October 19, 2009 OpenSG - AMI-ENTERPRISE 1
The Framework, Standards, and Plans
AMI-Enterprise Service Definition Team
Introduction
• The service definition process (high level view)
• IEC CIM alignment
• Future Plans
October 19, 2009 OpenSG - AMI-ENTERPRISE 2
October 19, 2009 OpenSG - AMI-ENTERPRISE 3
The Process
Use Cases
Business Processes
Integration Requirements
Services
•WSDLs
•XSDs
System Requirements Specification
For more info: smartgridipedia.org: HOW-TO service definition document
30,000 ft Level
October 19, 2009 OpenSG - AMI-ENTERPRISE 4
The Process
• Logical model input & development• Identification of integration requirements• Pattern naming• Information objects• Artifact generation• Posting• Issue generation and resolution• Versioning
October 19, 2009 OpenSG - AMI-ENTERPRISE 5
Logical Model Input
• IEC 61989-9 and Multispeak are the primary model inputs
• Use case contributions from SCE, Consumers Energy
• Up Coming additions: PHEV, OpenADE, OpenADR
SDO – User Group Relationship
• Iterative process• Analogy – early browser
development
October 19, 2009 OpenSG - AMI-ENTERPRISE 6
SDO
User Community
Thou shalt...
Yes and...
OpenSG example• First pass – IEC CIM draft XSD as
informative• Now – XSD as normative
Feedback
IEC CIM Alignment
• Consistent –some features of the spec, and in accordance, but also some additional features
• Compliant – some of spec not implemented, but what is implemented is in accordance
• Conformant – All features of spec implemented, but some additional features that are not conformant
• Fully Conformant – full correspondence between the spec and implementation.
October 19, 2009 OpenSG - AMI-ENTERPRISE 7
.
- Specification
- Implementation
Irrelevant
. Consistent
. Compliant
.Conformant
. Fully Conformant
Adapted from TOGAF 9
October 19, 2009 OpenSG - AMI-ENTERPRISE 8
Logical Model Development
• Standardized actors from AMI-ENT SRS
• Document business process in use cases and activity diagrams
October 19, 2009 OpenSG - AMI-ENTERPRISE 9
Identify Integration Requirements
• Simply where a process flow crosses an actor boundary
October 19, 2009 OpenSG - AMI-ENTERPRISE 10
Harmonize Integration Requirements
• Compare integration requirements and look for commonality:– Common actors– Common consumers– Common providers– Common information objects
• Eliminate duplicates, refine integration requirements
October 19, 2009 OpenSG - AMI-ENTERPRISE 11
Patterns – Using CIM Verbs
• Pattern naming allows for both ESB and non-ESB (point-to-point) architectural assumptions
• Verbs and Information objects are based IEC 61968
• Verb examples: – Create, Created– Send, Reply
• Information Object examples:– EndDeviceAsset– MeterSystemEvent– MeterReading
<IEC Verb><Information Object> e.g. CreatedMeterReading
October 19, 2009 OpenSG - AMI-ENTERPRISE 12
Artifacts & Versioning
Information objects are modeled in UML using Sparx EA. 1. IEC CIM is used as a Reference Model2. Classes and attributes are selected and transformed into
Semantic Model3. Each context folder contains an entity class diagram that lists all
entities that are used to describe an information object. 4. A model driven application tool is used to automatically generate
XSDs (implementation).
WSDL version control
An XSD is imported in a WSDL for data type definition.Two namespaces (XSD & WSDL) exist in a WSDL definition as
shown below:
targetNamespace="http://www.smartgridipedia.org/2009/03/MeterReading.wsdl"
xmlns:typeOrig="http://www.smartgridipedia.org/2009/03/MeterReading"
October 19, 2009 OpenSG - AMI-ENTERPRISE 13
Notification
• Subscribe to the Listserv– http://listserv.enernex.com/cgi/wa.exe
• Send listserv e-mail– [email protected]
• When new artifacts are generated notices are sent via the listserv
• Issues with artifacts should be noted on the OpenSG collaboration site– http://osgug.ucaiug.org/default.aspx
Plans - Feedback
• Current work (if approved), is shared with IEC WG14 (Use Cases, Requirements, Artifacts)
• Begin service definition work on other approved efforts e.g. OpenADE, OpenADR
October 19, 2009 OpenSG - AMI-ENTERPRISE 14
OpenSG ballot
October ‘09 January ‘10
IEC WG14
On-going service definition work