1
ENERGY BALANCE : BUILDINGS RANKED IN MONTHLY ENERGY DEMAND, SIDY BY SIDE WITH THEIR ON-SITE SOLAR POWER POTENTIAL = bury new line = bury grounding electrode 36” deep = install above-ground pull-box where buried junction box exists = install above-ground pull-box where no junction box exists = move sub-panel to accessible location = sub-panel = main panel = install sub-panel where some equipment exists = install sub-panel where no equipment exists X x A B C C 8512 Main 8604 Main x x A B C x x x x C A x 8512 8604 8512 8604 intern village January February March April May June July August September October November December 1.5 2.5 3.5 4.5 5.5 6.5 kWh/m2/day Average Solar Radiation for Flat-Plate Collectors Facing South at Fixed Tilt in Austin, TX 0 La tude - 15 La tude La tude + 15 90 ideal for solar PV not suitable possible but not ideal for solar PV existing power lines already PV code compliance work Code Compliance : keys explained 5 8 9 10 3 12 7 11 1 6 4 2 Buildings by Energy Balance Priority AC Energy Po- tential (kWh) indoor de- mand (kWh) AC Energy Po- tential (kWh) indoor de- mand (kWh) AC Energy Poten- tial (kWh) indoor demand (kWh) AC Energy Po- tential (kWh) indoor de- mand (kWh) AC Energy Po- tential (kWh) indoor de- mand (kWh) Monthly Solar AC Power Potential (kWh) 792.04 3213.4 Green Forms AC Energy Po- tential (kWh) indoor de- mand (kWh) 411.18 42.25 AC Energy Po- tential (kWh) indoor de- mand (kWh) 938.65 167.7 Classroom AC Energy Po- tential (kWh) indoor de- mand (kWh) 269.97 142.3 AC Energy Poten- tial (kWh) indoor demand (kWh) 905.43 122.27 Greenhouse AC Energy Po- tential (kWh) indoor de- mand (kWh) 398.72 11.22 AC Energy Po- tential (kWh) indoor de- mand (kWh) 289.45 4.94 Clubhouse + Bathroom AC Energy Po- tential (kWh) indoor de- mand (kWh) 163.8 AC Energy Po- tential (kWh) indoor de- mand (kWh) 163.8 Solar D AC Energy Po- tential (kWh) indoor de- mand (kWh) 42.65 Artist Residence AC Energy Po- tential (kWh) indoor de- mand (kWh) 386.7 Factory AC Energy Po- tential (kWh) indoor de- mand (kWh) AGBDB AC Energy Po- tential (kWh) indoor de- mand (kWh) I23.74 Monthly Solar AC Power Potential (kWh) Estimated Monthly Electrical Loads (kWh) 3 11 Buildings by Energy Balance Priority 3491.16 3226.19 OVERALL 411.18 1561.15 1 269.97 436.1 2 338.01 938.65 4 154.32 905.43 5 289.45 144.11 7 127.87 director’s house 42.65 woodshop+woodshed 109.87 corner house 8 9 10 11.76 Party Palace 12 6 9,994 10,800 Solar Decathlon 2 Artist Studio 13,963 7,200 6 Corner House 13,963 7,200 - 4 Greenhouse 13,069 7,992 - 5 7,672 28,800 - Club house & Bathroom 1 34,861 26,928 AGBDH - Party Palace 34,312 Classroom 10 44,667 20,184 8 Director’s House Woodshop & Woodshed 8,237 3,600 23,722 5,400 - 9 Factory Green Forms 11 12 7421 7909 water main cistern potential collection existing water lines possible new cisterns currently collecting proposed swimming pool (34k gal) proximity groups general direction of downhill intern village 3 7 OVERALL WATER BALANCE : BUILDINGS RANKED IN WATER DEMAND AND RAINWATER HARVESTING POTENTIAL Buildings by Annual Average Water Balance Priority Estimated Annual Indoor Demand (gal) Estimated Annual Rainwater Harvesting Potential (gal) 121,704 226,849 2 3 4 5 6 7 8 9 10 11 12 1 2 Water Balance - Overall Energy Balance - Overall Water Balance - Individual Energy Balance - Individual C D Established baseline demand of the existing site utility and initial performance baseline for potential on-site renewable energy and water technology.

Transcript of New Portfoilo Cmpbs Water Energy Report 02

9,99410,800

Solar Decathlon

2

Artist Studio

13,9637,200

6

Corner House

13,9637,200

-4

Greenhouse

13,0697,992

-5

7,672

28,800-

Club house & Bathroom

1

34,86126,928

AGBDH

-

Party Palace

34,312

Classroom

10

44,667

20,184

8

Director’s House

Woodshop & Woodshed

8,237

3,600

23,722

5,400

-9

Factory

Green Forms

11

12

7421

7909water main

Project Title

Scale

Job Title

Page Number

Date

rohtuA

rengiseD

daeL

cistern

potentialcollection

existing water lines

possible new cisterns

currently collecting

proposed swimming pool(34k gal)

proximity groups

generaldirection of downhill

intern village

3

7

OVERALL

WATER BALANCE : BUILDINGS RANKED IN WATER DEMAND AND RAINWATER HARVESTING POTENTIAL

Buildings by Annual Average Water Balance Priority

Estimated Annual Indoor Demand(gal)

Estimated Annual Rainwater Harvesting Potential(gal)

121,704

226,849

2

3

4

5

6

7

8

9

10

11

121

2

ENERGY BALANCE : BUILDINGS RANKED IN MONTHLY ENERGY DEMAND, SIDY BY SIDE WITH THEIR ON-SITE SOLAR POWER POTENTIAL

= bury new line= bury grounding electrode 36” deep= install above-ground pull-box where buried junction box exists= install above-ground pull-box where no junction box exists= move sub-panel to accessible location= sub-panel= main panel= install sub-panel where some equipment exists= install sub-panel where no equipment exists

X

xA

B

CC

8512 Main

8604 Main x

x

A

B

C

x

x

x

x

C

A

x

85128604

85128604intern village

3

JanuaryFebruary

MarchApril

MayJune

JulyAugust

SeptemberOctober

NovemberDecember

1.5

2.5

3.5

4.5

5.5

6.5

kWh/m2/day

Average Solar Radiation for Flat-Plate Collectors Facing

South at Fixed Tilt in Austin, TX

0La tude - 15La tude La tude + 1590

ideal for solar PV

not suitable

possible but not ideal for solar PV

existing power lines

already PV

code compliance work

Code Compliance : keys explained

5

8

9

10

3

12

711

1

6

42

Buildings by Energy Balance Priority

943

3213.4OVERALL

Green Forms

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

411.18

42.25

Solar D

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

938.65

167.7

269.97

142.3

Factory

ACEnergy Poten-tial(kWh)

indoor demand (kWh)

905.43

122.27

Greenhouse

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

398.72

11.22

Classroom

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

289.45

4.94

Party Palace and Bathroom

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

5.4

Clubhouse and Bathroom

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

163.8

Woodshop and Woodshed

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

42.65

Corner House

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

94.87

Artist’s Residence

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

24.6

Director’s House

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

I23.74

Monthly Solar AC Power Potential (kWh)

Estimated Monthly Electrical Loads (kWh)

1

2

3

4

5

6

269.97

436.1

792.04

3213.4

Green Forms

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

411.18

42.25

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

938.65

167.7

Classroom

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

269.97

142.3

ACEnergy Poten-tial(kWh)

indoor demand (kWh)

905.43

122.27

Greenhouse

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

398.72

11.22

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

289.45

4.94

Clubhouse + Bathroom

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

163.8

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

163.8

Solar D

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

42.65

Artist Residence

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

386.7

Factory

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

AGBDB

ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

I23.74

Monthly Solar AC Power Potential (kWh)

Estimated Monthly Electrical Loads (kWh)

3

11

Buildings by Energy Balance Priority

3491.16 3226.19

OVERALL

411.18

1561.15

1

269.97436.1

2

338.01

938.65

4

154.32

905.43

5

289.45144.11

7

127.87

director’s house

42.65

woodshop+woodshed

109.87

corner house

8

9

10

11.76

Party Palace 12

6

Project Title

Scale

Job Title

Page Number

Date

roht

uA

re

ngiseD

daeL

9,99410,800

Solar Decathlon

2

Artist Studio

13,9637,200

6

Corner House

13,9637,200

-4

Greenhouse

13,0697,992

-5

7,672

28,800-

Club house & Bathroom

1

34,86126,928

AGBDH

-

Party Palace

34,312

Classroom

10

44,667

20,184

8

Director’s House

Woodshop & Woodshed

8,237

3,600

23,722

5,400

-9

Factory

Green Forms

11

12

7421

7909water main

Project Title

Scale

Job Title

Page Number

Date

rohtuA

rengiseD

daeL

cistern

potentialcollection

existing water lines

possible new cisterns

currently collecting

proposed swimming pool(34k gal)

proximity groups

generaldirection of downhill

intern village

3

7

OVERALL

WATER BALANCE : BUILDINGS RANKED IN WATER DEMAND AND RAINWATER HARVESTING POTENTIAL

Buildings by Annual Average Water Balance Priority

Estimated Annual Indoor Demand(gal)

Estimated Annual Rainwater Harvesting Potential(gal)

121,704

226,849

2

3

4

5

6

7

8

9

10

11

121

2

= install sub-panel where no equipment exists C

269.97

142.3ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

5.4

6ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

269.97

142.3ACEnergy Po-tential(kWh)

indoor de-mand (kWh)

154.32

905.43 289.45144.11

76

Water Balance - OverallEnergy Balance - Overall

Water Balance - IndividualEnergy Balance - Individual

C D

Established baseline demand of the existing site utility and initial performance baseline for potential on-site renewable energy and water technology.