Problem StatementThe System level BOM of the Urbanna server product was ready in time to align with the new CPU silicon launch but the motherboard would not be production ready if we shipped by ocean.
The cost of shipping the entire product by air vs. ocean would add over $100 of cost per unit.
Proposed SolutionIf we shipped just the motherboard by air and the system by ocean, there would only be a $10 dollar added cost per unit.
I gave this this presentation to Management showing how we could still be ready at launch and save $90/unit.
1K units needed to be available worldwide at launch so we were able to save $90K in shipping charges as a result of this proposal.
Management approved the proposal and the plan was executed flawlessly. Jim Gates503-707-1880
INVENTEC CHINA
PRODUCTION FACILITY
INTEGRATION SITES
EUROPE
USA, LAX
ASIA, JAPAN
SAP
LAX
MEAE
IJKK
SAP
SAP
SAP
SHANGHAI
SHIP THE CHASSIS FIRST(6 WEEKS BEFORE SILICON LAUNCH)
Dowling - T
Driskill – T 2.5”
Petrof Bay - T
Driskill – T 3.5”
INVENTEC CHINA
PRODUCTION FACILITY
INTEGRATION SITES
EUROPE
USA, LAX
ASIA, JAPAN
SAP
LAX
MEAE
IJKK
SAP
SAP
SAP
SHANGHAI
ONCE URBANNA PRODUCTION APPROVED,
SHIP BY AIR
INVENTEC CHINA
PRODUCTION FACILITY
INTEGRATION SITES
EUROPE
USA, LAX
ASIA, JAPAN
SAP
LAX
MEAE
IJKK
SAP
SAP
SAP
SHANGHAI
INTEGRATE ANDRE-PACKAGE
INVENTEC CHINA
PRODUCTION FACILITY
INTEGRATION SITES
EUROPE
USA, LAX
ASIA, JAPAN
SAP
LAX
MEAE
IJKK
SAP
SAP
SAP
SHANGHAI
INTEGRATE ANDRE-PACKAGE
SHIP BYTRUCK TO
NEARBY SAPWAREHOUSE
PRODUCT DELIVERED
ON TIME$90,000 OF
SHIPPING COSTS SAVED!