Day 2 – People. DAY 1 – June 5, 2012. June 27, 2012. Philadelphia Professional Chapter Las Delicias Water Project. Miguel Delgado (from FIAT). 260 Homes Served by Tank 3. 280 Homes Served by NEW TANK At lower elevation. Daniel Rivera (Engineer from Rotary). Miguel Martinez - PowerPoint PPT Presentation

Transcript of Philadelphia Professional Chapter Las Delicias Water Project

PowerPoint Presentation

Philadelphia Professional ChapterLas Delicias Water ProjectProject DataProject Description

Chapter Name: Philadelphia Professional ChapterProject Name: Las Delicias Water ProjectProject Location: Las Delicias, El SalvadorProject Phase: ImplementationTotal Cost of Project: ?Project Chapter Contact and Email Address: Adam Brostow: [email protected] Organizations: Project FIAT (Handmaids of the Sacred Heart of Jesus), ADESCO (Las Delicias Water Committee)Significant Donors or Contributors: Boeing (2 grants)

Las Delicias is a village of about 3000 people located about an hour from the capital San Salvador. It has an existing drinking water system that consists of a well, two pumps (submersible and booster), three storage tanks at elevation (one supplied by a spring), and gravity distribution system.

The village experiences water shortage due to high electricity cost.Hoarding water leads to disease. Over 80% of children in the village have parasites which leads to school absenteeism. Standing water provides breeding ground for Dengue Fever mosquitoes.

Our chapter (EWB-MAP) came up with a way to supply about 30% more water for the same energy consumed. About 50% of the population lives below the elevation of ~250 above the elevation of the well while the tanks are located over 400 above the elevation of the well. The solution is to add another tank at an intermediate elevation and pump to two different pressures. The tank was completed in late 2012. Most of the trenching to connect to the existing system was done in 2013. Now we are ready to install a VFD on the booster pump.

Adding a VFD (Variable Frequency Drive) will allow (a) matching the flow rates of the two pumps; (b) efficiently pumping at lower head; (c) eliminating the Power Factor penalty to obtain electricity subsidy.

Construction of the new tank (now completed)Challenging part of trenching was excavating the concrete section of the road.Children will benefit most from the improved water system. Sponsors

260 Homes Served by Tank 3 33 Homes Served by Tank 2291 Homes Served by Tank 1DOWNHILLCURRENT LAS DELICIAS WATER SYSTEM

117 Homes Served by Tank 3

33 Homes Served by Tank 2154 Homes Served by Tank 1280 Homes Served by NEW TANKAt lower elevationDOWNHILLPROPOSED LAS DELICIAS WATER SYSTEM

DAY 1 June 5, 2012Photos of Project Progress

Day 2 PeopleDaniel Rivera (Engineer from Rotary)Miguel Delgado (from FIAT)Miguel Martinez(Supervisor)Holman (driver from FIAT)Sergio (LD ADESCO member)Mario (LD resident)

June 27, 2012

September, 2013September, 2013July, 2012Critical Elevation Diagram. Paintings are based on traditional El Salvadoran/Fernando Llort art.