Problem Statement The System level BOM of the Urbanna server product was ready in time to align with the new CPU silicon launch but the motherboard would not be production ready if we shipped by ocean. The cost of shipping the entire product by air vs. ocean would add over $100 of cost per unit. Proposed Solution If we shipped just the motherboard by air and the system by ocean, there would only be a $10 dollar added cost per unit. I gave this this presentation to Management showing how we could still be ready at launch and save $90/unit. 1K units needed to be available worldwide at launch so we were able to save $90K in shipping charges as a result of this proposal. Management approved the proposal and the plan was executed flawlessly. Jim Gates 503-707-1880

Transcript of MUST VIEW IN SLIDE SHOW MODE - Gates Presentation on Air vs Boat vs Ground Final.PPTX

Page 1: MUST VIEW IN SLIDE SHOW MODE - Gates Presentation on Air vs Boat vs Ground Final.PPTX

Problem StatementThe System level BOM of the Urbanna server product was ready in time to align with the new CPU silicon launch but the motherboard would not be production ready if we shipped by ocean.

The cost of shipping the entire product by air vs. ocean would add over $100 of cost per unit.

Proposed SolutionIf we shipped just the motherboard by air and the system by ocean, there would only be a $10 dollar added cost per unit.

I gave this this presentation to Management showing how we could still be ready at launch and save $90/unit.

1K units needed to be available worldwide at launch so we were able to save $90K in shipping charges as a result of this proposal.

Management approved the proposal and the plan was executed flawlessly.   Jim Gates503-707-1880

Page 2: MUST VIEW IN SLIDE SHOW MODE - Gates Presentation on Air vs Boat vs Ground Final.PPTX

INVENTEC CHINA

PRODUCTION FACILITY

INTEGRATION SITES

EUROPE

USA, LAX

ASIA, JAPAN

SAP

LAX

MEAE

IJKK

SAP

SAP

SAP

SHANGHAI

SHIP THE CHASSIS FIRST(6 WEEKS BEFORE SILICON LAUNCH)

Dowling - T

Driskill – T 2.5”

Petrof Bay - T

Driskill – T 3.5”

Page 3: MUST VIEW IN SLIDE SHOW MODE - Gates Presentation on Air vs Boat vs Ground Final.PPTX

INVENTEC CHINA

PRODUCTION FACILITY

INTEGRATION SITES

EUROPE

USA, LAX

ASIA, JAPAN

SAP

LAX

MEAE

IJKK

SAP

SAP

SAP

SHANGHAI

ONCE URBANNA PRODUCTION APPROVED,

SHIP BY AIR

Page 4: MUST VIEW IN SLIDE SHOW MODE - Gates Presentation on Air vs Boat vs Ground Final.PPTX

INVENTEC CHINA

PRODUCTION FACILITY

INTEGRATION SITES

EUROPE

USA, LAX

ASIA, JAPAN

SAP

LAX

MEAE

IJKK

SAP

SAP

SAP

SHANGHAI

INTEGRATE ANDRE-PACKAGE

Page 5: MUST VIEW IN SLIDE SHOW MODE - Gates Presentation on Air vs Boat vs Ground Final.PPTX

INVENTEC CHINA

PRODUCTION FACILITY

INTEGRATION SITES

EUROPE

USA, LAX

ASIA, JAPAN

SAP

LAX

MEAE

IJKK

SAP

SAP

SAP

SHANGHAI

INTEGRATE ANDRE-PACKAGE

SHIP BYTRUCK TO

NEARBY SAPWAREHOUSE

Page 6: MUST VIEW IN SLIDE SHOW MODE - Gates Presentation on Air vs Boat vs Ground Final.PPTX

PRODUCT DELIVERED

ON TIME$90,000 OF

SHIPPING COSTS SAVED!