PANELISED AND MODULAR OFFSITE CONSTRUCTION
February 5th 2019
James Young BEng (Hons) CEng MIEIDirector of Engineering Services
Professional History
• Graduated from CIT June 2006
• 2006 – 2009 – Fusion Building Systems, Cork
• 2010 – 2011 – Momentum Builders, Melbourne
• 2011 – 2013 – Fine Design Engineers, Melbourne
• 2013 – Present – Evolusion Innovation
• 2014 – Registered Title of Chartered Engineer with Engineers Ireland
• 2015 – NHBC Stage 2 Light Steel Frame Third Party Certifier (UK)
05/02/2019Engineers Ireland Cork 2
Objective of Presentation
• Provide brief history of Offsite Construction in Ireland
• Outline technical aspects associated with panelsied offsite systems
• Outline technical aspects associated with modular construction
• Case Studies
• What is the potential for Modular Construction
05/02/2019Engineers Ireland Cork 3
Why Evolusion Innovation
• We are Irish and UK leaders as Independent Turn Key Offsite Consultancy
• Evolusion to date have worked on Offsite projects to a value in excess of €2bn
• The Evolusion team has a proven track record in delivering Rapid Build projects and can provide the expertise with regard structural design consultancy for any Offsite system
• Evolusion have been advising some of the best known construction industry leaders in Offsite Construction in recent times
• Key staff nationally and internationally recognised as leading experts
05/02/2019Engineers Ireland Cork 4
OUR MISSION“To promote Offsite to the industry and the general public, and to
ensure that Offsite is of the highest quality and complies with, and/or surpasses, all Building Regulation requirements and standards.”
5
Offsite QS experts
BIM estimating
Project feasibility assessments
Value Engineering
Control costs
U and y-value calcs
Condensation risk calcs
BREEAM
Thermal/Dynamic
modelling
SAP/SBEM
DEAP/BER
Auditing and Inspection
FPC plans
CE Marking
DoPs
Third-party certification
Innovative product
development
Fire, acousric testing
Offsite Specialists
LGS Design
Modular & Panellised
Chartered Engineers
Our services
Structural Engineering
Building Physics
Quantity Surveying
Quality Engineering
Product Development
605/02/2019Engineers Ireland Cork
Structural Engineering
Building Physics
Quantity Surveying
Quality Engineering
Product Development
Auditing and Inspection
FPC plans
CE Marking
DoPs
Offsite QS experts
BIM estimating
Project feasibility assessments
Value Engineering
Control costs
Third-party
certification
Innovative product
development
Fire, acoustic testing
Offsite Specialists
LGS Design
Modular & Panellised
Chartered Engineers
U and y-value calcs
Condensation risk calcs
BREEAM
Thermal/Dynamic
modelling
SAP/SBEM
DEAP/BER
Our services
705/02/2019Engineers Ireland Cork
Structural Engineering
Building Physics
Quantity Surveying
Quality Engineering
Product Development
Auditing and Inspection
FPC plans
CE Marking
DoPs
Offsite QS experts
BIM estimating
Project feasibility assessments
Value Engineering
Control costs
Third-party
certification
Innovative product
development
Fire, acoustic testing
Offsite Specialists
LGS Design
Modular & Panellised
Chartered Engineers
U and y-value calcs
Condensation risk calcs
BREEAM
Thermal/Dynamic
modelling
SAP/SBEM
DEAP/BER
Our services
805/02/2019Engineers Ireland Cork
05/02/2019Engineers Ireland Cork 9
When I say Offsite…..
05/02/2019Engineers Ireland Cork 10
05/02/2019Engineers Ireland Cork 11
History of Offsite Construction in Ireland
Engineers Ireland Cork 2/5/2019 12
05/02/2019Engineers Ireland Cork 13
Panelised Construction – Cork (2007)
Modular Construction – Dublin (2008)
05/02/2019Engineers Ireland Cork 14
Offsite Systems in Ireland
05/02/2019Engineers Ireland Cork 15
Timber Frame
Light Gauge Steel Frame
Precast Concrete
Lightweight Modular Systems
HRS Modular Systems with Concrete Slab
Innovative Foundation Systems
Offsite Systems in Ireland
05/02/2019Engineers Ireland Cork 16
Timber Frame
Light Gauge Steel Frame
Precast Concrete
Lightweight Modular Systems
HRS Modular Systems with Concrete Slab
Innovative Foundation Systems
Light Gauge Steel
05/02/2019Engineers Ireland Cork 17
Also known as:
• Cold Formed Steel
• Light Steel Framing
• Light Gauge Steel Framing
• Loadbearing SFS
Advantages of LGS
05/02/2019Engineers Ireland Cork 18
• LGS has high strength to weight ratio
• Does not shrink or creep.
• Flexibility – can be used with steel joist floor or concrete composite deck floor
options.
• Can be designed to accommodate HRS beams and columns to deal with the
transfer of heavy loads.
• Lightweight system –can reduce the dead weight loading when built from a
transfer slab by up to 40%, up to 25% with Concrete Slabs
• Can accommodate multi level concrete slabs
• Currently systems certified up to 10 stories or 30m available in Ireland
05/02/2019Engineers Ireland Cork 19
05/02/2019Engineers Ireland Cork 20
Panelised System Providers in Ireland
05/02/2019Engineers Ireland Cork 21
NSAI Certified• Vision Built
NSAI Certification in Process
• Horizon Offsite• Carlow Concrete• Metal Frame Construction
Manufacture
05/02/2019Engineers Ireland Cork 22
Section Sizes
05/02/2019Engineers Ireland Cork 23
Typical Stud SizesH = 70mm – 150mmB1/B2 = 25mm – 75mmC = 0mm – 25mmT = 0.55mm – 5mm
Typical Joist SizesH = 100mm – 450mmB1/B2 = 25mm – 150mmC = 0mm – 25mmT = 1mm – 5mm
05/02/2019Engineers Ireland Cork 24
Beams (HRS or LGS Truss)
Internal Wall
External Wall
Party Wall
05/02/2019Engineers Ireland Cork 26
05/02/2019Engineers Ireland Cork 27
05/02/2019Engineers Ireland Cork 28
05/02/2019Engineers Ireland Cork 29
05/02/2019Engineers Ireland Cork 30
Panelised Case Studies
Engineers Ireland Cork 2/5/2019 31
Student Accommodation
05/02/2019Engineers Ireland Cork 32
Architects Model
05/02/2019Engineers Ireland Cork 33
05/02/2019Engineers Ireland Cork 34
Offsite BIM Model
05/02/2019Engineers Ireland Cork 35
Manufacturing Model
05/02/2019Engineers Ireland Cork 36
Finished Product
05/02/2019Engineers Ireland Cork 37
Residential
05/02/2019Engineers Ireland Cork 38
Architectural Revit Model
05/02/2019Engineers Ireland Cork 39
05/02/2019Engineers Ireland Cork 40
Panelised Revit Model
05/02/2019Engineers Ireland Cork 41
Manufacturing Model
05/02/2019Engineers Ireland Cork 42
05/02/2019Engineers Ireland Cork 43
Site Construction
Typical Completed Hotel
High Rise Residential
05/02/2019Engineers Ireland Cork 46
05/02/2019Engineers Ireland Cork 47
05/02/2019Engineers Ireland Cork 48
8 Storey Hotel
05/02/2019Engineers Ireland Cork 49
05/02/2019Engineers Ireland Cork 50
05/02/2019Engineers Ireland Cork 51
05/02/2019Engineers Ireland Cork 52
Modular Systems
05/02/2019Engineers Ireland Cork 53
Also known as:
• Volumetric
• Pods
Certified Modular System Providers in Ireland
05/02/2019Engineers Ireland Cork 54
NSAI Certified
• Modern Homes Ireland• 3 Storey System• (10 storey System Published Soon)
• Extraspace Solutions• Up to four stories
Uniformly Loaded Modular Structure
Engineers Ireland Cork 2/5/2019 55
LGS Uniformly Loaded Modules
05/02/2019Engineers Ireland Cork 56
05/02/2019Engineers Ireland Cork 57
05/02/2019Engineers Ireland Cork 58
05/02/2019Engineers Ireland Cork 59
05/02/2019Engineers Ireland Cork 60
Corner Supported Modular Structure
Engineers Ireland Cork 2/5/2019 61
4 Storey Primary School
05/02/2019Engineers Ireland Cork 62
TYPICAL FLOOR
PLAN
05/02/2019Engineers Ireland Cork 64
Disproportionate Collapse
05/02/2019Engineers Ireland Cork 65
05/02/2019Engineers Ireland Cork 66
05/02/2019Engineers Ireland Cork 67
05/02/2019Engineers Ireland Cork 68
05/02/2019Engineers Ireland Cork 69
05/02/2019Engineers Ireland Cork 70
05/02/2019Engineers Ireland Cork 71
Health Care
05/02/2019Engineers Ireland Cork 72
05/02/2019Engineers Ireland Cork 73
05/02/2019Engineers Ireland Cork 74
Other Design Considerations
05/02/2019Engineers Ireland Cork 75
NZEB will apply to All New Buildings
05/02/2019Engineers Ireland Cork 76
• 31st December 2020 – All new buildings Nearly Zero Energy
Building.
• 31st December 2018 – All buildings acquired by public bodies
Nearly Zero Energy Building.
• All buildings completed after these dates must have this
requirement.
• A certificate of compliance with Building regulations could
not be signed on 1st January 2021, unless it meets the NZEB
standard, and the building could not be occupied.
05/02/2019Engineers Ireland Cork 77
05/02/2019Engineers Ireland Cork 78
Energy efficiency:Fabric first approach
• Important to highlight the Fabric-First approach
• Particularly from a Thermal Bridging perspective
• Dynamic Simulation Modelling
79
Fire Testing:Loaded Walls
• Loaded walls tested to EN 1365-1/BS 476-21:1987
• Internal load bearing walls and external load bearing walls
• NB
• Adequate detailing of services in walls
• The importance of load
80
Fire testing:Loaded Floors EN 1365-2
81
STRUCTURAL FLOORS/COMPARTMENT
FLOORS
VERTICAL PENETRATIONS ALLOWED FROM CEILING TO FLOOR PROVIDED IT IS ADEQUATLEY FIRE STOPPED WITH APPROPRIATE TESTED PRODUCT
BS 8414 Testing on Building over 18 meters
• If your system is not minimum class A2 then you must have a system specific test
82
• Critically important to carry out lab testing at product development stage.
• Walls and Floors
• Airborne Sound:
• Impact sound
• Our policy is to design Offsite products for residential use that can achieve a minimum of 5dB better than building regulations on site during post completion testing.
83
Acoustic performance of systems and elements
Weather Testing of External Cladding
• CWCT Standard for systemised building Envelopes
• Air permeability
• Wind resistance
• Water penetration
• Water resistance
• Static test method
• Dynamic test method
84
Evolusion project manage
all types of tests
8505/02/2019Engineers Ireland Cork
The Future
2/5/2019 Engineers Ireland Cork 86
05/02/2019Engineers Ireland Cork 87
Chapter Living, Lewisham
Core & Podium concrete works
Module install – 2 floors per week
Parallel External & Internal Workstreams
H&S – incident/accident free
Planning Consent Nov 15 Module Start Jan 16 Practical Completion Aug16
Fully Occupied Sep16Module Finish April 16Start RC Works Dec 15
88
05/02/2019 89Engineers Ireland Cork