New Parkway AtGrade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013

Transcript of New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE...

Page 1: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

New Parkway At‐Grade Intersection(PAGI)

1

ITE Western District Annual MeetingJuly 2013

Page 2: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

ProjectAjo

Why

Lukeville

RoblesJunction

Arivaca

Sasabe

ArivacaJunction

Catalina

RediA

COC

SANTA CRUZProject

N

Project

Map source:  Google Maps

N

Project Location

You are here

Tucson Metro Area Population 990,000.

Page 3: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Existing Land Use and Parcel Boundaries

Page 4: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

215’

600’

900’

740’

950’

210’

175’ Legend

Lane Use

Traffic Control

Storage Length (ft.)

2008 Average Daily Traffic

XXX’

Kolb Rd.

Valencia Rd.

N

19,406

45,462

29,543

15,935

XX,XXX

24‐hour two‐way traffic volumes, collected Wednesday, March 26, 2008.

Source: Kolb Road / Valencia Road Intersection Final Traffic  Engineering Study, prepared by Kimley‐Horn and Associates, Inc., June 2008, prepared for Pima County Department of Transportation.

Existing Conditions

4

Page 5: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

2011 Turning Movement Volumes AM (PM)

Valencia Road

Kolb

Roa

d

1,34

1 (5

89)

521

(590

)25

4 (5

95)

29 (1

6)59

7 (5

60)

20 (1

34)

655 (373)501 (180)26 (41)

647 (990)227 (382)

20 (11)N

BA

ppro

ach

646

(710

)

SBA

ppro

ach

2,11

6 (1

,774

)

EBApproach894 (1,383)

WBApproach1,182 (594)

Total VehiclesAM = 4,838PM = 4,461

Source: Pima County Department of Transportation, May 5, 2011.  

Numbers shown in red font represent critical movements at the intersection.

N

5

Page 6: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

PM Photos

Northbound

Eastbound Southbound

6

Page 7: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

AM Performance StatisticsTotal Delay (hr):              56.0 Delay/Vehicle (s/veh):  41.8Total Stops:                    3,305Stops/Vehicle:                 0.68Total Vehicles:               4,821

PM Performance StatisticsTotal Delay (hr):              93.0Delay/Vehicle (s/veh):  75.7Total Stops:                   4,624Stops/Vehicle:                 1.05Total Vehicles:               4,439

Existing Condition2011 Volumes

N

Note: Level of Service (LOS)Shown AM (PM)

LEVEL OF SERVICE BY MOVEMENT

E(E)

D(E

)D

(D)

Valencia Road

Kolb Roa

dIntersection LOS

AM = DPM = (E)

Red Font = Critical LOS

120 sec. Cycle Length

7

Page 8: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Project Background• 2005 – 2008 Pima County contracts to study alternatives.• June 2008 Traffic Study: By‐pass option (new southern alignment) 6‐lane 

arterial  with grade separation needed for long‐term improvement ($40M ‐ $45M).

Existing intersection and alignment

Proposed new southern alignment and new intersections

Valencia Road

Kolb Road

N

Florida T‐Intersection

Florida T‐Intersection

Diamond Interchange

Page 9: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

• 2010 ‐ County searches for additional funding for the project.• Nov. 2010 PC advertises for DCR and Design Services – consultants must 

propose alternative that balances performance and cost using design traffic volumes provided.

• Feb. 2011 EPS awarded contract based on innovative design concept.- Several additional alternatives evaluated on southern alignment.- PAGI on existing (northern alignment) recommended.  - $16M PAGI concept “works better, costs less” and provides long term 

improvement.• 2012 PAG RTA takes over contract – asks for development of interim 

intersection improvement to reduce initial project cost.

Project Background

Page 10: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

MCDOT Parkway‐Parkway Grade Separated Interchange (PGSI)Source: Arizona Parkway Intersection/Interchange Operational Analysis and Design Concepts Study, August 2009, MCDOT.

PAGI Concept Development Started Here 

Page 11: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Source: Arizona Parkway Intersection/Interchange Operational Analysis and Design Concepts Study, prepared for the Maricopa County Department of Transportation, prepared by Wilson & Company in association with Morrison‐Maierle, Inc., August 2009.

Page 12: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Design Year Traffic VolumesDesign Volumes AM (PM)

Valencia Road

Kolb

Roa

d

640

(750

)87

0 (8

80)

690

(1,0

10)

30 (5

0)84

0 (8

60)

280

(860

)

1,060 (940)2,720 (1,580)680 (510)

710 (930)1,300 (2,930)

50 (40)N

BA

ppro

ach

1,15

0 (1

,770

)

SBA

ppro

ach

2,20

0 (2

,640

)

EBApproach

2,060 (3,900)

WBApproach

4,460 (3,030)

Design Year Total Vehicles

AM = 9,870PM = 11,340

N

2011Total Vehicles

AM = 4,838PM = 4,461

Page 13: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

PAGI Defining Characteristics

• Indirect left‐turns• 2‐Phase traffic signals.• Quadrant roadways (ramps) for high volume left‐turn movements.

• On‐ramp merge areas.• No left‐turn out for adjacent land development.

Page 14: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Initial PAGI Conceptualization

Page 15: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp
Page 16: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

PM Design Traffic

Page 17: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

B(C)

C(D)

C(B)B(B)

D(D)

B(B

)A

(A)

D(D

)

C(C

)B

(C)

B(A

)

AM Performance StatisticsTotal Delay (hr):              98.1 Delay/Vehicle (s/veh):  36.0Total Stops:                    8,048Stops/Vehicle:                    0.8Total Vehicles:               9,813

PM Performance StatisticsTotal Delay (hr):           141.5Delay/Vehicle (s/veh):  45.2Total Stops:                 11,158Stops/Vehicle:                  1.0Total Vehicles:            11,271

A(A)

C(C

)

A(B)C(C) C

(D)

PAGI w/3 RampsDesign Volumes

N

Note: Level of Service (LOS) Shown AM (PM)

LEVEL OF SERVICE BY MOVEMENT

Kolb Roa

d

120 sec. Cycle Length

Page 18: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Turning Movement PathsNB Left‐TurnSB Right‐TurnWB Left‐TurnEB Right‐TurnEB Left‐TurnWB Right‐TurnSB Left‐TurnNB Right‐Turn

PAGI W/3‐Ramps:  Recommended  Ramp Locations Shown in Blue.

Note that right‐turns will be allowed at the main intersection on all approaches for local access.

745’

755’

760’

• Existing and future land development• Ramp placement• Ramp geometry and acceleration lane 

length (design speed)• Local access potential• Existing access/access control impacts and 

turn restrictions• Right‐of‐way impacts• Pedestrian/bicycle accommodations

Page 19: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Potential Development Access Locations

Restricted access through ramp taper.

Northern Alignment

Potentially relocate McCulloch Dr.

Page 20: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Contract Amendment

• Compare the northern and southern alignment alternatives– Traffic Analysis and Cost Estimation

• Northern Parkway At‐Grade Intersection (PAGI)• Southern Conventional • Southern Continuous Flow Intersection (CFI)• Southern PAGI• Southern Grade Separated Diamond Traffic Interchange (DI)

– Environmental Impact Analysis

Page 21: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

AM Performance StatisticsTotal Delay (hrs):           159.7 Delay/Vehicle (s/veh):  57.8Total Stops:                 10,821Stops/Vehicle:                   1.1Total Vehicles:              9,943

PM Performance StatisticsTotal Delay (hrs):          224.3Delay/Vehicle (s/veh):  71.6Total Stops:                 14,212Stops/Vehicle:                  1.3Total Vehicles:            11,278

CFISouthern Alignment2025 Design Volumes

N

LEVEL OF SERVICE BY MOVEMENT

*(*)

B(B

)A

(A)

Kolb Roa

d

Note: Level of Service (LOS)Shown AM (PM)

** Minimal volume assumed forthis movement in this alternative

C(A

)D

(D)

A(A

)B(B)

C(D)

Page 22: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

0.010.020.030.040.050.060.070.080.090.0

100.0110.0120.0130.0140.0150.0

AM PM

Delay Per Veh

icle  (Sec/Ve

h)Delay Per Vehicle Comparison By Alternative 

2025 Design Volumes

PAGI North CFI South PAGI South DI South Conventional South

LOS DLOS D

LOS E LOS E

LOS E

LOS F

LOS F

LOS E

LOS F

LOS E

Page 23: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Total Delay & Cost Comparison of Alternatives

Incremental B/C < 0

Page 24: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

PAG RTA Interim Improvement Traffic Analysis

• Goals and Objectives– Identify interim improvement based on existing traffic distribution:

• Minimize cost.• Maximize use of existing roadway and right‐of‐way.• Provide improved traffic operations with residual capacity for traffic growth.

• Improve traffic safety by reducing conflicts and crash potential.• Minimize “throw away” elements to upgrade to ultimate improvement.

– Estimate traffic operations life span of interim improvement.– Address access needs for adjacent development while providing 

access management for improved safety and efficiency.• Constraints

– Valencia Road and Kolb Road will remain 4‐lane divided roadways except for the improvements needed for the interim improvement.

24

Page 25: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Alternatives Analysis1. Configuration of Alternatives Considered

– 3‐Ramp PAGI considered as base condition.– 2‐Ramp PAGI w/dual southbound right‐turn lanes (elimination of NW 

ramp).– 3‐Ramp PAGI w/dual westbound right‐turn lanes. 

2. Traffic Volume Alternatives Considered– Existing traffic volumes (2011).– Existing traffic volumes + 50% growth (estimate of service life).

3. Enhanced Access alternatives– Location of SE ramp.– Access to NE quadrant w/egress option from NW development.

25

Page 26: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

0.010.020.030.040.050.060.070.080.0

AM PM

Delay Per Veh

icle  (Sec/Ve

h)Delay Per Vehicle Comparison

Existing Condition (2011 Vols)

3‐Ramp PAGI Base Condition (2011 Vols)

2‐Ramp PAGI w/2 SB RT Lanes (2011 Vols)

3‐Ramp PAGI Base Condition (2011  +50% Vols)

3‐Ramp PAGI w/2 WB RT Lanes  (2011 +50% Vols)

2‐Ramp PAGI w/2 SB RT Lanes (2011  +50% Vols)

Comparison of Alternatives w.o./Access Alternative

Page 27: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

A(A)

C(C)

B(C

)A

(B)

C(C

)AM Performance StatisticsTotal Delay (hr):           91.1Delay/Veh (s/veh):      45.8 Total Stops:                 6,509 Stops/Vehicle:                0.9 Total Vehicles:            7,153 

PM Performance StatisticsTotal Delay (hr):            92.6 Delay/Veh (s/veh):       50.2 Total Stops:                 6,870 Stops/Vehicle:                1.0 Total Vehicles:            6,647 

2‐Ramp PAGI, Dual SB RTW/Access Alternatives

2011 Volumes +50% GrowthN

Note: Level of Service (LOS) Shown AM (PM)* Indicates Site Traffic Included in Metric Estimates.

LEVEL OF SERVICE BY MOVEMENT

Valencia Road

Kolb Roa

d

Intersection LOSAM = DPM = (D)

100 sec. Cycle Length

A(A

)

B(C)

D(B)C(B)

D(D) E(C

)E

(C)

C(A

)D

(C)

A(C)A(B)

C(B

)C

(B)

A(A)C(B)

E. Southpoint Rd

27

Page 28: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

AM PMDelay Per Vehicle  (Sec/Veh)

Delay Per Vehicle Comparison

2‐Ramp PAGI w/2 SB RT Lanes (50% Growth)

2‐Ramp PAGI, Dual  SB RT Lanes  W/Access  Alt (50 % Growth)

2‐Ramp PAGI, Dual  SB RT Lanes  W/Access  Alt (50 % Growth+Site)

Page 29: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Conclusions• The PAGI provides a low cost, high capacity alternative.• The PAGI provides a flexible design alternative in conjunction 

with the use of indirect left‐turns and 2‐phase traffic signals. – Ramp placement/design can be tailored:

Turn volume demand (ramps placed only where needed).Existing and proposed land development.  

• Quadrant ramps can be designed for two‐way traffic and access to adjacent development.

• 2‐Phase signals provide greater flexibility in setting timing/phasing/offsets and coordination to address traffic demand needs.

• Consideration of ramp placement can allow conversion of main intersection to a grade‐separation if needed, without relocation of ramp intersections.

29

Page 30: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Example of a Quadrant IntersectionAmherst Ave/Old Keene Mill Rd Springfield, VA

Page 31: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Contact Information

31

Darrell TruittEPS Group, Inc.2045 South Vineyard Ave, Suite 101Mesa, AZ 85210480‐503‐[email protected]

James WitkowskiEPS Group, Inc.8710 N. Thornydale Rd., Suite 140Tucson, AZ 85742520‐408‐[email protected]

Page 32: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

Bike and Ped Treatment w/Right‐lane Merge

Right‐lane merge – bike lane and sidewalk configuration (urban design – not for use on limited access freeways). Image source: FHWA Course on Bicycle and Pedestrian Transportation – Lesson 19 Bicycle Lanes.

Page 33: New Parkway At Grade Intersection (PAGI) · New Parkway At‐Grade Intersection (PAGI) 1 ITE Western District Annual Meeting July 2013. Project Ajo Why Lukeville Robles ... 2‐Ramp

A(A)

C(C)

B(C

)A

(B)

C(C

)AM Performance StatisticsTotal Delay (hr): 91.1 (93.5*)Delay/Veh (s/veh): 45.8 (46.6*)Total Stops: 6,509 (6,617*)Stops/Vehicle: 0.9 (0.9*)Total Vehicles: 7,153 (7,230*)

PM Performance StatisticsTotal Delay (hr): 92.6 (95.9*)Delay/Veh (s/veh): 50.2 (50.5*)Total Stops: 6,870 (7,173*)Stops/Vehicle: 1.0 (1.1*)Total Vehicles: 6,647 (6,830*)

2‐Ramp PAGI, Dual SB RTW/Access Alternatives

2011 Volumes +50% GrowthN

Note: Level of Service (LOS) Shown AM (PM)* Indicates Site Traffic Included in Metric Estimates.

LEVEL OF SERVICE BY MOVEMENT

Valencia Road

Kolb Roa

d

Intersection LOSAM = DPM = (D)

100 sec. Cycle Length

A(A

)

B(C)

D(B)C(B)

D(D) E(C

)E

(C)

C(A

)D

(C)

A(C)A(B)

C(B

)C

(B)

A(A)C(B)

E. Southpoint Rd

33