Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University...

13
Presentation of Project’s Timetable Presentation of Project’s Timetable and Partners’ Responsibilities and Partners’ Responsibilities National Technical University of Athens National Technical University of Athens Unit of Environmental Science and Technology Unit of Environmental Science and Technology By: Simos Malamis By: Simos Malamis Athens, 25 October 2005 Athens, 25 October 2005 Kick-off Meeting Kick-off Meeting Life-Environment Project Life-Environment Project Sustainable Construction in Public and Sustainable Construction in Public and Private Works through IPP Approach Private Works through IPP Approach (SUSCON) (SUSCON)

Transcript of Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University...

Page 1: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

Presentation of Project’s Timetable Presentation of Project’s Timetable and Partners’ Responsibilities and Partners’ Responsibilities

National Technical University of Athens National Technical University of Athens Unit of Environmental Science and Technology Unit of Environmental Science and Technology

By: Simos MalamisBy: Simos Malamis

Athens, 25 October 2005Athens, 25 October 2005

Kick-off MeetingKick-off Meeting

Life-Environment Project Life-Environment Project Sustainable Construction in Public and Private Sustainable Construction in Public and Private

Works through IPP Approach (SUSCON)Works through IPP Approach (SUSCON)

Page 2: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

General Remarks General Remarks

Project duration = 36 months Project duration = 36 months

Start date: 01/10/2005Start date: 01/10/2005

End-date: 30/09/2008End-date: 30/09/2008

7 Tasks in Total implemented by 6 7 Tasks in Total implemented by 6 partnerspartners

Page 3: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

TaskTask TitleTitle StartStart End End DurationDuration

(months)(months)

11 Task Management & Task Management & Reporting to the EC Reporting to the EC

01/10/0501/10/05 30/09/0830/09/08 3636

22 Analysis and Analysis and Documentation of the Documentation of the Construction Sector Construction Sector

01/11/0501/11/05 31/03/0631/03/06 55

33 LCA in 2 construction LCA in 2 construction sitessites

01/01/0601/01/06 30/06/0630/06/06 66

44 Development of eco-Development of eco-design criteria design criteria

01/07/0601/07/06 28/02/0728/02/07 88

55 Application of eco-design Application of eco-design criteria in construction criteria in construction

01/03/0701/03/07 30/09/0830/09/08 1919

66 Online database for the Online database for the construction industry construction industry

01/01/0601/01/06 30/09/0830/09/08 3333

77 Dissemination Dissemination 01/01/0601/01/06 30/09/0830/09/08 3333

Page 4: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

TaskTask TitleTitle Task leaderTask leader Involved Involved partnerspartners

11 Task Management & Task Management & Reporting to the EC Reporting to the EC

NTUANTUA AllAll

22 Analysis and Analysis and Documentation of the Documentation of the Construction Sector in Construction Sector in

Greece , Cyprus and EU Greece , Cyprus and EU level level

EPTAEPTA EDRASISEDRASIS

CYBARCO CYBARCO ETEKETEK

33 LCA in 2 construction sitesLCA in 2 construction sites NTUANTUA EDRASISEDRASIS

CYBARCOCYBARCO

44 Development of eco-design Development of eco-design criteria criteria

EPTAEPTA NTUA NTUA

UCYUCY

Page 5: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

Task NoTask No TitleTitle Task LeaderTask Leader Involved Involved Partners Partners

55 Application of eco-design Application of eco-design criteria in construction criteria in construction

EPTAEPTA EDRASIS EDRASIS

CYBARCOCYBARCO

NTUANTUA

66 Online database for the Online database for the construction industry construction industry

UCYUCY AllAll

77 Dissemination Dissemination NTUANTUA AllAll

Page 6: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

Task 1: Task 1: Task management & reporting to the ECTask management & reporting to the EC Action 1:Action 1:Task Management Task Management

• NTUA is legally & financially responsible for the project NTUA is legally & financially responsible for the project implementation & the management of the tasksimplementation & the management of the tasks

• All partners shall participate in the coordination groupAll partners shall participate in the coordination group

Action 2: Reporting to the EC Action 2: Reporting to the EC • NTUA is responsible for submitting reports to the ECNTUA is responsible for submitting reports to the EC

Action 3: Project Meetings Action 3: Project Meetings • 3 in Greece & 3 in Cyprus + kick-off (NTUA) 3 in Greece & 3 in Cyprus + kick-off (NTUA)

Action 4: Monitoring & Evaluation Action 4: Monitoring & Evaluation • All partners through the co-ordination groupAll partners through the co-ordination group• NTUA & EPTA shall develop the performance indicatorsNTUA & EPTA shall develop the performance indicators

Action 5:Advisory BoardAction 5:Advisory Board• EPTA and UCY are responsible for the organisation and EPTA and UCY are responsible for the organisation and

the co-ordination of the Advisory Board in each country. the co-ordination of the Advisory Board in each country.

Page 7: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

Task 2: Analysis and Documentation of the Task 2: Analysis and Documentation of the

Construction Sector in Greece, Cyprus & EU levelConstruction Sector in Greece, Cyprus & EU level Action 1:Action 1:Analysis of the construction Analysis of the construction

sector in Greece & Cyprussector in Greece & Cyprus• Co-ordinated & implemented by EPTA and Co-ordinated & implemented by EPTA and

EDRASIS (Greece) and by CYBARCO and ETEK EDRASIS (Greece) and by CYBARCO and ETEK (Cyprus) (Cyprus)

Action 2:Action 2:Environmental Impact Environmental Impact

Assessment from the construction Assessment from the construction activitiesactivities• Implemented by EPTA Implemented by EPTA

Page 8: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

Task 3: Task 3: LCA in two construction activitiesLCA in two construction activities

Action 1: Action 1: Data collection for the two Data collection for the two construction categoriesconstruction categories• EDRASIS & CYBARCO shall provide data EDRASIS & CYBARCO shall provide data • NTUA responsible for the co-ordination NTUA responsible for the co-ordination

Action 2:Action 2:Conduction of a LCA studyConduction of a LCA study

• NTUA is responsible NTUA is responsible

Page 9: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

Task 4: Task 4: Development of eco-design criteriaDevelopment of eco-design criteria

Action 1: Action 1: General assessment of eco-General assessment of eco-design strategiesdesign strategies• EPTA is responsibleEPTA is responsible

Action 2: Action 2: • Creation of an eco-design matrix and an eco-Creation of an eco-design matrix and an eco-

design checklistdesign checklist NTUA is responsibleNTUA is responsible

Action 3:Action 3:Development of eco-design Development of eco-design criteria criteria • UCY responsible UCY responsible

Page 10: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

Task 5: Application of eco-designTask 5: Application of eco-design

criteria in construction criteria in construction Action 1: Action 1: Software production for the evaluation Software production for the evaluation

of the environmental performance of construction of the environmental performance of construction works works • NTUA is responsible for subcontracting the software NTUA is responsible for subcontracting the software

design design

Action 2:Action 2:Application of the software to the Application of the software to the construction projects in the companiesconstruction projects in the companies• EDRASIS & CYBARCO shall apply the software tool to EDRASIS & CYBARCO shall apply the software tool to

their construction projects their construction projects • Comparison of their environmental performance Comparison of their environmental performance

Action 3:Action 3:Drafting National Institutional Drafting National Institutional ArrangementsArrangements• Participation of all partners Participation of all partners

Page 11: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

Task 6: Online Database for the Task 6: Online Database for the

Construction IndustryConstruction Industry Action 1:Action 1:General Specifications and functional General Specifications and functional

requirementsrequirements• UCY is responsibleUCY is responsible

Action 2:Action 2:Web-site structure design and Web-site structure design and implementation implementation • NTUA & UCYNTUA & UCY

Action 3:Action 3:Creation and Operation of the databaseCreation and Operation of the database• NTUA shall sub-contract the data-base developmentNTUA shall sub-contract the data-base development• UCY responsible for the continuous up-grading of the UCY responsible for the continuous up-grading of the

data-base data-base

Page 12: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

Task 7:Dissemination ActivitiesTask 7:Dissemination Activities Action 1:Web-site design & developmentAction 1:Web-site design & development

• NTUA is responsible; all partners shall provide input for updating NTUA is responsible; all partners shall provide input for updating the web-page the web-page

Action 2:Action 2:Organization of a national annual competition for ‘sustainable Organization of a national annual competition for ‘sustainable construction project’construction project’• EPTA & UCYEPTA & UCY

Action 3a:Action 3a:Organization of one-day informational events Organization of one-day informational events • EDRASIS and CYBARCOEDRASIS and CYBARCO

Action 3b: Final Conference Organization Action 3b: Final Conference Organization • Co-ordination by NTUA & EDRASIS with all partners involvedCo-ordination by NTUA & EDRASIS with all partners involved

Action 4:Newsletters Action 4:Newsletters • Template development by EPTATemplate development by EPTA• NTUA responsible for their productionNTUA responsible for their production• All partners involved in their distribution All partners involved in their distribution

Action 5:Advertisement Campaign Action 5:Advertisement Campaign • All partners involvedAll partners involved

Page 13: Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.

One task manager shall be assigned One task manager shall be assigned for each Task for each Task

Each task manager shall be Each task manager shall be responsible for the successful and responsible for the successful and on-time submission of the Taskon-time submission of the Task