NSP Reservoir 115 km85 km Halia Musi Paleru Munneru Wyra Kattaleru Pulichintala Project Barrage FRL:...

5
NSP Reservoir 115 km 85 km Halia Musi Paleru Munneru Wyra Kattaleru Pulichintala Project Barrage FRL: +53.34m Gross Cap: 45.75 TMC Live Cap: 36.23 TMC Spillwa y NOF NOF Non Over Flow Left Dam (442.60M) Non Over Flow Right Dam (91.50M) Spillwa y 754.90M ) Reservoir PULICHINTALA PROJECT Head works under progress

Transcript of NSP Reservoir 115 km85 km Halia Musi Paleru Munneru Wyra Kattaleru Pulichintala Project Barrage FRL:...

Page 1: NSP Reservoir 115 km85 km Halia Musi Paleru Munneru Wyra Kattaleru Pulichintala Project Barrage FRL: +53.34m Gross Cap: 45.75 TMC Live Cap: 36.23 TMC Spillway.

NSPReservoir

115 km 85 km

Hal

ia

Mus

i

Pal

eru

Mun

neru

Wyr

a

Kat

tale

ru

Pulichintala Project

Barrage

FRL: +53.34mGross Cap: 45.75 TMCLive Cap: 36.23 TMC

Sp

illw

ay

NOF

NOF

Non Over Flow Left Dam (442.60M)

Non Over Flow Right Dam (91.50M)

Spillway 754.90M)

Reservoir

PULICHINTALA PROJECT

Head works under progress

Page 2: NSP Reservoir 115 km85 km Halia Musi Paleru Munneru Wyra Kattaleru Pulichintala Project Barrage FRL: +53.34m Gross Cap: 45.75 TMC Live Cap: 36.23 TMC Spillway.

Spillway : 755.90 M

Left NOF : 422.60 M

Right NOF : 91.50 M

Gross Storage : 45.75 TMC

Live Storage : 36.23 TMC

MFD : 20,36,000C/s.

No. of Gates : 33Nos.

Riv

er

Tra

inin

g w

all

POWER

HOUSE

Riv

er

Tra

inin

g w

all

RIVER SLUICES

Dam Axis Length–1289 Mts.

Spill Way – 755.90 M

River Bed Portion400 Mts

NOF

91.5

0

L/S NOF – 441.60 M

CH 875M

CH 1275M

2116.60 M

Riv

er

Page 3: NSP Reservoir 115 km85 km Halia Musi Paleru Munneru Wyra Kattaleru Pulichintala Project Barrage FRL: +53.34m Gross Cap: 45.75 TMC Live Cap: 36.23 TMC Spillway.

1 Project Profile: Construction of Pulichintala Project (Balancing Reservoir) across river Krishna near Pulichintala (V), Guntur District. 85 Kms. U/S of Prakasam Barrage.

2 Administrative Sanction : G. O. Ms. No. 171, I & CAD, Dt: 30-10-2003 for Rs. 565.87 CroresG.O.Ms.No.208, I&CAD, Dt.18-11-2005, for Rs.681.604 Crs.

3 No. of EPC Packages : 1 No

4 Agreement value of 1 package : Rs.268.87 Crs.

5 Budget provision for 2006-07

: Rs.190.00 Crs.

6 Expenditure of the project

2004 – 05 : Rs. 66.82 Crs. (works Rs.2.26 Crs., LA=Rs.0.7 Crs., Estt. Rs.43.66 Crs., Misc. Rs.20.20 Crs.)

2005 – 06 : Rs. 172.31 Crs. (works Rs.2.20 Crs., LA=Rs.79.08 Crs., Forest Rs.58.54 Crs., Mob. Adv. Rs.26.42 Crs.)

Cum. Exp. : Rs. 239.13 Crs

7 Ayacut Stabilisation(Krishna Delta)

: 13.08 lakh acres

8 Land Acquisition

Required : 21310 acres

Acquired : 82 acres

PULICHINTALA PROJECT

Page 4: NSP Reservoir 115 km85 km Halia Musi Paleru Munneru Wyra Kattaleru Pulichintala Project Barrage FRL: +53.34m Gross Cap: 45.75 TMC Live Cap: 36.23 TMC Spillway.

9 Forest Land : 2859.441 acres. Forest clearance accorded from MOEF in Lr.No.F/8-7/05-Fc Div., New Delhi, dt.18-7-05.An amount of Rs. 109.21 Crs is to be deposited with forest authorities PCCF, Hyd. Rs.58.54 Crs. deposited to forest department.

10 Estimate cost of LA : Rs.230.62 Crs.

11 Estimate cost of R & R

: Rs.139.72 Crs.

12 Submergence of Villages No.of

VillagesNo. of

FamliesPopulation

No.of Villages

No. of Famlies

Population

Fully Submerged Villages 2 823 3847 5 1206 5262

Partly submerged 3 637 3035 2 695 3321

Villages where lands only affected

5 - - 1 - -

Total 10 1460 6882 8 1901 8583

Area Submerged

Nalgonda District Guntur District

13 Mob. Advance (Rs. in Crores) Paid Recovered

2005-06 : 26.42 -

Page 5: NSP Reservoir 115 km85 km Halia Musi Paleru Munneru Wyra Kattaleru Pulichintala Project Barrage FRL: +53.34m Gross Cap: 45.75 TMC Live Cap: 36.23 TMC Spillway.

Pkg.No. 12 : Construction of Pulichintala Project (Balancing Reservoir, Head works & its Components works)

Name of the Contractor : M/s. Srinivasa Const CR-18G-JV

Agreement Amount : Rs. 268.87 Crs.Agreement Date : 30-09-2004Period of completion : 30 months (10 milestones)Target date of completion : 3/2007

Investigation : Completed

Designs (Earth dam, NOF dam and spillway) : approved 3 Nos. against 5 Nos.

Power house : with CE, CDO

Gates : to be submitted by the agency

Execution : In progress

Qty. of earth work done : 1,18,000 cum against 25,98,000 cum

No. of Machinery : 29 Nos.

Expenditure : 2004-2005

- Rs. 66.82 Crs.

2005-2006

- Rs. 172.31 Crs.

Cum. Inc. Mob. Adv. only - Rs.

239.13 Crs

Land Acquisition : Required 21310.23 Acres, Acquired 78.825

Acres

PULICHINTALA PROJECT