The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
1
PBN Flight Procedure Design Seminar and
Capability Survey
For Vietnam
Hanoi, 25 – 28 October 2011
“Inception Report” Briefing and
Preparatory MeetingCAAV, 09:00-15:30, Tuesday, 25 October
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
BACKGROUND
1. Human resources development to having capability of design and publish the Instrument Flight Procedure (IFP) for Performance-based Navigation (PBN), which utilize Global Navigation Satellite System (GNSS), is one of the most important key factors for the Project.
2. However, Vietnam faces human resources challenges to implement adequate Flight Procedure Design (FPD) process, suffering with a shortage in human resources for PBN IFP.
3. ICAO’s Universal Safety Oversight Audit Programme (USOAP) pointed out inadequacy of FPD structure.
2
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
PBN FLIGHT PROCEDURE EXPERTS FROM JAPAN
Mr. Sadakazu KIRIHARA
Special Assistant to the Director
Flight Procedure and Airspace Program Office, Air Traffic Control Division, Air Traffic Services (ATS) Department, Civil Aviation Bureau (JCAB), Ministry of Land, Infrastructure, Transport and Tourism (MLIT)
3
Air Traffic Controller at Naha Area Control Center (ACC) , Kansai (Osaka) Airport, Naha Airport, Osaka Regional CAB
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
PBN FLIGHT PROCEDURE EXPERTS FROM JAPAN
Mr. Hidehisa YOSHIDA
Deputy Manager
Flight Procedure Design, Airspace Group, First Division, NTT DATA i Corporation
Assist JCAB in developing instrument flight procedure design and construction.
4
Architect and Civil Engineering
Airport Planning Consultant
Designed more than 100 Instrument Flight Procedures in Japan
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
OVERALL OBJECTIVES
1. Exchange of Basic Knowledge relating to PBN Flight Procedure Design between Vietnamese Counterparts and JICA Experts;
2. Study by JICA PBN Experts on PBN Flight Procedure Design Capability of Vietnamese Counterparts; and
3. Recommendations by JICA PBN Experts to the Project with a view to improving the Project Programs.
Through “the PBN Flight Procedure Design Seminar” and discussions with Vietnamese Stakeholders, such as CAAV,
VATM, NAC/MAC/SAC, VAA, Airlines, the Ministry of Natural Resources and Energy (MONRE).
5
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
WORK PLAN FOR VIETNAM1. Explanation and Confirmation of Inception Report (Tuesday)2. Preparatory Meeting (Tuesday)3. Seminar on PBN Flight Procedure Design (Wednesday)4. Information Survey and Assessment on FPD Structure and
Standards (Thursday)5. Assessment on PBN Roadmap (Thursday & Friday)6. Recommendation for Service Provider on PBN FPD
Implementation (Friday)7. Recommendation on Hanoi Flight Procedure Office (FPO)
(Tuesday, Thursday & Friday) * only in Vietnam8. Preparation and Submission of On-site Work Completion Report
(Friday)
6
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
INFORMATION SURVEY AND ASSESSMENT ON FPD STRUCTURE AND STANDARDS (1)
Conducted based on Questionnaire forwarded to CAAV on 7 October and replied by CAAV on 20 October;
Necessary information collected by interview with C/P and discussions at meetings on Tuesday, 25 and Thursday, 27;
Visit at office or working area where FPD process is carried out as far as possible;
Visit to ATC Facilities on Thursday, 27; Appreciate documented data and/or materials, such as
regulations, standards, manuals, and record etc.
7
Very Important, equally to the PBN Seminar,
for the PBN Capability Survey.
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
INFORMATION SURVEY AND ASSESSMENT ON FPD STRUCTURE AND STANDARDS (2)
Information to be covered by Survey
1. Flight Procedure Design Structure Organization Human Resources Equipment Materials Training
2. Flight Procedure Design Standards Flight Procedure Design Standards Manuals Forms
3. Other Terrain and Obstacle Data
8
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
HANOI FLIGHT PROCEDURE OFFICE (FPO) (1)
✈ Flight Procedure Office (FPO) will be established in Hanoi in accordance with the formal arrangements between CAAV and JICA under the Technical Corporation Agreement between the Government of Vietnam and Japan (Minutes of Meeting (M/M) signed on 8 June 2010, Record of Discussions (R/D), and M/M signed on 26 November 2010).
✈ Two (2) sets of Flight Procedure Design Software (Automation Tools) will be installed with necessary supporting systems by JICA.
✈ Software at Hanoi FPO will be used for PBN Flight Procedure Design-related training jointly for Cambodia, Lao PDR and Vietnam, during and after the Project period.
✈ First Flight Procedure Design training course will be programmed in May or June 2012 as earliest.
✈ Software at Hanoi FPO may be used for Flight Procedure Design and/or Validation by respective Counterpart.
9
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
HANOI FLIGHT PROCEDURE OFFICE (FPO) (2)
✈ JICA is currently undergoing procurement process of the Deign Software, and preparatory work of the Software installation is expected to begin November or December 2011.
✈ Location of Hanoi FPO needs to be decided as soon as possible;
✈ Adequate office space, facilities, equipment, personnel should be allocated to Hanoi FPO by Vietnamese Counterparts.
✈ Aeronautical Data necessary for the Software need to be provided (preferably in digital/electronic form, but if not available, in printed form) by Vietnamese Counterpart by 31 December 2011. They area. Data of airports/aerodromes, runways, ground navigation aids,
fixes/waypoints, FIR;b. Obstacle Data;c. Digital Elevation Model Data;d. Raster Map Image Data;e. National Border Lines or Coastlines Data.
10
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
PBN FLIGHT PROCEDURE DESIGN SEMINAR AND CAPABILITY SURVEY SCHEDULE (1)
Tuesday, 2508:45-09:00 Courtesy visit to Mr. Dinh Viet Thang, Deputy Director
General, CAAV, as the Project Director09:00-11:30 Preparatory Meeting with CAAV & VATM Counterparts
(Room 509 in CAAV)• PBN Seminar arrangement• PBN Capability Survey based on Questionnaire
forwarded to CAAV on 7 and replied by CAAV on 20 October
• establishment of Hanoi Flight Procedure Office (FPO) under the JICA Project
• any relevant subjects11:30-13:30 Lunch13:30-15:00 Preparatory Discussions with CAAV & VATM
Counterparts (continued)
*Attendance of CAAV & VATM Counterparts who are involved in Project Output 1, including TF-1 Leaders and Members, is essential.
11
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
PBN FLIGHT PROCEDURE DESIGN SEMINAR AND CAPABILITY SURVEY SCHEDULE (2)
Wednesday, 2608:30-11:30 PBN Flight Procedure Design Seminar at CAAV
(Room 211)11:45-13:30 Lunch hosted by JICA13:30-15:00 PBN Flight Procedure Design Seminar
Thursday, 2709:00-11:30 Discussions with Vietnamese Stakeholders (CAAV,
VATM, NAC/MAC/SAC, VAA, Airlines, MONRE) (Room 211 in CAAV)• PBN Capability Survey based on Questionnaire• establishment of Hanoi Flight Procedure Office
(FPO) under the JICA Project• any relevant subjects
14:00-17:00 ATC Facility Visit (Noi Bai Airport & Hanoi ACC), by JICA Experts and Stakeholders participants
12
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
PBN FLIGHT PROCEDURE DESIGN SEMINAR AND CAPABILITY SURVEY SCHEDULE (3)
Friday, 2809:30-11:30 Submission of Summary Report to CAAV
(Venue will be arranged by CAAV)14:00-15:00 Report to JICA Office (Experts only)
*Attendance of CAAV Representative (Mr. Dinh Viet Thang, Deputy Director General) and Project Counterpart appropriate to review the
contents of the Summary Report submitted by JICA Experts, and then receive the Report is essential.
Additional attendance of VATM Counterparts who are involved in Project Output 1 is desirable.
13
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
THE PBN FLIGHT PROCEDURE DESIGN SEMINAR (1)
Wednesday, 2608:30 Registration (Room 211 in CAAV)09:00 Opening
• Remarks by Mr. Dinh Viet Thang, Deputy Director General, CAAV, as the Project Director
• Remarks by Representative of JICA Vietnam Office09:15 Session 1: Overview of Activities and Programs relating to
PBN under “the Project for the Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam” (JICA Project Leader)
09:45 Session 2: PBN Planning and Implementation in Japan - Roles of Civil Aviation Authority as the “Regulator” in Leading PBN Implementation (JICA Expert)
10:30 Coffee Break (arranged by CAAV)10:45 Session 3: Roles of Flight Procedure Designers as the
Service Provider in Flight Procedure Design in Japan-Services, Organization, Qualification/Certificate and Training (JICA Expert)
14
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
THE PBN FLIGHT PROCEDURE DESIGN SEMINAR (1)
Wednesday, 2611:15 Session 4: Vietnam PBN Roadmap (CAAV/VATM)11:45 Lunch at Restaurant “Nhat Viet”
(hosted by JICA, transportation arranged by CAAV)13:30 Session 5: PBN To Improve Flight Efficiency in Japan
(JICA Expert)14:00 Session 6: Flight Procedure Design Implementation in Japan-
Situational Awareness, Flight Procedure Design, and Quality Assurance System (JICA Expert)
14:30 Session 7: Questions and Answers14:45 Summary15:00 Closing
• Remarks by Mr. Dinh Viet Thang, Deputy Director General, CAAV
MC: Mr. Nguyen Cong Long (CAAV) & Hiroshi Inoguchi
15
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
OUTCOMES OF THE PBN SEMINAR AND CAPABILITY SURVEY
1. Vietnamese Counterparts will understand the ideal Flight Procedure Design process through PBN FPD Seminar;
2. Vietnamese Counterparts will clearly recognize actual status and the issue to be challenged to achieve PBN Roadmap;
3. JICA Project will conduct succeeding training programs on PBN FPD implementation more efficiently;
4. Project Goal, transition to new CNS/ATM Systems, would be facilitated efficiently and effectively.
16
The Project for Capacity Development for Transition tothe New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam
PBN SEMINARS IN CAMBODIA AND LAO PDR
1. PBN Flight Procedure Design Seminar and Capability Survey was successfully conducted in Cambodia (17-19 October) and Lao PDR (20-24 October);
2. In Cambodia, there were 30 participants from all Stakeholders in PBN, representing SSCA, Air Navigation Service Provider (CATS), Airlines (3), Airport Operator (SCA), and Government Geographical Agency (MLUC);
3. In Lao ODR, there were 33 participants from all Stakeholders in PBN, representing DCA, Air Navigation Service Provider (LATM), Airlines (3), Military (Air Force), Airport Operator (LAA), and Government Geographical Agency (NGD);
4. Active participation by all resulted in completion of Survey based on Questionnaire in time and meaningful information exchange between Stakeholders and JICA Experts.