Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect...

24

Transcript of Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect...

Page 1: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with
Page 2: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with
Page 3: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with
Page 4: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

Expression of Interest

FOR

SELECTION OF AN

ARCHITECTURAL & ENGINEERING CONSULTANT

For Development of Commercial, Mixed use spaces, Parking and Landscaping for Public use in Mughal Canal Phase II and Phase III at

Karnal (Haryana)

Construction Agency:

U.P. Rajkiya Nirman Nigam Ltd., (A State Govt. Undertaking)

General Manager, Delhi Zone

C-20/1A/7, Sector-62, Noida Email. [email protected]

Page 5: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

Uttar Pradesh Rajkiya Nirman Nigam Ltd

(UP State Government Undertaking)

(ISO 9001:2015 QMS and ISO 14001:2004 EMS Certified)

General Manager (D/Z), C-20/1A/7, Sector 62, Noida

Notice No. 510/Karnal Arch./RNN/2019 Dated- 04/09/2019

E-Tender Notice

Invitation of online Expression of Interest (EOI) in two bid system for selection of

Architects and Engineering Consultant for Development of Commercial, Mixed use

spaces, Parking and Landscaping for Public use in Mughal Canal Phase II and Phase

III at Karnal (Haryana). Interested Architectural Firms may furnish their Expression of

Interest online with all necessary documents on or before 25 September 2019 by

5:00 PM. Eligibility criteria, terms/conditions and other details are available on E-

Tendering website https://etender.up.nic.in. For any change / corrigendum please

follow UPRNNs website: http://uprnn.upsdc.gov.in regularly.

General Manager (Delhi Zone)

Page 6: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

उत्तर प्रदेश राजकीय निर्ााण निगर् नि0 (उ.प्र. सरकार का उपक्रर्) दूरभाष सं0 0120&2400168

Uttar Pradesh Rajkiya Nirman Nigam Ltd. (A State Govt. Undertaking)

C-20/1A/7, FIRST FLOOR

SECTOR-62, NOIDA-201309

(GAUTAMBUDH NAGAR)

E mail: [email protected]

[email protected]

Ref.No. 510 /Karnal Arch./RNN/19 Dated:- 04/09/2019

Name of work: Invitation of Expression of Interest (EOI) for Selection of Architect & Engineering Consultant for DEVELOPMENT OF COMMERCIAL, MIXED USE SPACES, PARKING AND LANDSCAPING FOR PUBLIC USE IN

MUGHAL CANAL PHASE II AND PHASE III, KARNAL (HARYANA)

COST OF PROJECT: 225.00 CR.

1.0 AVAILABILITY OF DOCUEMENTS:

The EOI document can be downloaded from the website https://etender.up.nic.in. The Bidders are

expected to examine all the instructions, forms, terms, project requirements and other details in

the EOI documents. Failure to furnish complete information as mentioned in the EOI document in

every respect will be at the bidder’s risk and may result in rejection of the proposal.

Other General Terms & Conditions:

1.1 The EOI should be submitted in sealed cover only. It is responsibility of the bidders to

see that their offers reach the above address by due date and time.

1.2 The person signing the Expression of Interest documents should duly authenticate any

errors or corrections in the EOI. Overwriting should be attested.

1.3 An authorized representative of the bidders may remain present at the time of opening

of the offers for Express of Interest.

1.4 This is an invitation for Expression of interest and not a tender. No payment will be

made to the bidder for such Expression of Interest, if their offer for Expression of

Interest is considered acceptable.

2.0 TENTATIVE CALENDER OF EVENTS:

Sl.

No.

Milestone Date

2.1 Release of EOI 04 September 2019

2.2 Last date of submission of EOI Responses of

Part-A & Part-B

25 September 2019

2.3 Opening of bid “PART-A” for admitting the

bid / technical evaluation

25 September 2019

2.4 Date of Conceptual Representation by

shortlisted bidders (PART-A)

Shall be intimated

2.5 Date of Opening of Part B Shall be intimated

OFFICE OF THE GENERAL MANAGER, DELHI ZONE

Registered Office Vishweshwaraiya Bhawan Vibhuti Khand, Gomti Nagar, Lucknow-226010. Fax 0522-2720846 PBX : 0522-2720671, 2720665, 2720670

ISO 9001:2008

&

ISO 14001:2004

CERTIFIED

Corporate Identity Number U85320 UP 1975SGC004116

Page 7: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

THE SCOPE OF COMPREHENSIVE ARCHITECTURAL SERVICES SHALL COMPRISE OF THE FOLLOWING

2.1 Architectural Consultancy services from concept to commissioning including Planning,

Designing and Architect Services, Structural design with relevant seismic

considerations/Pre-engineering design for Civil, Electrical, Plumbing, HVAC, Fire

Fighting, Fire Detection, PA System, Lifts, Rainwater Harvesting work, External

Development work, Horticulture and Landscaping. IT enabled services, Internal &

External services etc. with design basis report. Preparation of Preliminary estimates

sufficient for the work, based on applicable Schedule of Rates and Market Rate Analysis

for tendering process, obtaining approvals from Local and Statutory bodies. The scope

of work includes preparation of Master Plan and working out various options (Layout

Plan, Elevation, 3D, Floor Plans, Conceptual Scheme of Services) for works of Widening

& lengthening of Road, Service Utilities, Landscaping, Parking Facility, Podium Floor,

Commercial space (Shops), Mixed use space, Suspension Bridge etc. Detailed Scope of

work is at Annexure-1

2.2 Preparation of DPR, tender document and bill of quantities.

2.3 Other related documents/drawings to execute the project.

2.4 Periodic supervision of the project to assist UPRNN in completion of the project..

2.5 Assist UPRNNL in completion of Project.

3.0 QUALIFICATION CRITERIA:

3.1 Experience of Comprehensive Architectural Consultancy Services work etc.

Principal Architect should be in the field of Architectural Consultancy for at least 12

years. The Architect must have previous exposure and experience of working with

UPRNN.

3.2 Principal Architect should be registered with Council of Architect.

3.3 Principal Architect should not be barred by any Government Department / PSU etc.

from participation in providing consultancy. An affidavit in this regard shall be

submitted. If any such information comes to the notice of the client he shall be liable

for debarment from further work and blacklisting with UPRNN.

3.4 Joint Venture/Consortium NOT ALLOWED.

4.0 FEE:

Fee for the consultancy services shall be limited to 0.75 per cent (Zero decimal seven five per

cent) of the estimated Project cost put to tender. Fee shall include GST and all other applicable

taxes.

It is hereby clarified that the actual payment to the Agency, under the Contract, shall be

restricted to the aforesaid percentage of the Estimated Project Cost or that of the actual Project

Cost, whichever is lower.

Schedule of payment shall be as per Annexure-II.

5.0 OFFERS SHALL BE IN TWO PARTS:

PART-A(To be submitted by the firms as per calendar given at Clause No. -2). This shall be

named as Technical Bid and shall comprise of the following:

5.1 Processing fee (Non-refundable) of Rs. 11800.00 (including GST) in the form of Demand

Draft/Banker Cheque/ Pay order drawn in favour of UPRNN Ltd., payable at Meerut.

5.2 Brief company profile along with the list of projects done with year of completion and

cost of the project.

Page 8: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

5.3 Certificate regarding Experience / exposure to UPRNN as mentioned at Clause No. 4.1

5.4 Certificate of registration with COA as mentioned at Clause No. 4.2.

5.5 List of Key Personnel with their qualifications and experience.

5.6 G.S.T. Registration Certificate.

5.7 Latest Income Tax Return documents

5.8 Participants of submit conceptual drawing, Presentation as per calendar given at clause

No. -2 as per site plan enclosed.

5.9 Presentation.

ENVELOPE-2

PART-B SHALL CONSIST OF ONLY PRICE BID/OFFER TO BE SUBMITTED ONLINE ONLY.

6.0 REQUIREMENTS:

7.1 The Project envisages the development of recreation, commercial & mixed use spaces

and parking.

7.2 Broadly, the project comprises the construction and maintenance of the following

components,

Road and road furniture

Construction of Podium floor

Provision of Service Utilities and Underground utilities such as water, sewerage,

drainage;

Overground utilities such as street lighting, signage’s; Landscaping;

Construction of commercial, mixed use space including provision of Parking;

Ramp / slider / Lift / escalator / elevators etc.,

7.0 EOI Evaluation :

(a) Short Listing: Technical bid submitted online shall be evaluated with respect

to the processing fee, qualification, information, experience and other

information furnished from 6.1 to 6.7. Qualification fulfillment as per criteria

mentioned in clause No. 4 shall be mandatory. A list shall be drawn up of

responsive firms who are found eligible for technical presentation.

(b) Selection of firm:

Date of presentation of Architectural design by short listed firms has

already been mentioned at clause No. 2.4.

The presentation shall be done in Noida at office of the General Manager

(Delhi Zone).

Exact time and place shall be intimidated before presentation date.

The presentation shall be evaluated by High level Committee formed by

Employer.

The High Level Committee shall select the most suitable proposal on the

criteria approved by the Employer.

The committee shall evaluate the evaluation criteria, sub-criteria and point

system as stipulated herein under:

Page 9: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

EVALUATION SHEET

Sl.

No.

Name &

Address

of Firms

Innovative

Elements

in the

Proposal

Aesthetic

aspect of

the

Proposal

Functional

Aspect of

the

Proposal

Optimum

use of

space in

the

Proposal

Total Evaluation

Max. Marks

25

Max. Marks

25

Max. Marks

25

Max. Marks

25

Max. Marks

100

Those Bidders who

score minimum 50%

marks in each category

and 70% in total shall

be eligible for opening

of financial proposals.

Evaluation shall be followed in CQCCBS mode with weight age as under:

Technical Evaluation: 70%

Financial Evaluation: 30 %

On the basis of the combined weighted score for quality and cost, the consultant shall be ranked in

terms of the total score obtained. The proposal obtaining the highest total combined score in

evaluation of quality and cost will be ranked asH-1 followed by the proposals securing lesser marks

as H-2, H-3etc. The proposal securing the highest combined marks and rankedH-1 will be invited for

negotiations, if required and shall be recommended for award of contract.

8.0 OTHER CONDITIONS FOR THE SELECTED CONSULTANT:

8.1 After selection as consultant, the firm shall have its setup in KARNAL/ NOIDA.

8.2 After selection as consultant, the firm shall have to deploy sufficient experts and

technical staff to meet the time schedule of the project. Time shall be the main essence

of the contract.

8.3 Performance Guarantee @ 5% of payable fee in the shape of DD/FDR drawn in favour of

UPRNN shall be submitted by the firm within 07 days from the date of issue of

LOA/Prior to signing of agreement.

8.4 Man power requirement for project will be worked out based on requirement of

project mutually OR as per CPWD’s manual.

8.5 UPRNN reserves the right to amend/add/delete services as per EPC work requirement

and accordingly fee for the same will be adjusted as per UPRNN norms/similar nature of

work agreement available.

NOTE:

UPRNN reserves the right to accept or reject any offer or extend the date of submission

of the offer or cancel any or all the EOI(s) or a null this EOI process without assigning any

reason whatsoever.

The Architects intending to participate EOI are requested to visit the e-tender web site

https://etender.up.nic.in regularly for this purpose.

Page 10: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

10.0 GUARANTEE

10.1 The consultant shall agree to re-design at his cost any portion of his

architectural/engineering design work, which due to his failure to use a reasonable

degree of design architectural/ skill shall be found to be defective within two year from

the date of start of regular use of the portion of work affected.

10.2. The Authority shall grant right of access to the consultant of these portions of the work

claimed to be defective for inspection.

10.3 The Authority may make good the loss by recovery from the dues of the consultant in

case of failure to comply with the above clause.

11.0 DETERMINATION OR RECESSION OF AGREEMENT

The Authority without any prejudice to its right against the consultant in respect of any

delay by notice in writing absolutely determine the contract in any of the following

cases:-

11.1 If the Consultant being a firm/company shall pass a resolution or the court shall make

any order that the firm/company shall be wound up or if a receiver or a manager on

behalf of the creditor shall be appointed or if circumstances shall arise which entitle the

court of creditor to appoint a receiver or a manager or which entitle the court to make

up a winding order.

11.2 If the Consultant is in breach of any of terms of agreement.

11.3 When the Consultant has made himself liable for action under any of the cases aforesaid

the Authority shall have powers:

11.3.1 To determine or rescind the agreement

11.3.2 To engage another consultant to carry out the balance work debiting the consultant the

excess amount if any so spent.

12.0 GENERAL

12.1 The Consultant shall be fully responsible for the technical soundness of the work including

those of the specialists engaged, if any and also ensure that the work is carried out in

accordance with drawings specifications and conceptual plan.

12.2 The Authority will get the work of Consultant and/or his sub-consultants

supervised/inspected at any time by any officer nominated by him who shall be at liberty

to examine the records, check estimate and designs.

12.3 The appointment of the Authority’s own supervisory staff, if any, does not absolve the Consultant of his responsibility of general supervisor/services of the work entrusted to

him so as to satisfy their requirement.

12.4 The Consultant hereby agrees that the fess to be paid as provided herein will be in full

discharge of functions to be performed by him and no claim whatsoever shall be against

the Authority in respect of any proprietary rights or copy right on the part of any other

party relating to the plans, models and drawings.

12.5 The Consultant shall indemnify and keep indemnified the Authority against any such claims

and against all cost and expenses paid by the Authority in defending itself against such

claims.

12.6 It is hereby further agreed between the parties that the stamp duly payable under the law

in respect of this agreement shall be borne by the Consultant.

Page 11: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

13.0 ARBITRATION CLAUSE:

DISPUTE RESOLUTION

The parties shall use their best efforts to settle amicably all disputes arising out of or in

connection with this Agreement/MOU in the manner specified in this clause, including any

unresolved controversy of dispute (s) arising out of or in connection with this

Agreement/MOU’s existence, interpretation, performance, or termination. The party

raising the dispute shall address to the other Party a notice requesting an amicable

settlement of the dispute within ten (10) days from the existence of the dispute. The matte

will then be referred for resolution by and between the Architect and General Manager

(D/Z) from UPRNN (or any other person duly authorized by the Managing Director,

U.P.R.N.N.L. The dispute shall be resolved by them and the Agreed course of action

documented within a further period of twenty (20) days. Any dispute between the Parties

that cannot be settled amicable in the manner described above within thirty (30) days after

receipt by one Party of the Party’s request for such amicable settlement may be referred by either party to arbitration. The seat of arbitration shall be Delhi. The arbitration shall be

conducted in accordance with the provisions of the Arbitration and Conciliation. Act, 1996

and any statutory modification or re-enactment thereof. Each Party to the dispute shall

appoint one arbitrator each and the two arbitrators shall appoint the third or the presiding

arbitrator (Umpire). The Arbitration proceeding shall be conducted in English or Hindi

language. The arbitral award shall be final and binding upon the parties and Judgment may

be entered thereon upon the application of either party to a Court having Jurisdiction as

per this MOU/agreement. Each party shall bear the cost of preparing and presenting its

own case and the cost of arbitration, including fees and expenses of the arbitrators shall be

shared equally by the parties unless the award otherwise provides.

SUBMISSION CHECK LIST:

a. Covering LETTER, demand draft/payment and all the documents mentioned at Clause

No.-6 “PART-A”

b. A folder of conceptual design and layout (on site plan attached) of the project for

which offer is being made as mentioned at clause No. 6 “PART-A”.

c. A folder of financial quote “PART-B”. To be submitted online only.

PLACE FOR SUBMISSION OF BIDS:

Office of the General Manager (Delhi Zone)

U.P. Rajkiya Nirman Nigam Ltd., C-20/1A/7, Sector-62,

Noida (Distt. Gautam Budh Nagar)

For any clarification please contact:

1. Er. Balendra, General Manager (Delhi Zone) (Mob. No. 9958960766)

2. Er. Manendra Singh , Project Manager (Mobile No. 9897832206)

Page 12: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

Annexure-I

Background, Objectives and Detailed Scope of the Assignment

PROJECT BACKGROUND

• Smart City Mission India is one of the fastest developing economies in the world, with the complexity of newly emerging

infrastructure networks which are changing drastically including change in living standard and migrating

from rural areas to urban areas.

The Smart Cities Mission (SCM) is an initiative by the Government of India to drive economic growth and

improve the quality of life of people by enabling local development and harnessing technology as a means

to create smart outcomes for citizens. The mission will cover 100 cities and its duration will be five years (FY

2015-16 to FY 2019-20). The Smart City Mission of Government of India focuses on promoting the cities

that provide core institutional, physical, social and economic infrastructure; provide decent quality of life to

city dwellers; sustainable environment and smart solutions.

The Smart Cities in India are also expected to attract investments, building cities that work well especially

for business and developing new technologies for communication.

The core infrastructure features of Smart City Mission includes adequate water supply, assured electricity

supply, sanitation, including solid waste management, efficient urban mobility and public transport,

affordable housing, especially for the poor, robust IT connectivity and digitalization, good governance,

especially e-governance and citizen participation, sustainable environment, safety and security of citizens,

particularly women, children and the elderly, and health and education. Some of its other features are

mixed use of land, Transit Oriented Development (TOD i.e. developing commercial and residential plots in

the same area to reduce use of vehicles or to increase the use of public transport, last mile connectivity

through para transport (autos, disabled friendly vehicles etc.), pedestrian / cyclist friendly design of streets,

preservation of open spaces and ecological balances, green buildings which reduce energy consumption,

mobile and e-governance etc.

Karnal City was ranked ‘12’ for implementation in round 3 of Smart City Challenge. Karnal Municipal

Corporation, in order to design, develop, and manage and implementation of Smart City Proposals, as per

MoUD guidelines, formed a Special Purpose Vehicle (SPV) called Karnal Smart City Limited (KSCL).

• City Background

The city is located at 29.68°N latitude and 76.98°E longitude; situated 240 meters above sea level.

Geologically, the city is a part of the Indo-Gangetic plains and lies in High damage risk zone - IV of

Earthquake hazard zones .

Administratively, Karnal city is the district headquarter of Karnal District. Situated on National Highway 44,

historically known as Grand Trunk (GT) road, it lies midway between Delhi and Chandigarh; 125 kms away

from National Capital of Delhi and 130 kms from Chandigarh, the State Capital of Haryana.

2. Location and Connectivity

Road: Karnal City is situated on National Highway No. 44 and well connected with other parts of India. City

has an Inter State Bus Terminus (ISBT) situated on the National Highway and one Intra State bus stand is

situated within the city near Karan Park. Karnal is well connected with Chandigarh, Delhi, Meerut,

Saharanpur, Kaithal, Jind, Hissar, Patiala, Rohtak, Panipat etc.

Page 13: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

Rail: Situated on Delhi Jammu Railway Track, it well connected with North (Punjab, J&K, UT Chandigarh,

and Himachal Pradesh) as well as rest of India through Rail Network. Shan e Punjab, Himachal Express,

Himalayan Queen Express, Howrah Kalka Express, Unchahar Express, Mussoorie Express, Jhelum Express,

Shatabdi are some of the trains that stop at this station.

Air: The Indira Gandhi International airport in Delhi is situated at a distance of 140 kms and Chandigarh

international Airport is situated 125 kms from Karnal City. Karnal has its own air strip situated about 3 kms

from the city but is not in use for regular flights.

3. PROJECT OBJECTIVE AND VISION

The objective of the Smart City Mission for Karnal is to provide core infrastructure and a clean and

sustainable environment by the application of ‘Smart’ Solutions to the basic infrastructure. The focus is on sustainable and inclusive development and the idea is to create a replicable model of smart, planned and

regulated urban development.

Broadly there are two types of component under the Smart City Initiative:

I. Area Based Development (ABD) – Covering part of City

II. PAN city – Covering the city as a whole

The core infrastructure elements targeted in a Smart City Mission include:

a) Adequate Water Supply,

b) Assured Electricity Supply,

c) Sanitation, Including Solid Waste Management,

d) Efficient Urban Mobility and Public Transport,

e) Affordable Housing, Especially for The Poor,

f) Robust IT Connectivity and Digitalization,

g) Good Governance, Especially E-Governance and Citizen Participation,

h) Sustainable Environment,

i) Safety And Security of Citizens, Particularly Women, Children and The Elderly, And

j) Health and Education

PROJECT COMPONENTS • Podium Structure

• Commercial & Mixed use spaces

• Road + Road Furniture

• Underground & Surface Service Utilities

• Landscaping

Minimum development Details of Components

Road length and Width Construction of two-lane new cement concrete road of minimum1770m length on each side of Canal (Phase II + Phase III) " ROW 12m

Service Utilities Water supply lines: approximately 3800 m " Sewerage lines: approximately 3800 m " Drainage system: approximately 3800 m " (Power) Street Lighting system: 3800 m " Telecommunication & OFC ducting: 3800 m " Firefighting system: as per norms covering entire development(podium floor + commercial & mixed use spaces) " Solar Panel: Minimum area 7000 sq.m. (approximately 70% of thetotal shop area) "

Page 14: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

Landscaping Type and design to be submitted; " Area: as indicated in the concept / working drawings; " The landscape design will include (not limited to) the heritage corridor / theme on the concept of Mahabharata (Karn Corridor).(statues made of FRP/Stone or any other innovative material) " Provision of high efficiency

Parking Facility Area: as earmarked in the concept / working drawings; " Number (minimum): 1020 "

Podium Floor Length: 1770m; Width: 40m (minimum) " Height: 7.5m above ground level (or as per approved design) "

Commercial space (Shops) Area: as earmarked in the concept / working drawings; "Shops: 456 nos." Size of shop (appox.): 2.75m x 8m " Facilities: all MEP facilities required to function the commercial space through utility duct etc.

Mixed use space Area: as earmarked in the concept / working drawings; " Type: Recreational etc.

Suspension Bridge

• To connect Mughal Canal Phase II & III

• Non-motorized Steel Bridge (40m x 24m) approximately

Deliverables: Agency will ensure to deliver everything as per ToR/Scope of work and asper requirement until or

unless specified.

Time Line: As below

Stage Duration

Master Plan/ Concept Plan 01 Month

DPR Preparation and submission of Structural Drawings & Designs for

approval from competent authority

02 Months

Construction of Podium floor i/c foundation, columns slabs, Roadwork,

Ramps, Staircase , lifts, Escalators and all associated electrical Mechanical

and automation works for commercial, Mixed use spaces i/c interiors ,

MEP work etc. landscape works.

21 Months

Total

24 months

Note: The time taken for the approval of DPR by the competent authority of the client department would

be excluded from this timeline.

Page 15: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with
Page 16: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with
Page 17: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with
Page 18: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

LIST OF DRAWINGS

S. No. Title

1 Concept Plan Phase II

Ground Floor

2 Concept Plan Phase II

Podium Floor

3 Concept Plan Phase III

Ground Floor

4 Concept Plan Phase III

Podium Floor

Page 19: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with
Page 20: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with
Page 21: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with
Page 22: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with
Page 23: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

ANNEXURE-II

The Agency shall be paid Architectural fee as a percentage of the financial quote as per schedule given

below:

Sl.

No.

Milestone % of

Fee

Remarks

1. i) On approval of Concept Plan, Master Plan,

Detailed Architectural design/drawings @ 3%.

ii) On submission of applications for

clearances and approvals from statutory

bodies and submission of approved

drawings @ 1%

Iii) On submission of Structural drawings duly

proof checked by requisite institute @ 1%.

iv) On submission of approved GFC drawings

along with Construction plan on PRIMAVERA

software @20%

25%

2. During Construction stage 60% Payable on quarterly basis

progressively on pro-rata

basis in proportion to the

value of the work executed

during that particular period

by the agency.

3. After finalization of the project at the stage of

handing over, submission of “As built

drawings” and submission of completion

certification/NOC from all statutory bodies.

15%

TOTAL 100%

Note: In case of incompleteness/default leading to delays on account of non-fulfillment of any of the

above sub clauses, UPRNN shall be at liberty to engage debatable Agency and levy penalty @

twice the prescribed fee, as above.

Page 24: Official website of Uttar Pradesh Rajkiya Nirman Nigam · 2019-09-06 · Designing and Architect Services, ... 5.2 Brief company profile along with the list of projects done with

PART-B

PRICE OFFER

To,

The General Manager (Delhi Zone),

U.P. Rajkiya Nirman Nigam Ltd.,

C-20/1A/7, Sector-62,Noida

Distt. Gautam Budh Nagar, Uttar Pradesh

Sub: Expression of Interest for Construction of DEVELOPMENT OF COMMERCIAL, MIXED USE SPACES,

PARKING AND LANDSCAPING FOR PUBLIC USE IN MUGHAL CANAL PHASE II AND PHASE III, KARNAL

( HARYANA)

SH: SUBMISSION OF PRICE OFFER

Dear Sir,

With reference Notice No. 510/Karnal Arch./RNN/2019 Dated 04.09.2019 regarding Expression

of interest for Selection of Architect & Engineering Consultant for Construction of DEVELOPMENT

OF COMMERCIAL, MIXED USE SPACES, PARKING AND LANDSCAPING FOR PUBLIC USE IN MUGHAL CANAL

PHASE II AND PHASE III, KARNAL ( HARYANA), WE HEREUNDER QUOTE OUR OFFER/PRICE FOR YOUR

CONSIDERATION:

SL.

NO.

PARTICULARS PRICE OFFER IN % AGE

IN FIGURE IN WORDS

1. Providing Architectural Consultancy services from

concept to commissioning including Planning,

Designing and Architect Services, Structural design

with relevant seismic considerations /Pre-

engineering design for Civil, Electrical, Plumbing,

HVAC, Fire Fighting, Fire Detection, PA System,

Lifts, Rainwater Harvesting work, External

Development work, Horticulture and Landscaping.

IT enabled services, Internal & External services etc.

with design basis report based on applicable

Schedule of Rates and Market Rate Analysis for

tendering process, Preparation of DPR, bill of

quantities, preparation of Master Plan etc. Preparation

of work plan for works of Widening & lengthening of

Road, Service Utilities, Landscaping, Parking Facility,

Podium Floor, Commercial space (Shops), Mixed use

space, Suspension Bridge etc. Providing

construction plan on primavera software and

obtaining approvals from Local and Statutory

bodies/Haryana Government.

NOTE: The above offer is inclusive of all applicable taxes whatsoever and nothing extra shall

be charged/claimed against providing Consultancy Services for the subject project.

Signature with Seal