NewFields Environmental Data...
Transcript of NewFields Environmental Data...
Structured dataField data
Permit compliance data
Site plans
Occupational health data
Analytical dataLoc. Lat. Lon. Elev. Analyte Result Date
TP1 111112.1 213257.3 3.25 DCB 0.25 20/02/18
BH78 32320.3 121350.2 4.21 MCB 0.32 22/02/18
GP54 54523.4 54632.5 1.25 DNT 0.05 21/03/18
Historical records
Document archives
Lab and field notes
Scientific literature
Reports
Unstructured dataContracts
Case files
Fact witnesses
Court notes
Legal dataTemporal-spacial data
Video
3D models
Visual analytics
MapsN
10
m0
.5m
1m
1m 2m
2m
lorem ipsum
lorem ipsum
lorem ipsum
Visual dataScientific findings
Technical analysis
Environmental risk
Human risk analysis
Assessment data
DATABASE
Applicable legislation
Deep Water Horizon – Forensic chemistry and sampling design and analysis of environmental data for the NRDA (Natural Resource Damage Assessment). The result was the largest environmental database ever created.
NewFields Environmental Data Management
Modeling
Area 23
Description: Nitration Plant
Former Use: 2,4 - Dinitrotoluene Production
Comments:
Estimated Cost Percentage:
Client
Stakeholder A
Stakeholder C
Stakeholder B
27%
42%
12%
19%
S t a k e h o l d e r A
20151995
Stakeholder B
Stakeholder A
Stakeholder C
Client
2000 2005 2010
C h l o r o b e n z e n e s
Area 23
Contaminantsin Soils Jan, 2015
Stock AuditDec, 1999
Stock AuditDec, 1998
PROAFeb, 2007
DQRAMarch 2015
Map annotationOct, 1996
AuditDec, 2004
PROAFeb, 2007DQRA
March, 2015
Internal memoJuly, 1997
Benzenes
Toluides Toluenes
Click on a node to dowload document(s)
Project A Sign out
i Feature PropertiesSelect Area in the Map Data Relationship Model
Large cost allocation project – Interactive tool to visualize the allocated liabilities of multiple stakeholders, related remediation costs and link to information/evidence sources.
Portfolio management browser - Bespoke database and visualization tool for the management and analysis of environmental and other site related information.
FILTERS
SITESelect a Site
COUNTYAny County
AUDIT/INSPECTIONS REVIEWS
Any Review Date
FLAGS
Pre-feasibilityUnder AcquisitionPhase 1No Flag
AnyRemediationConstructionPost-construction
Phase 2
PLANNING STATUSAnyPre-planningApplication Submitted
Granted
Granted with Conditions
AppealClosure
END USE
IndustrialPublic UseResidential
Any VacantAllotmentCommercial
DESIGN STATUSAny
No Active DesignFeasibility StudiesConceptual Design
30% Design60% DesignFinal DesignConstructionPost-Construction
Abbots Bromley.StaffordshireAustrey,WarwickshireBridlinghton, EastYorkshireBridport,DorsetCavendishSuffolkLong, Whatton,LeicestershireMargaretting,EssexMichleton,GloucestershireNiton,Isle of WightNomansland,WiltshireNorham,NorthumberlandOldcotes,NottinghamshirePenkridge,StaffordshireRayne,EssexSaltfleet,LicolnshireTitchmarsh,NorthamptonshireYorxfor,Suffolk
UPDATE SEARCH
RESULTS
FILTERS