Package 2 Renovate All Three Buildings · JOHN 048 jerram tocker ARCHITECTS 0001 llt.m.ei]l ....

2
Aro Valley Community Centre project number: 1802-980 date drawn: 14.12.18 revision: B AVCC Package 2 Renovate All Three Buildings Location Notes Footprint of hall building, office and pavilion remain largely unaltered. • South East corner of hall adjusted to widen pedestrian pinch point and improve sight lines. Amenities Cohesive plan to refit all three internal spaces, 1. Hall building 2. Pavilion 3. Office • Exterior priority - improve connection between three spaces as budget permits. Office Pavilion Hall

Transcript of Package 2 Renovate All Three Buildings · JOHN 048 jerram tocker ARCHITECTS 0001 llt.m.ei]l ....

Page 1: Package 2 Renovate All Three Buildings · JOHN 048 jerram tocker ARCHITECTS 0001 llt.m.ei]l . Created Date: 2/5/2019 1:02:14 PM ...

Aro Valley Community Centreproject number: 1802-980 date drawn: 14.12.18 revis ion: B

AVCC

Package 2

Renovate All Three BuildingsLocation Notes

• Footprint of hall building, office and pavilion remain largely unaltered.

• South East corner of hall adjusted to widen pedestrian pinch point and improve sight lines.

Amenities

• Cohesive plan to refit all three internal spaces,

1. Hall building

2. Pavilion

3. Office

• Exterior priority - improve connection between three spaces as budget permits.

Office

Pavilion

Hall

Page 2: Package 2 Renovate All Three Buildings · JOHN 048 jerram tocker ARCHITECTS 0001 llt.m.ei]l . Created Date: 2/5/2019 1:02:14 PM ...

Aro Valley Community Centreproject number: 1802-980 date drawn: 14.12.18 revis ion: B

AVCC

Hall

2m

Office

Pavilion

Package 2

Renovate All Three Buildings