Aro Valley Community Centreproject number: 1802-980 date drawn: 14.12.18 revis ion: B

AVCC

Package 2

Renovate All Three BuildingsLocation Notes

• Footprint of hall building, office and pavilion remain largely unaltered.

• South East corner of hall adjusted to widen pedestrian pinch point and improve sight lines.

Amenities

• Cohesive plan to refit all three internal spaces,

1. Hall building

2. Pavilion

3. Office

• Exterior priority - improve connection between three spaces as budget permits.

Office

Pavilion

Hall

Page 2: Package 2 Renovate All Three Buildings · JOHN 048 jerram tocker ARCHITECTS 0001 llt.m.ei]l . Created Date: 2/5/2019 1:02:14 PM ...

Aro Valley Community Centreproject number: 1802-980 date drawn: 14.12.18 revis ion: B

AVCC

Hall

2m

Office

Pavilion

Package 2

Renovate All Three Buildings