9,99410,800
Solar Decathlon
2
Artist Studio
13,9637,200
6
Corner House
13,9637,200
-4
Greenhouse
13,0697,992
-5
7,672
28,800-
Club house & Bathroom
1
34,86126,928
AGBDH
-
Party Palace
34,312
Classroom
10
44,667
20,184
8
Director’s House
Woodshop & Woodshed
8,237
3,600
23,722
5,400
-9
Factory
Green Forms
11
12
7421
7909water main
Project Title
Scale
Job Title
Page Number
Date
rohtuA
rengiseD
daeL
cistern
potentialcollection
existing water lines
possible new cisterns
currently collecting
proposed swimming pool(34k gal)
proximity groups
generaldirection of downhill
intern village
3
7
OVERALL
WATER BALANCE : BUILDINGS RANKED IN WATER DEMAND AND RAINWATER HARVESTING POTENTIAL
Buildings by Annual Average Water Balance Priority
Estimated Annual Indoor Demand(gal)
Estimated Annual Rainwater Harvesting Potential(gal)
121,704
226,849
2
3
4
5
6
7
8
9
10
11
121
2
ENERGY BALANCE : BUILDINGS RANKED IN MONTHLY ENERGY DEMAND, SIDY BY SIDE WITH THEIR ON-SITE SOLAR POWER POTENTIAL
= bury new line= bury grounding electrode 36” deep= install above-ground pull-box where buried junction box exists= install above-ground pull-box where no junction box exists= move sub-panel to accessible location= sub-panel= main panel= install sub-panel where some equipment exists= install sub-panel where no equipment exists
X
xA
B
CC
8512 Main
8604 Main x
x
A
B
C
x
x
x
x
C
A
x
85128604
85128604intern village
3
JanuaryFebruary
MarchApril
MayJune
JulyAugust
SeptemberOctober
NovemberDecember
1.5
2.5
3.5
4.5
5.5
6.5
kWh/m2/day
Average Solar Radiation for Flat-Plate Collectors Facing
South at Fixed Tilt in Austin, TX
0La tude - 15La tude La tude + 1590
ideal for solar PV
not suitable
possible but not ideal for solar PV
existing power lines
already PV
code compliance work
Code Compliance : keys explained
5
8
9
10
3
12
711
1
6
42
Buildings by Energy Balance Priority
943
3213.4OVERALL
Green Forms
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
411.18
42.25
Solar D
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
938.65
167.7
269.97
142.3
Factory
ACEnergy Poten-tial(kWh)
indoor demand (kWh)
905.43
122.27
Greenhouse
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
398.72
11.22
Classroom
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
289.45
4.94
Party Palace and Bathroom
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
5.4
Clubhouse and Bathroom
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
163.8
Woodshop and Woodshed
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
42.65
Corner House
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
94.87
Artist’s Residence
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
24.6
Director’s House
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
I23.74
Monthly Solar AC Power Potential (kWh)
Estimated Monthly Electrical Loads (kWh)
1
2
3
4
5
6
269.97
436.1
792.04
3213.4
Green Forms
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
411.18
42.25
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
938.65
167.7
Classroom
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
269.97
142.3
ACEnergy Poten-tial(kWh)
indoor demand (kWh)
905.43
122.27
Greenhouse
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
398.72
11.22
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
289.45
4.94
Clubhouse + Bathroom
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
163.8
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
163.8
Solar D
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
42.65
Artist Residence
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
386.7
Factory
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
AGBDB
ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
I23.74
Monthly Solar AC Power Potential (kWh)
Estimated Monthly Electrical Loads (kWh)
3
11
Buildings by Energy Balance Priority
3491.16 3226.19
OVERALL
411.18
1561.15
1
269.97436.1
2
338.01
938.65
4
154.32
905.43
5
289.45144.11
7
127.87
director’s house
42.65
woodshop+woodshed
109.87
corner house
8
9
10
11.76
Party Palace 12
6
Project Title
Scale
Job Title
Page Number
Date
roht
uA
re
ngiseD
daeL
9,99410,800
Solar Decathlon
2
Artist Studio
13,9637,200
6
Corner House
13,9637,200
-4
Greenhouse
13,0697,992
-5
7,672
28,800-
Club house & Bathroom
1
34,86126,928
AGBDH
-
Party Palace
34,312
Classroom
10
44,667
20,184
8
Director’s House
Woodshop & Woodshed
8,237
3,600
23,722
5,400
-9
Factory
Green Forms
11
12
7421
7909water main
Project Title
Scale
Job Title
Page Number
Date
rohtuA
rengiseD
daeL
cistern
potentialcollection
existing water lines
possible new cisterns
currently collecting
proposed swimming pool(34k gal)
proximity groups
generaldirection of downhill
intern village
3
7
OVERALL
WATER BALANCE : BUILDINGS RANKED IN WATER DEMAND AND RAINWATER HARVESTING POTENTIAL
Buildings by Annual Average Water Balance Priority
Estimated Annual Indoor Demand(gal)
Estimated Annual Rainwater Harvesting Potential(gal)
121,704
226,849
2
3
4
5
6
7
8
9
10
11
121
2
= install sub-panel where no equipment exists C
269.97
142.3ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
5.4
6ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
269.97
142.3ACEnergy Po-tential(kWh)
indoor de-mand (kWh)
154.32
905.43 289.45144.11
76
Water Balance - OverallEnergy Balance - Overall
Water Balance - IndividualEnergy Balance - Individual
C D
Established baseline demand of the existing site utility and initial performance baseline for potential on-site renewable energy and water technology.