Aro Valley Community Centre project number: 1802-980 date drawn: 14.12.18 revision: B AVCC Package 2 Renovate All Three Buildings Location Notes • Footprint of hall building, office and pavilion remain largely unaltered. • South East corner of hall adjusted to widen pedestrian pinch point and improve sight lines. Amenities • Cohesive plan to refit all three internal spaces, 1. Hall building 2. Pavilion 3. Office • Exterior priority - improve connection between three spaces as budget permits. Office Pavilion Hall
Transcript of Package 2 Renovate All Three Buildings · JOHN 048 jerram tocker ARCHITECTS 0001 llt.m.ei]l ....
Aro Valley Community Centreproject number: 1802-980 date drawn: 14.12.18 revis ion: B
AVCC
Package 2
Renovate All Three BuildingsLocation Notes
• Footprint of hall building, office and pavilion remain largely unaltered.
• South East corner of hall adjusted to widen pedestrian pinch point and improve sight lines.
Amenities
• Cohesive plan to refit all three internal spaces,
1. Hall building
2. Pavilion
3. Office
• Exterior priority - improve connection between three spaces as budget permits.
Office
Pavilion
Hall
Aro Valley Community Centreproject number: 1802-980 date drawn: 14.12.18 revis ion: B
AVCC
Hall
2m
Office
Pavilion
Package 2
Renovate All Three Buildings