OARnet Update Linda Roos

26
OARnet Update Linda Roos Gathering of State Networks February 4, 2004

description

OARnet Update Linda Roos. Gathering of State Networks February 4, 2004. Today’s Presentation. OARnet background OARnet current network Third Frontier Network. OARnet Background. Founded 1987 as part of the Ohio Supercomputing Center 90+ higher ed member institutions - PowerPoint PPT Presentation

Transcript of OARnet Update Linda Roos

Page 1: OARnet Update Linda Roos

OARnet UpdateLinda Roos

Gathering of State Networks

February 4, 2004

Page 2: OARnet Update Linda Roos

Today’s Presentation

• OARnet background

• OARnet current network

• Third Frontier Network

Page 3: OARnet Update Linda Roos

OARnet Background

• Founded 1987 as part of the Ohio Supercomputing Center

• 90+ higher ed member institutions

• Board of Regents funding

• OSTEER advisory council

• Internet2 gigapop

Page 4: OARnet Update Linda Roos

OARnet Background

• Over 2 million users downstream

• 1.8 Gigabits of commodity internet

• Ohio Valley Gigapop (Internet2) 2.5 Gbps

• Maintain over 4000 interfaces

• IP over ATM

Page 5: OARnet Update Linda Roos
Page 6: OARnet Update Linda Roos

Third Frontier Network

• Project Rationale

• History

• Backbone Acquisition and Funding

• Project Implementation

Page 7: OARnet Update Linda Roos

Project Rationale

• Started with a Bold Vision– The Ohio Plan: a $900 million research and

commercialization effort• Now Ohio’s $1.6B Third Frontier Project

– A Dark fiber network was essential to the plan• Ohio has a diverse and distributed array of research

universities– The state needs to use all its resources effectively

• Universities need to be connected to business & industry• Goal: “researcher in Athens and colleague in Cleveland could

work together as if labs next door to each others”

Page 8: OARnet Update Linda Roos

Rationale, continued

• Network Plan was Built on a Strong History– Ohio Supercomputer Center and the Ohio

Academic Resources Network (OARnet) were created in the mid-1980s

– SchoolNet created in the mid-1990s

Page 9: OARnet Update Linda Roos

Rationale, continued

• Why was Dark Fiber essential?– Cost and cost structure– Ability to manage the network to ensure:

• Quality of Service• Smooth scalability

Page 10: OARnet Update Linda Roos

History

• Given these circumstances, Ohio started to look at how to create a dark fiber network.

• In 2001, OARnet made a tentative commitment to a start-up, Mission Networks, that proposed to deploy a new fiber network to Tier 2 and 3 cities in Ohio.

• In early 2002, Mission Networks was unable to complete the financing for its project and did not build the network.

Page 11: OARnet Update Linda Roos

History

• It created the idea of a project structure where– Phase 1 would be replacing OARnet’s backbone

with dark fiber– Phase 2 would connect Ohio’s public universities,

private research universities, and federal labs to the network with dark fiber

– Phase 3 would be connecting other universities and colleges to the network.

• Recommended moving forward with an RFP for Phase 1

Page 12: OARnet Update Linda Roos

New Network

Page 13: OARnet Update Linda Roos

Backbone Acquisition

• In Summer of 2002, an RFP was issued

• Dark fiber was strongly preferred, but vendors were invited to propose alternative leased services.

• Vendors who bid dark fiber were required to offer a minimum of a single pair of fiber over their network.

Page 14: OARnet Update Linda Roos

Backbone Acquisition, cont.

• Statewide dark fiber committee decided– leased lambdas were too expensive and

not widely available.

• Selected a bid from Spectrum Networks that offered a package of fiber from– American Electric Power– Williams Communications (Wiltel), and – American Fiber Systems (AFS)

Page 15: OARnet Update Linda Roos

Backbone Acquisition, cont.

• Bid offered– Single pair of fibers– Connecting all of cities where OARnet had

a POP.– City rings in Cleveland and Columbus

• A public ring was already in place in Cincinnati

– Rings offering redundant routes to major cities.

Page 16: OARnet Update Linda Roos

Backbone Acquisition, cont.

• Fiber Purchased– More than 1600 route miles– $4.6 M for 20 year IRUs (Indefeasible Right

of Use)– $342K/yr for maintenance– Multiple types of fiber

• SMF-28, Teralight, and Truewave Classic• Aerial and buried

Page 17: OARnet Update Linda Roos

Backbone Financing

• Financing from Ohio State University– Long-term financing to pay for fiber ($7M)

• To be repaid by what OARnet had spent on its previous backbone

– Short-term financing ($2M)• To cover cost of running both networks in parallel and other

start-up costs.

• Financing from state capital budget– ($8.5M)

• To pay for equipment and last-mile connections for public universities, private research universities, and federal labs (17 institutions).

Page 18: OARnet Update Linda Roos

Project Implementation

• Guiding the project development– Multi-agency policy committee

• SchoolNet, DAS, OBR, OSC, and OARnet

– OARnet Advisory Committees

• Lighting and Architecture; Price Modeling Committee; Last Mile Committee; Implementation Committee

– OARnet Internal Staff Responsibilities• Project Management• Site Preparation• Network Management

Page 19: OARnet Update Linda Roos

Implementation, cont.

• First Two Tasks: Integration and Conversion1. Integration of purchased fibers

• Additional IRUs and Right of Ways are required• Fiber cannot be characterized until fibers are connected• Equipment can not be specified until fibers are

characterized.2. Preparation for Conversion by connecting new POPs

to old POPs.• Reduces the time required for conversion from old network

to new network• Decreases the time needed to run both networks

concurrently.

Page 20: OARnet Update Linda Roos

Implementation, cont.

• Lessons learned– With multiple types of fiber, fibers will have different core

sizes and splices will create inevitable core mismatches increasing attenuation.

• You want to minimize the number of these splices if you want to support high-speed bandwidth.

– Integration can be as or more legally complex process than purchasing the backbone fiber.

• There are many more fiber purchase, right-of-way, and maintenance agreements required.

Page 21: OARnet Update Linda Roos

Equipment

• Architectural choices– DWDM at the transport layer

• So we can have multiple private networks each with its own lambda

• Ability to provide Lambda for individual research project

– MPLS rather than SONET• Does not use as much bandwidth for overhead• Provides equivalent fail-over times.

Page 22: OARnet Update Linda Roos

Equipment

• Equipment Selection– Cisco selected for both Optical and

Switching Gear• Cisco 15454 DWDM• GSR 12000 Routers

– Equipment bought through SBC• SBC will do fiber characterization, configure,

pretest, and install equipment.• OARnet Team responsible for site preparation

Page 23: OARnet Update Linda Roos

Equipment

• Status– Equipment staged and tested at SBC

facility– Installation commencing following site

surveys and fiber characterization– Equipment being installed currently

Page 24: OARnet Update Linda Roos

Other Events

• RFP has been issued for last-mile connectivity to all higher education and K-12 telecom aggregation sites; vendors responded, proposals being reviewed.

• Setting policies on connecting to the network– Including business use of the network.

Page 25: OARnet Update Linda Roos

Next Steps

• Light and test backbone in April/May/June

• Connect first 17 institutions in June/July

Page 26: OARnet Update Linda Roos

Contact Information

Linda Roos

OARnet

[email protected]