PLF-1408-AT-SD-CO-213 - REV 00
-
Upload
mansoor-sakharkar -
Category
Documents
-
view
26 -
download
6
Transcript of PLF-1408-AT-SD-CO-213 - REV 00
4
SLSD2- 1m x 25mm69 L/s 1nos.
RLSD2- 1m x 25mm69 L/s 1nos.
VCD
Ø150 FLEX. DUCT (TYP)
350x150 EAD BOD 3080
350x200 SA BOD 3030
250x200 FAD BOD 3030 352
367
390
325
604
1532
600
431
325
VCD
VCD
350x200 FAD BOD 3030
350x150 FAD BOD 3080
4
Ø32 DCW COP 2920Ø32 DCW COP 2920Ø15 DCW COP 2913Ø32 DCW COP 2840
1075
1150
1225
1293
75
200
350
393
137 25
8201
Ø15 DCW COP 2975Ø32 DCW COP 2975Ø32 DCW COP 2975
Ø32 DCW COP 2975
4
'A' 'B' 'C'
4
Ø40 CHWR COP 2704
Ø40 CHWS COP 2704
Ø32 CHWR COP 2945
Ø32 CHWS COP 2945
Ø32 CHWR COP 2945
Ø32 CHWS COP 2945
IV
IV
DRV
111
615
172
507
657
872
4
Ø100 VP COP 2958
Ø110 WP I.L. 2756
959 300 1241
435
704
461
Ø80 WP I.L. 2776
Ø110 WP I.L. 2786
Ø25 CDP I.L. 2525
1431
50
1019
2500 (TYP)
1600 (TY
P)
300 (TY
P)
700 (TY
P)
4
020421
728
10
07
75
200
247
471
686
350
090915
13
22
17
409
507
08DRVIV
104
259 36
9
172
657800
23
134
Ø25 CDP
250
435 137
4
020405
728
18
07
75
200471686
350
090915
13
06
17
409
300
240
112
657
410
1908
08
337 38
3
2324
250
435137
Ø25 CDP
4
020405
728
07
75
200471
686
350
090915
1306
17
409 35
5
112
657
12
19
300 325
600
08 09
VCD
11
250
223
460
50
410
Ø25 CDP349
435
300
4
Ø25 FP COP 2850Ø25 WRP COP 2840
Ø25 FP COP 2937
802
440
793
471
800
112
Ø25 FP COP 2983
56208
206
Ø65 FP COP 2940
1243
Ø25 FP COP 2937
FHC
SA
LEGEND
- SUPPLY AIRED - EXTRACT AIR
- EXHAUST AIREAD
FCU
FTTFBTVCDFSD
CAVVAV
AHUSDFCHBAPCHW
SECDPRIM
SR
- FLAT TOP TAPER - FLAT BOTTOM TAPER - VOLUME CONTROL DAMPER - FIRE/SMOKE DAMPER - FAN COIL UNIT - CONSTANT AIR VOLUME - VARIABLE AIR VOLUME
- SMOKE DAMPER - AIR HANDLING UNIT
- FLEXIBLE CONNECTION - HEATER BATTERY - ACCESS PANEL - CHILLEDED WATER
- SECONDARY - PRIMARY
- SUPPLY - RETURN
MCV
IV
DRV
AVAAV
PTTPDCPRVSVSTR
L&P
LSV
FAS
- MOTORIZED CONTROL VALVE
- ISOLATION VALVE
- DOUBLE REGULATING VALVE
- AIR VENT - AUTOMATIC AIR VENT
- SAFETY VALVE
- PRESSURE GUAGE
- TEST POINT - TEMPERATURE GUAGE
- DRAIN COCK - PRESSURE REDUCING VALVE
- LOCKSHIELD VALVE
- STRAINER
- FIRE ALARM & SECURITY - LIGHTING & POWER
PWRHWS
MCWS
DCVCVUNNPNPWM
VPSP
WPRWP
RE
RWO SGCOND
- POWER- HOT WATER SUPPLY
- MAINS COLD WATER SERVICE
- DOUBLE CHECK VALVE - CHECK VALVE- UNION
- WATER METER
- NON-POTABLE- NON-POTABLE IRRIGATION
- SOIL PIPE- VENT PIPE- WASTE PIPE
- CONDENSATE
- RAIN WATER PIPE- RAIN WATER OUTLET - SHOWER GULLY
- RODDING EYE - SPRINKLERSPR- SET DOWNSDN
SU - SET UP
- LOW LEVEL - HIGH LEVEL
L/L H/L
- PIPEWORK EXPANSION BELLOWB
1. ALL DIMENSIONS ARE IN MM.2. SIZING & ROUTING OF SERVICES TO BE CHECKED BY CONSULTING ENGINEER.
NOTES:
COP. **** - CENTER LINE OF PIPE
TOD ****- TOP OF DUCT.
BOD ****- BOTTOM OF DUCT.
BOF ****- BOTTOM OF FRAME.IL. **** - BOTTOM OF TRAY/ TRUNKING/BASKET/DRAINAGE
TBV - THERMOSTATIC BALANCING VALVE
- EXHAUST AIREAD - FRESH AIR DUCTFAD
DCW - DOMESTIC COLD WATER
FD - FLOOR DRAINFT - FLOOR TRAP
FP - FIRE PIPEWRP - WET RISEER PIPESDP - SPRINKLER DRAIN PIPEFHC - FIRE HOSE CABINETLV - LANDING VALVEL/S - LITER PER SECOND
MSFD - FIRE DAMPER SHUTTER BLADE DUCT FSD - FIRE SMOKE DAMPERCO - CLEAN OUT
B1
(40X
90)
B1
(40X
90)
S .S .L
30. 725
B(
30
X4
0)
B(
30X4
0)
S B 4( 50 X7 0)SB4( 50X70)
SB
6(50
X140
)S
B6(
50X1
40)
SB
6(50
X140
)
SB
6(50
X140
)S
B6(
50X1
40)
SB
6(50
X140
)
S B 5( 60 X9 5)
S B 3( 40 X1 30 ) S B 3( 40 X1 30 )
S .S .L
30. 725
S .S .L
30. 725
S .S .L
30. 725
S .S .L
30. 725
S .S .L
30. 725
B2
(40X
50)
B2
(40X
50)
B2
(40X
50)
B2
(40X
50)
S B 5A (5 0 X1 05 )
SB
9(5
0X5
0)
SB
9(5
0X5
0)
PLBG SHAFT PLBG SHAFT
M ECH SHAFT PLBG SHAFT
M ECH SHAFT
PLBG SHAFTM EC H SHA FT
WA
TE
R M
ET
ER
ME
CH
SH
AF
T
M ECH SHAFT
PR
ES
SU
RI
ZA
TIO
N
SH
AF
T
PLBG SHAFT PLBG SHAFT
FHC
FHC
FI REM EN ELEVATO R
PR
ES
SU
RI
ZA
TIO
N
SH
AF
T
8400 8400 8400 8400 8400
9400
8000
A B C D E F
5
4
3
UP DN UP
MECCA
TRUE NORTH
PR
OJE
CT N
OR
TH
P.O. BOX 24689, DUBAI, U.A.E.
TEL. 04 5014800, FAX 04 3306430
www.plafondme.com
architects, designers & planners
TEL +971 4 332 2113+971 4 332 4455 FAXpo box 73033 dubai web site www.naga.ae
___
TEL +971 4 351 8873+971 4 351 8871 FAXpo box 120780 dubai web site www.kele.ae
MEP Contractor :
REFERENCE DWG. NO.:
DRAWING NO. DRAWING TITLEDATE
GENERAL NOTE:
REV
5. DISCREPANCY IN DIMENSIONS/GRAPHICS IN THIS DWG.MUST BE CLARIFIED PRIOR TO FABRICATION,EXECUTION AND INSTALLATION ON SITE, IF ANY.
4. ALL DIMENSIONS ARE IN MILLIMETERS OTHERWISE STATED.
1. THIS DRAWING IS THE PROPERTY OF PLAFOND - DUBAI. IT ISFORBIDDEN TO PRODUCE ITS CONTENTS IN ANYFORM, EXCEPT FOR THE INTENDED PURPOSE.
2. COPYRIGHT OF DESIGN SHOWN HEREON ISRETAINED BY THIS OFFICE, AUTHORITY ISREQUIRED FOR REPRODUCTION.
3. DO NOT SCALE FROM THE DRAWINGS.
Owner :
Rev. DESCRIPTION Date
Reviewed By Consultant
A APPROVED
B APPROVED WITH COMMENT
C REVISE & RESUBMIT
D REJECTED
Signature: Date:
Drawn
Principal Consultant :
1408
Drawing No. : Rev.
Drawing Title :
A0
SizeScale:Checked:Drawn:Job No.
Date: Date: Sheet no:
ANWA Real Estate DevelopmentLLC
Consultant :
Project :
(G+ 4P +44), ON PLOT No: 3212014 (DMC-08b)
DUBAI MARITIME CITY
ANWA BY OMNIYAT
Main Contractor :
6. ALL MEP SERVICES INVERT LEVEL FROM S.S.L
KEY PLAN
MA
24.10.2016 24.10.2016
As indicated
PLF-1408-AT-SD-CO-213
MS
8th to 9th & 12th to 15thFLOOR PLAN 03 MODULER
DETAIL
CO-ORDINATED MODULE LAYOUT (Axonometric) MODULE FRAME LAYOUT (Axonometric)
DUCTWORK (Axonometric) CHILLED WATER PIPEWORK (Axonometric)
01
350x150 EAD02
200x150 FAD
09
10
Ø65 FP
11
Ø25 FP
Ø32 DCW
350x150 FAD
250x150 SA01
02
03
04
Ø32 CHWR
06
08
Ø100 VP
05
09
07
Ø32 CHWS
10
11
CO-ORDINATED MODULE LAYOUT
DUCTWORK (SCALE 1:25) CHILLED WATER PIPEWORK (SCALE 1:25)
FIRE PIPEWORK (Axonometric)
FIRE PIPEWORK (SCALE 1:25)
SECTION 'A' (SCALE 1:20)
SECTION 'B' (SCALE 1:20)
DOMESTIC PIPEWORK (Axonometric)
DOMESTIC PIPEWORK (SCALE 1:25)
DRAINAGE PIPEWORK (Axonometric)
DRAINAGE PIPEWORK (SCALE 1:25)
Ø150 FLEX. DUCT
12
13 Ø15 DCW
SLSD2-1mx25mm 69 L/s
0
300x150 SA14
350x200 SA15
16 Ø50 VP
17 150x50 CT
300x200 FAD18
250x200 FAD19
20 Ø110 WP
Ø40 CHWR
22
21
Ø40 CHWS
SECTION 'C' (SCALE 1:20)
Ø80 WP
24
23
Ø110 WP
00 ISSUED FOR APPROVAL 30.11.2016 MS
00PLF-1408-AT-SD-FP-008 21-04-2016 7th to 9th & 12th to 15th FLOOR FIRE FIGHTING
01PLF-1408-AT-SD-VE-009 21-02-2015
7th to 9th & 12th to 15th AC LAYOUT(LVL 1 RES.)02PLF-1408-AT-SD-AC-010 03-01-2016
01 23-03-2016 7th to 9th & 12th to 15th LIGHTING LAYOUT
7th to 9th & 12th to 15th FAVE LAYOUT(LEVEL 3 RES.)PLF-1408-AT-SD-FAVE-006 02 14-09-2016
A-123 N 21-03-2016 7TH FLOOR PLAN (LEVEL-3 RES.)
S-128 G 21-03-2016 7TH FLOOR PLAN (LEVEL-3 RES.)
VENTILATION 5TH FLOOR PLAN-LVL 01 RES.
LEVEL 7 REFLECTED CEILING PLAN21-03-2016HI-152 A
PLF-1408-AT-SD-EL-008
00 23-03-2016 7th to 9th & 12th to 15th CB LAYOUT(LEVEL 3 RES.)PLF-1408-AT-SD-CB-008
LEVEL-3(7TH FLOOR)