Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban,...

17
Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation Authority April 14, 2015

Transcript of Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban,...

Page 1: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Our Plan Implemented…and BeyondLA Metro’s Sustainability Program2003 - Present

Cris B. Liban, D.Env., P.E.Los Angeles County Metropolitan Transportation Authority

April 14, 2015

Page 2: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Outline

> Agency Drivers> Implementation Examples> What the Future Holds> Comments/Questions

2

Page 3: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

LA Metro‘s Challenges Reflects Overarching Needs

What’s happening? What are we doing?

Evolving regulatory climate and climate change issues

Proactive operational activities to reduce impacts

Increasing costs of operation and decreasing resource availability

Create efficiencies, develop forecasting tools and implement innovative technologies

Adapt large infrastructure projects (Measure R) to future climate impacts

Transit schedule planning, mode selection, siting, alternatives, materials, and operational/maintenance changes.

3

Incidental Effects: Job Creation/Enhanced Customer Experience/Positive Community Impacts

Page 4: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Foundations of Change

> Environmental/Sustainability Plans/Policies> Design Criteria/Project Specifications> Annual Sustainability Reports> Environmental Management System> Environmental Training Institute> Partnerships with Colleges and Universities> Carbon Credit Initiatives> Pilot Program Funding

> www.metro.net/sustainability (Overall Efforts)> www.metro.net/ecsd (Infrastructure/Operations)

4

> LA Metro Transit = Sustainability> Incorporating into projects since 2003> Formal program began in 2007

Page 5: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Los Angeles County

VenturaCounty

Orange County

San BernardinoCounty

Los Angeles CountyMetropolitan Transportation Authority

Orange Line and ExtensionBuswayOpened in 2005, then 2012CNG articulated busesStormwater capture and rechargeSmart landscapingLED lighting stoplightsSolar panels along bikepath2015 and beyond: e-bus/recycled water Transit Applications: BuswayTransit Applications: Busway

Orange Line and Orange Line Extension

5

Page 6: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Los Angeles County

VenturaCounty

Orange County

San BernardinoCounty

Los Angeles CountyMetropolitan Transportation Authority

Gold Line Foothill ExtensionLight RailUnder Construction, opens 2015+Green Maintenance BuildingConsider wastewater capture and

infiltrationLocally sourced and recycled materialsDrought tolerant landscapingEnergy efficient stationsElectric vehicle chargers

Transit Applications: RailTransit Applications: Rail

Gold Line Foothill Extension

6

Page 7: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Green Buildings

> LEED Requirements> Five LEED-NC and One LEED-EBOM> Future LEED-NC: Division 13/Expo> Future LEED-EBOM: D10/D20/D7> All green campuses by 2020

Metro Gateway HQ, LADivision 13, Downtown LA

Bauchet Street, LADivision 9, El Monte

El Monte Bus Station, El Monte

7

Page 8: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Los Angeles County

VenturaCounty

Orange County

San BernardinoCounty

Los Angeles CountyMetropolitan Transportation Authority

Solar Panel Installations and Energy Management Systems

Solar Panel Installations and Energy Management Systems

213 KW

Chatsworth Sun Valley

213 KW

Carson

417 KW

Downtown LA: CMF

1000 KW

89 KW

El Monte Station

8

Downtown LA: Div 13

~500 KW

Monrovia M/O Facility

~179 KW

Goal: 66% Renewable Energy Use by 2020

Page 9: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Los Angeles County

VenturaCounty

Orange County

San BernardinoCounty

Los Angeles CountyMetropolitan Transportation Authority

Red Line: StorageFlywheel TechnologyJunction of Red/Purple Line

Wayside Energy Storage SystemsWayside Energy Storage Systems

Gold Line: Voltage RegulationFlywheel Technology

9

Page 10: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Los Angeles County

VenturaCounty

Orange County

San Bernardino

County

Los Angeles CountyMetropolitan Transportation Authority

A Vision for EV Charger Expansion

A Vision for EV Charger Expansion

Gold Line Foothill Extension

Expo Phase 2

Potential Site

Potential Site

Potential SitePotential Site

10

New for 2016•Workplace Charging•DC Fast Chargers

Page 11: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Recognitions and Grants

11

Page 12: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Considerations •Which comes first and why? PRIORITIES/BUSINESS CASE

•Application to All New Projects/Retrofits

•Energy Resiliency

•Effective Asset Management

• Operations and Maintenance

•Enhanced Customer Experience:

Social Equity/Sustainability

•Funding for pilot efforts

•Long-term Capital Financial Strategies including P3s

•Partnerships for Regional Sustainability/Resiliency

12

Page 13: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Biomethane Procurement

•Fossil vs. Renewable Natural Gas•Environmental benefits•Reduced carbon footprint•No operational changes•Summer 2015

• Biomethane Infrastructure

13

Page 14: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Water Management and Conservation Technologies

•Water Action Plan• 13 Strategies

•Recycling Water Systems•In-line Kinetic Descaling•Rail Carwash and Bus Wash•Regional Partnerships•Research Collaboration

14

Page 15: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Los Angeles County

VenturaCounty

Orange County

San BernardinoCounty

Los Angeles CountyMetropolitan Transportation Authority

Red LineBetween Universal/North Hollywood

Wind Tunnel Energy PilotWind Tunnel Energy Pilot

15

Page 16: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Concept Stage Pilots

16

ElectroLuminiscent LightingElectrokinetic Energy Generation

Page 17: Our Plan Implemented…and Beyond LA Metro’s Sustainability Program 2003 - Present Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation.

Questions/Discussion

Cris B. Liban, D.Env., P.E.

p: 213/922-2471

c: 213/792-5777

e/m: [email protected]