BIHAR RAJYA PUL NIRMAN NIGAM LTD.brpnn.bih.nic.in/Reports/Other Than Mega 30.09.2018.pdf ·...

50
30.09.2018 Financial Foundati on (in %) Sub- Structure (in %) Super- Structure (in %) Approach (in %) Cumulati ve 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 Darbhanga Construction of HLRCC bridge with Land acquisition ,approach road and protection work near naiyam gram at pachphutiya ghat in Bagmati river (7x24.75 m) Hari Construction & Associate Pvt. Ltd., Begusarai BDF Darbhanga 1816(s) 28/02/2014 2319.19 RCC/177.56 410M 03/2014 03/16 0 100 0 100 0 100 0 25 0.00 1257.27 03/2019 Section-11 is in Progress. 2 Darbhanga Construction of HL RCC bridge Ujjan PWD Road in Ghanshyampur Kathbara-Lagma Kkora Mcheta- Lalpatti Road of 11.10 KM in the District of Darbhanga. Royal Engineers. FDR Darbhanga 289 (S) dt. 10.01.2018 842.05 58.00 _ 05.05.18 04.11.19 0 70 0 0 0 0 0 0 195.29 36/36 Pile Complete. Pile dismentling started. 3 Darbhanga Construction of HL RCC bridge in 15 Km of Bathiya-Narayanpur- Kakodha- Devena-Rajkharwar with approach road, Diversion work and Miscellaneous work in the District of Darbhanga. FDR Darbhanga 292 (S) dt. 12.01.2018 1067 77.48 _ 11.04.2018 10.10.2019 2 2 0 0 0 0 0 0 0.00 Work in Progress. Two nos cutting edge placed . A1 well curb reinforcement completed. 4 Darbhanga Construction of HL RCC bridge at Shivnagar Ghat in 11.50KM of Ghanshyampur- Rasiyari Road with approach road, Diversion work and Miscellaneous work in the District of Darbhanga. FDR Darbhanga 294 (S) dt. 12.01.2018 1046.13 90.70 _ 11.04.2018 10.04.2019 0 0 0 0 0 0 0 0 0.00 Diversion completed and Work in Progress. 5 Darbhanga Construction of HL RCC bridge(4x14.50M) Ujjan PWD Road in Ghanshyampur Kathbara-Lagma Kkora Macheta-Lalpatti Road of 12.10 KM in the District of Darbhanga. FDR Darbhanga 290 (S) dt. 10.01.2018 816.71 60.48 - - 0 0 0 0 0 0 0 0 0.00 6 Darbhanga Construction of HL RCC bridge(2x16.50M) in 1st km of Bishanpur Atarbel Road in the District of Darbhanga. FDR Darbhanga 291 (S) dt. 13.01.2018 442.53 34.26 0 0 0 0 0 0 Diversion Work in Progress. Remarks Physical PROGRESS REPORT MONTH OF SEPTEMBER, 2018 Format circulated vide Letter No. 4454(s) we dt. 30.03.2007 of R.C.D. Bihar Sl.No Division Name Of Work Head/ Sub Head Distirct Administrative Approval Type/ Length Of Bridge(M) Length of Approach (in M) Date of Commenceme nt Date Of Scheduled completion Achievement for the month / till month Likely date of completion BIHAR RAJYA PUL NIRMAN NIGAM LTD.

Transcript of BIHAR RAJYA PUL NIRMAN NIGAM LTD.brpnn.bih.nic.in/Reports/Other Than Mega 30.09.2018.pdf ·...

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work near naiyam gram at pachphutiya ghat in Bagmati river (7x2475 m) Hari Construction amp Associate Pvt Ltd Begusarai

BD

F

Dar

bhan

ga

1816

(s)

280

220

1423

191

9

RC

C1

775

6

410M

032

014

031

6

0100

0100

0100

025

000125727

03

2019

Section-11 is in Progress

2

Dar

bhan

ga

Construction of HL RCC bridge Ujjan PWD Road in Ghanshyampur Kathbara-Lagma Kkora Mcheta-Lalpatti Road of 1110 KM in the District of DarbhangaRoyal Engineers

FDR

Dar

bhan

ga

289

(S) d

t 10

01

2018

84

205

5800 _

05

051

8

041

119 0

7000

00

00 19529

3636 Pile Complete Pile dismentling started

3

Dar

bhan

ga

Construction of HL RCC bridge in 15 Km of Bathiya-Narayanpur- Kakodha-Devena-Rajkharwar with approach road Diversion work and Miscellaneous work in the District of Darbhanga

FDR

Dar

bhan

ga

292

(S) d

t 12

01

2018

10

67 7748 _

110

420

18

101

020

19

22

00

00

00 000

Work in Progress Two nos cutting edge placed A1 well curb reinforcement completed

4

Dar

bhan

ga

Construction of HL RCC bridge at Shivnagar Ghat in 1150KM of Ghanshyampur- Rasiyari Road with approach road Diversion work and Miscellaneous work in the District of Darbhanga

FDR

Dar

bhan

ga

294

(S) d

t 12

01

2018

10

461

3

9070 _11

04

2018

100

420

19

00

00

00

00 000 Diversion completed and Work in

Progress

5

Dar

bhan

ga

Construction of HL RCCbridge(4x1450M) Ujjan PWD Roadin Ghanshyampur Kathbara-LagmaKkora Macheta-Lalpatti Road of1210 KM in the District ofDarbhanga

FDR

Dar

bhan

ga

290

(S) d

t 10

01

2018

81

671

6048 - - 00

00

00

00 000

6

Dar

bhan

ga

Construction of HL RCCbridge(2x1650M) in 1st km ofBishanpur Atarbel Road in theDistrict of Darbhanga

FDR

Dar

bhan

ga

291

(S) d

t 13

01

2018

44

253

342

6 00

00

00 Diversion Work in Progress

Rem

arksPhysical

PROGRESS REPORT MONTH OF SEPTEMBER 2018 Format circulated vide Letter No 4454(s) we dt 30032007 of RCD Bihar

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

BIHAR RAJYA PUL NIRMAN NIGAM LTD

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Dar

bhan

ga

costruction of HLRCC bridge near chandanpatti village (2 x 1875 m)MS Sanjay Kumar Singh 9470624199

MM

SNY

Pha

se

- IV

(201

3-14

)

Dar

bhan

ga

7584

(s)

110

820

1435

318

RC

C3

876

210M

122

014

092

014

031

6

121

5

0100

0100

0100

095

00019079

12

2018 lrr~ yht ij ysus gsrq Hkwfe fdLe LokfeRo

izekk i= oa fookn jfgr izekk i= dh ekax dh xbZ gSA

8

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work in the 18th km of baliya- kakodha -dewana-rajkherwar -jhanjharpur road(upto NH-57 in drabhanga distrcit(12x2475 m)Shiv Kishore Construction Pvt Ltd9431858543 RCD

PLA

N

Dar

bhan

ga

6219

(s)

090

720

1540

487

0

RC

C3

043

6

1130M

092

015

051

8

0100

095

0490

060

4655245337

03

2019

Section-37 is in progress

9

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work in tilyuga river between dwalak village and janki nagar tola under madhepur block in the district of madhubani (5x1875 m)Shreem Construction9470627503

BD

F

mad

huba

ni

1867

(s)

030

320

1499

574

RC

C9

684

290M

062

015

102

014

041

7

041

6

00094

0060

060

010 48898

12

2018 Work in progress and work to be

completed on 31122018

10

Dar

bhan

ga

costruction of HLRCC bridge at damla ghat in bisfi block (3x2175 m) Sri Krishna Kant Thakur9430897941

MM

SNY

Pha

se -

IV (2

013-

14)

Mad

huba

ni

8291

(s)

010

920

1447

047

RC

C6

712

330M

102

014

092

014

011

6

121

5

0100

0100

0100

050

00036977

12

2018

SIA in progress

11

Dar

bhan

ga

Construction of five noof lock gate in the road between jhaveri chowk and bhutaha chowk in chainage from 17645 km to 2519 km in madhubani districtBrajendra Kr Buildress PvtLtd0612-22764679431063085 RCD N

AB

AR

D R

IDF-

19

(RC

D)

mad

huba

ni

4553

(E) 1

507

201

542

791

8

RC

C1

240

0

250M

102

015

102

013

101

7

101

5

0100

0100

0100

050

9599326985

03

2019

Work in progress and work to be completed on 31122018 Fabrication of Mechanical

components started

12

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work near jhanjharpur at old NH-57 in kamala balan river in madhubani distrcit(9x2400 m)Tushar Construction Company Gaziabad RCD

PLA

N

mad

huba

ni

6220

(s)

090

720

1541

970

5

RC

C2

214

4

1620M

04

2016

12

2018 0

7202

00

00

00090590

12

2018 After flood site clearing and stocking

of materials startSection-7 is in ProgressSpecial committee formed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

13

Dar

bhan

ga

Construction of HL RCC bridge in Rampatti-Batlohia Road in 5th KM (5x1600M) in the District of Madhubani PL

AN

mad

huba

ni

2496

(s)

180

320

1886

571

RC

C8

000

041

220

17

030

620

19

1085

3040

00

00

723834665

6060 Pile Complete Sub structure work in progress

14

Dar

bhan

ga

costruction of HLRCC bridge in NH-28 through chand chourdih to pathan tol before river under ujiyarpur block (2x1450)Sri Rajesh Kumar94308343626

MM

SNY

Pha

se -

IV (2

013-

14)

Sam

astip

ur

7370

(s)

060

820

1420

459

RC

C3

026

65M

092

014

091

5

0100

0100

0100

080

00015103

03

2019

Traffic Started bl dkkZy ds i=kadamp771frac14vuq0frac12 fnukadamp31-

08-2018 kjk LFkkh HkwampvtZu ds rgr~ vfkkpuk iqu lefiZr A

15

Dar

bhan

ga

costruction of HLRCC bridge in near proposed bypass road of hasanpur bazar at marachi ujagar of virpur bramhsthan in hasanpur block(3x1875 m) Praveez Khan

MM

SNY

Pha

se -

IV

(201

3-14

)

Sam

astip

ur

9340

(s)

240

920

1440

094

RC

C5

812

130M

012

015

112

014

041

6

021

6

0100

0100

0100

0100

00022640

03

2019

Traffic Started

16

Dar

bhan

ga

Construction of HLRCC bridge at angar ghat in the budhi gandak river (10x2475 m) Braj Kishor Rai9430800861

NA

BA

RD

RID

F-17

(RC

D)

Sam

astip

ur

1583

(s)

090

220

1220

967

2

RC

C2

536

4

780M

032

012

071

4

031

4

0100

0100

0100

080

000146560

062

019

Rs 22786 Lacs has been Deposited to DLAO Samastipur vide letter No 487 dated 06062015 bl dkkZy ds i=kadamp709frac14vuq0frac12 fnukadamp13-08-2018 kjk LFkkh HkwampvtZu ds rgr~ vfkkpuk iqu

lefiZrA SIA gsrq laLFkku dk pu izfOslashk esa gSA

17

Dar

bhan

ga

Construction of HLRCC bridge at kakar ghat in rosra morwara road in kareh river(16x2475 m) Shiv Kishore Construction Pvt Ltd9431858543

NA

BA

RD

RID

F-17

(RC

D)

Sam

astip

ur

7802

(s)

130

720

1230

094

2

RC

C4

058

0

650M

122

012

031

5

121

4

0100

0100

0100

085

000299156

032

019

Rs1659870600 has been deposited to DLAO Samastipur vide letter no-949 dated-02092013 bl dkkZy ds i=kadamp694frac14vuq0frac12 fnukadamp09-08-2018 kjk LFkkh HkwampvtZu ds rgr~ vfkkpuk iqu

lefiZrA SIA gsrq laLFkku dk pu izfOslashk esa gSA

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work in kareh river between hasanpur to soharwa sati ghat in samastipur distrcit(21x2400 m)Ram Kripal Singh Constructon Pvt Ltd RCD

PLA

N

Sam

astip

ur

7171

(s)

050

820

1568

134

0

RC

C5

166

4

1500M

082

015

101

8

070

055

045

04

12882269545

06

2020

Section-19 completed

19

Dar

bhan

ga

Construction of HL RCC bridge in Tajpur-Halai Road in 14th KM of Noon River (5x2175M) in the District of Samastipur PL

AN

Sam

astip

ur

1207

7 (s

)27

12

2017

879

10

RC

C1

087

5

110

420

18

101

020

19

0100

045

00

00

00025729 Work in progress

1

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 31032 km in the district of Purvi champaran Package No- 7 (1 x 40 M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

521

69

RC

C4

000

105+95M

022

014

122

018

061

7

051

6

0100

0100

595

525

00047090

12

2018 Bridge Completed

Approach Road in Progress

2

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 31768 km in the district of Purvi champaran Package No- 7 (1 x 15M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

199

33

RC

C1

500

95+85M

022

014

122

018

061

7

051

6

0100

0100

095

080

00012425

12

2018 Bridge Completed

Approach Road in Progress

3

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 32875 km in the district of Purvi champaran Package No- 7 (2 x 35M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

849

03

RC

C6

000

160+140M

022

014

122

018

061

7

051

6

0100

0100

050

040

00064986

12

2018 One Span Completed and One Span

Balance Work in Progress

4

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 33900 km in the district of Purvi champaran Package No- 7 (1 x 30M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

398

24

RC

C3

000

90+110M

022

014

122

018

061

7

051

6

0100

0100

095

1030

00030521

12

2018 Bridge Part Completed

Approach Road in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 35650 km in the district of Purvi champaran Package No- 7 (2 x 35M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

802

94

RC

C7

000

105+95M

022

014

122

018

061

7

051

6

0100

0100

050

525

00066260

12

2018 One Span Completed and

One Span BalanceApproach Road in Progress

6

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 36858 km in the district of Purvi champaran Package No- 7 (2 x 25M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

545

23

RC

C5

000

95+105M

022

014

122

018

061

7

051

6

0100

0100

095

080

00065856

12

2018 Bridge Part Completed

Approach Road in Progress

7

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 40772 km in the district of Purvi champaran Package No- 7 (2 x 30M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

693

30

RC

C6

000

100+100M

022

014

122

018

061

7

051

6

0100

0100

050

520

00054335

12

2018 One Span Completed and

One Span Balance Approach Road in Progress

8

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge in Indo -Nepal border road at channage 41258 km in the district of Purvi champaran Package No- 7 (1 x 40M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

506

39

RC

C4

000

90+110M

022

014

122

018

061

7

051

6

0100

0100

595

525

00040141

12

2018 Bridge part Completed

Approach Road in Progress

9

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 105640 km in the district of Purvi champaran Package No-10 (3 x 8M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

293

66

RC

C2

400

170+108M

112

013

062

018

071

7

101

5

00

00

00

00

000031

Villagars demanded to change the Alignment then after RCD

Division Motihari recommended to RCDHq for approval to change

the Alignment

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge with approach road at kataha ghat in sikrahna river under mehsi block in the district of East champaran(12 x 24750 M) MS Jay shankar rai9934867236 N

AB

AR

D

East

Cha

mpa

ran

8079

(s)

171

020

1335

395

5

RC

C2

970

0

250+520M

032

014

031

6

0100

099

079

05

000183476

12

2018 Total Span = 12 nos (9 Span

Completed and 3 Span = Balance) LA in under Section -11 in Progress

11

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2175 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sugauli - Piparpati Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

126661 10875 -

050

520

18

040

520

20

00

00

00

00

0424 Diversion work is in Progress

12

Cha

mpa

ran

(Mot

ihar

i)

Construction of 4x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 11th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

75150 66 -

230

520

18

221

120

19

00

00

00

00

0510 Diversion work is in Progress

13

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sirauna - Patahi Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

40124 33 -

010

620

18

310

520

19

1070

00

00

00

000183 Work in Progress

14

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1875 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 7th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

1301

(s)

dt 1

602

201

852

388

Lac

s

3750 -

270

920

18

260

920

1900

00

00

00

0000 Diversion work is in Progress

15

Cha

mpa

ran

(Mot

ihar

i)

Construction of 7x25M size Bridge in Madanpur-Bhangha Road in Chainage 43400 Km Pakage No 03

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

314

029

110

137

1 RCC175 0+0

11

2016

07

2018 10

705

2000

55

566837339

06

2019

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

16

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Gerkahiya in Madanpur-Bhangha Road in Chainage 75734Km Pakage No 05 (New 78775KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

316

4913

921

6 RCC210 0+0

091

013

300

415 0

950

850

850

50000

144575

311

020

18 6 Span Completed and Last span stopped by Villagers due to

LA

17

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Birha in Madanpur-Bhangha Road in Chainage 72703Km Pakage No 05 (New 745540KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

356

073

411

18 RCC40 0+0

091

013

300

416 0

000

00

00

000072

311

020

18 Work Stopped by Villagers due to LA Agancy has requested to close the Agreement due to LA and old

rate

18

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC 2x3000 mtr In the district of West Champaran under Indo-Nepal Border Ch 5819 km Near Inerwa Bazar

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

5590

(s)

dt 2

706

201

799

097

000 RCC -

050

218

040

819 5

3000

00

00

0438

040

820

19

foundation in Progress

19

Cha

mpa

ran

(Mot

ihar

i)

Construction of 1x2000M Size Bridge at Chainage 18460Km in Bhangha-Bhutaha Road Pakage No 06

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

341

314

223

32 RCC20 320+72

310

713

310

720

18

0100

0100

0100

00

00023571

311

018 Bridge Completed Approach Road

work Stopped by Villagers due to LA

20

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (4x21-75 m) on 7th km of Balther - Narkatiyaganj Road over Kartaha River N

abar

d

Wes

t Cha

mpa

ran

179

dt 1

601

201

771

661

Lac

8719

02

18

180

819 10

901020

00

00

00031500

180

819

Work in Progress

21

Cha

mpa

ran

(Mot

ihar

i)

Construction Of HL RCC Bridge (3x1875m) over Harpatbeni River on Sakhlahi Path

Nab

ard

Wes

t Cha

mpa

ran

180

Dt

160

120

1757

127

Lac

56

190

218

180

818 10

4000

00

00

0114

180

820

19

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

22

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2370

(S)

dt 1

403

201

219

270

963

815

RC

C

127 1440+90

0

130

912

120

914 0

1000

1000

1000

67000

134928

12

2018

Bridge Completed Sarisawa bazar side approach road

completed and Maheshara side approach uncompleted due to LA

The member of AN Sinha Institute visited at the site on 14092018 for

Quotation for SIA work

23

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2211

(S)

dt 2

702

201

219

982

1700

68

RC

C

127 2558362

+154768

240

113

230

714 0

1000

1000

1000

55000

102099

12

2018

Bridge Completed The member of AN Sinha Institute visited at the site on 18082018 for

Quotation for SIA work

24

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (7x1200m) on 1st Km of Lauriya - Ramnagar Road

Plan

Wes

t Cha

mpa

ran

292

(S)

Dt

100

120

1811

255

3 La

c84 -

290

518

281

119 0

000

00

00

00 - Diversion work is in Progress

25

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (8x1600m) over Balore River on 1st km of Narkatiyaganj - Binwalia Road

Plan

Wes

t Cha

mpa

ran

1161

2 (S

)D

t 13

12

2017

1759

38

Lac

96

090

518

080

520 5

4000

00

00

845652016

080

520

20

Work in Progress

26

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (5x1200m) on 1st Km of Lauriya - Sikarpur-Thori Road

FD

R 2

017

Wes

t Cha

mpa

ran

1383

(S)

Dt

210

220

1886

200

Lac

RCC 60 75+75

270

920

18

261

220

1900

00

00

00

00 - Diversion work is in Progress

1

Kha

gari

a

costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x2175 m)Mansa Engicom Pvt Ltd9431060060 RWD

MM

SNY

Pha

se -

II (2

009-

10)

Beg

usar

ai

9410

(s)

230

620

1065

872

RC

C1

342

0

225M

May

-10

031

2

111

1

0100

0100

0100

010

00084057

12

2018

Section-35 has been completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

2

Kha

gari

a

Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district

Plan

Kha

garia

Rs 1520

12622(S)dated

141106

RCC 39600m 505m

Mar

-07

June

-09

0100

0100

0100

045

000257345

The Real possesion of land by DLAO Khagaria was not given to

BRPNNL due to which approach road could not be constructed till date The DLAO Khagaria requested by

various letter of Senior Project Engineer for real possesion of land

MD BRPNNL vide his letter no 77 dated 02022016 468 dated

04082016 and 892 dated 24112017 have remined RCD for sanction of

Revised AA for the projectYear of completion of Bridge

Construction 2010-11

1

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Bagaucha-Srmer-Kotnrhwa Road of Saran Main Nahar12th Km in the District of Gopalganj

FDR

Gop

alga

nj

Rs 85218 Lac

685(S)19012018

HL RCC 4x1600 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

2

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Gopalganj-Brhriyaroad of Saran Main Nahar 2nd Km inthe District of Gopalganj

FDR

Gop

alga

nj

Rs 79030 Lac

686(S)19012018

HL RCC

4x1400 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

3

Sara

n w

orks

Div

isio

n C

hhap

ra Construction of Mirganj-Bhagipatti-Smaur Road in Hathua Nahar 15thKm in the District of Gopalganj

FDR

Gop

alga

nj

Rs 54907 Lac

895(S)30012018

RCC 2x1600

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 332 dated-14052018 WRD

Anishabad Patna returned to Chief Engineer WRD siwan to issue NOC Vide letter no-439 Dated-14062018

Work order issued

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of 4x1875m HL RCCBridge including Approach Roadrotection Work amp Miscellaneouswork over Bashi river crossing 1stKM of Tamkuhi-chhitauni roadDamaged in 2017 Flood underGopalganj Distric

FDR

Gop

alga

nj

Rs 80874 Lac

687(s)19-01-2018

RCC 4x1875

2x200=400 M

031

020

18

- - - - - - - Work awardedWork order issued

1 Ara

Construction of HL RCC BridgerOver Kauw river in samta Bigha -Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in theDistrict of Rohtas under MMSNY(Brajesh Kumar Singh)

MM

SNY

Roh

tas

21450 1949 (S)

dt 04-03-

2014 of RCD Patna

RC

C22

40

A1 Side-75 M

A2 Side-75 M 11

-05-

2015

10-0

5-20

16

0100

0100

045

00

0009416

122

018 Reinforcement for deck slab in

Progress Contractor debarred for delayNotice for rescind issued

2 Ara

Construction of HL RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt Ltd 9431012004

MM

SNY

Bho

jpur Rs 37263

Lac7655 (S) dt 11082014

RCC6708 20000

280

116

270

417 0

1000

1000

10015

100000

22080

10

2018

Completed

1

GA

YA

Construction of HLRCC17x2175m Bridge includingapproach road and protection workover river Muhane between Silaunjua-Bataspur village in BodhGaya Blockof Gaya District under NABARDScheme(Ajay Engicon Pvt Ltd Aurangabad(Bihar)

Nab

ard

RW

D

GA

YA

1127

86

1128

Dt

05-0

3-20

12 o

f RW

D

983

95 RCC38000

A1 Side-60 M

A2 Side-100 M 15

03

13

140

914 0

1000

1000

1000

80000

96020

Dec

embe

r 2

018

Bridge work completed amp ApproachRoad work in progress SIACompleted Final Pubishing underSection-11 Tenure of 60 days ispassed away on dt 24-08-2018Further R amp R is being processed byDLAO

2

GA

YA

Construction of HLRCC22x2175m Bridge includingapproach road and protection workover Falgu river in Sripur-Keni Roadin Gaya District under NABARDScheme(Ms Rakesh Construction PvtLtd9431303918)

Nab

ard

RW

D

GA

YA

2835

09

2493

dt

31-1

0-20

14 o

f RW

D

2292

48 RCC

49200

A1 Side-280 M

A2 Side-280 M 06

01

2015

050

120

17

0100

0100

0100

070

000237293

Oct

ober

201

8

Bridge work completed amp ApproachRoad work in progress A Temple issituated in alignment NewConstruction of temple is in progressAfter that approach road will befinished

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Dar

bhan

ga

costruction of HLRCC bridge near chandanpatti village (2 x 1875 m)MS Sanjay Kumar Singh 9470624199

MM

SNY

Pha

se

- IV

(201

3-14

)

Dar

bhan

ga

7584

(s)

110

820

1435

318

RC

C3

876

210M

122

014

092

014

031

6

121

5

0100

0100

0100

095

00019079

12

2018 lrr~ yht ij ysus gsrq Hkwfe fdLe LokfeRo

izekk i= oa fookn jfgr izekk i= dh ekax dh xbZ gSA

8

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work in the 18th km of baliya- kakodha -dewana-rajkherwar -jhanjharpur road(upto NH-57 in drabhanga distrcit(12x2475 m)Shiv Kishore Construction Pvt Ltd9431858543 RCD

PLA

N

Dar

bhan

ga

6219

(s)

090

720

1540

487

0

RC

C3

043

6

1130M

092

015

051

8

0100

095

0490

060

4655245337

03

2019

Section-37 is in progress

9

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work in tilyuga river between dwalak village and janki nagar tola under madhepur block in the district of madhubani (5x1875 m)Shreem Construction9470627503

BD

F

mad

huba

ni

1867

(s)

030

320

1499

574

RC

C9

684

290M

062

015

102

014

041

7

041

6

00094

0060

060

010 48898

12

2018 Work in progress and work to be

completed on 31122018

10

Dar

bhan

ga

costruction of HLRCC bridge at damla ghat in bisfi block (3x2175 m) Sri Krishna Kant Thakur9430897941

MM

SNY

Pha

se -

IV (2

013-

14)

Mad

huba

ni

8291

(s)

010

920

1447

047

RC

C6

712

330M

102

014

092

014

011

6

121

5

0100

0100

0100

050

00036977

12

2018

SIA in progress

11

Dar

bhan

ga

Construction of five noof lock gate in the road between jhaveri chowk and bhutaha chowk in chainage from 17645 km to 2519 km in madhubani districtBrajendra Kr Buildress PvtLtd0612-22764679431063085 RCD N

AB

AR

D R

IDF-

19

(RC

D)

mad

huba

ni

4553

(E) 1

507

201

542

791

8

RC

C1

240

0

250M

102

015

102

013

101

7

101

5

0100

0100

0100

050

9599326985

03

2019

Work in progress and work to be completed on 31122018 Fabrication of Mechanical

components started

12

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work near jhanjharpur at old NH-57 in kamala balan river in madhubani distrcit(9x2400 m)Tushar Construction Company Gaziabad RCD

PLA

N

mad

huba

ni

6220

(s)

090

720

1541

970

5

RC

C2

214

4

1620M

04

2016

12

2018 0

7202

00

00

00090590

12

2018 After flood site clearing and stocking

of materials startSection-7 is in ProgressSpecial committee formed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

13

Dar

bhan

ga

Construction of HL RCC bridge in Rampatti-Batlohia Road in 5th KM (5x1600M) in the District of Madhubani PL

AN

mad

huba

ni

2496

(s)

180

320

1886

571

RC

C8

000

041

220

17

030

620

19

1085

3040

00

00

723834665

6060 Pile Complete Sub structure work in progress

14

Dar

bhan

ga

costruction of HLRCC bridge in NH-28 through chand chourdih to pathan tol before river under ujiyarpur block (2x1450)Sri Rajesh Kumar94308343626

MM

SNY

Pha

se -

IV (2

013-

14)

Sam

astip

ur

7370

(s)

060

820

1420

459

RC

C3

026

65M

092

014

091

5

0100

0100

0100

080

00015103

03

2019

Traffic Started bl dkkZy ds i=kadamp771frac14vuq0frac12 fnukadamp31-

08-2018 kjk LFkkh HkwampvtZu ds rgr~ vfkkpuk iqu lefiZr A

15

Dar

bhan

ga

costruction of HLRCC bridge in near proposed bypass road of hasanpur bazar at marachi ujagar of virpur bramhsthan in hasanpur block(3x1875 m) Praveez Khan

MM

SNY

Pha

se -

IV

(201

3-14

)

Sam

astip

ur

9340

(s)

240

920

1440

094

RC

C5

812

130M

012

015

112

014

041

6

021

6

0100

0100

0100

0100

00022640

03

2019

Traffic Started

16

Dar

bhan

ga

Construction of HLRCC bridge at angar ghat in the budhi gandak river (10x2475 m) Braj Kishor Rai9430800861

NA

BA

RD

RID

F-17

(RC

D)

Sam

astip

ur

1583

(s)

090

220

1220

967

2

RC

C2

536

4

780M

032

012

071

4

031

4

0100

0100

0100

080

000146560

062

019

Rs 22786 Lacs has been Deposited to DLAO Samastipur vide letter No 487 dated 06062015 bl dkkZy ds i=kadamp709frac14vuq0frac12 fnukadamp13-08-2018 kjk LFkkh HkwampvtZu ds rgr~ vfkkpuk iqu

lefiZrA SIA gsrq laLFkku dk pu izfOslashk esa gSA

17

Dar

bhan

ga

Construction of HLRCC bridge at kakar ghat in rosra morwara road in kareh river(16x2475 m) Shiv Kishore Construction Pvt Ltd9431858543

NA

BA

RD

RID

F-17

(RC

D)

Sam

astip

ur

7802

(s)

130

720

1230

094

2

RC

C4

058

0

650M

122

012

031

5

121

4

0100

0100

0100

085

000299156

032

019

Rs1659870600 has been deposited to DLAO Samastipur vide letter no-949 dated-02092013 bl dkkZy ds i=kadamp694frac14vuq0frac12 fnukadamp09-08-2018 kjk LFkkh HkwampvtZu ds rgr~ vfkkpuk iqu

lefiZrA SIA gsrq laLFkku dk pu izfOslashk esa gSA

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work in kareh river between hasanpur to soharwa sati ghat in samastipur distrcit(21x2400 m)Ram Kripal Singh Constructon Pvt Ltd RCD

PLA

N

Sam

astip

ur

7171

(s)

050

820

1568

134

0

RC

C5

166

4

1500M

082

015

101

8

070

055

045

04

12882269545

06

2020

Section-19 completed

19

Dar

bhan

ga

Construction of HL RCC bridge in Tajpur-Halai Road in 14th KM of Noon River (5x2175M) in the District of Samastipur PL

AN

Sam

astip

ur

1207

7 (s

)27

12

2017

879

10

RC

C1

087

5

110

420

18

101

020

19

0100

045

00

00

00025729 Work in progress

1

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 31032 km in the district of Purvi champaran Package No- 7 (1 x 40 M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

521

69

RC

C4

000

105+95M

022

014

122

018

061

7

051

6

0100

0100

595

525

00047090

12

2018 Bridge Completed

Approach Road in Progress

2

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 31768 km in the district of Purvi champaran Package No- 7 (1 x 15M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

199

33

RC

C1

500

95+85M

022

014

122

018

061

7

051

6

0100

0100

095

080

00012425

12

2018 Bridge Completed

Approach Road in Progress

3

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 32875 km in the district of Purvi champaran Package No- 7 (2 x 35M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

849

03

RC

C6

000

160+140M

022

014

122

018

061

7

051

6

0100

0100

050

040

00064986

12

2018 One Span Completed and One Span

Balance Work in Progress

4

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 33900 km in the district of Purvi champaran Package No- 7 (1 x 30M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

398

24

RC

C3

000

90+110M

022

014

122

018

061

7

051

6

0100

0100

095

1030

00030521

12

2018 Bridge Part Completed

Approach Road in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 35650 km in the district of Purvi champaran Package No- 7 (2 x 35M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

802

94

RC

C7

000

105+95M

022

014

122

018

061

7

051

6

0100

0100

050

525

00066260

12

2018 One Span Completed and

One Span BalanceApproach Road in Progress

6

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 36858 km in the district of Purvi champaran Package No- 7 (2 x 25M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

545

23

RC

C5

000

95+105M

022

014

122

018

061

7

051

6

0100

0100

095

080

00065856

12

2018 Bridge Part Completed

Approach Road in Progress

7

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 40772 km in the district of Purvi champaran Package No- 7 (2 x 30M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

693

30

RC

C6

000

100+100M

022

014

122

018

061

7

051

6

0100

0100

050

520

00054335

12

2018 One Span Completed and

One Span Balance Approach Road in Progress

8

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge in Indo -Nepal border road at channage 41258 km in the district of Purvi champaran Package No- 7 (1 x 40M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

506

39

RC

C4

000

90+110M

022

014

122

018

061

7

051

6

0100

0100

595

525

00040141

12

2018 Bridge part Completed

Approach Road in Progress

9

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 105640 km in the district of Purvi champaran Package No-10 (3 x 8M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

293

66

RC

C2

400

170+108M

112

013

062

018

071

7

101

5

00

00

00

00

000031

Villagars demanded to change the Alignment then after RCD

Division Motihari recommended to RCDHq for approval to change

the Alignment

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge with approach road at kataha ghat in sikrahna river under mehsi block in the district of East champaran(12 x 24750 M) MS Jay shankar rai9934867236 N

AB

AR

D

East

Cha

mpa

ran

8079

(s)

171

020

1335

395

5

RC

C2

970

0

250+520M

032

014

031

6

0100

099

079

05

000183476

12

2018 Total Span = 12 nos (9 Span

Completed and 3 Span = Balance) LA in under Section -11 in Progress

11

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2175 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sugauli - Piparpati Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

126661 10875 -

050

520

18

040

520

20

00

00

00

00

0424 Diversion work is in Progress

12

Cha

mpa

ran

(Mot

ihar

i)

Construction of 4x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 11th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

75150 66 -

230

520

18

221

120

19

00

00

00

00

0510 Diversion work is in Progress

13

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sirauna - Patahi Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

40124 33 -

010

620

18

310

520

19

1070

00

00

00

000183 Work in Progress

14

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1875 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 7th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

1301

(s)

dt 1

602

201

852

388

Lac

s

3750 -

270

920

18

260

920

1900

00

00

00

0000 Diversion work is in Progress

15

Cha

mpa

ran

(Mot

ihar

i)

Construction of 7x25M size Bridge in Madanpur-Bhangha Road in Chainage 43400 Km Pakage No 03

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

314

029

110

137

1 RCC175 0+0

11

2016

07

2018 10

705

2000

55

566837339

06

2019

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

16

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Gerkahiya in Madanpur-Bhangha Road in Chainage 75734Km Pakage No 05 (New 78775KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

316

4913

921

6 RCC210 0+0

091

013

300

415 0

950

850

850

50000

144575

311

020

18 6 Span Completed and Last span stopped by Villagers due to

LA

17

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Birha in Madanpur-Bhangha Road in Chainage 72703Km Pakage No 05 (New 745540KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

356

073

411

18 RCC40 0+0

091

013

300

416 0

000

00

00

000072

311

020

18 Work Stopped by Villagers due to LA Agancy has requested to close the Agreement due to LA and old

rate

18

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC 2x3000 mtr In the district of West Champaran under Indo-Nepal Border Ch 5819 km Near Inerwa Bazar

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

5590

(s)

dt 2

706

201

799

097

000 RCC -

050

218

040

819 5

3000

00

00

0438

040

820

19

foundation in Progress

19

Cha

mpa

ran

(Mot

ihar

i)

Construction of 1x2000M Size Bridge at Chainage 18460Km in Bhangha-Bhutaha Road Pakage No 06

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

341

314

223

32 RCC20 320+72

310

713

310

720

18

0100

0100

0100

00

00023571

311

018 Bridge Completed Approach Road

work Stopped by Villagers due to LA

20

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (4x21-75 m) on 7th km of Balther - Narkatiyaganj Road over Kartaha River N

abar

d

Wes

t Cha

mpa

ran

179

dt 1

601

201

771

661

Lac

8719

02

18

180

819 10

901020

00

00

00031500

180

819

Work in Progress

21

Cha

mpa

ran

(Mot

ihar

i)

Construction Of HL RCC Bridge (3x1875m) over Harpatbeni River on Sakhlahi Path

Nab

ard

Wes

t Cha

mpa

ran

180

Dt

160

120

1757

127

Lac

56

190

218

180

818 10

4000

00

00

0114

180

820

19

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

22

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2370

(S)

dt 1

403

201

219

270

963

815

RC

C

127 1440+90

0

130

912

120

914 0

1000

1000

1000

67000

134928

12

2018

Bridge Completed Sarisawa bazar side approach road

completed and Maheshara side approach uncompleted due to LA

The member of AN Sinha Institute visited at the site on 14092018 for

Quotation for SIA work

23

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2211

(S)

dt 2

702

201

219

982

1700

68

RC

C

127 2558362

+154768

240

113

230

714 0

1000

1000

1000

55000

102099

12

2018

Bridge Completed The member of AN Sinha Institute visited at the site on 18082018 for

Quotation for SIA work

24

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (7x1200m) on 1st Km of Lauriya - Ramnagar Road

Plan

Wes

t Cha

mpa

ran

292

(S)

Dt

100

120

1811

255

3 La

c84 -

290

518

281

119 0

000

00

00

00 - Diversion work is in Progress

25

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (8x1600m) over Balore River on 1st km of Narkatiyaganj - Binwalia Road

Plan

Wes

t Cha

mpa

ran

1161

2 (S

)D

t 13

12

2017

1759

38

Lac

96

090

518

080

520 5

4000

00

00

845652016

080

520

20

Work in Progress

26

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (5x1200m) on 1st Km of Lauriya - Sikarpur-Thori Road

FD

R 2

017

Wes

t Cha

mpa

ran

1383

(S)

Dt

210

220

1886

200

Lac

RCC 60 75+75

270

920

18

261

220

1900

00

00

00

00 - Diversion work is in Progress

1

Kha

gari

a

costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x2175 m)Mansa Engicom Pvt Ltd9431060060 RWD

MM

SNY

Pha

se -

II (2

009-

10)

Beg

usar

ai

9410

(s)

230

620

1065

872

RC

C1

342

0

225M

May

-10

031

2

111

1

0100

0100

0100

010

00084057

12

2018

Section-35 has been completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

2

Kha

gari

a

Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district

Plan

Kha

garia

Rs 1520

12622(S)dated

141106

RCC 39600m 505m

Mar

-07

June

-09

0100

0100

0100

045

000257345

The Real possesion of land by DLAO Khagaria was not given to

BRPNNL due to which approach road could not be constructed till date The DLAO Khagaria requested by

various letter of Senior Project Engineer for real possesion of land

MD BRPNNL vide his letter no 77 dated 02022016 468 dated

04082016 and 892 dated 24112017 have remined RCD for sanction of

Revised AA for the projectYear of completion of Bridge

Construction 2010-11

1

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Bagaucha-Srmer-Kotnrhwa Road of Saran Main Nahar12th Km in the District of Gopalganj

FDR

Gop

alga

nj

Rs 85218 Lac

685(S)19012018

HL RCC 4x1600 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

2

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Gopalganj-Brhriyaroad of Saran Main Nahar 2nd Km inthe District of Gopalganj

FDR

Gop

alga

nj

Rs 79030 Lac

686(S)19012018

HL RCC

4x1400 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

3

Sara

n w

orks

Div

isio

n C

hhap

ra Construction of Mirganj-Bhagipatti-Smaur Road in Hathua Nahar 15thKm in the District of Gopalganj

FDR

Gop

alga

nj

Rs 54907 Lac

895(S)30012018

RCC 2x1600

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 332 dated-14052018 WRD

Anishabad Patna returned to Chief Engineer WRD siwan to issue NOC Vide letter no-439 Dated-14062018

Work order issued

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of 4x1875m HL RCCBridge including Approach Roadrotection Work amp Miscellaneouswork over Bashi river crossing 1stKM of Tamkuhi-chhitauni roadDamaged in 2017 Flood underGopalganj Distric

FDR

Gop

alga

nj

Rs 80874 Lac

687(s)19-01-2018

RCC 4x1875

2x200=400 M

031

020

18

- - - - - - - Work awardedWork order issued

1 Ara

Construction of HL RCC BridgerOver Kauw river in samta Bigha -Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in theDistrict of Rohtas under MMSNY(Brajesh Kumar Singh)

MM

SNY

Roh

tas

21450 1949 (S)

dt 04-03-

2014 of RCD Patna

RC

C22

40

A1 Side-75 M

A2 Side-75 M 11

-05-

2015

10-0

5-20

16

0100

0100

045

00

0009416

122

018 Reinforcement for deck slab in

Progress Contractor debarred for delayNotice for rescind issued

2 Ara

Construction of HL RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt Ltd 9431012004

MM

SNY

Bho

jpur Rs 37263

Lac7655 (S) dt 11082014

RCC6708 20000

280

116

270

417 0

1000

1000

10015

100000

22080

10

2018

Completed

1

GA

YA

Construction of HLRCC17x2175m Bridge includingapproach road and protection workover river Muhane between Silaunjua-Bataspur village in BodhGaya Blockof Gaya District under NABARDScheme(Ajay Engicon Pvt Ltd Aurangabad(Bihar)

Nab

ard

RW

D

GA

YA

1127

86

1128

Dt

05-0

3-20

12 o

f RW

D

983

95 RCC38000

A1 Side-60 M

A2 Side-100 M 15

03

13

140

914 0

1000

1000

1000

80000

96020

Dec

embe

r 2

018

Bridge work completed amp ApproachRoad work in progress SIACompleted Final Pubishing underSection-11 Tenure of 60 days ispassed away on dt 24-08-2018Further R amp R is being processed byDLAO

2

GA

YA

Construction of HLRCC22x2175m Bridge includingapproach road and protection workover Falgu river in Sripur-Keni Roadin Gaya District under NABARDScheme(Ms Rakesh Construction PvtLtd9431303918)

Nab

ard

RW

D

GA

YA

2835

09

2493

dt

31-1

0-20

14 o

f RW

D

2292

48 RCC

49200

A1 Side-280 M

A2 Side-280 M 06

01

2015

050

120

17

0100

0100

0100

070

000237293

Oct

ober

201

8

Bridge work completed amp ApproachRoad work in progress A Temple issituated in alignment NewConstruction of temple is in progressAfter that approach road will befinished

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

13

Dar

bhan

ga

Construction of HL RCC bridge in Rampatti-Batlohia Road in 5th KM (5x1600M) in the District of Madhubani PL

AN

mad

huba

ni

2496

(s)

180

320

1886

571

RC

C8

000

041

220

17

030

620

19

1085

3040

00

00

723834665

6060 Pile Complete Sub structure work in progress

14

Dar

bhan

ga

costruction of HLRCC bridge in NH-28 through chand chourdih to pathan tol before river under ujiyarpur block (2x1450)Sri Rajesh Kumar94308343626

MM

SNY

Pha

se -

IV (2

013-

14)

Sam

astip

ur

7370

(s)

060

820

1420

459

RC

C3

026

65M

092

014

091

5

0100

0100

0100

080

00015103

03

2019

Traffic Started bl dkkZy ds i=kadamp771frac14vuq0frac12 fnukadamp31-

08-2018 kjk LFkkh HkwampvtZu ds rgr~ vfkkpuk iqu lefiZr A

15

Dar

bhan

ga

costruction of HLRCC bridge in near proposed bypass road of hasanpur bazar at marachi ujagar of virpur bramhsthan in hasanpur block(3x1875 m) Praveez Khan

MM

SNY

Pha

se -

IV

(201

3-14

)

Sam

astip

ur

9340

(s)

240

920

1440

094

RC

C5

812

130M

012

015

112

014

041

6

021

6

0100

0100

0100

0100

00022640

03

2019

Traffic Started

16

Dar

bhan

ga

Construction of HLRCC bridge at angar ghat in the budhi gandak river (10x2475 m) Braj Kishor Rai9430800861

NA

BA

RD

RID

F-17

(RC

D)

Sam

astip

ur

1583

(s)

090

220

1220

967

2

RC

C2

536

4

780M

032

012

071

4

031

4

0100

0100

0100

080

000146560

062

019

Rs 22786 Lacs has been Deposited to DLAO Samastipur vide letter No 487 dated 06062015 bl dkkZy ds i=kadamp709frac14vuq0frac12 fnukadamp13-08-2018 kjk LFkkh HkwampvtZu ds rgr~ vfkkpuk iqu

lefiZrA SIA gsrq laLFkku dk pu izfOslashk esa gSA

17

Dar

bhan

ga

Construction of HLRCC bridge at kakar ghat in rosra morwara road in kareh river(16x2475 m) Shiv Kishore Construction Pvt Ltd9431858543

NA

BA

RD

RID

F-17

(RC

D)

Sam

astip

ur

7802

(s)

130

720

1230

094

2

RC

C4

058

0

650M

122

012

031

5

121

4

0100

0100

0100

085

000299156

032

019

Rs1659870600 has been deposited to DLAO Samastipur vide letter no-949 dated-02092013 bl dkkZy ds i=kadamp694frac14vuq0frac12 fnukadamp09-08-2018 kjk LFkkh HkwampvtZu ds rgr~ vfkkpuk iqu

lefiZrA SIA gsrq laLFkku dk pu izfOslashk esa gSA

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work in kareh river between hasanpur to soharwa sati ghat in samastipur distrcit(21x2400 m)Ram Kripal Singh Constructon Pvt Ltd RCD

PLA

N

Sam

astip

ur

7171

(s)

050

820

1568

134

0

RC

C5

166

4

1500M

082

015

101

8

070

055

045

04

12882269545

06

2020

Section-19 completed

19

Dar

bhan

ga

Construction of HL RCC bridge in Tajpur-Halai Road in 14th KM of Noon River (5x2175M) in the District of Samastipur PL

AN

Sam

astip

ur

1207

7 (s

)27

12

2017

879

10

RC

C1

087

5

110

420

18

101

020

19

0100

045

00

00

00025729 Work in progress

1

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 31032 km in the district of Purvi champaran Package No- 7 (1 x 40 M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

521

69

RC

C4

000

105+95M

022

014

122

018

061

7

051

6

0100

0100

595

525

00047090

12

2018 Bridge Completed

Approach Road in Progress

2

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 31768 km in the district of Purvi champaran Package No- 7 (1 x 15M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

199

33

RC

C1

500

95+85M

022

014

122

018

061

7

051

6

0100

0100

095

080

00012425

12

2018 Bridge Completed

Approach Road in Progress

3

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 32875 km in the district of Purvi champaran Package No- 7 (2 x 35M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

849

03

RC

C6

000

160+140M

022

014

122

018

061

7

051

6

0100

0100

050

040

00064986

12

2018 One Span Completed and One Span

Balance Work in Progress

4

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 33900 km in the district of Purvi champaran Package No- 7 (1 x 30M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

398

24

RC

C3

000

90+110M

022

014

122

018

061

7

051

6

0100

0100

095

1030

00030521

12

2018 Bridge Part Completed

Approach Road in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 35650 km in the district of Purvi champaran Package No- 7 (2 x 35M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

802

94

RC

C7

000

105+95M

022

014

122

018

061

7

051

6

0100

0100

050

525

00066260

12

2018 One Span Completed and

One Span BalanceApproach Road in Progress

6

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 36858 km in the district of Purvi champaran Package No- 7 (2 x 25M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

545

23

RC

C5

000

95+105M

022

014

122

018

061

7

051

6

0100

0100

095

080

00065856

12

2018 Bridge Part Completed

Approach Road in Progress

7

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 40772 km in the district of Purvi champaran Package No- 7 (2 x 30M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

693

30

RC

C6

000

100+100M

022

014

122

018

061

7

051

6

0100

0100

050

520

00054335

12

2018 One Span Completed and

One Span Balance Approach Road in Progress

8

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge in Indo -Nepal border road at channage 41258 km in the district of Purvi champaran Package No- 7 (1 x 40M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

506

39

RC

C4

000

90+110M

022

014

122

018

061

7

051

6

0100

0100

595

525

00040141

12

2018 Bridge part Completed

Approach Road in Progress

9

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 105640 km in the district of Purvi champaran Package No-10 (3 x 8M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

293

66

RC

C2

400

170+108M

112

013

062

018

071

7

101

5

00

00

00

00

000031

Villagars demanded to change the Alignment then after RCD

Division Motihari recommended to RCDHq for approval to change

the Alignment

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge with approach road at kataha ghat in sikrahna river under mehsi block in the district of East champaran(12 x 24750 M) MS Jay shankar rai9934867236 N

AB

AR

D

East

Cha

mpa

ran

8079

(s)

171

020

1335

395

5

RC

C2

970

0

250+520M

032

014

031

6

0100

099

079

05

000183476

12

2018 Total Span = 12 nos (9 Span

Completed and 3 Span = Balance) LA in under Section -11 in Progress

11

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2175 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sugauli - Piparpati Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

126661 10875 -

050

520

18

040

520

20

00

00

00

00

0424 Diversion work is in Progress

12

Cha

mpa

ran

(Mot

ihar

i)

Construction of 4x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 11th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

75150 66 -

230

520

18

221

120

19

00

00

00

00

0510 Diversion work is in Progress

13

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sirauna - Patahi Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

40124 33 -

010

620

18

310

520

19

1070

00

00

00

000183 Work in Progress

14

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1875 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 7th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

1301

(s)

dt 1

602

201

852

388

Lac

s

3750 -

270

920

18

260

920

1900

00

00

00

0000 Diversion work is in Progress

15

Cha

mpa

ran

(Mot

ihar

i)

Construction of 7x25M size Bridge in Madanpur-Bhangha Road in Chainage 43400 Km Pakage No 03

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

314

029

110

137

1 RCC175 0+0

11

2016

07

2018 10

705

2000

55

566837339

06

2019

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

16

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Gerkahiya in Madanpur-Bhangha Road in Chainage 75734Km Pakage No 05 (New 78775KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

316

4913

921

6 RCC210 0+0

091

013

300

415 0

950

850

850

50000

144575

311

020

18 6 Span Completed and Last span stopped by Villagers due to

LA

17

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Birha in Madanpur-Bhangha Road in Chainage 72703Km Pakage No 05 (New 745540KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

356

073

411

18 RCC40 0+0

091

013

300

416 0

000

00

00

000072

311

020

18 Work Stopped by Villagers due to LA Agancy has requested to close the Agreement due to LA and old

rate

18

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC 2x3000 mtr In the district of West Champaran under Indo-Nepal Border Ch 5819 km Near Inerwa Bazar

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

5590

(s)

dt 2

706

201

799

097

000 RCC -

050

218

040

819 5

3000

00

00

0438

040

820

19

foundation in Progress

19

Cha

mpa

ran

(Mot

ihar

i)

Construction of 1x2000M Size Bridge at Chainage 18460Km in Bhangha-Bhutaha Road Pakage No 06

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

341

314

223

32 RCC20 320+72

310

713

310

720

18

0100

0100

0100

00

00023571

311

018 Bridge Completed Approach Road

work Stopped by Villagers due to LA

20

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (4x21-75 m) on 7th km of Balther - Narkatiyaganj Road over Kartaha River N

abar

d

Wes

t Cha

mpa

ran

179

dt 1

601

201

771

661

Lac

8719

02

18

180

819 10

901020

00

00

00031500

180

819

Work in Progress

21

Cha

mpa

ran

(Mot

ihar

i)

Construction Of HL RCC Bridge (3x1875m) over Harpatbeni River on Sakhlahi Path

Nab

ard

Wes

t Cha

mpa

ran

180

Dt

160

120

1757

127

Lac

56

190

218

180

818 10

4000

00

00

0114

180

820

19

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

22

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2370

(S)

dt 1

403

201

219

270

963

815

RC

C

127 1440+90

0

130

912

120

914 0

1000

1000

1000

67000

134928

12

2018

Bridge Completed Sarisawa bazar side approach road

completed and Maheshara side approach uncompleted due to LA

The member of AN Sinha Institute visited at the site on 14092018 for

Quotation for SIA work

23

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2211

(S)

dt 2

702

201

219

982

1700

68

RC

C

127 2558362

+154768

240

113

230

714 0

1000

1000

1000

55000

102099

12

2018

Bridge Completed The member of AN Sinha Institute visited at the site on 18082018 for

Quotation for SIA work

24

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (7x1200m) on 1st Km of Lauriya - Ramnagar Road

Plan

Wes

t Cha

mpa

ran

292

(S)

Dt

100

120

1811

255

3 La

c84 -

290

518

281

119 0

000

00

00

00 - Diversion work is in Progress

25

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (8x1600m) over Balore River on 1st km of Narkatiyaganj - Binwalia Road

Plan

Wes

t Cha

mpa

ran

1161

2 (S

)D

t 13

12

2017

1759

38

Lac

96

090

518

080

520 5

4000

00

00

845652016

080

520

20

Work in Progress

26

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (5x1200m) on 1st Km of Lauriya - Sikarpur-Thori Road

FD

R 2

017

Wes

t Cha

mpa

ran

1383

(S)

Dt

210

220

1886

200

Lac

RCC 60 75+75

270

920

18

261

220

1900

00

00

00

00 - Diversion work is in Progress

1

Kha

gari

a

costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x2175 m)Mansa Engicom Pvt Ltd9431060060 RWD

MM

SNY

Pha

se -

II (2

009-

10)

Beg

usar

ai

9410

(s)

230

620

1065

872

RC

C1

342

0

225M

May

-10

031

2

111

1

0100

0100

0100

010

00084057

12

2018

Section-35 has been completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

2

Kha

gari

a

Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district

Plan

Kha

garia

Rs 1520

12622(S)dated

141106

RCC 39600m 505m

Mar

-07

June

-09

0100

0100

0100

045

000257345

The Real possesion of land by DLAO Khagaria was not given to

BRPNNL due to which approach road could not be constructed till date The DLAO Khagaria requested by

various letter of Senior Project Engineer for real possesion of land

MD BRPNNL vide his letter no 77 dated 02022016 468 dated

04082016 and 892 dated 24112017 have remined RCD for sanction of

Revised AA for the projectYear of completion of Bridge

Construction 2010-11

1

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Bagaucha-Srmer-Kotnrhwa Road of Saran Main Nahar12th Km in the District of Gopalganj

FDR

Gop

alga

nj

Rs 85218 Lac

685(S)19012018

HL RCC 4x1600 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

2

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Gopalganj-Brhriyaroad of Saran Main Nahar 2nd Km inthe District of Gopalganj

FDR

Gop

alga

nj

Rs 79030 Lac

686(S)19012018

HL RCC

4x1400 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

3

Sara

n w

orks

Div

isio

n C

hhap

ra Construction of Mirganj-Bhagipatti-Smaur Road in Hathua Nahar 15thKm in the District of Gopalganj

FDR

Gop

alga

nj

Rs 54907 Lac

895(S)30012018

RCC 2x1600

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 332 dated-14052018 WRD

Anishabad Patna returned to Chief Engineer WRD siwan to issue NOC Vide letter no-439 Dated-14062018

Work order issued

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of 4x1875m HL RCCBridge including Approach Roadrotection Work amp Miscellaneouswork over Bashi river crossing 1stKM of Tamkuhi-chhitauni roadDamaged in 2017 Flood underGopalganj Distric

FDR

Gop

alga

nj

Rs 80874 Lac

687(s)19-01-2018

RCC 4x1875

2x200=400 M

031

020

18

- - - - - - - Work awardedWork order issued

1 Ara

Construction of HL RCC BridgerOver Kauw river in samta Bigha -Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in theDistrict of Rohtas under MMSNY(Brajesh Kumar Singh)

MM

SNY

Roh

tas

21450 1949 (S)

dt 04-03-

2014 of RCD Patna

RC

C22

40

A1 Side-75 M

A2 Side-75 M 11

-05-

2015

10-0

5-20

16

0100

0100

045

00

0009416

122

018 Reinforcement for deck slab in

Progress Contractor debarred for delayNotice for rescind issued

2 Ara

Construction of HL RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt Ltd 9431012004

MM

SNY

Bho

jpur Rs 37263

Lac7655 (S) dt 11082014

RCC6708 20000

280

116

270

417 0

1000

1000

10015

100000

22080

10

2018

Completed

1

GA

YA

Construction of HLRCC17x2175m Bridge includingapproach road and protection workover river Muhane between Silaunjua-Bataspur village in BodhGaya Blockof Gaya District under NABARDScheme(Ajay Engicon Pvt Ltd Aurangabad(Bihar)

Nab

ard

RW

D

GA

YA

1127

86

1128

Dt

05-0

3-20

12 o

f RW

D

983

95 RCC38000

A1 Side-60 M

A2 Side-100 M 15

03

13

140

914 0

1000

1000

1000

80000

96020

Dec

embe

r 2

018

Bridge work completed amp ApproachRoad work in progress SIACompleted Final Pubishing underSection-11 Tenure of 60 days ispassed away on dt 24-08-2018Further R amp R is being processed byDLAO

2

GA

YA

Construction of HLRCC22x2175m Bridge includingapproach road and protection workover Falgu river in Sripur-Keni Roadin Gaya District under NABARDScheme(Ms Rakesh Construction PvtLtd9431303918)

Nab

ard

RW

D

GA

YA

2835

09

2493

dt

31-1

0-20

14 o

f RW

D

2292

48 RCC

49200

A1 Side-280 M

A2 Side-280 M 06

01

2015

050

120

17

0100

0100

0100

070

000237293

Oct

ober

201

8

Bridge work completed amp ApproachRoad work in progress A Temple issituated in alignment NewConstruction of temple is in progressAfter that approach road will befinished

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Dar

bhan

ga

Construction of HLRCC bridge with Land acquisition approach road and protection work in kareh river between hasanpur to soharwa sati ghat in samastipur distrcit(21x2400 m)Ram Kripal Singh Constructon Pvt Ltd RCD

PLA

N

Sam

astip

ur

7171

(s)

050

820

1568

134

0

RC

C5

166

4

1500M

082

015

101

8

070

055

045

04

12882269545

06

2020

Section-19 completed

19

Dar

bhan

ga

Construction of HL RCC bridge in Tajpur-Halai Road in 14th KM of Noon River (5x2175M) in the District of Samastipur PL

AN

Sam

astip

ur

1207

7 (s

)27

12

2017

879

10

RC

C1

087

5

110

420

18

101

020

19

0100

045

00

00

00025729 Work in progress

1

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 31032 km in the district of Purvi champaran Package No- 7 (1 x 40 M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

521

69

RC

C4

000

105+95M

022

014

122

018

061

7

051

6

0100

0100

595

525

00047090

12

2018 Bridge Completed

Approach Road in Progress

2

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 31768 km in the district of Purvi champaran Package No- 7 (1 x 15M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

199

33

RC

C1

500

95+85M

022

014

122

018

061

7

051

6

0100

0100

095

080

00012425

12

2018 Bridge Completed

Approach Road in Progress

3

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 32875 km in the district of Purvi champaran Package No- 7 (2 x 35M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

849

03

RC

C6

000

160+140M

022

014

122

018

061

7

051

6

0100

0100

050

040

00064986

12

2018 One Span Completed and One Span

Balance Work in Progress

4

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 33900 km in the district of Purvi champaran Package No- 7 (1 x 30M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

398

24

RC

C3

000

90+110M

022

014

122

018

061

7

051

6

0100

0100

095

1030

00030521

12

2018 Bridge Part Completed

Approach Road in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 35650 km in the district of Purvi champaran Package No- 7 (2 x 35M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

802

94

RC

C7

000

105+95M

022

014

122

018

061

7

051

6

0100

0100

050

525

00066260

12

2018 One Span Completed and

One Span BalanceApproach Road in Progress

6

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 36858 km in the district of Purvi champaran Package No- 7 (2 x 25M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

545

23

RC

C5

000

95+105M

022

014

122

018

061

7

051

6

0100

0100

095

080

00065856

12

2018 Bridge Part Completed

Approach Road in Progress

7

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 40772 km in the district of Purvi champaran Package No- 7 (2 x 30M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

693

30

RC

C6

000

100+100M

022

014

122

018

061

7

051

6

0100

0100

050

520

00054335

12

2018 One Span Completed and

One Span Balance Approach Road in Progress

8

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge in Indo -Nepal border road at channage 41258 km in the district of Purvi champaran Package No- 7 (1 x 40M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

506

39

RC

C4

000

90+110M

022

014

122

018

061

7

051

6

0100

0100

595

525

00040141

12

2018 Bridge part Completed

Approach Road in Progress

9

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 105640 km in the district of Purvi champaran Package No-10 (3 x 8M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

293

66

RC

C2

400

170+108M

112

013

062

018

071

7

101

5

00

00

00

00

000031

Villagars demanded to change the Alignment then after RCD

Division Motihari recommended to RCDHq for approval to change

the Alignment

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge with approach road at kataha ghat in sikrahna river under mehsi block in the district of East champaran(12 x 24750 M) MS Jay shankar rai9934867236 N

AB

AR

D

East

Cha

mpa

ran

8079

(s)

171

020

1335

395

5

RC

C2

970

0

250+520M

032

014

031

6

0100

099

079

05

000183476

12

2018 Total Span = 12 nos (9 Span

Completed and 3 Span = Balance) LA in under Section -11 in Progress

11

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2175 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sugauli - Piparpati Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

126661 10875 -

050

520

18

040

520

20

00

00

00

00

0424 Diversion work is in Progress

12

Cha

mpa

ran

(Mot

ihar

i)

Construction of 4x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 11th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

75150 66 -

230

520

18

221

120

19

00

00

00

00

0510 Diversion work is in Progress

13

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sirauna - Patahi Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

40124 33 -

010

620

18

310

520

19

1070

00

00

00

000183 Work in Progress

14

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1875 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 7th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

1301

(s)

dt 1

602

201

852

388

Lac

s

3750 -

270

920

18

260

920

1900

00

00

00

0000 Diversion work is in Progress

15

Cha

mpa

ran

(Mot

ihar

i)

Construction of 7x25M size Bridge in Madanpur-Bhangha Road in Chainage 43400 Km Pakage No 03

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

314

029

110

137

1 RCC175 0+0

11

2016

07

2018 10

705

2000

55

566837339

06

2019

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

16

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Gerkahiya in Madanpur-Bhangha Road in Chainage 75734Km Pakage No 05 (New 78775KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

316

4913

921

6 RCC210 0+0

091

013

300

415 0

950

850

850

50000

144575

311

020

18 6 Span Completed and Last span stopped by Villagers due to

LA

17

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Birha in Madanpur-Bhangha Road in Chainage 72703Km Pakage No 05 (New 745540KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

356

073

411

18 RCC40 0+0

091

013

300

416 0

000

00

00

000072

311

020

18 Work Stopped by Villagers due to LA Agancy has requested to close the Agreement due to LA and old

rate

18

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC 2x3000 mtr In the district of West Champaran under Indo-Nepal Border Ch 5819 km Near Inerwa Bazar

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

5590

(s)

dt 2

706

201

799

097

000 RCC -

050

218

040

819 5

3000

00

00

0438

040

820

19

foundation in Progress

19

Cha

mpa

ran

(Mot

ihar

i)

Construction of 1x2000M Size Bridge at Chainage 18460Km in Bhangha-Bhutaha Road Pakage No 06

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

341

314

223

32 RCC20 320+72

310

713

310

720

18

0100

0100

0100

00

00023571

311

018 Bridge Completed Approach Road

work Stopped by Villagers due to LA

20

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (4x21-75 m) on 7th km of Balther - Narkatiyaganj Road over Kartaha River N

abar

d

Wes

t Cha

mpa

ran

179

dt 1

601

201

771

661

Lac

8719

02

18

180

819 10

901020

00

00

00031500

180

819

Work in Progress

21

Cha

mpa

ran

(Mot

ihar

i)

Construction Of HL RCC Bridge (3x1875m) over Harpatbeni River on Sakhlahi Path

Nab

ard

Wes

t Cha

mpa

ran

180

Dt

160

120

1757

127

Lac

56

190

218

180

818 10

4000

00

00

0114

180

820

19

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

22

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2370

(S)

dt 1

403

201

219

270

963

815

RC

C

127 1440+90

0

130

912

120

914 0

1000

1000

1000

67000

134928

12

2018

Bridge Completed Sarisawa bazar side approach road

completed and Maheshara side approach uncompleted due to LA

The member of AN Sinha Institute visited at the site on 14092018 for

Quotation for SIA work

23

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2211

(S)

dt 2

702

201

219

982

1700

68

RC

C

127 2558362

+154768

240

113

230

714 0

1000

1000

1000

55000

102099

12

2018

Bridge Completed The member of AN Sinha Institute visited at the site on 18082018 for

Quotation for SIA work

24

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (7x1200m) on 1st Km of Lauriya - Ramnagar Road

Plan

Wes

t Cha

mpa

ran

292

(S)

Dt

100

120

1811

255

3 La

c84 -

290

518

281

119 0

000

00

00

00 - Diversion work is in Progress

25

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (8x1600m) over Balore River on 1st km of Narkatiyaganj - Binwalia Road

Plan

Wes

t Cha

mpa

ran

1161

2 (S

)D

t 13

12

2017

1759

38

Lac

96

090

518

080

520 5

4000

00

00

845652016

080

520

20

Work in Progress

26

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (5x1200m) on 1st Km of Lauriya - Sikarpur-Thori Road

FD

R 2

017

Wes

t Cha

mpa

ran

1383

(S)

Dt

210

220

1886

200

Lac

RCC 60 75+75

270

920

18

261

220

1900

00

00

00

00 - Diversion work is in Progress

1

Kha

gari

a

costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x2175 m)Mansa Engicom Pvt Ltd9431060060 RWD

MM

SNY

Pha

se -

II (2

009-

10)

Beg

usar

ai

9410

(s)

230

620

1065

872

RC

C1

342

0

225M

May

-10

031

2

111

1

0100

0100

0100

010

00084057

12

2018

Section-35 has been completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

2

Kha

gari

a

Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district

Plan

Kha

garia

Rs 1520

12622(S)dated

141106

RCC 39600m 505m

Mar

-07

June

-09

0100

0100

0100

045

000257345

The Real possesion of land by DLAO Khagaria was not given to

BRPNNL due to which approach road could not be constructed till date The DLAO Khagaria requested by

various letter of Senior Project Engineer for real possesion of land

MD BRPNNL vide his letter no 77 dated 02022016 468 dated

04082016 and 892 dated 24112017 have remined RCD for sanction of

Revised AA for the projectYear of completion of Bridge

Construction 2010-11

1

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Bagaucha-Srmer-Kotnrhwa Road of Saran Main Nahar12th Km in the District of Gopalganj

FDR

Gop

alga

nj

Rs 85218 Lac

685(S)19012018

HL RCC 4x1600 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

2

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Gopalganj-Brhriyaroad of Saran Main Nahar 2nd Km inthe District of Gopalganj

FDR

Gop

alga

nj

Rs 79030 Lac

686(S)19012018

HL RCC

4x1400 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

3

Sara

n w

orks

Div

isio

n C

hhap

ra Construction of Mirganj-Bhagipatti-Smaur Road in Hathua Nahar 15thKm in the District of Gopalganj

FDR

Gop

alga

nj

Rs 54907 Lac

895(S)30012018

RCC 2x1600

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 332 dated-14052018 WRD

Anishabad Patna returned to Chief Engineer WRD siwan to issue NOC Vide letter no-439 Dated-14062018

Work order issued

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of 4x1875m HL RCCBridge including Approach Roadrotection Work amp Miscellaneouswork over Bashi river crossing 1stKM of Tamkuhi-chhitauni roadDamaged in 2017 Flood underGopalganj Distric

FDR

Gop

alga

nj

Rs 80874 Lac

687(s)19-01-2018

RCC 4x1875

2x200=400 M

031

020

18

- - - - - - - Work awardedWork order issued

1 Ara

Construction of HL RCC BridgerOver Kauw river in samta Bigha -Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in theDistrict of Rohtas under MMSNY(Brajesh Kumar Singh)

MM

SNY

Roh

tas

21450 1949 (S)

dt 04-03-

2014 of RCD Patna

RC

C22

40

A1 Side-75 M

A2 Side-75 M 11

-05-

2015

10-0

5-20

16

0100

0100

045

00

0009416

122

018 Reinforcement for deck slab in

Progress Contractor debarred for delayNotice for rescind issued

2 Ara

Construction of HL RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt Ltd 9431012004

MM

SNY

Bho

jpur Rs 37263

Lac7655 (S) dt 11082014

RCC6708 20000

280

116

270

417 0

1000

1000

10015

100000

22080

10

2018

Completed

1

GA

YA

Construction of HLRCC17x2175m Bridge includingapproach road and protection workover river Muhane between Silaunjua-Bataspur village in BodhGaya Blockof Gaya District under NABARDScheme(Ajay Engicon Pvt Ltd Aurangabad(Bihar)

Nab

ard

RW

D

GA

YA

1127

86

1128

Dt

05-0

3-20

12 o

f RW

D

983

95 RCC38000

A1 Side-60 M

A2 Side-100 M 15

03

13

140

914 0

1000

1000

1000

80000

96020

Dec

embe

r 2

018

Bridge work completed amp ApproachRoad work in progress SIACompleted Final Pubishing underSection-11 Tenure of 60 days ispassed away on dt 24-08-2018Further R amp R is being processed byDLAO

2

GA

YA

Construction of HLRCC22x2175m Bridge includingapproach road and protection workover Falgu river in Sripur-Keni Roadin Gaya District under NABARDScheme(Ms Rakesh Construction PvtLtd9431303918)

Nab

ard

RW

D

GA

YA

2835

09

2493

dt

31-1

0-20

14 o

f RW

D

2292

48 RCC

49200

A1 Side-280 M

A2 Side-280 M 06

01

2015

050

120

17

0100

0100

0100

070

000237293

Oct

ober

201

8

Bridge work completed amp ApproachRoad work in progress A Temple issituated in alignment NewConstruction of temple is in progressAfter that approach road will befinished

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 35650 km in the district of Purvi champaran Package No- 7 (2 x 35M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

802

94

RC

C7

000

105+95M

022

014

122

018

061

7

051

6

0100

0100

050

525

00066260

12

2018 One Span Completed and

One Span BalanceApproach Road in Progress

6

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 36858 km in the district of Purvi champaran Package No- 7 (2 x 25M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

545

23

RC

C5

000

95+105M

022

014

122

018

061

7

051

6

0100

0100

095

080

00065856

12

2018 Bridge Part Completed

Approach Road in Progress

7

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 40772 km in the district of Purvi champaran Package No- 7 (2 x 30M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

693

30

RC

C6

000

100+100M

022

014

122

018

061

7

051

6

0100

0100

050

520

00054335

12

2018 One Span Completed and

One Span Balance Approach Road in Progress

8

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge in Indo -Nepal border road at channage 41258 km in the district of Purvi champaran Package No- 7 (1 x 40M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

506

39

RC

C4

000

90+110M

022

014

122

018

061

7

051

6

0100

0100

595

525

00040141

12

2018 Bridge part Completed

Approach Road in Progress

9

Cha

mpa

ran

(Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 105640 km in the district of Purvi champaran Package No-10 (3 x 8M)Barhonia engicor Pvt ltd9431269809

NA

BA

RD

Ind

o-N

epal

East

Cha

mpa

ran

7209

(s)w

e09

09

2013

293

66

RC

C2

400

170+108M

112

013

062

018

071

7

101

5

00

00

00

00

000031

Villagars demanded to change the Alignment then after RCD

Division Motihari recommended to RCDHq for approval to change

the Alignment

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge with approach road at kataha ghat in sikrahna river under mehsi block in the district of East champaran(12 x 24750 M) MS Jay shankar rai9934867236 N

AB

AR

D

East

Cha

mpa

ran

8079

(s)

171

020

1335

395

5

RC

C2

970

0

250+520M

032

014

031

6

0100

099

079

05

000183476

12

2018 Total Span = 12 nos (9 Span

Completed and 3 Span = Balance) LA in under Section -11 in Progress

11

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2175 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sugauli - Piparpati Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

126661 10875 -

050

520

18

040

520

20

00

00

00

00

0424 Diversion work is in Progress

12

Cha

mpa

ran

(Mot

ihar

i)

Construction of 4x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 11th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

75150 66 -

230

520

18

221

120

19

00

00

00

00

0510 Diversion work is in Progress

13

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sirauna - Patahi Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

40124 33 -

010

620

18

310

520

19

1070

00

00

00

000183 Work in Progress

14

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1875 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 7th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

1301

(s)

dt 1

602

201

852

388

Lac

s

3750 -

270

920

18

260

920

1900

00

00

00

0000 Diversion work is in Progress

15

Cha

mpa

ran

(Mot

ihar

i)

Construction of 7x25M size Bridge in Madanpur-Bhangha Road in Chainage 43400 Km Pakage No 03

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

314

029

110

137

1 RCC175 0+0

11

2016

07

2018 10

705

2000

55

566837339

06

2019

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

16

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Gerkahiya in Madanpur-Bhangha Road in Chainage 75734Km Pakage No 05 (New 78775KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

316

4913

921

6 RCC210 0+0

091

013

300

415 0

950

850

850

50000

144575

311

020

18 6 Span Completed and Last span stopped by Villagers due to

LA

17

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Birha in Madanpur-Bhangha Road in Chainage 72703Km Pakage No 05 (New 745540KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

356

073

411

18 RCC40 0+0

091

013

300

416 0

000

00

00

000072

311

020

18 Work Stopped by Villagers due to LA Agancy has requested to close the Agreement due to LA and old

rate

18

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC 2x3000 mtr In the district of West Champaran under Indo-Nepal Border Ch 5819 km Near Inerwa Bazar

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

5590

(s)

dt 2

706

201

799

097

000 RCC -

050

218

040

819 5

3000

00

00

0438

040

820

19

foundation in Progress

19

Cha

mpa

ran

(Mot

ihar

i)

Construction of 1x2000M Size Bridge at Chainage 18460Km in Bhangha-Bhutaha Road Pakage No 06

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

341

314

223

32 RCC20 320+72

310

713

310

720

18

0100

0100

0100

00

00023571

311

018 Bridge Completed Approach Road

work Stopped by Villagers due to LA

20

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (4x21-75 m) on 7th km of Balther - Narkatiyaganj Road over Kartaha River N

abar

d

Wes

t Cha

mpa

ran

179

dt 1

601

201

771

661

Lac

8719

02

18

180

819 10

901020

00

00

00031500

180

819

Work in Progress

21

Cha

mpa

ran

(Mot

ihar

i)

Construction Of HL RCC Bridge (3x1875m) over Harpatbeni River on Sakhlahi Path

Nab

ard

Wes

t Cha

mpa

ran

180

Dt

160

120

1757

127

Lac

56

190

218

180

818 10

4000

00

00

0114

180

820

19

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

22

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2370

(S)

dt 1

403

201

219

270

963

815

RC

C

127 1440+90

0

130

912

120

914 0

1000

1000

1000

67000

134928

12

2018

Bridge Completed Sarisawa bazar side approach road

completed and Maheshara side approach uncompleted due to LA

The member of AN Sinha Institute visited at the site on 14092018 for

Quotation for SIA work

23

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2211

(S)

dt 2

702

201

219

982

1700

68

RC

C

127 2558362

+154768

240

113

230

714 0

1000

1000

1000

55000

102099

12

2018

Bridge Completed The member of AN Sinha Institute visited at the site on 18082018 for

Quotation for SIA work

24

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (7x1200m) on 1st Km of Lauriya - Ramnagar Road

Plan

Wes

t Cha

mpa

ran

292

(S)

Dt

100

120

1811

255

3 La

c84 -

290

518

281

119 0

000

00

00

00 - Diversion work is in Progress

25

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (8x1600m) over Balore River on 1st km of Narkatiyaganj - Binwalia Road

Plan

Wes

t Cha

mpa

ran

1161

2 (S

)D

t 13

12

2017

1759

38

Lac

96

090

518

080

520 5

4000

00

00

845652016

080

520

20

Work in Progress

26

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (5x1200m) on 1st Km of Lauriya - Sikarpur-Thori Road

FD

R 2

017

Wes

t Cha

mpa

ran

1383

(S)

Dt

210

220

1886

200

Lac

RCC 60 75+75

270

920

18

261

220

1900

00

00

00

00 - Diversion work is in Progress

1

Kha

gari

a

costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x2175 m)Mansa Engicom Pvt Ltd9431060060 RWD

MM

SNY

Pha

se -

II (2

009-

10)

Beg

usar

ai

9410

(s)

230

620

1065

872

RC

C1

342

0

225M

May

-10

031

2

111

1

0100

0100

0100

010

00084057

12

2018

Section-35 has been completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

2

Kha

gari

a

Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district

Plan

Kha

garia

Rs 1520

12622(S)dated

141106

RCC 39600m 505m

Mar

-07

June

-09

0100

0100

0100

045

000257345

The Real possesion of land by DLAO Khagaria was not given to

BRPNNL due to which approach road could not be constructed till date The DLAO Khagaria requested by

various letter of Senior Project Engineer for real possesion of land

MD BRPNNL vide his letter no 77 dated 02022016 468 dated

04082016 and 892 dated 24112017 have remined RCD for sanction of

Revised AA for the projectYear of completion of Bridge

Construction 2010-11

1

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Bagaucha-Srmer-Kotnrhwa Road of Saran Main Nahar12th Km in the District of Gopalganj

FDR

Gop

alga

nj

Rs 85218 Lac

685(S)19012018

HL RCC 4x1600 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

2

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Gopalganj-Brhriyaroad of Saran Main Nahar 2nd Km inthe District of Gopalganj

FDR

Gop

alga

nj

Rs 79030 Lac

686(S)19012018

HL RCC

4x1400 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

3

Sara

n w

orks

Div

isio

n C

hhap

ra Construction of Mirganj-Bhagipatti-Smaur Road in Hathua Nahar 15thKm in the District of Gopalganj

FDR

Gop

alga

nj

Rs 54907 Lac

895(S)30012018

RCC 2x1600

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 332 dated-14052018 WRD

Anishabad Patna returned to Chief Engineer WRD siwan to issue NOC Vide letter no-439 Dated-14062018

Work order issued

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of 4x1875m HL RCCBridge including Approach Roadrotection Work amp Miscellaneouswork over Bashi river crossing 1stKM of Tamkuhi-chhitauni roadDamaged in 2017 Flood underGopalganj Distric

FDR

Gop

alga

nj

Rs 80874 Lac

687(s)19-01-2018

RCC 4x1875

2x200=400 M

031

020

18

- - - - - - - Work awardedWork order issued

1 Ara

Construction of HL RCC BridgerOver Kauw river in samta Bigha -Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in theDistrict of Rohtas under MMSNY(Brajesh Kumar Singh)

MM

SNY

Roh

tas

21450 1949 (S)

dt 04-03-

2014 of RCD Patna

RC

C22

40

A1 Side-75 M

A2 Side-75 M 11

-05-

2015

10-0

5-20

16

0100

0100

045

00

0009416

122

018 Reinforcement for deck slab in

Progress Contractor debarred for delayNotice for rescind issued

2 Ara

Construction of HL RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt Ltd 9431012004

MM

SNY

Bho

jpur Rs 37263

Lac7655 (S) dt 11082014

RCC6708 20000

280

116

270

417 0

1000

1000

10015

100000

22080

10

2018

Completed

1

GA

YA

Construction of HLRCC17x2175m Bridge includingapproach road and protection workover river Muhane between Silaunjua-Bataspur village in BodhGaya Blockof Gaya District under NABARDScheme(Ajay Engicon Pvt Ltd Aurangabad(Bihar)

Nab

ard

RW

D

GA

YA

1127

86

1128

Dt

05-0

3-20

12 o

f RW

D

983

95 RCC38000

A1 Side-60 M

A2 Side-100 M 15

03

13

140

914 0

1000

1000

1000

80000

96020

Dec

embe

r 2

018

Bridge work completed amp ApproachRoad work in progress SIACompleted Final Pubishing underSection-11 Tenure of 60 days ispassed away on dt 24-08-2018Further R amp R is being processed byDLAO

2

GA

YA

Construction of HLRCC22x2175m Bridge includingapproach road and protection workover Falgu river in Sripur-Keni Roadin Gaya District under NABARDScheme(Ms Rakesh Construction PvtLtd9431303918)

Nab

ard

RW

D

GA

YA

2835

09

2493

dt

31-1

0-20

14 o

f RW

D

2292

48 RCC

49200

A1 Side-280 M

A2 Side-280 M 06

01

2015

050

120

17

0100

0100

0100

070

000237293

Oct

ober

201

8

Bridge work completed amp ApproachRoad work in progress A Temple issituated in alignment NewConstruction of temple is in progressAfter that approach road will befinished

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Cha

mpa

ran

(Mot

ihar

i) Construction of HLRCC bridge with approach road at kataha ghat in sikrahna river under mehsi block in the district of East champaran(12 x 24750 M) MS Jay shankar rai9934867236 N

AB

AR

D

East

Cha

mpa

ran

8079

(s)

171

020

1335

395

5

RC

C2

970

0

250+520M

032

014

031

6

0100

099

079

05

000183476

12

2018 Total Span = 12 nos (9 Span

Completed and 3 Span = Balance) LA in under Section -11 in Progress

11

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2175 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sugauli - Piparpati Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

126661 10875 -

050

520

18

040

520

20

00

00

00

00

0424 Diversion work is in Progress

12

Cha

mpa

ran

(Mot

ihar

i)

Construction of 4x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 11th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

75150 66 -

230

520

18

221

120

19

00

00

00

00

0510 Diversion work is in Progress

13

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1650 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 5th km of Sirauna - Patahi Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

40124 33 -

010

620

18

310

520

19

1070

00

00

00

000183 Work in Progress

14

Cha

mpa

ran

(Mot

ihar

i)

Construction of 2x1875 m HL RCC Bridge with Approach Road Safety work Diversion work and Misclaneous work in 7th km of Dhaka - Phulwariya Road in East Champaran

FD

R 2

017

East

Cha

mpa

ran

1301

(s)

dt 1

602

201

852

388

Lac

s

3750 -

270

920

18

260

920

1900

00

00

00

0000 Diversion work is in Progress

15

Cha

mpa

ran

(Mot

ihar

i)

Construction of 7x25M size Bridge in Madanpur-Bhangha Road in Chainage 43400 Km Pakage No 03

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

314

029

110

137

1 RCC175 0+0

11

2016

07

2018 10

705

2000

55

566837339

06

2019

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

16

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Gerkahiya in Madanpur-Bhangha Road in Chainage 75734Km Pakage No 05 (New 78775KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

316

4913

921

6 RCC210 0+0

091

013

300

415 0

950

850

850

50000

144575

311

020

18 6 Span Completed and Last span stopped by Villagers due to

LA

17

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Birha in Madanpur-Bhangha Road in Chainage 72703Km Pakage No 05 (New 745540KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

356

073

411

18 RCC40 0+0

091

013

300

416 0

000

00

00

000072

311

020

18 Work Stopped by Villagers due to LA Agancy has requested to close the Agreement due to LA and old

rate

18

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC 2x3000 mtr In the district of West Champaran under Indo-Nepal Border Ch 5819 km Near Inerwa Bazar

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

5590

(s)

dt 2

706

201

799

097

000 RCC -

050

218

040

819 5

3000

00

00

0438

040

820

19

foundation in Progress

19

Cha

mpa

ran

(Mot

ihar

i)

Construction of 1x2000M Size Bridge at Chainage 18460Km in Bhangha-Bhutaha Road Pakage No 06

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

341

314

223

32 RCC20 320+72

310

713

310

720

18

0100

0100

0100

00

00023571

311

018 Bridge Completed Approach Road

work Stopped by Villagers due to LA

20

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (4x21-75 m) on 7th km of Balther - Narkatiyaganj Road over Kartaha River N

abar

d

Wes

t Cha

mpa

ran

179

dt 1

601

201

771

661

Lac

8719

02

18

180

819 10

901020

00

00

00031500

180

819

Work in Progress

21

Cha

mpa

ran

(Mot

ihar

i)

Construction Of HL RCC Bridge (3x1875m) over Harpatbeni River on Sakhlahi Path

Nab

ard

Wes

t Cha

mpa

ran

180

Dt

160

120

1757

127

Lac

56

190

218

180

818 10

4000

00

00

0114

180

820

19

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

22

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2370

(S)

dt 1

403

201

219

270

963

815

RC

C

127 1440+90

0

130

912

120

914 0

1000

1000

1000

67000

134928

12

2018

Bridge Completed Sarisawa bazar side approach road

completed and Maheshara side approach uncompleted due to LA

The member of AN Sinha Institute visited at the site on 14092018 for

Quotation for SIA work

23

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2211

(S)

dt 2

702

201

219

982

1700

68

RC

C

127 2558362

+154768

240

113

230

714 0

1000

1000

1000

55000

102099

12

2018

Bridge Completed The member of AN Sinha Institute visited at the site on 18082018 for

Quotation for SIA work

24

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (7x1200m) on 1st Km of Lauriya - Ramnagar Road

Plan

Wes

t Cha

mpa

ran

292

(S)

Dt

100

120

1811

255

3 La

c84 -

290

518

281

119 0

000

00

00

00 - Diversion work is in Progress

25

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (8x1600m) over Balore River on 1st km of Narkatiyaganj - Binwalia Road

Plan

Wes

t Cha

mpa

ran

1161

2 (S

)D

t 13

12

2017

1759

38

Lac

96

090

518

080

520 5

4000

00

00

845652016

080

520

20

Work in Progress

26

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (5x1200m) on 1st Km of Lauriya - Sikarpur-Thori Road

FD

R 2

017

Wes

t Cha

mpa

ran

1383

(S)

Dt

210

220

1886

200

Lac

RCC 60 75+75

270

920

18

261

220

1900

00

00

00

00 - Diversion work is in Progress

1

Kha

gari

a

costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x2175 m)Mansa Engicom Pvt Ltd9431060060 RWD

MM

SNY

Pha

se -

II (2

009-

10)

Beg

usar

ai

9410

(s)

230

620

1065

872

RC

C1

342

0

225M

May

-10

031

2

111

1

0100

0100

0100

010

00084057

12

2018

Section-35 has been completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

2

Kha

gari

a

Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district

Plan

Kha

garia

Rs 1520

12622(S)dated

141106

RCC 39600m 505m

Mar

-07

June

-09

0100

0100

0100

045

000257345

The Real possesion of land by DLAO Khagaria was not given to

BRPNNL due to which approach road could not be constructed till date The DLAO Khagaria requested by

various letter of Senior Project Engineer for real possesion of land

MD BRPNNL vide his letter no 77 dated 02022016 468 dated

04082016 and 892 dated 24112017 have remined RCD for sanction of

Revised AA for the projectYear of completion of Bridge

Construction 2010-11

1

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Bagaucha-Srmer-Kotnrhwa Road of Saran Main Nahar12th Km in the District of Gopalganj

FDR

Gop

alga

nj

Rs 85218 Lac

685(S)19012018

HL RCC 4x1600 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

2

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Gopalganj-Brhriyaroad of Saran Main Nahar 2nd Km inthe District of Gopalganj

FDR

Gop

alga

nj

Rs 79030 Lac

686(S)19012018

HL RCC

4x1400 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

3

Sara

n w

orks

Div

isio

n C

hhap

ra Construction of Mirganj-Bhagipatti-Smaur Road in Hathua Nahar 15thKm in the District of Gopalganj

FDR

Gop

alga

nj

Rs 54907 Lac

895(S)30012018

RCC 2x1600

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 332 dated-14052018 WRD

Anishabad Patna returned to Chief Engineer WRD siwan to issue NOC Vide letter no-439 Dated-14062018

Work order issued

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of 4x1875m HL RCCBridge including Approach Roadrotection Work amp Miscellaneouswork over Bashi river crossing 1stKM of Tamkuhi-chhitauni roadDamaged in 2017 Flood underGopalganj Distric

FDR

Gop

alga

nj

Rs 80874 Lac

687(s)19-01-2018

RCC 4x1875

2x200=400 M

031

020

18

- - - - - - - Work awardedWork order issued

1 Ara

Construction of HL RCC BridgerOver Kauw river in samta Bigha -Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in theDistrict of Rohtas under MMSNY(Brajesh Kumar Singh)

MM

SNY

Roh

tas

21450 1949 (S)

dt 04-03-

2014 of RCD Patna

RC

C22

40

A1 Side-75 M

A2 Side-75 M 11

-05-

2015

10-0

5-20

16

0100

0100

045

00

0009416

122

018 Reinforcement for deck slab in

Progress Contractor debarred for delayNotice for rescind issued

2 Ara

Construction of HL RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt Ltd 9431012004

MM

SNY

Bho

jpur Rs 37263

Lac7655 (S) dt 11082014

RCC6708 20000

280

116

270

417 0

1000

1000

10015

100000

22080

10

2018

Completed

1

GA

YA

Construction of HLRCC17x2175m Bridge includingapproach road and protection workover river Muhane between Silaunjua-Bataspur village in BodhGaya Blockof Gaya District under NABARDScheme(Ajay Engicon Pvt Ltd Aurangabad(Bihar)

Nab

ard

RW

D

GA

YA

1127

86

1128

Dt

05-0

3-20

12 o

f RW

D

983

95 RCC38000

A1 Side-60 M

A2 Side-100 M 15

03

13

140

914 0

1000

1000

1000

80000

96020

Dec

embe

r 2

018

Bridge work completed amp ApproachRoad work in progress SIACompleted Final Pubishing underSection-11 Tenure of 60 days ispassed away on dt 24-08-2018Further R amp R is being processed byDLAO

2

GA

YA

Construction of HLRCC22x2175m Bridge includingapproach road and protection workover Falgu river in Sripur-Keni Roadin Gaya District under NABARDScheme(Ms Rakesh Construction PvtLtd9431303918)

Nab

ard

RW

D

GA

YA

2835

09

2493

dt

31-1

0-20

14 o

f RW

D

2292

48 RCC

49200

A1 Side-280 M

A2 Side-280 M 06

01

2015

050

120

17

0100

0100

0100

070

000237293

Oct

ober

201

8

Bridge work completed amp ApproachRoad work in progress A Temple issituated in alignment NewConstruction of temple is in progressAfter that approach road will befinished

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

16

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Gerkahiya in Madanpur-Bhangha Road in Chainage 75734Km Pakage No 05 (New 78775KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

316

4913

921

6 RCC210 0+0

091

013

300

415 0

950

850

850

50000

144575

311

020

18 6 Span Completed and Last span stopped by Villagers due to

LA

17

Cha

mpa

ran

(Mot

ihar

i)

Construction of Bridge at Birha in Madanpur-Bhangha Road in Chainage 72703Km Pakage No 05 (New 745540KM)

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

356

073

411

18 RCC40 0+0

091

013

300

416 0

000

00

00

000072

311

020

18 Work Stopped by Villagers due to LA Agancy has requested to close the Agreement due to LA and old

rate

18

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC 2x3000 mtr In the district of West Champaran under Indo-Nepal Border Ch 5819 km Near Inerwa Bazar

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

5590

(s)

dt 2

706

201

799

097

000 RCC -

050

218

040

819 5

3000

00

00

0438

040

820

19

foundation in Progress

19

Cha

mpa

ran

(Mot

ihar

i)

Construction of 1x2000M Size Bridge at Chainage 18460Km in Bhangha-Bhutaha Road Pakage No 06

Nab

ard

Indo

Nep

al

(RID

F-X

VII

I)

Wes

t Cha

mpa

ran

2160

(S)

dt 1

403

201

341

314

223

32 RCC20 320+72

310

713

310

720

18

0100

0100

0100

00

00023571

311

018 Bridge Completed Approach Road

work Stopped by Villagers due to LA

20

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (4x21-75 m) on 7th km of Balther - Narkatiyaganj Road over Kartaha River N

abar

d

Wes

t Cha

mpa

ran

179

dt 1

601

201

771

661

Lac

8719

02

18

180

819 10

901020

00

00

00031500

180

819

Work in Progress

21

Cha

mpa

ran

(Mot

ihar

i)

Construction Of HL RCC Bridge (3x1875m) over Harpatbeni River on Sakhlahi Path

Nab

ard

Wes

t Cha

mpa

ran

180

Dt

160

120

1757

127

Lac

56

190

218

180

818 10

4000

00

00

0114

180

820

19

Work in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

22

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2370

(S)

dt 1

403

201

219

270

963

815

RC

C

127 1440+90

0

130

912

120

914 0

1000

1000

1000

67000

134928

12

2018

Bridge Completed Sarisawa bazar side approach road

completed and Maheshara side approach uncompleted due to LA

The member of AN Sinha Institute visited at the site on 14092018 for

Quotation for SIA work

23

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2211

(S)

dt 2

702

201

219

982

1700

68

RC

C

127 2558362

+154768

240

113

230

714 0

1000

1000

1000

55000

102099

12

2018

Bridge Completed The member of AN Sinha Institute visited at the site on 18082018 for

Quotation for SIA work

24

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (7x1200m) on 1st Km of Lauriya - Ramnagar Road

Plan

Wes

t Cha

mpa

ran

292

(S)

Dt

100

120

1811

255

3 La

c84 -

290

518

281

119 0

000

00

00

00 - Diversion work is in Progress

25

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (8x1600m) over Balore River on 1st km of Narkatiyaganj - Binwalia Road

Plan

Wes

t Cha

mpa

ran

1161

2 (S

)D

t 13

12

2017

1759

38

Lac

96

090

518

080

520 5

4000

00

00

845652016

080

520

20

Work in Progress

26

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (5x1200m) on 1st Km of Lauriya - Sikarpur-Thori Road

FD

R 2

017

Wes

t Cha

mpa

ran

1383

(S)

Dt

210

220

1886

200

Lac

RCC 60 75+75

270

920

18

261

220

1900

00

00

00

00 - Diversion work is in Progress

1

Kha

gari

a

costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x2175 m)Mansa Engicom Pvt Ltd9431060060 RWD

MM

SNY

Pha

se -

II (2

009-

10)

Beg

usar

ai

9410

(s)

230

620

1065

872

RC

C1

342

0

225M

May

-10

031

2

111

1

0100

0100

0100

010

00084057

12

2018

Section-35 has been completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

2

Kha

gari

a

Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district

Plan

Kha

garia

Rs 1520

12622(S)dated

141106

RCC 39600m 505m

Mar

-07

June

-09

0100

0100

0100

045

000257345

The Real possesion of land by DLAO Khagaria was not given to

BRPNNL due to which approach road could not be constructed till date The DLAO Khagaria requested by

various letter of Senior Project Engineer for real possesion of land

MD BRPNNL vide his letter no 77 dated 02022016 468 dated

04082016 and 892 dated 24112017 have remined RCD for sanction of

Revised AA for the projectYear of completion of Bridge

Construction 2010-11

1

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Bagaucha-Srmer-Kotnrhwa Road of Saran Main Nahar12th Km in the District of Gopalganj

FDR

Gop

alga

nj

Rs 85218 Lac

685(S)19012018

HL RCC 4x1600 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

2

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Gopalganj-Brhriyaroad of Saran Main Nahar 2nd Km inthe District of Gopalganj

FDR

Gop

alga

nj

Rs 79030 Lac

686(S)19012018

HL RCC

4x1400 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

3

Sara

n w

orks

Div

isio

n C

hhap

ra Construction of Mirganj-Bhagipatti-Smaur Road in Hathua Nahar 15thKm in the District of Gopalganj

FDR

Gop

alga

nj

Rs 54907 Lac

895(S)30012018

RCC 2x1600

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 332 dated-14052018 WRD

Anishabad Patna returned to Chief Engineer WRD siwan to issue NOC Vide letter no-439 Dated-14062018

Work order issued

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of 4x1875m HL RCCBridge including Approach Roadrotection Work amp Miscellaneouswork over Bashi river crossing 1stKM of Tamkuhi-chhitauni roadDamaged in 2017 Flood underGopalganj Distric

FDR

Gop

alga

nj

Rs 80874 Lac

687(s)19-01-2018

RCC 4x1875

2x200=400 M

031

020

18

- - - - - - - Work awardedWork order issued

1 Ara

Construction of HL RCC BridgerOver Kauw river in samta Bigha -Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in theDistrict of Rohtas under MMSNY(Brajesh Kumar Singh)

MM

SNY

Roh

tas

21450 1949 (S)

dt 04-03-

2014 of RCD Patna

RC

C22

40

A1 Side-75 M

A2 Side-75 M 11

-05-

2015

10-0

5-20

16

0100

0100

045

00

0009416

122

018 Reinforcement for deck slab in

Progress Contractor debarred for delayNotice for rescind issued

2 Ara

Construction of HL RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt Ltd 9431012004

MM

SNY

Bho

jpur Rs 37263

Lac7655 (S) dt 11082014

RCC6708 20000

280

116

270

417 0

1000

1000

10015

100000

22080

10

2018

Completed

1

GA

YA

Construction of HLRCC17x2175m Bridge includingapproach road and protection workover river Muhane between Silaunjua-Bataspur village in BodhGaya Blockof Gaya District under NABARDScheme(Ajay Engicon Pvt Ltd Aurangabad(Bihar)

Nab

ard

RW

D

GA

YA

1127

86

1128

Dt

05-0

3-20

12 o

f RW

D

983

95 RCC38000

A1 Side-60 M

A2 Side-100 M 15

03

13

140

914 0

1000

1000

1000

80000

96020

Dec

embe

r 2

018

Bridge work completed amp ApproachRoad work in progress SIACompleted Final Pubishing underSection-11 Tenure of 60 days ispassed away on dt 24-08-2018Further R amp R is being processed byDLAO

2

GA

YA

Construction of HLRCC22x2175m Bridge includingapproach road and protection workover Falgu river in Sripur-Keni Roadin Gaya District under NABARDScheme(Ms Rakesh Construction PvtLtd9431303918)

Nab

ard

RW

D

GA

YA

2835

09

2493

dt

31-1

0-20

14 o

f RW

D

2292

48 RCC

49200

A1 Side-280 M

A2 Side-280 M 06

01

2015

050

120

17

0100

0100

0100

070

000237293

Oct

ober

201

8

Bridge work completed amp ApproachRoad work in progress A Temple issituated in alignment NewConstruction of temple is in progressAfter that approach road will befinished

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

22

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2370

(S)

dt 1

403

201

219

270

963

815

RC

C

127 1440+90

0

130

912

120

914 0

1000

1000

1000

67000

134928

12

2018

Bridge Completed Sarisawa bazar side approach road

completed and Maheshara side approach uncompleted due to LA

The member of AN Sinha Institute visited at the site on 14092018 for

Quotation for SIA work

23

Cha

mpa

ran

(Mot

ihar

i)

Construction of 5x2475M RCC brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road

Nab

ard

Wes

t Cha

mpa

ran

2211

(S)

dt 2

702

201

219

982

1700

68

RC

C

127 2558362

+154768

240

113

230

714 0

1000

1000

1000

55000

102099

12

2018

Bridge Completed The member of AN Sinha Institute visited at the site on 18082018 for

Quotation for SIA work

24

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (7x1200m) on 1st Km of Lauriya - Ramnagar Road

Plan

Wes

t Cha

mpa

ran

292

(S)

Dt

100

120

1811

255

3 La

c84 -

290

518

281

119 0

000

00

00

00 - Diversion work is in Progress

25

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (8x1600m) over Balore River on 1st km of Narkatiyaganj - Binwalia Road

Plan

Wes

t Cha

mpa

ran

1161

2 (S

)D

t 13

12

2017

1759

38

Lac

96

090

518

080

520 5

4000

00

00

845652016

080

520

20

Work in Progress

26

Cha

mpa

ran

(Mot

ihar

i)

Construction of HL RCC Bridge (5x1200m) on 1st Km of Lauriya - Sikarpur-Thori Road

FD

R 2

017

Wes

t Cha

mpa

ran

1383

(S)

Dt

210

220

1886

200

Lac

RCC 60 75+75

270

920

18

261

220

1900

00

00

00

00 - Diversion work is in Progress

1

Kha

gari

a

costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x2175 m)Mansa Engicom Pvt Ltd9431060060 RWD

MM

SNY

Pha

se -

II (2

009-

10)

Beg

usar

ai

9410

(s)

230

620

1065

872

RC

C1

342

0

225M

May

-10

031

2

111

1

0100

0100

0100

010

00084057

12

2018

Section-35 has been completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

2

Kha

gari

a

Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district

Plan

Kha

garia

Rs 1520

12622(S)dated

141106

RCC 39600m 505m

Mar

-07

June

-09

0100

0100

0100

045

000257345

The Real possesion of land by DLAO Khagaria was not given to

BRPNNL due to which approach road could not be constructed till date The DLAO Khagaria requested by

various letter of Senior Project Engineer for real possesion of land

MD BRPNNL vide his letter no 77 dated 02022016 468 dated

04082016 and 892 dated 24112017 have remined RCD for sanction of

Revised AA for the projectYear of completion of Bridge

Construction 2010-11

1

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Bagaucha-Srmer-Kotnrhwa Road of Saran Main Nahar12th Km in the District of Gopalganj

FDR

Gop

alga

nj

Rs 85218 Lac

685(S)19012018

HL RCC 4x1600 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

2

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Gopalganj-Brhriyaroad of Saran Main Nahar 2nd Km inthe District of Gopalganj

FDR

Gop

alga

nj

Rs 79030 Lac

686(S)19012018

HL RCC

4x1400 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

3

Sara

n w

orks

Div

isio

n C

hhap

ra Construction of Mirganj-Bhagipatti-Smaur Road in Hathua Nahar 15thKm in the District of Gopalganj

FDR

Gop

alga

nj

Rs 54907 Lac

895(S)30012018

RCC 2x1600

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 332 dated-14052018 WRD

Anishabad Patna returned to Chief Engineer WRD siwan to issue NOC Vide letter no-439 Dated-14062018

Work order issued

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of 4x1875m HL RCCBridge including Approach Roadrotection Work amp Miscellaneouswork over Bashi river crossing 1stKM of Tamkuhi-chhitauni roadDamaged in 2017 Flood underGopalganj Distric

FDR

Gop

alga

nj

Rs 80874 Lac

687(s)19-01-2018

RCC 4x1875

2x200=400 M

031

020

18

- - - - - - - Work awardedWork order issued

1 Ara

Construction of HL RCC BridgerOver Kauw river in samta Bigha -Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in theDistrict of Rohtas under MMSNY(Brajesh Kumar Singh)

MM

SNY

Roh

tas

21450 1949 (S)

dt 04-03-

2014 of RCD Patna

RC

C22

40

A1 Side-75 M

A2 Side-75 M 11

-05-

2015

10-0

5-20

16

0100

0100

045

00

0009416

122

018 Reinforcement for deck slab in

Progress Contractor debarred for delayNotice for rescind issued

2 Ara

Construction of HL RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt Ltd 9431012004

MM

SNY

Bho

jpur Rs 37263

Lac7655 (S) dt 11082014

RCC6708 20000

280

116

270

417 0

1000

1000

10015

100000

22080

10

2018

Completed

1

GA

YA

Construction of HLRCC17x2175m Bridge includingapproach road and protection workover river Muhane between Silaunjua-Bataspur village in BodhGaya Blockof Gaya District under NABARDScheme(Ajay Engicon Pvt Ltd Aurangabad(Bihar)

Nab

ard

RW

D

GA

YA

1127

86

1128

Dt

05-0

3-20

12 o

f RW

D

983

95 RCC38000

A1 Side-60 M

A2 Side-100 M 15

03

13

140

914 0

1000

1000

1000

80000

96020

Dec

embe

r 2

018

Bridge work completed amp ApproachRoad work in progress SIACompleted Final Pubishing underSection-11 Tenure of 60 days ispassed away on dt 24-08-2018Further R amp R is being processed byDLAO

2

GA

YA

Construction of HLRCC22x2175m Bridge includingapproach road and protection workover Falgu river in Sripur-Keni Roadin Gaya District under NABARDScheme(Ms Rakesh Construction PvtLtd9431303918)

Nab

ard

RW

D

GA

YA

2835

09

2493

dt

31-1

0-20

14 o

f RW

D

2292

48 RCC

49200

A1 Side-280 M

A2 Side-280 M 06

01

2015

050

120

17

0100

0100

0100

070

000237293

Oct

ober

201

8

Bridge work completed amp ApproachRoad work in progress A Temple issituated in alignment NewConstruction of temple is in progressAfter that approach road will befinished

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

2

Kha

gari

a

Construction of High Level RCC Bridge along with approach roads on Fultoura Ghat in the 8th Km of Alouli-Saharbanni road in Khagaria district

Plan

Kha

garia

Rs 1520

12622(S)dated

141106

RCC 39600m 505m

Mar

-07

June

-09

0100

0100

0100

045

000257345

The Real possesion of land by DLAO Khagaria was not given to

BRPNNL due to which approach road could not be constructed till date The DLAO Khagaria requested by

various letter of Senior Project Engineer for real possesion of land

MD BRPNNL vide his letter no 77 dated 02022016 468 dated

04082016 and 892 dated 24112017 have remined RCD for sanction of

Revised AA for the projectYear of completion of Bridge

Construction 2010-11

1

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Bagaucha-Srmer-Kotnrhwa Road of Saran Main Nahar12th Km in the District of Gopalganj

FDR

Gop

alga

nj

Rs 85218 Lac

685(S)19012018

HL RCC 4x1600 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

2

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of Gopalganj-Brhriyaroad of Saran Main Nahar 2nd Km inthe District of Gopalganj

FDR

Gop

alga

nj

Rs 79030 Lac

686(S)19012018

HL RCC

4x1400 m

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 322 dated-14052018 After

query compliance report also submitted to WRD Anishabad Patna

vide this office letter no 08 Dated-09072018

Work order issued

3

Sara

n w

orks

Div

isio

n C

hhap

ra Construction of Mirganj-Bhagipatti-Smaur Road in Hathua Nahar 15thKm in the District of Gopalganj

FDR

Gop

alga

nj

Rs 54907 Lac

895(S)30012018

RCC 2x1600

2x100=200 M

031

020

18

- - - - - - -

Work awardedFor NOC Proposal submitted to Chief Engineer WRD Siwan vide this office letter no 332 dated-14052018 WRD

Anishabad Patna returned to Chief Engineer WRD siwan to issue NOC Vide letter no-439 Dated-14062018

Work order issued

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of 4x1875m HL RCCBridge including Approach Roadrotection Work amp Miscellaneouswork over Bashi river crossing 1stKM of Tamkuhi-chhitauni roadDamaged in 2017 Flood underGopalganj Distric

FDR

Gop

alga

nj

Rs 80874 Lac

687(s)19-01-2018

RCC 4x1875

2x200=400 M

031

020

18

- - - - - - - Work awardedWork order issued

1 Ara

Construction of HL RCC BridgerOver Kauw river in samta Bigha -Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in theDistrict of Rohtas under MMSNY(Brajesh Kumar Singh)

MM

SNY

Roh

tas

21450 1949 (S)

dt 04-03-

2014 of RCD Patna

RC

C22

40

A1 Side-75 M

A2 Side-75 M 11

-05-

2015

10-0

5-20

16

0100

0100

045

00

0009416

122

018 Reinforcement for deck slab in

Progress Contractor debarred for delayNotice for rescind issued

2 Ara

Construction of HL RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt Ltd 9431012004

MM

SNY

Bho

jpur Rs 37263

Lac7655 (S) dt 11082014

RCC6708 20000

280

116

270

417 0

1000

1000

10015

100000

22080

10

2018

Completed

1

GA

YA

Construction of HLRCC17x2175m Bridge includingapproach road and protection workover river Muhane between Silaunjua-Bataspur village in BodhGaya Blockof Gaya District under NABARDScheme(Ajay Engicon Pvt Ltd Aurangabad(Bihar)

Nab

ard

RW

D

GA

YA

1127

86

1128

Dt

05-0

3-20

12 o

f RW

D

983

95 RCC38000

A1 Side-60 M

A2 Side-100 M 15

03

13

140

914 0

1000

1000

1000

80000

96020

Dec

embe

r 2

018

Bridge work completed amp ApproachRoad work in progress SIACompleted Final Pubishing underSection-11 Tenure of 60 days ispassed away on dt 24-08-2018Further R amp R is being processed byDLAO

2

GA

YA

Construction of HLRCC22x2175m Bridge includingapproach road and protection workover Falgu river in Sripur-Keni Roadin Gaya District under NABARDScheme(Ms Rakesh Construction PvtLtd9431303918)

Nab

ard

RW

D

GA

YA

2835

09

2493

dt

31-1

0-20

14 o

f RW

D

2292

48 RCC

49200

A1 Side-280 M

A2 Side-280 M 06

01

2015

050

120

17

0100

0100

0100

070

000237293

Oct

ober

201

8

Bridge work completed amp ApproachRoad work in progress A Temple issituated in alignment NewConstruction of temple is in progressAfter that approach road will befinished

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Sara

n w

orks

Div

isio

n C

hhap

ra

Construction of 4x1875m HL RCCBridge including Approach Roadrotection Work amp Miscellaneouswork over Bashi river crossing 1stKM of Tamkuhi-chhitauni roadDamaged in 2017 Flood underGopalganj Distric

FDR

Gop

alga

nj

Rs 80874 Lac

687(s)19-01-2018

RCC 4x1875

2x200=400 M

031

020

18

- - - - - - - Work awardedWork order issued

1 Ara

Construction of HL RCC BridgerOver Kauw river in samta Bigha -Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in theDistrict of Rohtas under MMSNY(Brajesh Kumar Singh)

MM

SNY

Roh

tas

21450 1949 (S)

dt 04-03-

2014 of RCD Patna

RC

C22

40

A1 Side-75 M

A2 Side-75 M 11

-05-

2015

10-0

5-20

16

0100

0100

045

00

0009416

122

018 Reinforcement for deck slab in

Progress Contractor debarred for delayNotice for rescind issued

2 Ara

Construction of HL RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt Ltd 9431012004

MM

SNY

Bho

jpur Rs 37263

Lac7655 (S) dt 11082014

RCC6708 20000

280

116

270

417 0

1000

1000

10015

100000

22080

10

2018

Completed

1

GA

YA

Construction of HLRCC17x2175m Bridge includingapproach road and protection workover river Muhane between Silaunjua-Bataspur village in BodhGaya Blockof Gaya District under NABARDScheme(Ajay Engicon Pvt Ltd Aurangabad(Bihar)

Nab

ard

RW

D

GA

YA

1127

86

1128

Dt

05-0

3-20

12 o

f RW

D

983

95 RCC38000

A1 Side-60 M

A2 Side-100 M 15

03

13

140

914 0

1000

1000

1000

80000

96020

Dec

embe

r 2

018

Bridge work completed amp ApproachRoad work in progress SIACompleted Final Pubishing underSection-11 Tenure of 60 days ispassed away on dt 24-08-2018Further R amp R is being processed byDLAO

2

GA

YA

Construction of HLRCC22x2175m Bridge includingapproach road and protection workover Falgu river in Sripur-Keni Roadin Gaya District under NABARDScheme(Ms Rakesh Construction PvtLtd9431303918)

Nab

ard

RW

D

GA

YA

2835

09

2493

dt

31-1

0-20

14 o

f RW

D

2292

48 RCC

49200

A1 Side-280 M

A2 Side-280 M 06

01

2015

050

120

17

0100

0100

0100

070

000237293

Oct

ober

201

8

Bridge work completed amp ApproachRoad work in progress A Temple issituated in alignment NewConstruction of temple is in progressAfter that approach road will befinished

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariyato Belaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M 27

-05-

2015

26-0

8-20

16

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

2

GA

YA

Construction of HLRCC 4x1600mBridge including approach road andprotection work in 2ND KM ofDomuhan-Cherki Road (KM 0 toKM 093) in Gaya District underPLAN Scheme (RAS Enterprises 9199245601)

Plan

GA

YA

363

9210

885

(S)

14

11

2014

of R

CD

RCC6484

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

8-20

17

0100

0100

0100

2060

00022188

Oct

ober

201

8 Bridge work Completed ApproachRoad Work in Progress Contractorhas warned to finish the work in 2ndweek of October

3

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 3560 Min Gaya District under PLANScheme (Ms Laxman Kumar)

Plan

GA

YA

664

9111

539

(S)

011

220

14 o

f RC

D

RCC11160

A1 Side-100 M

A2 Side-100 M 12

-01-

2018

11-0

7-20

19

0100

0100

2580

010

00023883

July

201

9

Work in Progress

4

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 4545 Min Gaya District under PLANScheme (Shree Tirupati Balaji Enterprises9470664329)

Plan

GA

YA

450

6211

539

(S)

011

220

14 o

f RC

D

RCC4384

A1 Side-100 M

A2 Side-100 M 18

-02-

2016

17-0

5-20

17

565

525

00

00

0008381

Mar

ch 2

019

Reminder sent to Contractor forprogress Notice for debar sent toContractor

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

GA

YA

Construction of HLRCC 3x1400mBridge including approach road andprotection work in Dhangai Bazar toBB Pesra-Sobh to GT Road (KM0 to KM 1410) in Chainage 13970M in Gaya District under PLANScheme (Ms JAY SHANKAR RAYMuzaffarpur)

Plan

GA

YA

429

7311

539

(S)

011

220

14 o

f RC

D

RCC5584

A1 Side-88 M

A2 Side-106 M 26

-12-

2016

25-0

3-20

18

0100

1560

00

00

000113

Mar

ch 2

019

Work is in Progress

6

GA

YA

Construction of HLRCC 3x2100mBridge including approach road andprotection work in Bhalua to Paharpur Road (KM 0 to KM 26325) inChainage 600 M in Gaya Districtunder PLAN Scheme (Ramiya Construction Pvt Ltd Gaya)

Plan

GA

YA

556

2811

466

(S)

281

120

14 o

f RC

D

RCC6484

A1 Side-100 M

A2 Side-100 M 10

-05-

2018

09-1

1-20

19

0100

555

00

00

000080

Nov

embe

r 2

019

After receiving NOC from ForestDeptt work in progress

7

GA

YA

Construction of HLRCC20x2175m Bridge includingapproach road and protection workover Morhar River at Chitabkhurdvillage in Amas Block in GayaDistrict under PLAN Scheme(RAS Enterprises 9199245601)

Plan

GA

YA

1994

33

8317

(S)

010

920

1513

844

8 RCC432

A1 Side-100 M

A2 Side-100 M 22

-04-

2016

21-0

4-20

18

0100

0100

590

00

000130988

Dec

embe

r 2

018

Bridge work in progress Wearingcoat amp expansion joint work is inprogress

8

GA

YA

Construction of HLRCC 9x2100mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in GayaDistrict

Plan

GA

YA

1610

87

353

(S)

010

220

18

RCC19440

A1 Side-150 M

A2 Side-150 M 10

-05-

2018

09-0

2-20

20

------- ------- ------ ------- 000550

Febr

uary

202

0

Work in Progress (Diversion work Completed)Dismentling of existing old bridge isstart

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

GA

YA

Construction of HLRCC Box Cell4x1600m Bridge including approachroad and protection work in Dumariya toBelaghati (Jharkhand Border) viaKacher at 7th KM in Gaya Districtunder PLAN Scheme (Haque Construction Co 9431223551)

Plan

GA

YA

532

2211

464

(S)

281

120

1447

041

RCC6600

A1 Side-40 M

A2 Side-65 M

27-05-2015

26-08-2016

0100

0100

0100

20100

00032941

Sept

embe

r 2

018

Bridge amp Approach roadCompleted

10

GA

YA

Construction of HLRCC 5x1875m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme

(RAS Enterprises 9199245601)

Nab

ard

(RC

D)

A

RW

AL

569

290

7135

(S) D

t05

-09-

2013

49

267 RCC

9700

A1 Side-150 M

A2 Side-150 M 10

12

13

100

615 0

1000

1000

1000

25000

39986 ------ Bridge work completed Proposal for

LA is being prepared

10

GA

YA

Construction of Retaining wall ampaddional lane approach road fornewely Constructed HL RCCBridge over Falgu River at Bararivillage in Mashauri-Okri-Telhara-Ekangarsarai road in JehanabadDistrict Under NON PLAN (2 x12000 M)

Non

Pla

n

JEH

AN

AB

AD

249

84

217(

S) d

t04

-01-

2012

of R

CD

Pa

tna

RCC12000

------

----

--

----

-- 00

00

00

00

0002685 ---

--

Bridge amp approach road completedAward declared in old LA ActPayment to raiyat in process AfterLA tender to be invited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Nal

anda

Construction of HL RCC bridge 4x1000m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district

CR

F

Nal

anda

320

8056

79 (S

)25

06

2015

RC

C40

00

50+5

0=10

0

_ _ - - 0002194

1 ye

ar (s

ubje

ct to

star

t the

wor

k)

After retender work order has been issued in favour of MS Haque Construction on dated 18042018 Electrical executive engineer has been requested to remove abandone poles Removal of Tree started from site after Reauction Tree cutting work has been obstructed by local people and also site encroched by them thereafter a letter send to SDO Nalanda on dated-10072018 to request to remove the hindrance at site In monthly review meeting DM Nalanda instructed to SDO Nalanda to remove the encrochment SDO Nalanda has instructed CO Nalanda to remove encrochment with Consult of officers pul Nigam Nalanda There after meeting with CO nalanda he said that after Ganesh puja encrochment immediatly should be removed from working site we had Personally Consult to CO Biharsharif on dated-01102018 to remove encrochment after Ganesh Puja but not any action taken by them Construction of Diversion has started at site

2

Nal

anda

construction of HL RCC bridge 9x2475M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district NARAYAN DAS CONSTRUCTION Mob - 9431815725 9431815726

Plan

Lakh

isar

ai

Rs3

068

39Lt

-182

1(s)

dt-2

802

201

4R

s187

661

RC

C

253

60M

368+

112=

480

081

120

14

071

120

16

00100

00100

00100

0040

000152694

310

320

19

Bridge work completed As per Design and Drawing of approach road submitted by NIT Patna revised estimate submitted for approval For some clarification of stablization of soil from NIT Patna a letter has given by SPE Nalanda Till date clarification of Soil stablization is not received LA ISSUE-Approach Road- 368+112= 480m - 23 raisyat lease registration completed (12473 acre) out of 24 raiyats 1(one) Raiyat who is unable to submit land papers and no any obstructions by him

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Nal

anda

construction of HL RCC Bridge 12x2475M on Harohar river near

surjichak village at Pipriya Block IN Lakhisarai district ( RAM

KRIPAL SINGH CONSTRUCTION Mob- 9810813322)

Plan

Lakh

isar

ai

Rs3

623

75 L

t-719

3(S)

05-0

8-20

15(R

ev)R

s284

154

RC

C

304

32M

525+

675=

1200

010

220

15

310

720

17

00100

00100

0099

0060

5762201954

Dec

embe

r 20

18 (S

ubje

ct to

LA

)

Bridge work completed LA ISSUE- Effective Approach Road - 475 +725 = 1200 M A2 side approach road earth work is completed and A1 side 400 m is completed A RCC Box-cell culvert 1 x 50 x 50 m is in progress Some raiyats are not ready to give their land under perpetual lease and obstructed approach road work A1 side Only 13 (thirteen) Raiyats (out of 33 Raiyats consent) have registered their land (2141 acre) and 8 (eight) raiyats document is under verification Rest Raiyats are submitting their documents All the matters put up before DM Lakhisarai and again as per direction of Principal secretry RCD at monthly review meeting held on 19072018 fresh proposal sent to District office for regular land acquisition for two mauza on 24072018

Patn

a-1

(a) Construction of HLRCC Bridge 3x1650M and approach road work in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block in the District of Patna

Nab

ard

Patn

a

Rs

418

98 L

akh

Lt N

o18

71 (S

) D

ated

03

031

4 20

498

Lak

h RCC 51385

M120M 24111

423111

50

850

750

650

40000

14744

Patn

a-1

(b) Construction of Balance work of one span out of three span HLRCC Bridge (1x1650M) across Dhaba River in 4th Km of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist Including Approach in both side and Bituminous work thereof

Nab

ard

Patn

a

Rs

167

00 L

akh RCC

1650M 60M - - - - - - - -

2

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to Panapur Diyara (including opening amp Resetting for 5 Years) in district Patna

Plan

Patn

a

Rs1

114

99 L

akh

LN

-119

65(S

) dt

21

122

017

Pont

oon

Brid

ge

12M

060

220

18

5Yea

rs

Mai

nten

ance

)

- - - - 00017321 -

Pontoon Bridge dismentaled due tomonsoon season

1

Due to unavailability of land Thework is stopped LA on PerpetualLease under process A letter hasbeen written to Patna DM for LAas per new Perpetual Lease policyvide letter no1334 (WE) dated-29052018 and letter no1816 dated-01082018 Six Man Committee hasvisited the site on 23082018 for rateevaluation

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

3

Patn

a-1

Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening amp Resetting for 5 Years) of Bakhtiyarpur Block in district Patna

Plan

Patn

a

Rs5

822

3 La

cL

N-1

1964

(S)

dt 2

112

201

7

Pont

oon

Brid

ge

400M

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - 3758385 - Pontoon Bridge dismentaled due to

monsoon season

4

Patn

a-1 Construction of HLRCC Bridge

5x240 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District

Plan

Patn

a

Lac

LN

-878

0(S)

dt

09

102

017

RC

C

Brid

ge1

20m

120M

250

420

18

261

020

19 525

05 - - 14113

14113 - Work in progress P1 P2 Pile CapCompleted

1

Kat

ihar

Construction of 2x30m Size of HLRCC bridge at (Velbwa River)Mieerganj Railway crossing toDhabeli Road Chainage 3075 of Indo-Nepal Border Road in the District ofArariaBaba Const N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria 2160

(s)

140

320

1357

080

RCC6000 37000

042

013

061

4

0100

0100

060

00

00020575

12201

8

Work is stoped due to LA Problem LAis done by RCD Araria

2

Kat

ihar

Construction of 27x30m Size of HLRCC bridge at (Saidabad)Mieerganj Railway crossing toDhabeli Road Chainage 5080 of Indo-Nepal Border Road in the District ofArariaD2S Infra Structures Pvt Ltd N

abar

d In

do N

epal

(R

IDF-

XV

III)

Ara

ria

2160

(s)

140

320

1375

950

7RCC81000

169000

072

013

071

6

0100

0100

0100

095

00067090

1

12201

8

Bridge work completed 1620 approachroad BT work completed Work isstoped due to LA LA is done byRCD Araria Only 70m work isremaning in approach road

3

Kat

ihar

Construction of 7x2175M Bridge overPaharia Ghat of Bakra River inKursakanta to Teera Road of DomSadak Road in the District of ArariaMS Raj Construction N

abar

d R

WD

Ara

ria

318

190

120

1819

158

1

RCC15700 36000

Feb-

12

121

9 0100

090

070

00

43792301

122019

Super Structure Work completed in 5spans 2 spans super structure workremaining 6 span super structure staggingwork in progress

3

Kat

ihar

Const of 11x1875m HLRCCBridge over Parmar river on DiyariGhat in between Dumariya to Diyariin the district of ArariaBraj Kishor Construction

Plan

Ara

ria

7081

(s)

300

720

1542

442

0

RCC20625

310700

03

011

6

02

011

8

0100

0100

0100

385

00022193

7

03201

9

Bridge work completed Approachwork is in ProgressRevised TS submitted for Approval

4

Kat

ihar

Construction of 6X2400m HLRCC Bridge over Bakra river at 1stkm of Udahat Tekni road underPLAN in the District of ArariaTirupati Balajee Earth Work PvtLtd

Plan

Ara

ria

1293

(s)

160

220

1722

117

3

RCC14785

30000

01

011

8

010

120 20

3000

00

00

00010870

AT A1=7m30m P1=225m27mP2=150m25m Well sinkingconcretingwork is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Kat

ihar

Construction of 3x1650m HLRCC Bridge including approachRoad in 3rd Km of Saifganj Road inthe District of ArariaShivdani Engineers Patna N

on P

lan

Ara

ria

1435

3(S)

281

220

1131

722 RCC5

00020000

06

2012

06

2013 0

1000

1000

1000

40000

18855

12201

8

Bridge Work completed LA is underprocess Publication LA details send toPress for Publication

6

Kat

ihar

Construction of 4x2200m span HLRCC Bridge over Retva River inPWD Nehru Chowk to DharamganjRoad of Araria DistrictSK Construction M

MSN

Y

Ara

ria 6776

(s)

210

720

1441

522

RCC6800

29500

102

014

101

5

095

070

040

00

00015256

03201

9

Revised TS is submitted to MD SirBRPNNL

7

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Dhiwha (Chakka)dhar in front of Yogipur in farhi tokanholi Road of Narpatganj block inthe District of Araria DistrictPankaj Kumar

MM

SNY

Ara

ria 9346

(s)

240

820

1233

194

RCC6500

32000

122

012

021

4

0100

0100

00

00

00019500

122018

Super Structure 1st span stagging workin progress

8

Kat

ihar

Construction of 4x2175m spanRCC Bridge over Adiwashi Tola inDumariya to Rampur Road of PalasiPanchayat in the District of ArariaDistrictPankaj Kumar

MM

SNY

Ara

ria 9348

(s)

240

820

1241

065

RCC8700

32000

122

012

021

4

0100

0100

0100

050

00032300

122018 Earth Work Progress in Approach road

9

Kat

ihar

Construction of 3x2175m spanRCC Bridge over Jahanpur Ghat inthe District of Araria DistrictPankaj Kumar M

MSN

Y

Ara

ria

9272

(s)

230

820

1242

066 RCC7

00032000

102

012

011

4

0100

0100

00

040

00026200

12201

8

Super Structure 1st span stagging workin progress

10

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of ArariaARZU CONST LTD PATNA

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

11

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in 2nd km of ArariaMeerganj Chowk Kuwari BypassSkiti Dhabeli road under FDR in theDistrict ArariaSHIV CHANDRA KUMKAR

FDR

Ara

ria

573

7245

(S)

020

120

18

5808 25000

270

420

18

260

719 0

000

00

00

000324 Work is Going to Start

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

12

Kat

ihar

Construction of of HL RCC bridge(3X1875 m) in Place of Damaged byflood in 2017 in the 4th km ofAraria Meerganj Chowk KuwariBypass Skiti Dhabeli road under inthe District ArariaRAJ KISHOR SINGH ARARIA

FDR

Ara

ria

604

5028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000324 Pilling work started

13

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 9th Km ofBairagachi-Banglacol road in theDistrict of ArariaMS SONA CONSTRUCTIONSUPAUL

FDR

Ara

ria

547

0828

7 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

14

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) in Place of Damaged byflood in 2017 in the 12th Km ofBairagachi-Banglacol road in theDistrict of Araria

FDR

Ara

ria

557

0728

6 (S

)10

01

2018

3322 26000

190

820

18

181

1201

9

00

00

00

00

000213

Work is not started due to Local Public Hindrence

15

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) in Place of Damaged byflood in 2017 in the 70th Km ofRefugee colony to Mirganj Chowk(NH57A) road in the District ofArariaBIPIN KUMAR KATIHAR

FDR

Ara

ria

746

7028

5 (S

)10

01

2018

5583 26000

190

820

18

181

1201

9

00

00

00

00

000325

Diversion work completed Pilling work started

16

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli roadin the distric of ArariaMS JAI MATA DI CONSTBEGUSARAI

FDR

Ara

ria

742

8447

9 (S

)15

01

2018

5583 26000

190

820

18

181

1201

900

00

00

00

000325 Diversion work is in Progress

17

Kat

ihar

Construction of of HL RCC bridge(3X1200 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe ch Ch 7th Km of ArariaKurshakatta road in the distric ofArariaTIRUPATI BALAJI EARTHWORK PVT LTD PATNA

FDR

Ara

ria

584

1247

7 (S

)15

01

2018

3722 26000

170

820

18

161

120

19

00

00

00

00

000233 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of ArariaSHAILESH KR SINGH

FDR

Ara

ria

554

5028

3(S)

101

020

18

3320 25000

191

020

18

181

020

20

00

00

00

00

Diversion work completed Pilling work started

19

Kat

ihar

Construction of of HL RCC bridge(3X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inCh 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj

chowk in the district of ArariaBIPIN KUMAR SINGH KATIHAR

FDR

Ara

ria

734

5768

0(S)

190

120

18

5580 28000

191

020

18

180

420

20

00

00

00

00

Diversion work completed Pilling work started

20

Kat

ihar

Construction of of HL RCC bridge(2X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in7th Km of Bairgachhi-Banglacolroad in the district of ArariaSAIYAD MUMTAZ AKHTAR

FDR

Ara

ria

557

9267

7(S)

190

120

18

3320 28000

191

020

18

180

120

20

00

00

00

00

Work stopped due to locol public hindrence

21

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in8th Km of Meerganj chowk-kuwari by pass to sikti dhabeli roadin the district of ArariaARJU CONST PATNA

FDR

Ara

ria

762

4667

8(S)

130

120

18

4980 30000

191

020

18

180

420

2000

00

00

00 Diversion work completed

22

Kat

ihar

Construction of of HL RCC bridge(2X1800 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in82Km of Refujee colony-Meerganjchowk (NH57A) road in the districtof ArariaARJU CONST PATNA

FDR

Ara

ria

557

6947

8(S)

150

120

18

3720 28000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Kat

ihar

Construction of of HL RCC bridge(3X1400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 in15th Km of Parwaha-MirdaulPWD road in the distrtict of ArariaAAKASH KUMAR PATNA

FDR

Ara

ria

685

1547

6(S)

150

120

18

4380 30000

191

020

18

180

120

20

00

00

00

00 Diversion work is in Progress

24

Kat

ihar

Construction of HL RCC bridge in10th Km of Barsoi Banbhui-Dhachana Road of Katihar DistrictShankar Sharma

Nab

ard

Kat

ihar

9585

(s)

131

220

1319

656

5

RCC19400

41500

032

014

031

6

0100

0100

0100

060

00016853

3

03201

9

Bridge work completedLA Registrywork in under process

4

Kat

ihar

Construction of HL RCC Bridgeon Ganjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road viaBeghour Hat to Katihar DistrictRaj Construction N

abar

d R

WD

Kat

ihar

920

110

620

1316

915

111

817

5

RCC20100 36500

102

013

071

5

0100

0100

0100

090

000161614

12

2018

Bridge work completed LA AgreeLetters of Land Owners submitted toDLO Katihar Letter No- 1661 On 24-09-2018

25

Kat

ihar

Construction of 2x1250m spanRCC Bridge over hara dhar inbetween Gogra-Lalganj of KatiharDistrictAshwani Kr Singh Katihar M

MSN

Y

Kat

ihar 1026

5(s)

130

920

1225

164

RCC3000

42000

122

012

121

3

0100

0100

0100

00

00016240

03201

9

Bridge work completed But Both sideof approach road not complettedPerpesual lease LA in underprogressBridge work completed LAAgree Letters of Land Ownerssubmitted to DLO Katihar Letter No-1660 On 24-09-2018

5

Kat

ihar

Construction of 6X2175m HLRCCBridge at Kundi Tola in MohnaChandpur Panchayat of Barari Blockof Katihar DistrictVishundev Yadav

MM

KV

Y

Kat

ihar

1454

(s)

210

320

1718

000

0

RCC 13428 30000

11

2017

112

019

040

00

00

00

00035040

AT A1=3939 P1=395395P2=395395 P3=288395 Wellconcereting amp sinking work is inprogress

26

Kat

ihar

Construction of HL RCC bridge(5X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (2ndCutting) in the district of KatiharGOKUL HITECH INFRA PVTLTD

FDR

Kat

ihar

866

8829

3(S)

100

120

18

8305 24000

130

618

120

919 0

000

00

00

000217 Diversion work is in Progress

27

Kat

ihar

Construction of HL RCC bridge(3X1600 M) in Belauri-Shivganj-Salmari Bazar 19th km of (1stCutting) in the district of KatiharBABAN KUMAR SINGH

FDR

Kat

ihar

639

7329

4(S)

100

120

18

4983 23000

130

620

18

120

919 0

000

00

00

000302 Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Kat

ihar

Construction of RCC HL bridge(2X1650 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 3rd km of Aajamnagar link roadin the district of KatiharMS JAI SHIV CONSTRUCTION

FDR

Kat

ihar

387

2769

3(S)

190

120

18

3422 20000

010

620

18

310

819 0

1001515

00

00

372212446

1818 Pilling work completed A1 amp P1A2 pile Cap work completed A1

shaft work in progress

29

Kat

ihar

Construction of RCC HL bridge(2x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharMS SHAILESH KUMAR

FDR

Kat

ihar

458

7248

0(S)

150

120

18

4922 24000

010

620

18

310

819 0

000

00

00

000255 422 Pilling work completed

30

Kat

ihar

Construction of RCC HL bridge(2x1800 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of KatiharBIPIN KUMAR SINGH

FDR

Kat

ihar

459

5648

1(S)

150

120

18

3722 20000

010

620

18

310

820

19

00

00

00

00

000283 Pilling work started

31

Kat

ihar

Construction of RCC HL bridge(2x2175m) at 9th KM of KadwaBlock headquarter-chowki viabharri Aashiyani road includingapproach road diversion protectionwork and road sefty in place ofdmaged road by flood in 2017 in thedistrict of KatiharMS SHIV SHAKTI CONSTPURNEA

FDR

Kat

ihar

517

1113

90(S

)21

02

2018

4472 20000

240

820

18

230

820

1900

00

00

00

000335 Site Camp and Diversion work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Kat

ihar

Construction of RCC HL bridge(6x2100m) in the 15th Km ofKatihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road includingapproach road diversion protectionwork in place of damaged road byflood in 2017 in the distric of KatiharMUKESH KUMAR KATIHAR

FDR

Kat

ihar

1379

21

2348

(S)

280

320

18

12722 35000

240

820

18

230

820

20

00

00

00

00

000675

Cutting Edge Fabiracation amp Placing work in progress

33

Kat

ihar

Construction of RCC HL bridge(6x2100m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazarroad in this district of Katihar ARJUN PRASAD

FDR

Kat

ihar

1471

00

2541

(S)

12960 30000

101

020

18

171

020

20

00

00

00

00

Cutting Edge Fabiracation work in progress

34

Kat

ihar

Construction of RCC HL bridge(2x2175 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Damdama-Azamnagar-Keshari Chwok viaAzamnagar railway Station road inthe district of KatiharOM CONT KATIHAR

FDR

Kat

ihar

586

0013

91(S

)4472 25000

101

020

18

170

120

20

00

00

00

00

Land Owners Claiming the road is in their own lands Work is not Started due

to Land Dispute

35

Kat

ihar

Construction of 3x1875m span HLRCC Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea Baba Construction N

abar

d

Purn

ia 1806

(s)

050

320

1342

856

RCC5808

2700004

201

3

071

4

0100

0100

0100

075

00028000

12201

8

Bridge work completed Approach roadwork completed upto WMM Work isstop due to LA LA is at Section 18level

36

Kat

ihar

Construction of Balance work ofHL RCC bridge (4x2100 m) in 9thkm of Jokihat-Dalmalpur-Gerua road in the district of PurniaBAIJNATH SHARMA

FDR

Purn

ia

1196

00

44(S

)02

01

2018

8644 24000

150

420

18

140

418 20

5000

00

00

859440599

Well casting and sinking work in progress A2P3 well plugged A1-

3030 P1-3030 bottom soil send to quality cantrol for CampOslash test

37

Kat

ihar

Construction of of HL RCC bridge(3X1650 m) in 9th km of KaliMandir to Baraily road in theDistrict of PurneaSHANKAR SHARMA

FDR

Purn

ia

723

7643

(S)

020

120

18

5133 24000

160

320

18

150

919 0

3000

00

00

000282

1230 Pile completed Pilling work is stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

38

Kat

ihar

Construction of of HL RCC bridge(3X1600 m) in (SH-99) 9th km ofBaisi-Amour-Bahadurganj road inthe District of PurneaRAJKISHOR SINGH

FDR

Purn

ia

739

0041

(S)

020

120

18

4983 24000

280

320

18

220

919 0

6000

00

00

00023780

3636 piles completedDe Watering work in progress for Pile

cap work

39

Kat

ihar

Construction of HL RCC bridge(3x1650 M) in 2nd Km of Ekhuamahmadodia-Bareli-Duboli road inthe district of PurneaBAIJNATH SHARMA

FDR

Purn

ia

619

2442

(S)

020

120

18

5133 24000

050

420

18

040

719 20

7000

00

00

00013359

2424 piles completed A1 Pille cap work completed P1 pille cap work in

progress

40

Kat

ihar

Construction of RCC HL bridge(8x1800m) including approach roaddiversion and protection work in theplace of 10th km of Jokihat-Dalmalpur-Gerua road in thedistrict of PurniaSHANKAR SHARMA ampBAIJNATH SHARMA (JV)

FDR

Purn

ia

1478

98

1209

2(S)

271

220

17

14888 24000

270

320

18

230

320 0

6000

00

00

238647403

Pile cap work stopped due to water logging 8080 piles completed

41

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of PurniaMS SHAILESH KUMAR

FDR

Purn

ia

552

1729

6 (S

)10

01

2018

5133 24000

040

420

18

030

719 0

7500

00

00

00014530

2424 piles completed Two pille caps also completed Work stopped due to

water logging

42

Kat

ihar

Construction of HL RCC bridge(3X1650 M) in the 9th km ofBelgachhi PWD road via Nitendra-Machharhatta-Geria road in thedistrict of PurniaHAQUE CONSTRUCTION

FDR

Purn

ia

729

4529

5 (S

)10

01

2018

5133 2400013

06

2018

120

919 0

000

00

00

000202

Side camp is ready Divertion work is a started

43

Kat

ihar

Construction of RCC HL bridge(4x1600 m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 6th km of Jokihat-Dalmalpur-Garua road in the district of PurneaRAJ KISHOR SINGH

FDR

Purn

ia

877

5368

3 (S

)19

01

2018

6644 24000

130

620

18

121

219 0

000

00

00

000192 Side camp is ready Pilling work started

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

44

Kat

ihar

Construction of RCC HL bridge(2X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 29th km of Biasi-Amor-Bahadurganj road(SH-99) in thedistrict of PurneaHAQUE CONSTRUCTION

FDR

Purn

ia

794

7569

0 (S

)19

01

2018

4922 24000

130

620

18

121

219 5

1500

00

00

72277227

Well casting and sinking work in progress A1-2240028 amp A2-

2240028 work in progress

45

Kat

ihar

Construction of RCC HL bridgeincluding approach road diversionand protection work in place ofdamaged by flood in 2017 in 1st Kmof Palsa- Kali Mandir-Baraili Road(4x2700m)span (Ch 245m to340m) and (5x2100m) span in (Ch480m to 600m ) in the district ofPurneaHAQUE CONSTRUCTIONMuzaffarpur

FDR

Purn

ia

2791

30

1307

(S)

160

220

18

21840 50000

101

020

18

170

120

20

00

00

00

00 Work is stop due to water logging

46

Kat

ihar

Construction of RCC HL bridge(3X2475 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 1st Km of Belgachi PWD RoadVia Nitendra-Macharhatta-goriaroad in the district of PurneaMS SHIV SHAKTI CONSTPURNEA

FDR

Purn

ia

1185

00

1384

(S)

210

220

18

7608 25000

101

020

18

170

420

20

00

00

00

00 Diversion wok is in progress

47

Kat

ihar

Construction of RCC HL bridge(5X2400 m) including approachroad diversion and protection work inplace of damaged by flood in 2017 inthe 4th Km of Plasi-Baraili road inthe district of PurneaPRABHAT KR

FDR

Purn

ia

1606

00

1677

(S)

050

320

18

12300 30000

101

020

18

170

420

20

00

00

00

00 Work stop due to water logging

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Muz

affa

rpur

Construction of HLRCC Bridge inKodariya under Meenapur Block inthe district of Muzaffarpur (Nabard)

Nab

ard

Muz

affa

rpur

3300

00

1190

8(s)

091

120

1223

621

2

RCC32500 _

Dec

-12

061

5

121

4

0100

0100

0100

080

15904326366

Dec

201

8 (S

ubje

ct to

LA

)

(i) Bridge Part completed LA Issue for approach roadKodariya Mauja- 167 acres Mursandi Mauja- 7325 acresGovt land- 038 acresTotal land- 8995 acresTotal Raiyat- 61LPC received from DM Muzaffarpur Registred Raiyat -5 (Five)Registred Area-255 Acres

2

Muz

affa

rpur

Construction of HLRCC Bridgeacross canal in Dighara Butler roadin the district of Muzaffarpur(Nabard)

Nab

ard

Muz

affa

rpur

310

1734

(s)

020

120

1329

262 RCC

2100 _

Feb-

14

021

5

0100

0100

0100

025

00016937 -

Bridge part completed amp Approachroad under LA issue which is underprocess by RCD Muzaffarpur Aletter has been sent to Road division1 Muzaffarpur to take over chagre ofthe bridge

3

Muz

affa

rpur Construction of HLRCC Bridge in

Runni-Saidpur-Katra-Keowatsa roadin km of 2615the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

880

7677

71(s

)26

09

2013

741

42 RCC9600 _

Jan-

14

081

5

0100

0100

0100

090

00057203 -

Under Departmental enquiry Tender invited for another bridge

in DS by RCD Div-2 Muzaffarpurunder LWE Scheme

4

Muz

affa

rpur

Construction of HLRCC Bridge inDr Jarnath Mishra College in betweenSoda Godaun to Ahiyapur withapproach road in the district ofMuzaffarpur (Nabard) N

abar

d

Muz

affa

rpur

4329

61

7889

(s)

031

020

1331

071

0

RCC 30000 _

Feb-

14

16-F

eb 095

085

073

00

000231504

062

019

(Sub

ject

to L

A)

LA Issue for approach roadChaqmohabbat Mauja- 167 acres Nazirpur Mauja- 445 acresChandrawara Mauja- 904 acres Total Land- 1601 acresTotal Raiyat- 22LPC Awaited

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Muz

affa

rpur

Construction of HLRCC Bridge inAthar Ghat over Bhudhi Gandak riverunder Bochaha Block in the district ofMuzaffapur (Plan)

Plan

Muz

affa

rpur

3554

81

1817

(s)

dt 2

802

201

428

155

9

RCC 29700 _

112

014

111

6

0100

0100

585

540

7418193084 06

19

(Sub

ject

to L

A)

Work in Progress LA Issue for approach roadAthar banshman Mauja- 5485 acresBishunpur Jagdish Mauja- 2605acresBinda Mauja-10615 acresTotal land- 18705 acresTotal Raiyat- 66LPC received from DM MuzaffarpurDocumentation for registration isunder process

6

Muz

affa

rpur

Construction of HLRCC Bridge in3rd km of Aurai- Jale Road in thedistrict of Muzaffarpur

FDR

Muz

affa

rpur

590

4027

7(S)

100

120

18

RCC5812m 24000

240

520

18

240

820

19

090

5050

00

00

435216324 - Work in Progress

7

Muz

affa

rpur Construction of RCC HL Bridge

Belsand-chhitauni-Tariyani Road in 2nd Km 4x2100M District of Sitamarhi

NA

BA

RD

RID

F-18

(RC

D)

Sita

mar

hi 1012510092012

85146RCC8400 24000

Dec

-12

Jun-

14 0100

0100

0100

00

57782076

Mar

ch 2

019

1 Bridge work has been completed2 Corrected Revised Estimate for the remaining work provisioning LA amp Approach road has been submitted vide SPE Muzaffrapur letter no 1040 (E) Dt 110920183Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund Sitamarhi District (Circle- Belsund) - Mauja Basaul - 0520 AcresRaiyat- 06 No

8

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132400) 1x4000m District of Sitamarhi NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

59975RCC4000 80000

Jan-

14

Jan-

16 0100

0100

0100

050

25248017

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

Muz

affa

rpur Construction of RCC HL Bridge

Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3906) 1x2500m District of Sitamarhi

NA

BA

RD

RID

F-18

(R

CD

)

Sita

mar

hi 720909092013

4189841378

RCC2500 35000

Jan-

14

Jan-

16 0100

0100

0100

065

00035670

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

10

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11011) 4x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

93223RCC8800 75000

Jan-

14

Jan-

16 0100

0100

0100

080

000790212

Nov

201

8

Bridge work has been completedWork of Approach Road in Progress

11

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11695) 3x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

83502RCC5400 97500

Jan-

14

Jan-

16 0100

0100

0100

085

00068429

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

12

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13066) 2x2500m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

71964RCC5000 90000

Jan-

14

Jan-

16 0100

0100

0100

080

305862575

Nov

201

8 Bridge construction work has beencompletedWork of Approach Roadis in progress

13

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22730) 1x2200m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

58157RCC2200 67500

Jan-

14

Jan-

16 0100

0100

0100

075

00046032

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

14

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26675) 4x1800m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

89016RCC7200 35000

Jan-

14

Jan-

16 0100

0100

0100

030

00070516

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

15

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45166) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24561RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

065

47016856

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

16

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46812) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24293RCC7200 107500

Jan-

14

Jan-

16 0100

0100

0100

080

00020402

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

17

Muz

affa

rpur

Construction of RCC HL Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45888) 2x600m District of Sitamarhi N

AB

AR

D R

IDF-

18

(RC

D)

Sita

mar

hi 720909092013

24606RCC1200 102500

Jan-

14

Jan-

16 0100

0100

0100

080

85323433

Nov

201

8 Bridge work has been completedWork of Approach Road is inProgress

18

Muz

affa

rpur Construction of RCC HL Bridge

Approach Road in Bagmatti River Manderghat 24x2475 m 2lane District of Sitamarhi N

AB

AR

D

Sita

mar

hi 473006062014

198933RCC

58948 210000

Mar

-15

Mar

-16 0

100000

151715

(i)A

s per

agr

eem

ent -

wor

k co

mpl

eted

in Ju

ly 2

018

(ii)

2nd

Part

- Sub

ject

of R

A

1 Work of approach road has been completed2 DPR for additional bridge along breached point has been submitted to Engineer-in-Chief RCD Patna vide MD letter no 663(E) Dated 01102018 This was caused due to flood on 14082017 3 Vide letter no 598 Dt 11-09-2018 request has been sent for land ownership (Raiyatee) verification by DALO Sitamarhi to CO Belsund(A) Sitamarhi District (Circle- Belsund) -(i) Mauja Mander - 5105 AcresRaiyat- 51 No(ii) Mauja Madhkaul- 0945 AcresRaiyat- 10 No (B) Sheohar District (Circle- Tariani) -(i) Mauja Tariani Chhapra - 7621 AcresRaiyat- 01 No

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

19

Muz

affa

rpur

Construction of RCC HL Bridge Chandauli Ghat in Bagmati River District of Sitamarhi PL

AN

Sita

mar

hi 7394(s)10082016

708938RCC

43200 110000

Feb-

16

Apr

-19 0

7000

00

00

10146149593

Apr

il 2

019

Foundation work in progressRequesition for land acquisition has beensubmitted to District Land AcquisitionOfficer Sitamarhi vide this office letterNo 63 (Encl) Dated-27012017As per provision of Revenue amp LandReform Department Letter no 494 Dt27042018 process for taking consent ofLand Owners (Raiyat) has been started Sitamarhi District (Circle- Belsund) -(i) Mauja Chandauli Timaha - 7285AcresRaiyat- 59 No(ii) Mauja Bharwari - 5540 AcresRaiyat- 58 No (iii) Mauja Bharwari Nankar - 1548AcresRaiyat- 09 No Total Area to be acquired- 14365Total No of Raiyat- 126

20

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Kachidargah toRustampur (Raghopur) (includingopening amp Resetting for 5 Years) ofRaghopur Block in district Vaishali

Plan

Vai

shal

i

Rs7

515

7 La

cL

N-1

1804

(S)

dt 1

912

201

7

Pont

oon

Brid

ge

060

220

18

5Yea

rs (M

aint

enan

ce)

- - - - - 00017302 -

Pontoon will reset before ChhatFestivle

21

Muz

affa

rpur Construction of Pontoon Bridge in

river Ganga between Chakosanghat toJamindari Ghat (including opening ampResetting for 5 Years) of Bidupur indistrict Vaishali

Plan

Vai

shal

i

Rs3

013

65 L

acL

N-2

338(

S)

dt 3

103

201

6

Pont

oon

Brid

ge

060

220

18

5Yea

rs

(Mai

nten

ance

)

- - - - - 00019243 -

Pontoon will reset before ChhatFestivle

22

Muz

affa

rpur Construction of 2x1037M size

Bridge over Canal to Simanchakjamal Siman Road in ward No33 of Vaishali District

MM

SNY

Vai

shal

i

Rs1

690

4 La

kh

Lt N

o60

66 (S

) D

ated

08

071

4R

s129

74

Lakh

RC

C

220

M

60M

21

111

4

201

115 0

1000

1000

1000

90000

10670

12

2018

1 Bridge Completed LA issue inapproach road under PL2Area- 01375 Acre3Formalities of News Paperpublication has been compelted4 LPC awaited from DM Viashali

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

SAH

AR

SA

Constraction of HL RCC Bridge(2x1450) over Canal at Baildour insouth of Choutham Basa(Banni Basa)village in Kasnagar Panchayat underMMSNY in saharsa distt Sulekha Devi 9939775544

MM

SNY

SAH

AR

SA

6771

(s)

dt 2

107

14

200

71 RCC2500 100M+

100M

Jan

201

6

Jan

- 201

7

0100

0100

0100

10100

00019106

092

018

work is complete in all respectPerpetual Lease is in Progress

2

SAH

AR

SA

Construction of High Level RCCBridge (3x2475M) at 385th KM ofBalthi Musharniyan viya NH-107Road in the district of Saharsaincluding Approach road ProtectionWork Diversion WorkShashi Ranjan 7488173962

FDR

SAH

AR

SA

1207

5 (S

) Dt

- 27

12

2017

826

99 RCC7609

M

100M+100M

070

420

18

061

020

1930

06

2019

070

00

00

00

00016368

300

620

19

All 26 Pile completed P1 Pile cap complete

3

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 3rd KM ofBalthi Musharniyan viya NH-107 toBund Road in the district of Saharsaincluding Approach road ProtectionWork in flood effected damage year2017 Balram Singh-9431082277

FDR

SAH

AR

SA

483

(S)

Dt

- 15

012

018

386

710

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

0 0 0 0 76007600

300

620

19

Layout has been done Work is in progress

4

SAH

AR

SA

Construction of High Level RCCBridge (2x1650M) at 1st KM ofFatehpur-Kashnagar Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Balram Singh-9431082277

FDR

SAH

AR

SA

482

(S)

Dt

- 15

012

018

317

RCC 3350

M

100M+100M

030

820

18

020

820

1930

06

2019

10003500 0 0 0 7600

7600

300

620

19

11 Pile Completed 5 Pile in progress

5

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 5th KM ofBalthi Musharniyan Road in thedistrict of Saharsa includingApproach road Protection Work inflood effected damage year 2017Arju Construction - 9304026134

FDR

SAH

AR

SA

510

(S)

Dt

- 16

012

018

309

70 RCC 4950

M

100M+100M

030

820

18

021

120

1930

06

2019

25002500 0 0 0 5600

5600

300

620

19

8 out of 20 Piles has done Work is in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

SAH

AR

SA

Construction of High Level RCC(4x1875) Bridge over river Tilawe inSupaul Block of Jhahura Village NearMehata Tola in the district of Supaul(NABARD)Shankar Sharma9934756142

NA

BA

RD

(RW

D)

SUPA

UL

7397

D

t - 1

007

201

756

474 RCC

75 M1272

M

Jan

2018

Jun-

19 00100

00100

5100

0040

00030898

Jun

201

9

Approach Work in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (6x1875) Marauna block ofGanaura PWD Road to Maharaji Tolain the district of Supaul (NABARD)Manoj Kumar - 9470049418

NA

BA

RD

(RW

D)

SUPA

UL

7452

Dt

- 14

07

2017

RCC 13050

M

1122 M

Jan

2018

Dec

-20

00050 0 0 0 6004

26504 Dec

-20

5 Well complete Sinking of well in progress for bottom plugging

6

SAH

AR

SA

Constraction of HL RCC (6x1800M)Bridge on tilyuga River in 1st KM ofLalminia-simraha road under PlanHead Marouna block in supaul distt Raj Construction 9430883767

Plan

SUPA

UL

3007

(S)

dt

31

031

513

596

3 RCC11160 100M+

100M

Dec

-201

5

Dec

embe

r-2

017 0

1000

1000

1000

65000

80687

11

2018 Bridge Work is Complete Approach

Work in Progress Perpetual Lease is in Progress

7

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 880th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection WorkBraj Kishor Ray 9430800861

FDR

Supa

ul

1207

8 (S

) D

t - 2

712

201

758

400 RCC

10148M

125M+130M

070

420

18

060

720

1930

06

2019

085

1040

1020

00

00016846

300

620

19

All piles 3 Pile cap amp 1 Deck slab are completed Work in Progress

8

SAH

AR

SA

Construction of High Level RCCBridge (4x2475M) at 19th KM ofNirmali-Marauna-Madhepur Road inthe district of Suapul includingApproach road Protection Work inflood effected damage year 2017Shashi Ranjan7488173962

FDR

Supa

ul

47 (S

) D

t - 0

201

201

860

400 RCC

10148M

150M+150M

310

520

18

300

820

2030

06

2019

00

00

00

00

000000

300

620

19

Work stopped by the local people

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

9

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 270th KM ofLalminiyan-Simraha Road in thedistrict of Suapul including Approachroad Protection Work in floodeffected damage year 2017Haqu Construction Mob - 9955334076 amp 7667383440

FDR

Supa

ul

508(

S) D

ated

- 16

01

2018

395

56 4950M

100M+100M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Diversion work in progress

10

SAH

AR

SA

Construction of High Level RCC

Bridge (3x1650M) at 1000th KM of

Lalminiyan-Simraha Road in the

district of Suapul including Approach

road Protection Work in flood

effected damage year 2017

Laxman Kumar - 9431383203

FDR

Supa

ul

509

(S) D

ated

- 16

01

2018

425

00 4950M

150M+150M

280

920

18

271

220

1930

06

2019

00

00

00

00

000000

300

620

19

laosnd dks i=kad 1418 fnukad 28-09-2018 kjk dkkZnsk fuxZrA

11

SAH

AR

SA

Construction of High Level RCCBridge (3x1650M) at 660th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridge in thedistrict of Madhepura in floodeffected damage year 2017Manoj Kumar - 9470049418

FDR

MA

DH

EPU

RA

1196

7 (S

) D

t - 2

112

201

741

943

0 RCC5137

M

150M+150M

070

420

18

060

420

1930

06

2019

040

00

00

00

24737473

300

620

19

8 Pile Complete 12 Pile in progress

12

SAH

AR

SA

Construction of High Level RCCBridge (3x2175M) at 540th KM ofGwalpada to Bihariganj Road at theplace of Old Scrow Pile Bridgeincluding Approach Road Protectionwork in the district of Madhepura inflood effected damage year 2017(Pile Foundation)Shiv Krishna Builders PvtltdMob - 9431268201

FDR

MA

DH

EPU

RA

899

(S) D

ated

3

001

201

848

255

0 RCC6712

M

200M+200M

060

920

18

051

220

1930

06

2019

00

00

00

00

000000

300

620

19

Old Screw Pile Dismentaling work in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Bha

galp

ur

Construction of HL RCC Bridge 14x1875 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII)Ms Ganesh Ram Dokania Dokania Market Aliganj BankaMobno 9931130066

Nab

ard

Bha

galp

ur

2296

08

2501

(s)

250

320

1313

223

0

RCC 25168

A1 side -650 m

A2 side-400 m

(Jharkhand)

240

513

240

515 00

10000

10000

1000000

000150734

-

Bhagalpur(i) Section 11 notified on letter No 107 dt-300318(ii) Land Acquisition-433 Accre Bhagalpur Bihar

2

Bha

galp

ur

Constriction of H L RCC Bridge 12X2475m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII)Ms Naraindas Construction Pvt Ltd Binodpur Katihar Mobno 9431815725 9431815726

Nab

ard

Bha

galp

ur

2460

57

2502

(s)

250

320

1320

358

3

RCC 30436

A1 side -260m

A2 side-225 m + 125 m Branch

road

109

201

3

108

201

5

00100

00100

00100

0070

000237762

-

(i) Section 11 notified on letter No 03 (P) LA dt- 10032018(ii) LA -752 Accre(iii) Six Member Committee under the Chairmanship of DM has been constituted for rehabilitation amp Re-arrangment Vid office Commnique No 340 dated- 18082018

3

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting Repairing Dissmentalling maintainence work during flood available 28 ests module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia amp Dholbajja bazar in Bhagalpur District Pontoon Bridge on Koshi river at Vijay Ghat between Nougachia amp Dholbajja bazar Year 2017-21-22

Plan

Bhag

alpu

r

1179

4(s)

191

220

1739

475

0

28 S

ets

120

220

18

270

220

18

- - - -000693

कोशी नद म बाढ़ का पानी बढ जान क फल व प पीपा पल को खोलकर सर त थान पर रख दया गया ह |

4

Bha

galp

ur

Construction of High Level RCCBridge with Approach Road andprotection Work in 6th Km ofSanhaula- Hanwara Road nearVaisa Village in place of damage SPBridge in the District of Bhagalpur

Plan

Bhag

alpu

r

3133(s)31032017

4969264m 200

150

220

18

140

520

19

00100

00100

5575

00

000021731

140

520

19

(i) Foundation -Completed(ii) Sub Structure -Completed(iii) Super Structure - Deck Slab Casted- 44(iv) Approach- 0

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

5

Bha

galp

ur

Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 1650 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

344

40L

tno

830

0 (s

) dt

010

920

1525

815 Highlevel

Bridge6844 m

A1 side - 100 m

A2 side-110 m

150

220

16

140

520

17

00100

00100

00100

0080

00022737

123

020

18

(i) Appraoch with (connectivity) in progress(ii) Protection work in Progress

6

Bha

galp

ur

Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 2175 m Ms Hardev Const Pvt Ltd Station Road B Deoghar (Jharkhand) Mobno 9006024148

MM

SNY

Bha

galp

ur

979

58 L

t no

829

6 (s

) dt

01

092

015

727

22 Highlevel Bridge15652

A1 side - 110 m

A2 side - 110 m 24

02

2016

230

820

17

00100

0080

0060

0000

00047722

331

201

9 (i) Foundation - 88(ii) Sub Structure - 78(iii) Super Structure - 47

7

Bha

galp

ur

Construction of HLRCC Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district ( Balance Work )Balkrishna Bhalotia Const PvtLtd Jamui Bazar Jamui Mobno 9431234037

Plan

Jam

ui

965

291

1195

7(s)

120

820

10

RCC3354 273 m

26

102

016

15 M

onth

s

00100

00100

0890

0080

00044564

123

120

18 (i) Foundation - Completed (ii) Sub Structure - Completed(iii) Sup Structure - 1112

8

Bha

galp

ur

Construction of ROB Bariyarpur in Lieu of LC No 15BT at km 34710-12 Between Bariyarpur Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN ( Balance Work ) Bhabesh Mishra Construction Pvt Ltd Nayachak Near Budhia Kali Asthan Isakchak Bhagalpur Mobno 9470627503

RO

B

Mun

ger

2727

00

143(

s) d

t 05

01

2007

1041

00

RCC 354

A1 side - 269 m

A2 side-156 m 15

01

2016

140

720

17

00100

00100

0090

0750

000361117

113

020

18

(i) Foundation - Completed(ii) Sub Structure - Completed(iii) Super Structure - completed(iv) Crash Barrier in progress(v)RE wall - in progress (vi) Slip road amp Drainage work both sides in progress

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 37x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 10965SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1366

549

4

RCC111000 53700

101

3

071

6

0100

0100

0100

020

000652503 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per iformation compensation ofbuilding of Sri Yugal Agrawal hasnot been awarded in A1 side

2

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of 3x30m HL RCCBridge on River Burhi Kanki of IndoNepal Border Road in the District ofKisanganj at Ch- 113640SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1372

471

650

49 RCC9000 30000

101

3

041

6

0100

0100

0100

015

00054705 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender2 No LA issue at persent3 Revised BOQ Submitted vide SPEltno Dt

3

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha of IndoNepal Border Road in the District ofKisanganj at Ch- 12300SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1365

085

507

64 RCC6000 26000

101

3

041

6

0100

0100

0100

020

00040507 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 1) Khata No -330 Khesra - 3 and Khata No - 150Khesra - 4 in A2 side

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

4

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 14x30m HL RCCBridge on River maichi of Indo NepalBorder Road in the District ofKisanganj at Ch-12400SP Singla Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1337

291

725

975

8 RCC42000 24600

101

3

041

6

0100

0100

0100

00

000233022 0918

1 Agreement to be closed (vide DCElt No1455 dt 250518) and balancework to be done through tender afterLA 2 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Tant Paua (Sheet No- 2) in A2 side

5

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj

Construction of 2x30m HL RCCBridge on River Surbhitha Local Nalaof Indo Nepal Border Road in theDistrict of Kisanganj at Ch- 146850Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1359

360

444

15 RCC6122 32000

101

3

071

5

0100

0100

0100

070

00027965 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Dalle Ganv (Sheet No- 1) and MauzaChurali (Sheet No- 6) in A2 side

6

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of 2x30m HL RCCBridge on River Local Nala of IndoNepal Border Road in the District ofKisanganj at Ch- 14900Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1369

173

422

26 RCC6000 38000

101

3

071

5

0100

0100

0100

05

00027628 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per Knowledge compensationof Tea plant has not been awarded

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

7

Ext

erna

l Pro

ject

s Div

isio

n - 2

Kis

anga

nj Construction of 2x30m HL RCCBridge on River Pahari Local Nala ofIndo Nepal Border Road in theDistrict of Kisanganj at Ch- 15100Bhartiya Infrastructure Pvt Ltd

Nab

ard

Indo

Nep

al (

RID

F-X

IX)

Kis

anga

nj

7209

(s)

090

920

1355

563

423

59 RCC6000 42000

101

3

071

5

0100

0100

0100

05

00024875 0918

1 Agency requested for closed theAgreement on 180920182 LA is under Process by RCDKishanganj 3 Requested to EE RCD Kishanganjfor up to date status regarding LAvide ltno 156 dt 1809184 As per information different plotshave not been acquired in Mauza -Bhatganv (Sheet No- 2)

6

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of HL RCC BridgeKoul River in Jurail Lauch Rod ofRWD Road in the District ofKisanganjNavin Chandra Sarkar Katihar

Nab

ard

RW

D

Kis

anga

nj

200530062011293472520597

0101201805

RCC43000 -

022

012

032

018

021

4

091

9 1055

00

00

055

913375874 919

Due to Increase of Span Work is inProgress

8

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 6X2475M

HLRCC Bridge in 11th km ofMurarigach-Thakurgan road overChenga river at Chenga Ghat inKishanganj DistrictShiv Kishore Construction

PLA

N

Kis

anga

nj

1292

(s)

180

220

1720

850

0

RCC 14778 0

118

012

0 312

00

00

00

000000 0120 Work in Progress

9

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of 2x1650m RCC

Bridge over Kathliya Kochpara Dharin Kishanganj Block in the District ofKishanganjStar Construction

MM

SNY

Kis

anga

nj

6868

(s)

230

720

1426

153

244

33 RCC3300 18500

101

4

101

5 0100

0100

0100

050

00016691 0918

1 Bridge Work completed EW completed Work has been stoped by contractor2 Contractor Debared vide MD lt No 1015 dt 1503163 SPE recommended for rescind vide lt No 572 (WE) dt 100717

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n -

2 K

isan

ganj

Construction of RCC HL bridge(3x1600m) including approach roaddiversion and protection work inplace of 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjBIDYANAND GUPTA

FDR

Kis

anga

nj

570

9112

072

(S)

271

220

17

4983 30000

031

8

061

9 050

00

00

00

396012969 0619

Work in Progress1 Pile Work Completed

11

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(4X1600 m) in 11th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBINOD KUMAR SINGH FD

R

Kis

anga

nj

786

0012

073

(S)

271

220

17

6644 30000

031

8

091

9 050

00

00

00

206022407 0919

Work in Progress1 Pile Work Completed

12

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(3X1600 m) in 9th km ofBahadurganj-Tedhagach road in theDistrict of KishanganjBIPIN KUMAR SINGH FD

R

Kis

anga

nj

690

4312

090

(S)

271

220

174983 30000

041

8

071

9 0100

090

00

00 000

344870719

Work in Progress1 Foundation Work Completed

2 Sub-Structure Work Completed

13

Ext

erna

l Pro

ject

s D

ivis

ion

- 2 K

isan

ganj Construction of of HL RCC bridge

(5X1600 m) in 6th km ofKishanganj-Bahadurganj road underFDR in the District KishanganjBALRAM SINGH FD

R

Kis

anga

nj

791

4447

(S)

020

120

18

8305 3000003

18

091

9 00

00

00

00

000000 0919 Work in Progress

14

Ext

erna

l Pro

ject

s Div

isio

n - 2

K

isan

ganj

Construction of RCC HL bridge(2x1600m) including approach roaddiversion and protection work inplace of damaged by flood in 2017 inthe 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of KishanganjTIRUPATI BALAJEE EARTHWORK PVT LTD

FDR

Kis

anga

nj

442

7311

968

(S)

211

220

17

3322 30000

031

8

061

9 050

00

00

00

0009343 0619

Work in Progress1 Pile Work Completed

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

1

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 11th Km ofChandradei-Bangama-Matiyari-Mogra road in the district of ArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

857

6140

428

05

2014

105 495

270

220

16

260

820

17

0100

0100

020

010

00035325

1

220

18

2

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 5th KM ofJokihat - Dalmalpur road in thedistrict of Araria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

689

8940

428

05

2014

63 380

270

220

16

260

520

17

0100

0100

0100

065

00038533

122

018

3

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in3rd Km of Nasir Chowk BelwaMazgama-Mongara road in thedistrict of Araria(Braj Kishore Roy Village-Kamrgama Post-Tira JatmalpurPS-Kalyanpur District-Samastipur-847301)

WB

P Ph

ase-

2

Ara

ria

612

6440

428

05

201463 380

020

320

16

010

620

17

00

00

00

00

000000

09

2018

4

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Chandradei-Kamaldha-Paratha road along LaliahiDhar in 2nd Km in the district ofAraria(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Ara

ria

509

9540

428

05

2014

21 350

270

220

16

260

520

17

0100

0100

0100

070

0007893873

122

018

5

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in alongKakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district ofArariaNirman Engicons Pvt Ltd At +PO- Mohanpur District-Begusarai (Bihar)-851131

WB

P Ph

ase-

2

Ara

ria

757

7640

428

05

2014

75 100

270

220

16

260

820

17

060

00

00

00

00030178

062

019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

6

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 2nd KM of Karpoori Chowk - Patarghat Road in Palce of Old SP Bridge in the district of MadhepuraRaj Construction Meenapur Salmari Katihar-855113 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1417

44

404

280

520

14

99 320

071

220

16

061

220

18

0100

3090

00

00

00099830

12

2018

7

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 10th Km inKhurhan-Parel-Ratwara-Kapasia road

in the district of Madhepura(Extended part of RCD road 0 to 15km) (Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

851

6740

428

05

2014

100 320

071

220

16

061

120

18

0100

090

020

00

8

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th Km ofAlamnagar-Budhma- Mali road inthe district of Madhepura(Haque Construction Co SaraiSyed Ali Muzaffarpur-842001)

WB

P Ph

ase-

2

Mad

hepu

ra

595

8040

428

05

2014

42 320

071

220

16

061

120

18

0100

090

060

00

9

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 km)(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1732

66

404

280

520

14

198 38008

11

2016

071

120

18

0100

090

060

4040

000193309

11

2018

00053999

11

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

10

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 13th Km(2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in thedistrict of Madhepura (Extended partof RCD road 0 to 15 km)Brij Construction Pvt Ltd HouseNo-26 Nageshwar Colony KaviRaman Path Boring Road Patna-800001 (Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1084

08

404

280

520

14

84 300

131

220

16

121

220

18

0100

090

025

00

00071304

12

2018

11

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 15th Km inKhurhan-Parel-Ratwara-Kapasia roadon Laliya Dhar in the district ofMadhepura (Extended part of RCDroad 0 to 15 km)Ms Sri Ram Enterprises 2ndFloor Sri ram Tower MPDRoadNaya Bazar Bhagalpur-812002(Bihar)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

29

404

280

520

14132 320

130

920

17

120

920

19

085

010

00

00

00076940

09

2019

12

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw PileBridge(3x375M) from East inMadhepura District (Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Mad

hepu

ra

1433

00

436

2015

090

720

15

1125 350

270

220

16

260

220

180

1000

1000

1000

60000

145111

12

2018

13

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 16th KMof Kadava-Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

750

4640

428

05

2014

84 416

270

220

16

260

220

18

0100

0100

0100

065

000

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

14

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 18th KMof Kadava - Sonouli Road in PurniaDistrict(Tirupati Balaji Earth Work PvtLtd A230 PC ColonyKankarbagh Patna-800020)

WB

P Ph

ase-

2

Purn

ia

655

9240

428

05

2014

75 250

270

220

16

260

220

18

0100

0100

0100

065

15

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 4th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road in the District of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

685

3340

428

05

2014

50 475

270

220

16

260

220

18

0100

0100

2070

020

16

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 25th KM ofFalka-Sripur-Bhawanipur-KarmanChowk road (at Balia Ghat) in theDistrict of PurneaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

608

4540

428

05

2014

50 475

270

220

16

260

220

18

0100

080

05

00

17

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 3rd Km ofBelgachhi-Chandpur to Rouniya-Kanharia road in the district of PurniaBasant Vanijya LimitedLakhibagh Manpur Gaya-825003(Bihar)

WB

P Ph

ase-

2

Purn

ia

443

2240

428

05

2014

21 335

270

220

16

260

520

170

1000

1000

1000

70000

19689

122

018

00080000

12

2018

00044546

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

18

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Panchgachhiya - Nauhatta Road in Palce of Old SP Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1018

28

404

280

520

14

66 300

211

220

16

201

220

18

0100

030

00

00

19

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Panchgachhiya-Nauhatta road in Palce of damaged Old RCC Bridge in the district of Saharsa(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

764

6760

925

07

2014

50 300

211

220

16

201

220

18

020

00

00

00

20

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 5th Km ofBaluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road inPlace of SP Bridge in the district ofSaharsaShiv Kishore Construction PvtLtd At-Saidnagar Opposite PetrolPump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Saha

rsa

1257

84

404

280

520

14

99 320

270

220

16

260

220

18

0100

0100

0590

1050

00076375

122

018

21

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge in 3rd KM of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa W

BP

Phas

e-2

Saha

rsa

1031

43

404

280

520

14

112 - 00

00

00

00

000000 0 Technical Evaluation is in Process

22

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in11th KM of Baluwahat koshi bandhvia Aghori-Sakra-Paharpur-Baghwaroad in Place of SP Bridge in thedistrict of Saharsa(Devraha Construction Pvt LtdGoutam Nagar Ward No-12Saharsa-852201)

WB

P Ph

ase-

2

Saha

rsa

1632

71

404

280

520

14

99 1700

290

920

16

290

920

18

0100

0100

025

060

00068228

09

201

8

00086721

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

23

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridgewith its approach road in 15th KMof Ranginiya-Sonbarsa Road in Palceof Old SP Bridge in the district ofSaharsa(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Saha

rsa

1549

36

404

280

520

14

132 300

290

620

17

280

620

19

015

00

00

00

00017342

06

2019

24

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 11th KMof Sonbarsa-Gwalpara Road in Palceof Old SP Bridge in the District ofSaharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

768

9540

428

05

2014

66 320

061

220

16

051

220

18

0100

0100

575

010

25

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (1stCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1565

57

609

250

720

14

112 1550

061

220

16

051

220

18

0100

0100

1590

075

26

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 17th KM ofSonebarsa-Gwalpara road (2ndCutting) in the district of Saharsa(Ms Jai Mata Di ConstructionShri Krishnapuri (South)Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1001

77

609

250

720

14

56 300

061

220

16

051

220

18

0100

0100

080

070

27

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 9th KM ofShaur-Patarghat Road in Palce ofShitalpatti Old SP Bridge in thedistrict of Saharsa W

BP

Phas

e-2

Saha

rsa

1265

51

404

280

520

14

99 - 00

00

00

00

000000 Technical Evaluation is in Process

9039225916

12

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

28

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna Construction of HL RCC Bridge

with its approach road in 8th KM ofSimri-Bakhtiyarpur-Salkhua road inPlace of damaged Old SP Bridge inthe district of Saharsa(Ms Trimurti Engicons andTraders Pvt Ltd Co SrikantChoudhary Tatma Toli RajabanNear Chath Pokhar Purnea-854301)

WB

P Ph

ase-

2

Saha

rsa

1015

00

609

250

720

14

375 1000

150

420

17

141

020

18

0100

0100

070

550

00048038

10

2018

29

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridgewith its approach road in 14th KMof Chaudhara-Amha-Lokha-Saharsaroad in Place of damaged Old RCCBridge in the district of Saharsa(Sincon Infrastructure Pvt LtdSK Puri LG-1 amp 2 MajesticPlaza West Boring Canal RoadPatna-800001)

WB

P Ph

ase-

2

Saha

rsa

870

0060

925

07

2014

56 350

270

220

16

260

820

17

090

00

00

00

00025208

122

018

30

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 1st Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

749

1560

925

07

2014

375 260

270

220

16

260

220

18

0100

0100

0100

015

31

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 6th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Royal Infraconstru Ltd Godrej Waterside Building Tower No-1 4th Floor No-401 Plot No-5 DP Block Salt Lake Sector-V Kolkata-700091)

WB

P Ph

ase-

2

Supa

ul

642

7660

925

07

2014

375 240

270

220

16

260

220

18

0100

0100

0100

020

00057898

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

32

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 7th Km of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

796

0077

025

09

2014

50 250

081

120

16

071

120

18

0100

085

00

00

33

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 7th Km of Meha - Simar Ganpatganj Road in Palce of damaged Old SP Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

958

3140

428

05

2014

99 270

081

120

16

071

120

18

0100

0100

060

00

34

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

663

3640

428

05

201450 250

131

220

16

121

220

18

060

00

00

00

35

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

706

1740

428

05

2014

50 20013

12

2016

121

220

18

0100

0100

040

00

36

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridge with its approach road in 1st KM of Parsarma-chinkni road in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

531

8840

428

05

2014

33 200

120

820

17

110

820

19

2070

00

00

00

12

2018

000147208

11

2018

00087394

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

37

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge in 4th KM of Perserma-Chikni road in Palce of damaged Old SP Bridge (on Khardaha Dhar) in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

550

6640

428

05

2014

50 200

120

820

17

110

820

19

575

00

00

00

38

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 4th KM of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old RCC Bridge in the district of Supaul(Lall Construction Co AA-105 Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

792

7460

925

07

2014

56 250

120

820

17

110

820

19

570

00

00

00

39

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM of Supaul Station to Bariya Manch in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

943

4740

428

05

2014

50 350

270

220

16

260

220

18

0100

0100

0100

1020

40

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a

Construction of HL RCC Bridge with its approach road in 3rd KM Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

387

2940

428

05

2014

33 16027

02

2016

260

220

18

080

00

00

00

41

Ext

erna

l Pro

ject

s D

ivis

ion

Patn

a Construction of HL RCC Bridgewith its approach road in 5th KM ofChhatapur-Girdharpu-Chunni road inthe district of Supaul(Lall Construction Co AA-105Shalimar Bagh Delhi-110088)

WB

P Ph

ase-

2

Supa

ul

1988

26

404

280

520

14

165 300

140

220

17

130

220

19

0100

060

00

00

1768144863

02

2019

223480868

08

2019

00067577

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

42

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in 2nd KM of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul(Tirupati Balaji Earth Work Pvt Ltd A230 PC Colony Kankarbagh Patna-800020)

WB

P Ph

ase-

2

Supa

ul

1645

25

404

280

520

14

175 300

270

220

16

260

220

18

0100

0100

0100

070

000106862

122

018

43

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction RCC Bridge with itsapproach road in Dubhari-ChaklaGhat to Kosi Embankment road (NearSpur) on 5720 RD of KosiEmbankment in the district of Supaul Vishwanath Sharma Vill + PO-Rahua PS-Rosera District-Samastipur-848210 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1530

91

404

280

520

14

175 350

171

020

16

161

020

18

0100

0100

060

00

00093632

10

2018

LA Issue

44

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul Shiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1151

28

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

090

050

45

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of SupaulShiv Kishore Construction At-Saidnagar Opposite Petrol Pump Laheriasarai Darbhanga-846001 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1150

91

770

250

920

14

100 300

270

220

16

260

220

18

0100

0100

1090

050

6624165314

122

018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

46

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Khardaha river near Bela village in Veena-Jharkha road in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

859

4377

025

09

2014

75 300

270

220

16

260

220

18

0100

0100

15100

2020

47

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul(Balram Singh So Late Surendra Nath Singh At+Post-Patory (Panchgachiya) District-Saharsa-852124)

WB

P Ph

ase-

2

Supa

ul

729

5177

025

09

2014

50 300

270

220

16

260

220

18

085

075

020

00

48

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul (Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

1172

78

770

250

920

14

100 350

150

220

17

140

220

19

025

00

00

00

49

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

867

7777

025

09

2014

75 350

150

220

17

140

220

19

055

00

00

00 LA Issue

00082067

072

019

00036515

02

2019

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018

30092018

Financial

Foundat

ion

(in

)

Sub-

Str

uct

ure

(in

)

Super

- Str

uct

ure

(in

)

Appro

ach

(in

)

Cum

ula

tive

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Rem

arksPhysical

SlN

o

Div

isio

n

Nam

e O

f W

ork

Hea

d

Sub

Hea

d

Dis

tirc

t

Adm

inis

trat

ive

Appro

val

Typ

eLe

ngth

Of

Bridge(

M)

Length

of

Appro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

fSch

edule

d

com

ple

tion

Achievement for the month till month

Like

ly d

ate

of

com

ple

tion

50

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road in Basba Gaon in Basbitti Panchyat near 626 RD of Kosi Embankment in the District of Supaul(Devraha Construction Pvt Ltd Goutam Nagar Ward No-12 Saharsa-852201)

WB

P Ph

ase-

2

Supa

ul

705

9077

025

09

2014

50 500

270

220

16

260

520

17

0100

0100

0100

070

00049295

122

018

51

Ext

erna

l Pro

ject

s Div

isio

n Pa

tna

Construction of HL RCC Bridge with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of SupaulMukesh Kumar Singh At-Ekderwa Masuria PO-Maker Saran-841215 (Bihar)

WB

P Ph

ase-

2

Supa

ul

1317

24

935

231

220

14

125 350

290

920

16

290

920

18

0100

0100

0100

090

00099929

09

2018