Session: Future Enhancements
Status Update of the 10 CFR 72.48 Program Changes
U.S Nuclear Regulatory Commission
Regulatory Conference (REG CON)
September 18, 2019
Jeremy Tapp, Storage and Transportation Safety InspectorU.S. NRC Office of Nuclear Material Safety and Safeguards
Division of Spent Fuel Management
![Page 2: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/2.jpg)
9/18/2019 2
Content
• Introduction
• Background
• Overview of 72.48 Program Changes
• Summary
• Questions
![Page 3: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/3.jpg)
9/18/2019 3
Introduction
• The purpose of this presentation is to provide a brief overview of the U.S. Nuclear Regulatory Commission (NRC) program changes related to future enhancements of the 10 CFR 72.48 program.
• Success for this presentation is that all interested parties would have a good understanding of future enhancements and status for the upcoming 72.48 program changes.
![Page 4: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/4.jpg)
9/18/2019 4
Background
Documents
Regulatory Guide (RG) 3.72
NEI 96-07 Appendix B
Inspection Procedure (IP)
60857
Nuclear Energy Institute (NEI)
12-04
![Page 5: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/5.jpg)
9/18/2019 5
Overview
NEI 96-07, Appendix B, “Guidelines for 10 CFR 72.48 Implementation”
Regulatory Guide (RG) 3.72
• NEI 96-07, Appendix B
• Endorsed by Regulatory Guide 3.72, Revision 0
![Page 6: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/6.jpg)
9/18/2019 6
Overview
NEI 12-04 “Guidelines for 10 CFR
72.48 Implementation”
Revision 2
Regulatory Guide (RG) 3.72
• NEI 12-04 to supersede NEI 96-07, Appendix B
• Endorsed with a revision to Regulatory Guide (RG) 3.72
• Draft RG Fall of 2019 (Public Comment)
![Page 7: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/7.jpg)
9/18/2019 7
Overview
NEI 96-07, Appendix B, “Guidelines for 10 CFR 72.48
Implementation”
NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation”
Revision 2
Regulatory Guide (RG) 3.72
![Page 8: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/8.jpg)
9/18/2019 8
Overview
Inspection Procedure (IP) 60857
![Page 9: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/9.jpg)
9/18/2019
9
Overview
New Appendix
Confinement
Criticality
Shielding
Thermal (Heat
Removal)
![Page 10: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/10.jpg)
Risk Levels (Graded Approach Tables) The graded approach tables rate dry storage structures, systems, and components (SSCs) from levels 1 to 3 based on the potential impact on safety.
• Level 1: Changes to SSCs ITS that could increase risk
• Level 2: Changes to SSCs ITS that could potentially cause a low increase in risk
• Level 3: Changes to SSCs ITS that could have very low or no impact on risk
9/18/2019
10
Overview
![Page 11: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/11.jpg)
Level C1: Change to SSC ITS that could increase
risk
Level C2: low increase in risk
Level C3: small or no
risk9/18/2019 11
Overview
![Page 12: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/12.jpg)
• Based on a judgement of SSCs risk significance using ITS classification (A, B, and C) from NUREG/CR-6407
Past:
• Continue developing a standard risk-informed approach to incorporate by reference into the 10 CFR 72.48 inspection procedure
Current:
• Use the new standard guidance to further risk-inform the review of 10 CFR 72.48 evaluations and screenings
Ahead:
9/18/2019
12
Overview
Inspection Procedure (IP)
60857
IP 60857 reference to IMC 2690 Appendix
![Page 13: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/13.jpg)
9/18/2019 13
Summary
Future Enhancements
NEI 12-04 Endorsement
IP 60857 Risk Guidance
![Page 14: Presentation Slides: Status Update of 72.48 Program ChangesOverview NEI 12-04 “Guidelines for 10 CFR 72.48 Implementation” Revision 2 Regulatory Guide (RG) 3.72 • NEI 12-04 to](https://reader033.fdocuments.us/reader033/viewer/2022050406/5f83b3cc216c3230447d2409/html5/thumbnails/14.jpg)
9/18/2019 14
This Photo by Unknown Author is licensed under CC BY-NC-ND
Questions