of road that hake lane. This will ald bike users to accons as well as conna where bus transed. 

ll add a multi‐use hat does not have ery limited sidewabeen noted that ADed in this area as live on this stretchted access to Ringg

.  From 2010 Bike/etwork 

f roadway to removes 

Maintenance on RoDayton Blvd. to Hixyer Rd. 

oulder width and lm US‐11 to SR‐58. Ttional travel lanescapacity. 

Maintenance on W

ide to implement ll federally classifiays within urban ation from 2010 . 

rom two lanes to f

From

path d an al to oga  

US‐41 (RinggoldRoad) 

se as no llow cess nect it 

US‐41 (RinggoldRoad) 

path 

alk DA 

h of gold 

US‐41 (McBrienRoad Soufrom RinRoad) 

/Ped  BrainerdRd./McCAve. 

ove  N/A 

oberts xson 

Dayton B

eft There s and 

US‐11 

W Rd.    

ed areas 

  

four  Bradley County L

m:  To

d Chattanoat SouthTerrace

d South Te(ChattanCity Lim

n uth nggold 

Georgia Line at Stateline

 Callie 

South SeminolDrive. 

  

Blvd.  Hixson CRoad / SRoad 

SR‐58 

  

  

Line SR‐58 wHamiltoCounty

o: Length (miles)

ooga h 

1.05 

errace nooga its) 

0.78 

State 

e Road 

0.792 

e 2 

0.25 

Camp Sawyer 

3.2 

5.72 

 

 

ithin n 

1.1 

Project Cost (

$1,010,8

$873,5

$974,0

$2,839,3

$678,3

$1,068,4

$20,395,3

$5,087,6

$20,000,0

$15,806,6

(YOE) Federal 

Cate

841.36  TranspoAlternat

562.75  TranspoAlternat

076.50  TranspoAlternat

339.01  CongestMitigatioAir Qual

352.57  HighwayImproveProgram

405.30  Surface TranspoProgram

307.97  HighwayImproveProgram

644.30  Surface TranspoProgram

000.00  TranspoAlternat

649.18  Surface TranspoProgram

Chattanoog

Funding egory  Fed

rtation ives 

rtation ives 

rtation ives 

ion on and ity 

y Safety ement m 

rtation m ‐ TPO 

y Safety ement m 

$

rtation m ‐ TPO 

rtation ives 

rtation m ‐ State 

$

ga‐Hamilton Cou

ederal Funds 

$808,673.09 

$698,850.20 

$779,261.20 

$2,271,471.21 

$610,517.32 

$854,724.24 

$18,355,777.17 

$4,070,115.44 

$200,000.00 

$12,645,319.35 

unty/North Geo

Percent Federal Funding  S

80.00% 

80.00% 

80.00% 

80.00% 

90.00% 

80.00% 

90.00% 

80.00% 

1.00% 

80.00% 

orgia 2040 Regio

S

State Funds 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

$3,161,329.84 

onal Transporta

Section 8 – Inv

Percent State 

Funding  Lo

0.00% 

0.00% 

0.00% 

0.00% 

0.00% 

0.00% 

0.00%  $

0.00%  $

0.00%  $1

20.00% 

tion Plan 

vestment Prio

ocal Funds  F

$202,168.27 

$174,712.55 

$194,815.30 

$567,867.80 

$67,835.26 

$213,681.06 

$2,039,530.80 

$1,017,528.86 

19,800,000.00 

$0.00 

rities 

155 

Percent Local 

Funding 

20.00% 

20.00% 

20.00% 

20.00% 

10.00% 

20.00% 

10.00% 

20.00% 

99.00% 

0.00% 

Page 15: Project Maps & List: Draft 2040 Regional Transportation Plan

Chatt

Section 8 – In

156 

State RevenTier

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

TN  2030 

anooga‐Hamilto

nvestment Pri

nue r 

2040 RTP ID 

112  TD

114  TD

122  TD

214  Va

224  Va

220  Va

228  Va

227  Va

225  Va

213  Va

223  Va

on County/Nort

iorities 

Project Sponsor  S

DOT  RTTe

DOT  RTTe

DOT  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

th Georgia 2040 

Source  Pro

TP eam 

I‐24 

TP eam 

I‐75 

TP eam 

US‐11/72/SR‐2HighwaROW 

TP eam 

TN BridMainteAside 2

TP eam 

TN Safe2021‐20

TP eam 

TN PaveMainteAside 2

TP eam 

TN Tran2021‐20

TP eam 

TN Safe2021‐20

TP eam 

TN Safe2021‐20

TP eam 

TN BridMainteAside 2

TP eam 

ArteriaUpgradSynchroAside 2

Regional Trans

oject Name: 

US‐64/US‐2/Cummings ay ‐ PE and 

dge nance Set 2021‐2030 

ety Set Aside 030 

ement nance Set 2021‐2030 

nsit Set Aside 030 

ety Set Aside 030 

ety Set Aside 030 

dge nance Set 2021‐2030 

l ITS Signal des and onization‐ Set 2021‐2030 

sportation Plan 

Category 

Widening 

Widening 

Widening 

Preventative Maintenance 

Safety Improvements 

Preventative Maintenance 

Transit‐Local Bus 

Safety Improvements 

Safety Improvements 

Preventative Maintenance 

ITS 

Shor

Widen from 4 tstructurally defand I‐124 

Widen 6 to 8 ladeficient bridgeof I‐24 intercha

ensure 4 lanes through two RRmedian, turn la

Funding set asipreventative m

Funding set asiimprovements in the future toemphasis areasdeparture, aggintersections. 

Funding set asipreventative m

Funding set asiadditional trancapacity projecidentified in th

Funding set asiimprovements in the future toemphasis areasdeparture, aggintersections. 

Funding set asiimprovements in the future toemphasis areasdeparture, aggintersections. 

Funding set asipreventative m

Funding set asiupgrades and s

rt Description 

to 6 lanes; fix ficient bridge at I‐

anes; fix structurale at southern portange 

throughout includR underpasses; adanes and shoulder

ide for bridge maintenance activi

ide for targeted saas they are identio address safety s of roadway ressive driving, an

ide for pavement maintenance activi

ide for set aside fosit cts as they are e future. 

ide for targeted saas they are identio address safety s of roadway ressive driving, an

ide for targeted saas they are identio address safety s of roadway ressive driving, an

ide for bridge maintenance activi

ide for ITS signal synchronization 

From

24 TN/GA SLine 

lly tion 

I‐24 

ding dd rs 

Browns 

ties.   

afety ified 

nd 

  

ties.   

or    

afety ified 

nd 

  

afety ified 

nd 

  

ties.   

  

m:  To

tate  US‐27 

TN/GA SLine 

Ferry  TennessAvenue

  

  

  

  

  

  

  

  

o: Length (miles)

7.6 

State  1.2 

ee  2.7 

 

 

 

 

 

 

 

 

Project Cost (

$293,240,5

$27,090,2

$9,959,2

$41,729,9

$11,500,0

$242,033,5

$33,000,0

$23,000,0

$27,000,0

$41,729,9

$15,000,0

(YOE) Federal 

Cate

532.04  NationalHighwayPerformProgram

244.58  NationalHighwayPerformProgram

235.00  Surface TranspoProgram

917.00  Surface TranspoProgram

000.00  Surface TranspoProgram

517.00  Surface TranspoProgram

000.00  Federal TFunding 5310, 535339) 

000.00  HighwayImproveProgram

000.00  Surface TranspoProgram

917.00  NationalHighwayPerformProgram

000.00  Surface TranspoProgram

Funding egory  Fed

l y ance 

$2

l y ance 

$

rtation m ‐ State 

rtation m ‐ State 

$

rtation m ‐ TPO 

rtation m ‐ State 

$1

Transit (5307, 337, 

y Safety ement m 

$

rtation m ‐ State 

$

l y ance 

$

rtation m ‐ State 

$

ederal Funds 

263,916,478.84 

$24,381,220.12 

$7,967,388.00 

$33,383,933.60 

$9,200,000.00 

121,016,758.50 

$5,280,000.00 

$18,400,000.00 

$21,600,000.00 

$33,383,933.60 

$12,000,000.00 

Percent Federal Funding  S

90.00%  $

90.00% 

80.00% 

80.00% 

80.00% 

50.00%  $

16.00% 

80.00% 

80.00% 

80.00% 

80.00% 

State Funds 

$29,324,053.20 

$2,709,024.46 

$1,991,847.00 

$4,172,991.70 

$0.00 

$24,203,351.70 

$4,950,000.00 

$0.00 

$2,700,000.00 

$4,172,991.70 

$3,000,000.00 

Percent State 

Funding  Lo

10.00% 

10.00% 

20.00% 

10.00%  $

0.00%  $

10.00%  $9

15.00%  $2

0.00%  $

10.00%  $

10.00%  $

20.00% 

ocal Funds  F

$0.00 

$0.00 

$0.00 

$4,172,991.70 

$2,300,000.00 

96,813,406.80 

22,770,000.00 

$4,600,000.00 

$2,700,000.00 

$4,172,991.70 

$0.00 

Percent Local 

Funding 

0.00% 

0.00% 

0.00% 

10.00% 

20.00% 

40.00% 

69.00% 

20.00% 

10.00% 

10.00% 

0.00% 

Page 16: Project Maps & List: Draft 2040 Regional Transportation Plan

State RevenTier

TN  2030 

TN  2030 

Tennessee 2021

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

nue r 

2040 RTP ID 

219  Va

226  Va

1‐2030 Total: 

143  CA

13  CA

16  CA

14  CA

19  CA

20  CA

15  CA

135  CA

184  CiCh

Project Sponsor  S

arious  RTTe

arious  RTTe

ARTA  RTTe

ARTA  CaPr

ARTA  CaPr

ARTA  CaPr

ARTA  CaPr

ARTA  CaPr

ARTA  CaPr

ARTA  RTTe

ty of hattanooga 

RTTe

Source  Pro

TP eam 

TN PaveMainteAside 2

TP eam 

TN Safe2021‐20

TP eam 

CARTA FrequeImprov2040 

all for rojects 

CARTA TranspoSystemimprov2040 

all for rojects 

CARTA needs 2

all for rojects 

CARTA incline replaceadditio

all for rojects 

CARTA Route i2031‐20

all for rojects 

CARTA Mainte2040 

all for rojects 

CARTA Improv2040 

TP eam 

N. GA/ERidge/A

TP eam 

SR 319/Parkwa

oject Name: 

ement nance Set 2021‐2030 

ety Set Aside 030 

Route ncy ements 2031‐

Intelligent ortation  ements 2031‐

bus shelter 2031‐2040 

bus and car ements and ns 2031‐2040 

Care a Van ncreases 040 

Preventive nance 2031‐

Incline Railway ements 2031‐

East Airport 

/Dupont ay 

Category 

Preventative Maintenance 

Safety Improvements 

Transit‐Frequency Improvements 

Transit‐General 

Transit‐General 

Transit‐General 

Transit‐General 

Transit‐General 

Transit‐General 

Transit‐Local Bus 

Complete Streets‐Bike/Ped 

Shor

Funding set asipreventative m

Funding set asiimprovements in the future toemphasis areasdeparture, aggintersections. 

Increase freque9, 16, and 21  t

General technoupgrade 

Maintenance/eshelters 

Vehicle replace

No specific rou

General mainte

Maintenance/eexisting system

TN portion of nthrough N. GA Center and Airp

Multi‐use pathRTP Gap Analys

rt Description 

ide for pavement maintenance activi

ide for targeted saas they are identio address safety s of roadway ressive driving, an

ency of CARTA routo cut headways in

ology maintenance

enhancements for

ement, existing se

utes defined 

enance 

enhancements form 

new local bus servto Eastgate Town port 

/bridge. From 204sis. 

From

ties.   

afety ified 

nd 

  

utes n half 

  

e and    

r bus    

rvice    

  

  

r    

ice  ChattanoAirport TCenter 

40  SR 58/AmnHighway

m:  To

  

  

  

  

  

  

  

  

  

ooga Transit 

TN/GA SLine andSmith Rd

icola y 

Hixson P

o: Length (miles)

 

 

 

 

 

 

 

 

 

State d Mack d. 

3.3 

Pike   

Project Cost (

$242,033,5

$80,000,0

$1,656,938,4

$83,915,9

$6,521,7

$1,843,3

$56,521,7

$1,843,3

$43,478,2

$6,521,7

$15,473,8

$25,461,9

(YOE) Federal 

Cate

517.00  NationalHighwayPerformProgram

000.00  NationalHighwayPerformProgram

485.00 

940.84  Federal TFunding 5310, 535339) 

739.00  Federal TFunding 5310, 535339) 

350.19  Federal TFunding 5310, 535339) 

739.00  Federal TFunding 5310, 535339) 

350.19  Federal TFunding 5310, 535339) 

261.00  Federal TFunding 5310, 535339) 

739.00  Federal TFunding5310, 535339) 

890.69  Federal TFunding 5310, 535339) 

928.49  CongestMitigatioAir Qual

Chattanoog

Funding egory  Fed

l y ance 

$1

l y ance 

$

   $1,1

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

Transit (5307, 337, 

$

Transit (5307, 337, 

Transit (5307, 337, 

$

Transit (5307, 337, 

Transit (5307, 337, 

$

ion on and ity 

$

ga‐Hamilton Cou

ederal Funds 

193,626,813.60 

$64,000,000.00 

146,487,982.28

$6,713,275.27 

$4,565,217.30 

$1,290,345.14 

$39,565,217.30 

$1,290,345.14 

$30,434,782.70 

$4,565,217.30 

$12,379,112.55 

$17,823,349.94 

unty/North Geo

Percent Federal Funding  S

80.00%  $

80.00% 

  $1

8.00%  $

70.00% 

70.00% 

70.00%  $

70.00% 

70.00% 

70.00% 

80.00% 

70.00% 

orgia 2040 Regio

S

State Funds 

$24,203,351.70 

$8,000,000.00 

69,927,431.20

$10,069,912.90 

$1,304,347.80 

$0.00 

$11,304,347.80 

$0.00 

$8,695,652.20 

$1,304,347.80 

$270,793.09 

$0.00 

onal Transporta

Section 8 – Inv

Percent State 

Funding  Lo

10.00%  $2

10.00%  $

  $34

12.00%  $6

20.00% 

0.00% 

20.00%  $

0.00% 

20.00%  $

20.00% 

1.75%  $

0.00%  $

tion Plan 

vestment Prio

ocal Funds  F

24,203,351.70 

$8,000,000.00 

40,523,071.52

67,132,752.67 

$652,173.90 

$553,005.06 

$5,652,173.90 

$553,005.06 

$4,347,826.10 

$652,173.90 

$2,823,985.05 

$7,638,578.55 

rities 

157 

Percent Local 

Funding 

10.00% 

10.00% 

 

80.00% 

10.00% 

30.00% 

10.00% 

30.00% 

10.00% 

10.00% 

18.25% 

30.00% 

Page 17: Project Maps & List: Draft 2040 Regional Transportation Plan

Chatt

Section 8 – In

158 

State RevenTier

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

anooga‐Hamilto

nvestment Pri

nue r 

2040 RTP ID 

57  CiCh

163  CiCh

61  CiCh

70  CiCh

62  CiCh

69  CiCh

99  CiCo

33  CiRi

156  CiBa

73  CiM

77  CiDa

on County/Nort

iorities 

Project Sponsor  S

ty of hattanooga 

CaPr

ty of hattanooga 

RTTe

ty of hattanooga 

CaPr

ty of hattanooga 

CaPr

ty of hattanooga 

CaPr

ty of hattanooga 

CaPr

ty of ollegedale 

CaPr

ty of East dge 

CaPr

ty of Red ank 

RTTe

ty of Signal Mountain 

CaPr

ty of Soddy‐aisy 

CaPr

th Georgia 2040 

Source  Pro

all for rojects 

SR‐58/S319/AmHighwa

TP eam 

Lee HighwaRd./McAve./BaKing Blv

all for rojects 

Hickory

all for rojects 

SR317/Drive ‐ 

all for rojects 

Wauha

all for rojects 

US‐11/2/Lee H

all for rojects 

SAU Lo

all for rojects 

Camp JAuduboUse Pat

TP eam 

DaytonBlvd./C

all for rojects 

Signal MTranspoStudy/TAnalysi

all for rojects 

Daisy DrailroadHarrisoLane/Co

Regional Trans

oject Name: 

SR‐mnicola ay 

ay/Brainerd cCallie ailey Ave./ML vd. 

y Valley Road 

/Bonny Oaks Construction 

tchie Pike 

US‐64/SR‐Hwy 

op Road 

ordan Park to on Acres Multi‐th 

 Cherokee Blvd. 

Mountain ortation Traffic Impact s 

Dallas Road d overpass @ on onnector Road 

sportation Plan 

Category 

Widening 

Complete Streets‐Bike/Ped 

Widening 

Widening 

Widening 

Widening 

New Roadway 

Complete Streets‐Bike/Ped 

Complete Streets‐Bike/Ped 

Study 

New Roadway 

Shor

Widening fromfrom Riverport

Add bike lanesPlan Primary N

Widening exist2lane section tStandifer Gap RParkway 

Widen from 2 tlanes either dirspecifically fromto I‐75 and fromwest to SR‐17) 

Widening fromfrom US‐11 to 

Widening from

New road for acollege campuspart of Universfunctional classUniversity Driv

This project wito connect Audhistoric area anTears (ChattanPark. 

Add bike lanesPlan Primary N

This extension would connectRoad in the vicElementary andMiddle/High Sc

Daisy Dallas RoHarrison Lane/provides conneHWY 27 (SR29)Pike) 

rt Description 

m 4‐lanes to 6‐lanet Road to SR‐153 

.  From 2010 Bike/etwork 

ting roadway fromo a 4 lane section Road to Enterprise

to 4 lanes (alreadyrection of listed tem Silverdale Road m Preservation Dr

m 2 lanes to 4 lanesUS‐41/US64 

m 2 lanes to 4 lanes

a bypass around a s.  Replacement fosity Drive.  Move sification from e to new loop roa

ll add a multi‐use dubon Acres, a natnd part of the Traiooga) to Camp Jor

.  From 2010 Bike/etwork 

of Timesville Roadt with Shackleford inity of Nolan d the Signal Mounchool. 

oad railroad overp/Connector Road ectivity between U) and SR319 (Hixso

From

s  RiverporRoad 

/Ped  McCutchRoad 

m a from e 

StandifeRoad 

y four ermini east rive 

PreservaDrive 

s  US‐11 

s  McCutchRoad 

or a 

d. 

UniversitDrive at College DEast 

path tural l of rdan 

No specipath at ttime. 

/Ped  Market S

d Ridge 

ntain 

TimesvilRoad DeEnd 

ass @ 

US‐on 

US‐HWY(SR29) aSR319 (HPike) 

m:  To

rt  SR‐153

heon  RiverfroParkway

r Gap  EnterpriParkway

ation  SilverdaRoad 

US‐41/U

heon  SR‐317/Oaks Dri

ty 

Drive 

Apison P(SR‐317)

fic this 

  

St.  SR 153 

le ad 

ShacklefRidge Ro

27 nd Hixson 

  

o: Length (miles)

3.3 

nt y 

11 

se y 

1.4 

le  5.1 

US‐64  2.8 

Bonny ive 

1.6 

Pike ) 

0.928 

 

ford oad 

1.34 

3.4 

Project Cost (

$106,960,3

$22,161,1

$23,049,1

$50,625,8

$23,432,4

$35,260,7

$7,162,4

$679,0

$18,936,4

$300,0

$47,111,0

(YOE) Federal 

Cate

320.20  NationalHighwayPerformProgram

108.68  CongestMitigatioAir Qual

171.54  Surface TranspoProgram

817.31  Surface TranspoProgram

440.65  Surface TranspoProgram

759.87  NationalHighwayPerformProgram

430.69  Surface TranspoProgram

045.84  TranspoAlternat

413.77  Surface TranspoProgram

000.00  Surface TranspoProgram

059.76  Surface TranspoProgram

Funding egory  Fed

l y ance 

$

ion on and ity 

$

rtation m ‐ TPO 

$

rtation m ‐ State 

$

rtation m ‐ TPO 

$

l y ance 

$

rtation m ‐ TPO 

rtation ives 

rtation m ‐ TPO 

$

rtation m ‐ TPO 

rtation m ‐ TPO 

$

ederal Funds 

$85,568,256.16 

$15,512,776.08 

$18,439,337.23 

$40,500,653.85 

$18,745,952.52 

$28,208,607.90 

$5,729,944.55 

$543,236.67 

$15,149,131.02 

$240,000.00 

$37,688,847.81 

Percent Federal Funding  S

80.00%  $

70.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

80.00% 

State Funds 

$10,696,032.02 

$0.00 

$0.00 

$5,062,581.73 

$0.00 

$3,526,075.99 

$0.00 

$0.00 

$0.00 

$0.00 

$0.00 

Percent State 

Funding  Lo

10.00%  $1

0.00%  $

0.00%  $

10.00%  $

0.00%  $

10.00%  $

0.00%  $

0.00% 

0.00%  $

0.00% 

0.00%  $

ocal Funds  F

10,696,032.02 

$6,648,332.60 

$4,609,834.31 

$5,062,581.73 

$4,686,488.13 

$3,526,075.99 

$1,432,486.14 

$135,809.17 

$3,787,282.75 

$60,000.00 

$9,422,211.95 

Percent Local 

Funding 

10.00% 

30.00% 

20.00% 

10.00% 

20.00% 

10.00% 

20.00% 

20.00% 

20.00% 

20.00% 

20.00% 

Page 18: Project Maps & List: Draft 2040 Regional Transportation Plan

State RevenTier

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

TN  2040 

nue r 

2040 RTP ID 

22  HaCo

29  HaCo

153  TD

113  TD

129  TD

122  TD

222  Va

228  Va

216  Va

227  Va

223  Va

Project Sponsor  S

amilton ounty 

CaPr

amilton ounty 

CaPr

DOT  RTTe

DOT  RTTe

DOT  RTTe

DOT  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

arious  RTTe

Source  Pro

all for rojects 

OoltewGeorgeProvide

all for rojects 

Snow H

TP eam 

I‐24 ExpValley 

TP eam 

I‐24 

TP eam 

SR‐153 

TP eam 

US‐11/72/SR‐2HighwaMAINT 

TP eam 

TN PaveMainteAside 2

TP eam 

TN Tran2031‐20

TP eam 

TN BridMainteAside 2

TP eam 

TN Safe2031‐20

TP eam 

ArteriaUpgradSynchroAside 2

oject Name: 

wah‐etown Road at ence Road 

Hill Road 

press Lookout 

BRT 

US‐64/US‐2/Cummings ay ‐CONST and 

ement nance Set 2031‐2040 

nsit Set Aside 040 

dge nance Set 2031‐2040 

ety Set Aside 040 

l ITS Signal des and onization‐ Set 2031‐2040 

Category 

Intersection Improvements 

Safety Improvements 

Transit‐Premium Bus 

Widening 

Transit‐BRT 

Widening 

Preventative Maintenance 

Transit‐Local Bus 

Preventative Maintenance 

Safety Improvements 

ITS 

Shor

Intersection imroundabout or 

Addition of shoturn lanes fromto SR‐312/Mahwill be no additno additional c

New Premium connecting LooDowntown Cha

Widen from 6 tSeminole Dr. stbridge over I‐24Ridge 

New BRT serviccorridor from SNorthgate MalPlace 

ensure 4 lanes through two RRmedian, turn la

Funding set asipreventative m

Funding set asiadditional trancapacity projecidentified in th

Funding set asipreventative m

Funding set asiimprovements in the future toemphasis areasdeparture, aggintersections. 

Funding set asiupgrades and s

rt Description 

mprovement with traffic signal 

oulder width and lm Mountain View Rhan Gap Road. Thetional travel lanescapacity. 

Bus express routeokout Valley with attanooga via I‐24

to 8 lanes; fix S. tructurally deficien4 at top of Mission

ce in SR‐153/US‐2Soddy‐Daisy to l to Airport to Ham

throughout includR underpasses; adanes and shoulder

ide for pavement maintenance activi

ide for set aside fosit cts as they are e future. 

ide for bridge maintenance activi

ide for targeted saas they are identio address safety s of roadway ressive driving, an

ide for ITS signal synchronization 

From

N/A 

eft Road ere s and 

MountaiView Roa

 

I‐24/LeeHighwayIntercha

nt nary 

US‐27 

milton 

Soddy D

ding dd rs 

Browns 

ties.   

or    

ties.   

afety ified 

nd 

  

  

m:  To

  

n ad 

SR‐312/MaGap Roa

y nge 

DowntoStation

I‐75 

aisy  HamiltoPlace M

Ferry  TennessAvenue

  

  

  

  

  

o: Length (miles)

 

han ad 

6.81 

wn  6.6 

6.9 

n all 

19 

ee  2.7 

 

 

 

 

 

Project Cost (

$1,273,1

$28,573,4

$46,421,7

$227,232,1

$245,676,3

$105,637,6

$242,033,5

$89,000,0

$41,729,9

$25,000,0

$15,000,0

(YOE) Federal 

Cate

180.92  HighwayImproveProgram

441.69  HighwayImproveProgram

745.81  NationalHighwayPerformProgram

130.05  NationalHighwayPerformProgram

340.29  NationalHighwayPerformProgram

633.20  Surface TranspoProgram

517.00  Surface TranspoProgram

000.00  Federal TFunding 5310, 535339) 

917.00  Surface TranspoProgram

000.00  HighwayImproveProgram

000.00  Surface TranspoProgram

Chattanoog

Funding egory  Fed

y Safety ement m 

y Safety ement m 

$

l y ance 

$

l y ance 

$2

l y ance 

$1

rtation m ‐ State 

$

rtation m ‐ State 

$1

Transit (5307, 337, 

$

rtation m ‐ State 

$

y Safety ement m 

$

rtation m ‐ State 

$

ga‐Hamilton Cou

ederal Funds 

$1,145,862.83 

$25,716,097.52 

$41,779,571.23 

204,508,917.04 

196,541,072.23 

$73,946,343.24 

121,016,758.50 

$25,365,000.00 

$33,383,933.60 

$20,000,000.00 

$12,000,000.00 

unty/North Geo

Percent Federal Funding  S

90.00% 

90.00% 

90.00% 

90.00%  $

80.00%  $

70.00%  $

50.00%  $

28.50% 

80.00% 

80.00% 

80.00% 

orgia 2040 Regio

S

State Funds 

$0.00 

$0.00 

$4,642,174.58 

$22,723,213.00 

$12,283,817.01 

$21,127,526.64 

$24,203,351.70 

$7,120,000.00 

$4,172,991.70 

$0.00 

$3,000,000.00 

onal Transporta

Section 8 – Inv

Percent State 

Funding  Lo

0.00% 

0.00%  $

10.00% 

10.00% 

5.00%  $3

20.00%  $1

10.00%  $9

8.00%  $5

10.00%  $

0.00%  $

20.00% 

tion Plan 

vestment Prio

ocal Funds  F

$127,318.09 

$2,857,344.17 

$0.00 

$0.00 

36,851,451.04 

10,563,763.32 

96,813,406.80 

56,515,000.00 

$4,172,991.70 

$5,000,000.00 

$0.00 

rities 

159 

Percent Local 

Funding 

10.00% 

10.00% 

0.00% 

0.00% 

15.00% 

10.00% 

40.00% 

63.50% 

10.00% 

20.00% 

0.00%