Falaj Al Qabail Interchange - Monthly Progress Report for February 2015

Transcript of Monthly Progress Report

  • SULTANATE OF OMAN

    MINISTRY OF TRANSPORT AND COMMUNICATIONS DIRECTORATE GENERAL OF ROADS & LAND TRANSPORT

    MUSCAT

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT TENDER NO. 51/2012

    MONTHLY PROGRESS REPORT NO. 14

    FEBRUARY 2015

    CONSULTANT:

    RENARDET S.A. & PARTNERS CONSULTING ENGINEERS LLC. P.O. Box 579, Muscat, P.C. 100, Sultanate of Oman

    CONTRACTOR:

    CONSOLIDATED CONTRACTORS CO. LLC P.O. Box 614, Muscat, P.C. 100, Sultanate of Oman

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 1

    Table of Contents

    1. PROJECT PARTICULARS .............................................................................................................................................. 2

    2. SCOPE OF WORK ....................................................................................................................................................... 3

    3. TYPICAL CROSS SECTIONS .......................................................................................................................................... 4

    4. SITE VISITS/ MEETINGS .............................................................................................................................................. 6

    5. F DEPLOYMENT ....................................................................................................................... 7

    6. PROGRESS S-CURVE ................................................................................................................................................... 8

    7. STATUS OF MAJOR ACTIVITIES ................................................................................................................................ 10

    8. BRIDGE PROGRESS SCHEDULE ................................................................................................................................. 11

    9. MSE WALLS PROGRESS SCHEDULE ........................................................................................................................... 12

    10. BOX CULVERTS PROGRESS SCHEDULE ...................................................................................................................... 17

    11. PROGRESS STATUS OF RETAINING WALLS ............................................................................................................... 22

    12. PROGRESS STATUS OF UTILITY CROSSING DUCTS .................................................................................................... 23

    13. PROJECT PROGRESS STRIP CHART ........................................................................................................................... 27

    14. FINANCIAL STATUS OF PAYMENTS .......................................................................................................................... 33

    15. DETAILS OF EQUIPMENT AVAILABLE AT SITE ........................................................................................................... 34

    16. EQUIPMENT HISTOGRAM ........................................................................................................................................ 35

    17. DETAILS OF MANPOWER AVAILABLE AT SITE .......................................................................................................... 36

    18. MANPOWER HISTOGRAM ....................................................................................................................................... 37

    19. QA/QC REPORTS ...................................................................................................................................................... 38

    20. STATUS OF MATERIAL APPROVALS .......................................................................................................................... 43

    21. ......................................................................................................................................... 45

    22. CORRESPONDENCE DURING THE MONTH................................................................................................................ 46

    23. PROGRESS PHOTOGRAPHS ...................................................................................................................................... 49

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 2

    1.

    Client: Ministry of Transport & Communications

    P.O. Box 684, Muscat, Postal Code 113

    Directorate General of Roads

    Sultanate of Oman.

    Consultant: Renardet S.A & Partners L.L.C.

    P.O. Box 579, Muscat, Postal Code 100

    Sultanate of Oman.

    Contractor: Consolidated Contractors Company L.L.C.

    P.O. Box 614, Muscat, Postal Code 100

    Sultanate of Oman.

    Project Commencement Date: 30.10.2013

    Mobilization Period: 60 Days

    Construction Period: 548 Days

    Completion date: 29.06.2015

    Original Contract Value:

    (Including Contingencies) R.O. 17,884,403.000

    Amount of Contingencies: R.O. 1,402,155.613

    Original Contract Value:

    (Excluding Contingencies) R.O. 16,482,247.387

    Planned Physical Progress for January 2015 6.50%

    Actual Physical Progress for January 2015 4.61%

    Planned physical progress cumulative up to

    end of January 2015

    77.31%

    Achieved physical progress cumulative up

    to end of January 2015 67.88%

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 3

    2.

    This project is located in Batinah Region on existing Batinah Highway in the Wilayat Sohar and

    consists of construction of an interchange in place of existing roundabout along with allied works.

    Total length of the project along Batinah highway is about 4.0 km which shall be converted from four

    lanes to six lanes with tapering back to 4lanes, all as shown on plans. Also included in the scope of

    work is the construction of service roads, pedestrian underpasses.

    The work also includes expropriation of properties, relocation/protection of services (sewerage,

    telephone, electricity, water, irrigation) road lighting works and traffic signals.

    Major items within the scope of work consist of but not limited to the following:

    Removal of existing asphalt surface, extension of existing embankment and earthwork to

    achieve the designed profile and gradient.

    Removal of existing drainage structures and construction of new ones including protection

    works as shown on construction drawings and as directed.

    Expropriation of open/built up properties and removal of existing structures thereupon.

    Construction of interchange ramps, Box Girder Bridge, roundabout, pedestrian underpasses and

    service roads.

    Provision of new street lighting system/traffic signals and removal/disposal of existing street

    light poles including conductors/cables, transformers, feeder pillars, foundations etc., all for the

    proper completion of the job.

    Construction of earthen embankment/sub grade, sub-base, aggregate base course, bituminous

    base course and bituminous wearing course as per details on the construction drawings.

    Installation of road side furniture (traffic signs, road marking etc.) and protection works on

    embankment slopes.

    Relocation/Protection of existing LT, 11KV and 33KV transmission lines and allied items

    (transformers etc.) as per the requirements of concerned authority.

    Relocation/Protection of existing utilities (sewerage, telephone, electricity, water lines and

    irrigation) as per the requirements of concerned authorities.

    Provision of ducts for future utilities as per the requirements of utility operator.

    Construction of concrete safety barriers, fixing of guard rails and paving tiles.

    Provision of traffic diversion in coordination with concerned authorities.

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 4

    3.

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 5

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 6

    4.

    S. No. Details of Site Visit/ meeting Date Final Outcome/ Decisions

    1 Meeting with Director of QS at

    Muscat Office.

    02.02.2015 Director instructed Consultant to

    get the Variation Order quantities

    verified by Renardet QS.

    2 Evaluation of Payment Application

    Surveyor.

    04.02.2015

    to

    07.02.2015

    Application No. 10 is completed.

    3 Meeting with Dept. of Water Supply 19.02.2015 1. Water Supply Department

    instructed to submit corrected

    drawing showing the fittings details

    for their approval.

    2. Electrical Cable Routing Drawing

    shall be submitted.

    3. Material Submittal for Fittings and

    Valves shall be submitted for

    approval.

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 7

    5.

    S.

    No. Name Designation

    Date of

    Joining

    1. Roberto Benigni Head Supervision Projects

    2. Muneer Abdul Resident Engineer 19.03.2014

    3. Hussein Shah Material Engineer 04.01.2014

    4. Ernesto B. Paredes Bridge Engineer 16.04.2014

    5. Sande H Tangaras Civil Engineer 08.06.2014

    6. Danilo Quantity Surveyor 19.06.2014

    6. Mohamed Safie Land Surveyor 04.01.2014

    7. Aseef Iqbal Site Inspector 10.02.2014

    8. Alaa Aldin Abdelfatah Site Inspector 30.03.2014

    9. Walid Samy Abdoh Mostafa Material Inspector 01.04.2014

    10. Haneefa Mohmmed Al Zadjali Secretary 13.04.2014

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 8

    6. -

    2013

    Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

    0.01 0.25 1.42 4.23 7.25 10.06 9.42 9.73 10.21 9.79 8.49 5.72 4.55 3.56 2.79 3.83 3.55 3.47 1.67 - - - -

    0.11 0.14 0.23 0.28 1.71 3.18 6.84 9.16 9.14 9.08 7.69 7.98 8.32 6.96 6.50 4.68 3.59 3.34 4.43 3.29 1.64 1.11 0.62

    - 0.28 0.18 1.01 3.69 4.85 5.18 7.36 7.30 9.33 6.20 6.02 6.23 5.64 4.52 - - - - - - - -

    0.01 0.26 1.67 5.91 13.15 23.21 32.64 42.37 52.58 62.37 70.86 76.59 81.13 84.69 87.48 91.31 94.86 98.33 100.00 100.00 100.00 100.00 100.00

    0.11 0.25 0.48 0.76 2.47 5.64 12.48 21.64 30.78 39.87 47.55 55.53 63.86 70.81 77.31 81.99 85.59 88.93 93.35 96.64 98.28 99.39 100.00

    - 0.28 0.45 1.46 5.16 10.01 15.19 22.55 29.86 39.18 45.39 51.41 57.63 63.27 67.79

    CUMULATIVE PROGRESS

    CL14 Org Plan Cumulative %

    Actual Cumulative

    2014 2015

    MONTHLY PROGRESS

    CL14 Org Plan per Month %

    Actual per Month

    Revised Sch. per Month %

    Revised Sch. Cummulative %

    0.00

    20.00

    40.00

    60.00

    80.00

    100.00

    120.00

    -

    2

    4

    6

    8

    10

    12

    Dec

    Jan

    Fe

    b

    Ma

    r

    Apr

    Ma

    y

    Jun

    Jul

    Aug

    Sep

    Oct

    Nov

    Dec

    Jan

    Fe

    b

    Ma

    r

    Apr

    Ma

    y

    Jun

    Jul

    Aug

    Sep

    Oct

    2013 2014 2015

    % C

    um

    ula

    tive

    % M

    ON

    TH

    LY

    MONTHS

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT PROJECT - OMANMONTHLY CL 14 PLANNED VS. ACTUAL MANHOURS

    CL14 Org Plan per Month % Revised Sch. per Month % Actual per Month CL14 Org Plan Cumulative % Revised Sch. Cummulative % Actual Cumulative

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 9

    REV.: 0

    PERIOD ENDING: Feb-15

    2013

    Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

    CL14 Plan % 0.30 8.67 19.23 26.89 31.77 36.64 41.51 46.39 51.26 56.13 61.01 65.88 70.76 75.63 80.50 85.38 90.25 95.13 100.00 100.00 100.00 100.00 100.00

    Revised Plan % 4.11 9.30 17.58 24.18 30.90 35.16 38.97 42.78 46.60 50.41 54.23 58.04 61.86 65.67 69.48 73.30 77.11 80.93 84.74 88.56 92.37 96.18 100.00

    Actual - 6.62 13.03 22.36 37.31 43.00 44.11 51.21 56.24 60.13 65.67 69.96 74.25 74.25 78.54

    CL14 Plan % 0.00 0.00 0.38 20.37 47.70 48.33 48.33 48.33 48.33 48.33 48.33 48.33 48.33 59.91 77.84 90.27 94.93 100.00 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - - - 7.40 29.85 78.13 78.13 78.13 78.13 78.13 78.13 78.13 78.13 78.13 78.13 80.66 87.59 88.57 100.00 100.00 100.00

    Actual - 10.09 10.09 17.59 19.52 77.42 69.96 70.18 70.18 70.18 83.49 84.12 84.95 84.46 84.46

    CL14 Plan % 0.00 0.00 0.00 0.78 6.58 16.76 29.38 41.37 58.64 66.60 74.18 82.85 84.75 84.75 85.24 92.34 92.34 98.36 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - - - - - 3.32 12.89 28.83 43.89 60.03 74.82 90.03 95.24 95.95 95.95 96.09 98.30 99.46 99.54 100.00 100.00

    Actual - - - - 4.35 4.89 - 5.27 14.93 29.52 47.15 47.31 67.50 79.41 74.90

    CL14 Plan % 0.00 0.00 1.01 9.21 29.30 45.91 56.90 62.24 64.59 67.94 69.08 69.08 75.05 82.85 93.48 98.64 100.00 100.00 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - - - 4.26 8.17 16.03 32.68 53.13 67.05 67.47 67.47 67.90 68.32 68.32 68.32 81.11 93.02 97.11 100.00 100.00 100.00

    Actual - - - 5.00 5.00 53.23 62.16 74.91 78.29 91.86 98.62 115.33 55.50 60.38 55.97

    CL14 Plan % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.07 26.27 41.98 59.98 78.73 79.90 79.90 85.20 89.45 92.60 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - - - - - - - - - 3.58 17.42 31.37 51.32 75.82 75.82 75.82 75.82 87.25 87.25 98.60 100.00

    Actual 1.26 3.19 5.42 10.68 27.25 39.98

    CL14 Plan % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 7.77 19.32 31.22 44.94 51.98 52.14 90.14 90.14 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - - - - - - - - - - - 0.08 8.44 22.42 46.57 51.97 52.05 86.74 90.13 93.11 100.08

    Actual

    CL14 Plan % 0.00 0.00 0.23 1.43 2.97 10.17 23.65 36.51 51.47 63.06 74.26 75.97 77.37 80.05 82.40 88.97 92.13 98.55 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - 0.26 2.64 7.33 20.62 35.14 50.06 62.76 68.40 72.78 74.07 74.67 83.42 84.04 84.30 87.32 95.58 98.11 99.44 100.00 100.00

    Actual - - - 0.48 1.26 5.59 14.93 27.72 40.08 55.38 66.20 71.35 77.45 79.50 81.70

    CL14 Plan % 0.00 0.00 4.02 15.21 34.62 57.89 69.26 81.40 83.38 83.46 84.50 92.89 99.96 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - - 2.77 7.75 13.76 22.09 29.64 39.02 49.64 59.51 71.33 85.14 87.00 93.50 100.00 100.00 100.00 100.00 100.00 100.00 100.00

    Actual - - - 0.01 6.05 14.73 18.14 22.33 26.30 30.75 34.14 46.19 56.00 70.86 76.31

    CL14 Plan % 0.00 0.00 0.00 0.00 0.00 0.38 1.21 2.63 3.42 4.23 5.50 6.08 6.08 34.35 99.38 99.76 99.76 100.00 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - - - - - - - - 8.09 26.17 57.85 78.53 94.70 94.70 94.70 94.70 98.41 100.00 100.00 100.00 100.00

    Actual - - - 2.50 69.64 14.39 13.24 16.19 16.72 27.56 21.22 41.44 54.32 63.05 83.60

    CL14 Plan % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.80 17.87 43.85 61.59 72.98 81.15 83.94 84.42 85.35 92.86 96.39 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - - - - - - - - 7.02 20.33 38.29 50.60 59.52 72.89 81.07 83.55 86.89 90.26 95.34 98.27 100.00

    Actual - - - - - 2.61 4.98 6.42 8.31 10.67 12.36 14.45 16.54 17.77 24.53

    CL14 Plan % 0.00 0.00 0.00 4.43 17.23 33.36 49.13 65.07 80.79 93.82 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - - - 0.99 2.30 17.26 33.64 49.01 64.70 79.88 95.44 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

    Actual - - - 6.16 9.87 17.63 25.69 35.90 49.03 65.95 72.27 72.29 83.86 91.41 98.93

    CL14 Plan % 0.00 0.00 0.00 0.00 0.00 0.17 0.79 1.43 5.65 13.41 21.84 30.56 32.94 70.94 75.04 94.02 96.43 100.00 100.00 100.00 100.00 100.00 100.00

    Revised Plan % - - - - - - - 0.33 2.34 9.42 17.07 23.51 31.40 41.66 47.49 47.55 47.55 83.28 93.95 97.61 100.00 100.00 100.00

    Actual - - - 0.13 5.52 9.26 13.38 16.87 17.75 20.45 14.38 26.70 24.67 22.20 35.00

    Revised Plan 0.11 0.25 0.48 0.76 2.47 5.64 12.48 21.64 30.78 39.87 47.55 55.53 63.86 70.81 77.31 81.99 85.59 88.93 93.35 96.64 98.28 99.39 100.00

    Actual Cum - 0.28 0.45 1.46 5.16 10.01 15.19 22.55 29.86 39.18 45.39 51.41 57.63 63.27 67.79 - - - - - - - -

    2013

    Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

    0.01 0.25 1.42 4.23 7.25 10.06 9.42 9.73 10.21 9.79 8.49 5.72 4.55 3.56 2.79 3.83 3.55 3.47 1.67 - - - -

    0.11 0.14 0.23 0.28 1.71 3.18 6.84 9.16 9.14 9.08 7.69 7.98 8.32 6.96 6.50 4.68 3.59 3.34 4.43 3.29 1.64 1.11 0.62

    - 0.28 0.18 1.01 3.69 4.85 5.18 7.36 7.30 9.33 6.20 6.02 6.23 5.64 4.52

    0.01 0.26 1.67 5.91 13.15 23.21 32.64 42.37 52.58 62.37 70.86 76.59 81.13 84.69 87.48 91.31 94.86 98.33 100.00 100.00 100.00 100.00 100.00

    0.11 0.25 0.48 0.76 2.47 5.64 12.48 21.64 30.78 39.87 47.55 55.53 63.86 70.81 77.31 81.99 85.59 88.93 93.35 96.64 98.28 99.39 100.00

    - 0.28 0.45 1.46 5.16 10.01 15.19 22.55 29.86 39.18 45.39 51.41 57.63 63.27 67.79

    2014 2015

    MONTHLY PROGRESS

    CL14 Org Plan per Month %

    Actual per Month

    CUMULATIVE PROGRESS

    CL14 Org Plan Cumulative %

    Actual Cumulative

    MMEP Works &

    Ducts4.03

    TOTAL 100.000

    Revised Sch. per Month %

    Revised Sch. Cummulative %

    83,264

    2,063,644

    L MSE walls 6.84

    J Drainage Works 1.50

    KIncidental

    Construction13.33

    30,920

    275,037

    141,190

    IConcrete for

    Bridge22.12

    H

    Concrete for

    Box Culvert

    /Underpas

    38.19788,138

    456,522

    GBituminous

    Pavement3.57

    FSubbase &

    Aggregate Base2.4250,004

    73,724

    EStructural

    Excavation0.72

    D Embankment 3.5974,043

    14,821

    C

    Clearing &

    Removal of

    Obstructions

    0.95

    2015

    B Road Diversions 2.73

    Budgeted

    Man-Hrs

    56,423

    19,558

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT - OMAN

    MANHOURS OVERALL PROJECT S-CURVE

    Item Description Wtd.

    %

    Plan/

    Actual

    2014

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 10

    7.

    Sl. No.

    Description Unit BOQ Qty.

    (Revised)

    Actual Qty.

    % Completion

    1 Clearing & Grubbing M2 162,000 138,801 85.67%

    2 Borrow Excavation (to embankment)

    M3 430,000 289,392 67.30%

    3 Granular Sub-base M3 47,000 24,920 53.02%

    4 Concrete for Culverts M3 19,000 13,422 70.64%

    5 Concrete for Bridge M3 9,500 6,449 67.88%

    6 Steel reinforcement Fixing ton 4,800 3,326 69.29%

    7 Working Piles M3 2,826 2,826 100.00%

    8 Mortared Stone Riprap M3 5,210 0.00 0.00%

    9 MSE Walls Fixing M2 13,030 12,394 95.12%

    10 RCC Drainage Pipes LM 4,350 3,251 74.74%

    11 Aggregate Base Course M3 64,000 22,673 35.43%

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 11

    8.

    ACTIVITY AB1 L P1L P2L P4L P5L AB2 L

    PEDESTAL/POT BEARING 9-Nov-14 9-Nov-14 9-Nov-14 15-Nov-14 - - 24-Feb-15 19-Feb-15

    PIER N/A - - - - N/A

    2nd Lift (backwall) 13-Aug-14 19-Aug-14 29-Sep-14 4-Sep-14 (backwall)

    Height (m) 15-Feb-15 6.920 6.920 6.920 6.920 -

    1st Lift (note: recess) 23-Jul-14 7-Aug-14 15-Sep-14 10-Aug-14 (note: recess)

    Height (m) 18-Jan-15 1.153 1.210 1.248 1.225 -

    BIT. PAINTING on-going 28-May-14 26-Jun-14 4-Sep-14 23-Jun-14 on-going

    PILE CAP (Pier & Abut.) 4-Nov-14 17-May-14 18-Jun-14 25-Aug-14 11-Jun-14 7-Jan-15

    F/P & BLINDING 21-Oct-14 11-May-14 11-Jun-14 17-Aug-14 3-Jun-14 24-Dec-14

    ACTIVITY AB1 R P1R P2R P4R P5R AB2 R

    PEDESTAL/POT BEARING 16-Oct-14 14-Oct-14 14-Oct-14 16-Oct-14 22-Jan-15 18-Jan-15 18-Jan-15 12-Jan-15

    PIER N/A - - - - N/A

    2nd Lift (backwall) 9-Jun-14 28-Jun-14 20-Sep-14 10-Jul-14 (backwall)

    Height (m) 13-Jan-15 6.920 6.920 6.920 6.920 -

    1st Lift (note: recess) 20-May-14 11-Jun-14 10-Sep-14 22-Jun-14 (note: recess)

    Height (m) 16-Dec-15 0.366 0.423 0.461 0.438 -

    BIT. PAINTING on-going 12-May-14 25-May-14 4-Sep-14 31-May-14 on-going

    PILE CAP (Pier & Abut.) 9-Oct-14 4-May-14 13-May-14 27-Aug-14 20-May-14 22-Dec-14

    F/P & BLINDING 2-Oct-14 27-Apr-14 7-May-14 20-Aug-14 14-May-14 14-Dec-14

    PREVIOUSPREVIOUS

    MONTHTHIS MONTH

    0.649

    8-May-14

    30-Apr-14

    22-Apr-14

    P3R

    -

    22-Jun-14

    6.920

    26-May-14

    SUB-STRUCTURE WORK PROGRESS (RHS)

    SUB-STRUCTURE WORK PROGRESS (LHS)

    P3L

    24-Jul-14

    6.920

    29-Jun-14

    1.440

    17-May-14

    -

    8-May-14

    1-May-14

    AB1 L P1L P2L P3L P3L P4L P5L AB2 L

    EXPANSION JOINT - N/A N/A - - N/A N/A -

    CONCRETE BARRIER

    Grouting

    Prestressing

    TOP SLAB (DECK) 1-Jan-15 1-Jan-15 1-Jan-15 1-Jan-15 - - - -

    WEB: - - - - - - - -

    W8 16-Dec-14 16-Dec-14 16-Dec-14 16-Dec-14 - - - -

    W7 16-Dec-14 16-Dec-14 16-Dec-14 16-Dec-14 - - - -

    W6 16-Dec-14 16-Dec-14 16-Dec-14 16-Dec-14 - - - -

    W5 16-Dec-14 16-Dec-14 16-Dec-14 16-Dec-14 - - - -

    BOTTOM SLAB (BASE) 7-Dec-14 7-Dec-14 7-Dec-14 7-Dec-14 - - - -

    AB1 R P1R P2R P3R P3R P4R P5R AB2 R

    EXPANSION JOINT - N/A N/A - - N/A N/A -

    CONCRETE BARRIER

    Grouting

    Prestressing

    TOP SLAB (DECK) 26-Nov-14 26-Nov-14 26-Nov-14 26-Nov-14 - - - -

    WEB: - - - - - - - -

    W4 10-Nov-14 10-Nov-14 10-Nov-14 10-Nov-14 22-Feb-15 22-Feb-15 22-Feb-15 22-Feb-15

    W3 10-Nov-14 10-Nov-14 10-Nov-14 10-Nov-14 22-Feb-15 22-Feb-15 22-Feb-15 22-Feb-15

    W2 10-Nov-14 10-Nov-14 10-Nov-14 10-Nov-14 22-Feb-15 22-Feb-15 22-Feb-15 22-Feb-15

    W1 10-Nov-14 10-Nov-14 10-Nov-14 10-Nov-14 22-Feb-15 22-Feb-15 22-Feb-15 22-Feb-15

    BOTTOM SLAB (BASE) 28-Oct-14 28-Oct-14 28-Oct-14 28-Oct-14 9-Feb-15 9-Feb-15 9-Feb-15 9-Feb-15

    12/13/2014 (W1, W2, W3, W4)

    12/7/2014

    -

    -

    -

    -

    Dec-14 -

    Jan-15 -

    1/13/2015 (W5 & W6); 1/15/2015 (W7 & W8)

    1/8/2015

    ACTIVITY (RHS)SUPER-STRUCTURE (BRIDGE 1 - RHS) SUPER-STRUCTURE (BRIDGE 2 - RHS)

    SUPER-STRUCTURE (BRIDGE 4 - LHS) SUPER-STRUCTURE (BRIDGE 3 - LHS)ACTIVITY (LHS)

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 12

    9.

    DATE Elevation DATE

    FROM TOFOUNDATION

    /BLINDINGFROM TO

    FOUNDATION

    /BLINDING

    22+702.653 22+760 2-Oct-14 22+718.936 22+810 17-Sep-14

    3-Oct-14 18-Sep-14

    22+760 22+825 30-Sep-14 22+810 22+893.032 9-Aug-14

    1-Oct-14 10-Aug-14

    22+825 22+840 13-Jul-14 22+893.032 22+976.294 13-Aug-14

    14-Jul-14 14-Aug-14

    22+840 22+880 6-Jul-14 22+976.294 23+040 18-Aug-14

    13-Jul-14 19-Aug-14

    22+880 22+908.387 10-Aug-14 23+040 23+088.046 26-Jul-14

    11-Aug-14 27-Jul-14

    22+908.387 22+969.478 3-Jul-14 23+088.046 23+130 21-Jul-14

    5-Jul-14 22-Jul-14

    22+969.478 23+000 4-Aug-14 23+130 23+191.774 7-Jul-14

    5-Aug-14 10-Jul-14

    23+000 23+025 20-Jul-14 23+191.774 23+270.800 26-Jun-14

    21-Jul-14 27-Jun-14

    23+025 23+070 17-Jul-14

    18-Jul-14

    23+070 23+140 30-Jun-14

    1-Jul-14 DATE

    23+140 23+164.573 16-Jun-14 FROM TOFOUNDATION

    /BLINDING

    17-Jun-14 23+270.762 (L) 23+270.800 (R ) 26-Jun-14

    23+164.573 23+237.536 23-Jun-14 27-Jun-14

    24-Jun-14

    23+237.536 23+270.762 17-Jun-14

    18-Jun-14

    PREVIOUSP R EVIOUS

    M ON T HTHIS MONTH

    El. 21.20

    LOCATION (AB 1)

    Elevation

    Elevation

    LOCATION (LHS)

    El. 21.20

    El. 22.00

    El. 22.00

    LOCATION (RHS)

    El. 20.40

    El. 22.00

    El. 22.00

    El. 22.80

    El. 22.00

    El. 20.40

    El. 22.80

    DATE DATE

    FROM TOFOUNDATION

    /BLINDINGFROM TO

    FOUNDATION

    /BLINDING

    23+508.239 23+520 15-Sep-14 23+508.239 (L) 23+508.197 (R ) 15-Sep-14

    16-Sep-14 16-Sep-14

    23+520 23+580.877 20-Aug-14

    21-Aug-14

    23+580.877 23+650 26-Aug-14 Elevation DATE

    27-Aug-14 FROM TOFOUNDATION

    /BLINDING

    23+650 23+735 1-Sep-14 23+508.197 23+607.634 8-Sep-14

    2-Sep-14 9-Sep-14

    23+735 23+790 19-Sep-14 23+607.634 23+740 22-Sep-14

    20-Sep-14 23-Sep-14

    23+790 23+827.635 10-Oct-14 23+740 23+750 16-Oct-14

    11-Oct-14 17-Oct-14

    23+827.635 23+949.895 15-Oct-14 23+750 23+950.153 3-Nov-14

    16-Oct-14 4-Nov-14

    El. 23.30

    El. 24.90

    El. 24.10

    El. 23.30

    LOCATION (LHS) LOCATION (AB 2)Elevation

    El. 24.10

    Elevation

    El. 23.30

    LOCATION (RHS)

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 13

    22+825 22+840 22+880 22+908.387 22+969.478 22+991 23+084 23+164.573 23+237.536 23+270.762

    24.363 Elev. 24.882 Elev. 26.054 Elev. 26.986 Elev. 28.796 Elev. 29.326 Elev. 31.680 Elev. 33.382 Elev. 34.590 Elev. 34.915 Elev.

    23+066 23+110 -34.800 - - - - - - 23+036 23+137 23+180 -34.000 - - - - - - 23+007 - - -33.200 - - - - - - - 2-Feb-15 2-Feb-15 2-Feb-1532.400 - - - - - - 21-Jan-15 21-Jan-15 27-Jan-15 29-Jan-1531.600 - - - - - - 15-Jan-15 15-Jan-15 6-Jan-15 6-Jan-1530.800 - - - - - 22+975 11-Jan-15 11-Jan-15 2-Jan-15 5-Jan-1530.000 - - - - - - 8-Jan-15 13-Nov-14 13-Nov-14 8-Jan-1529.200 - - - - - 28-Dec-14 28-Dec-14 19-Oct-14 1-Oct-14 1-Oct-1428.400 - - - - 22+922 22-Dec-14 22-Dec-14 18-Oct-14 24-Sep-14 24-Sep-1427.600 - - 22+870 - - 16-Dec-14 16-Dec-14 20-Sep-14 18-Sep-14 18-Sep-1426.800 - - - - 9-Dec-14 9-Dec-14 18-Nov-14 9-Sep-14 15-Sep-14 15-Sep-1426.000 22+810 - 21-Dec-14 21-Dec-14 4-Dec-14 4-Dec-14 20-Oct-14 4-Sep-14 28-Aug-14 28-Aug-1425.200 22+727 - 21-Dec-14 21-Dec-14 5-Nov-14 5-Nov-14 16-Sep-14 26-Aug-14 19-Aug-14 19-Aug-1424.400 - - 25-Nov-14 25-Nov-14 29-Oct-14 29-Oct-14 4-Sep-14 18-Aug-14 6-Aug-14 6-Aug-1423.600 5-Jan-15 10-Nov-14 10-Nov-14 10-Nov-14 21-Sep-14 17-Sep-14 27-Aug-14 13-Aug-14 24-Jul-14 24-Jul-1422.800 27-Dec-14 22-Sep-14 22-Sep-14 22-Sep-14 11-Sep-14 24-Aug-14 9-Aug-14 28-Jul-14 - 13-Jul-1422.000 27-Nov-14 3-Sep-14 3-Sep-14 3-Sep-14 28-Aug-14 - - - - -21.200 18-Nov-14 28-Aug-14 28-Aug-14 28-Aug-14 - - - - - -

    20.400 - - - - - - - - - -

    22+810 22+893.032 22+976.294 23+035 23+088.046 23+191.774 23+270.800 23+270.762 (L) 23+270.8 (R )

    23.697 Elev. 25.464 Elev. 27.221 Elev. 28.810 Elev. 30.105 Elev. 32.318 Elev. 33.340 Elev. 29.844 Elev. 29.056 Elev.

    23+2234 to 23+270

    23+137 23+218 to 23+234

    23+116 23+234

    33.200 - - - - - 23+098 - -32.400 - - - - - - 1/22 & 27/2015 - -31.600 - - 22+948 - 23+066 18-Jan-15 18-Jan-15 - -30.800 - - 22+941 23+005 - 8-Jan-15 8-Jan-15 - -30.000 - - 22+908 - 11-Jan-15 24-Dec-14 24-Dec-14 21-Oct-14 -29.200 - - 22+903 - 7-Jan-15 16-Nov-14 30-Sep-14 28-Sep-14 28-Sep-1428.400 - - - 24-Dec-14 24-Dec-14 30-Sep-14 24-Sep-14 24-Sep-14 24-Sep-1427.600 - 22+866 11-Dec-14 22-Dec-14 22-Dec-14 27-Sep-14 18-Sep-14 19-Sep-14 19-Sep-1426.800 - 22+833 11-Dec-14 16-Nov-14 16-Nov-14 13-Sep-14 13-Sep-14 11-Sep-14 11-Sep-1426.000 22+791 - 1-Dec-14 20-Oct-14 20-Oct-14 2-Sep-14 31-Aug-14 28-Aug-14 28-Aug-1425.200 22+731 31-Dec-14 18-Nov-14 18-Oct-14 18-Oct-14 24-Aug-14 18-Aug-14 18-Aug-14 18-Aug-1424.400 - 22-Dec-14 23-Oct-14 20-Sep-14 20-Sep-14 13-Aug-14 6-Aug-14 7-Aug-14 7-Aug-1423.600 20-Dec-14 20-Dec-14 25-Sep-14 8-Sep-14 8-Sep-14 9-Aug-14 24-Jul-14 24-Jul-14 24-Jul-1422.800 15-Dec-14 15-Dec-14 18-Sep-14 21-Aug-14 18-Aug-14 - 13-Jul-14 13-Jul-14 13-Jul-1422.000 27-Nov-14 23-Sep-14 26-Aug-14 - - - - - -21.200 18-Nov-14 4-Sep-14 - - - - - - -

    20.400 - - - - - - - - -

    PREVIOUSP R EVIOUS

    M ON T HTHIS MONTH

    RHS (AB 1), from Sta. 22+718.936 (22.932 Elev.) to Sta. 23+270.800 (33.340 Elev.)

    LHS (AB 1), from Sta. 22+702.653 (22.275 Elev.) to Sta. 23+270.762 (34.915 Elev.)

    ELEV.

    ELEV.

    AB 1 Face

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 14

    23+520 23+580.877 23+650 23+703 23+730 23+827.635 23+949.895

    34.922 Elev. 34.205 Elev. 33.016 Elev. 31.936 Elev. 31.194 Elev. 28.899 Elev. 27.625 Elev.

    34.500 - - 23+626 23+669 - - -33.700 - - 22-Feb-15 - - - -32.900 12-Feb-15 12-Feb-15 12-Feb-15 12-Feb-15 - 23+766 -32.100 2-Feb-15 2-Feb-15 20-Jan-15 20-Jan-15 - 23+802 -31.300 15-Jan-15 15-Jan-15 19-Jan-15 19-Jan-15 - - 23+845

    30.500 12-Jan-15 12-Jan-15 12-Jan-15 12-Jan-15 12-Jan-15 22-Feb-15 23+914

    29.700 - - - - - 15-Jan-15 -28.900 - - 24-Dec-14 24-Dec-14 24-Dec-14 4-Jan-15 4-Jan-1528.100 22-Dec-14 22-Dec-14 22-Dec-14 22-Dec-14 22-Dec-14 31-Dec-14 1-Jan-1527.300 6-Dec-14 6-Dec-14 6-Dec-14 6-Dec-14 6-Dec-14 27-Dec-14 -26.500 8-Nov-14 8-Nov-14 15-Nov-14 15-Nov-14 24-Nov-14 22-Dec-14 22-Dec-1425.700 29-Oct-14 29-Oct-14 1-Nov-14 1-Nov-14 16-Nov-14 20-Dec-14 20-Dec-1424.900 13-Oct-14 13-Oct-14 26-Sep-14 26-Sep-14 13-Nov-14 8-Dec-14 -24.100 25-Sep-14 25-Sep-14 - - - - -23.300 - - - - - - -

    23+508.239 (L) 23+508.197-R 23+607.634 23+669 23+720 23+950.15329.951 Elev. 29.165 Elev. 32.167 Elev. 31.032 Elev. 29.874 Elev. 26.050 Elev.

    33.700 - - - 23+628 - 23+736

    32.900 - - - - - 23+791

    32.100 - - 13-Feb-15 13-Feb-15 23+705 23+848

    31.300 - - 2-Feb-15 24-Jan-15 - 23+917

    30.500 24-Dec-14 - 15-Jan-15 15-Jan-15 20-Jan-15 -29.700 24-Dec-14 22-Dec-14 11-Jan-15 11-Jan-15 18-Jan-15 18-Jan-1528.900 24-Dec-14 22-Dec-14 6-Jan-15 6-Jan-15 18-Jan-15 18-Jan-1528.100 22-Dec-14 22-Dec-14 28-Dec-13 28-Dec-13 12-Jan-15 12-Jan-1527.300 16-Dec-14 6-Dec-14 10-Dec-13 24-Dec-13 7-Jan-15 7-Jan-1526.500 26-Nov-14 26-Nov-14 8-Dec-14 29-Nov-14 29-Nov-14 2-Jan-1525.700 5-Nov-14 5-Nov-14 11-Nov-14 25-Nov-14 25-Nov-14 22-Dec-1424.900 16-Oct-14 16-Oct-14 15-Oct-14 15-Oct-14 21-Nov-14 15-Dec-1424.100 30-Sep-14 30-Sep-14 9-Oct-14 - - -23.300 - - - - - -

    ELEV.AB 2 Face

    LHS (AB 2), from Sta. 23+508.239 (35.015 Elev.) to Sta. 23+949.895 (27.625 Elev.)ELEV.

    R HS ( A B 2 ) , f rom 2 3 +50 8 .19 7 ( 3 3 .4 4 0 Elev.) t o 2 3 +9 50 .153 ( 2 6 .0 50 Elev.)

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 15

    FROM TO FROM TO

    22+702.653 22+712 15-Jan-15 9-Feb-15 16-Feb-15 20-Feb-15 22+718.936 22+731 5-Jan-15 8-Jan-15 21-Jan-15 18-Jan-15

    22+712 22+724 15-Jan-15 24-Jan-15 16-Feb-15 20-Feb-15 22+731 22+743 4-Jan-15 7-Jan-15 21-Jan-15 18-Jan-15

    22+724 22+736 15-Jan-15 19-Jan-15 2-Feb-15 5-Feb-15 22+743 22+755 4-Jan-15 7-Jan-15 13-Jan-15 18-Jan-15

    22+736 22+748 15-Jan-15 18-Jan-15 2-Feb-15 5-Feb-15 22+755 22+767 4-Jan-15 7-Jan-15 13-Jan-15 18-Jan-15

    22+748 22+760 15-Jan-15 19-Jan-15 2-Feb-15 5-Feb-15 22+767 22+779 4-Jan-15 7-Jan-15 13-Jan-15 18-Jan-15

    22+760 22+772 15-Jan-15 19-Jan-15 2-Feb-15 5-Feb-15 22+779 22+791 4-Jan-15 7-Jan-15 13-Jan-15 18-Jan-15

    22+772 22+784 15-Jan-15 22-Jan-15 2-Feb-15 5-Feb-15 22+791 22+803 28-Dec-14 6-Jan-15 13-Jan-15 18-Jan-15

    22+784 22+796 15-Jan-15 22-Jan-15 2-Feb-15 5-Feb-15 22+803 22+815 28-Dec-14 6-Jan-15 13-Jan-15 18-Jan-15

    22+796 22+808 15-Jan-15 22-Jan-15 3-Feb-15 5-Feb-15 22+815 22+827 28-Dec-14 6-Jan-15 10-Jan-15 18-Jan-15

    22+808 22+820 15-Jan-15 21-Jan-15 3-Feb-15 5-Feb-15 22+827 22+839 28-Dec-14 5-Jan-15 10-Jan-15 18-Jan-15

    22+820 22+832 15-Jan-15 21-Jan-15 3-Feb-15 5-Feb-15 22+839 22+851 30-Nov-14 5-Jan-15 10-Jan-15 18-Jan-15

    22+832 22+844 30-Nov-14 4-Dec-14 3-Feb-15 6-Feb-15 22+851 22+863 30-Nov-14 5-Jan-15 7-Jan-15 18-Jan-15

    22+844 22+856 30-Nov-14 4-Dec-14 3-Feb-15 6-Feb-15 22+863 22+875 16-Dec-14 24-Dec-14 7-Jan-15 18-Jan-15

    22+856 22+868 10-Dec-14 15-Dec-14 3-Feb-15 6-Feb-15 22+875 22+887 16-Dec-14 24-Dec-14 7-Jan-15 18-Jan-15

    22+868 22+880 10-Dec-14 15-Dec-14 28-Jan-15 6-Feb-15 22+887 22+899 16-Dec-14 24-Dec-14 11-Jan-15 18-Jan-15

    22+880 22+892 22-Dec-14 28-Dec-14 28-Jan-15 6-Feb-15 22+899 22+911 16-Dec-14 24-Dec-14 11-Jan-15 18-Jan-15

    22+892 22+904 22-Dec-14 28-Dec-14 28-Jan-15 6-Feb-15 22+911 22+923 16-Dec-14 24-Dec-14 11-Jan-15 18-Jan-15

    22+904 22+916 22-Dec-14 28-Dec-14 4-Feb-15 7-Feb-15 22+923 22+935 16-Dec-14 24-Dec-14 12-Jan-15 18-Jan-15

    22+916 22+928 22-Dec-14 18-Jan-15 4-Feb-15 7-Feb-15 22+935 22+947 16-Dec-14 24-Dec-14 12-Jan-15 18-Jan-15

    22+928 22+940 22-Dec-14 19-Jan-15 4-Feb-15 7-Feb-15 22+947 22+959 16-Dec-14 24-Dec-14 12-Jan-15 18-Jan-15

    22+940 22+952 31-Dec-14 18-Jan-15 4-Feb-15 7-Feb-15 22+959 22+971 16-Dec-14 24-Dec-14 6-Jan-15 18-Jan-15

    22+952 22+964 31-Dec-14 20-Jan-15 4-Feb-15 7-Feb-15 22+971 22+983 16-Dec-14 29-Dec-14 6-Jan-15 18-Jan-15

    22+964 22+976 31-Dec-14 20-Jan-15 4-Feb-15 7-Feb-15 22+983 22+995 23-Dec-14 29-Dec-14 6-Jan-15 18-Jan-15

    22+976 22+988 31-Dec-14 20-Jan-15 5-Feb-15 7-Feb-15 22+995 23+007 23-Dec-14 30-Dec-14 12-Jan-15 18-Jan-15

    22+988 23+000 18-Jan-15 20-Jan-15 5-Feb-15 7-Feb-15 23+007 23+019 23-Dec-14 30-Dec-14 12-Jan-15 18-Jan-15

    23+000 23+012 18-Jan-15 20-Jan-15 5-Feb-15 7-Feb-15 23+019 23+031 23-Dec-14 30-Dec-14 12-Jan-15 18-Jan-15

    23+012 23+024 18-Jan-15 21-Jan-15 25-Jan-15 8-Feb-15 23+031 23+043 23-Dec-14 30-Dec-14 14-Jan-15 18-Jan-15

    23+024 23+036 18-Jan-15 21-Jan-15 25-Jan-15 8-Feb-15 23+043 23+055 23-Dec-14 30-Dec-14 14-Jan-15 18-Jan-15

    23+036 23+048 18-Jan-15 21-Jan-15 25-Jan-15 8-Feb-15 23+055 23+067 5-Jan-15 11-Jan-15 14-Jan-15 20-Jan-15

    23+048 23+060 18-Jan-15 21-Jan-15 8-Feb-15 16-Feb-15 23+067 23+079 5-Jan-15 11-Jan-15 19-Jan-15 20-Jan-15

    23+060 23+072 26-Jan-15 4-Feb-15 8-Feb-15 16-Feb-15 23+079 23+091 5-Jan-15 10-Jan-15 19-Jan-15 20-Jan-15

    23+072 23+084 26-Jan-15 4-Feb-15 8-Feb-15 16-Feb-15 23+091 23+103 5-Jan-15 13-Jan-15 19-Jan-15 20-Jan-15

    23+084 23+096 1-Feb-15 5-Feb-15 14-Feb-15 17-Feb-15 23+103 23+115 5-Jan-15 14-Jan-15 19-Jan-15 20-Jan-15

    23+096 23+108 1-Feb-15 7-Feb-15 14-Feb-15 17-Feb-15 23+115 23+127 5-Jan-15 14-Jan-15 19-Jan-15 20-Jan-15

    23+108 23+120 1-Feb-15 7-Feb-15 14-Feb-15 17-Feb-15 23+127 23+139 8-Jan-15 11-Jan-15 19-Jan-15 20-Jan-15

    23+120 23+132 1-Feb-15 8-Feb-15 18-Feb-15 22-Feb-15 23+139 23+151 8-Jan-15 12-Jan-15 19-Jan-15 20-Jan-15

    23+132 23+144 2-Feb-15 8-Feb-15 18-Feb-15 22-Feb-15 23+151 23+163 8-Jan-15 11-Jan-15 19-Jan-15 20-Jan-15

    23+144 23+156 2-Feb-15 8-Feb-15 18-Feb-15 22-Feb-15 23+163 23+175 8-Jan-15 12-Jan-15 19-Jan-15 20-Jan-15

    23+156 23+168 2-Feb-15 8-Feb-15 18-Feb-15 22-Feb-15 23+175 23+187 27-Jan-15 4-Feb-15 9-Feb-15 11-Feb-15

    23+168 23+180 2-Feb-15 9-Feb-15 18-Feb-15 22-Feb-15 23+187 23+199 27-Jan-15 4-Feb-15 9-Feb-15 11-Feb-15

    23+180 23+192 2-Feb-15 9-Feb-15 18-Feb-15 22-Feb-15 23+199 23+211 27-Jan-15 5-Feb-15 9-Feb-15 11-Feb-15

    23+192 23+204 2-Feb-15 11-Feb-15 18-Feb-15 22-Feb-15 23+211 23+223

    23+204 23+216 23+223 23+235

    23+216 23+228 23+235 23+247

    23+228 23+240 23+247 23+259

    23+240 23+252 23+259 23+271

    23+252 23+264

    23+264 23+276

    23+276 23+288

    FRICTION SLAB & CONCRETE BARRIER (@ AB1)

    STATIONBLINDING FRICTION SLAB

    CONCRETE

    BARRIERBITUMEN PAINT

    STATIONBLINDING FRICTION SLAB

    CONCRETE

    BARRIERBITUMEN PAINT

    PREVIOUS (MONTH BEFORE)PREVIOUS

    MONTHTHIS MONTH

    AB1 - LHS AB1 - RHS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 16

    FROM TO FROM TO

    23+508 23+520 23+508 23+520

    23+520 23+532 23+520 23+532

    23+532 23+544 23+532 23+544

    23+544 23+556 23+544 23+556

    23+556 23+568 23+556 23+568

    23+568 23+580 23+568 23+580

    23+580 23+592 23+580 23+592 2-Mar-15

    23+592 23+604 23+592 23+604 2-Mar-15

    23+604 23+616 23+604 23+616 19-Feb-15 26-Feb-15

    23+616 23+628 23+616 23+628 19-Feb-15 26-Feb-15

    23+628 23+640 23+628 23+640 19-Feb-15 26-Feb-15

    23+640 23+652 23+640 23+652 19-Feb-15 26-Feb-15

    23+652 23+664 23+652 23+664 19-Feb-15 26-Feb-15

    23+664 23+676 23+664 23+676 17-Feb-15 26-Feb-15

    23+676 23+688 23+676 23+688 17-Feb-15 26-Feb-15

    23+688 23+700 23+688 23+700 17-Feb-15 23-Feb-15

    23+700 23+712 23+700 23+712 17-Feb-15 23-Feb-15 26-Feb-15

    23+712 23+724 23+712 23+724 17-Feb-15 23-Feb-15 26-Feb-15

    23+724 23+736 23+724 23+736 17-Feb-15 21-Feb-15 26-Feb-15

    23+736 23+748 23+736 23+748 17-Feb-15 21-Feb-15 25-Feb-15

    23+748 23+760 23+748 23+760 17-Feb-15 21-Feb-15 25-Feb-15

    23+760 23+772 23+760 23+772 17-Feb-15 19-Feb-15 25-Feb-15

    23+772 23+784 23+772 23+784 17-Feb-15 19-Feb-15 24-Feb-15 25-Feb-15

    23+784 23+796 23+784 23+796 25-Jan-15 11-Feb-15 24-Feb-15 25-Feb-15

    23+796 23+808 23+796 23+808 25-Jan-15 11-Feb-15 24-Feb-15 25-Feb-15

    23+808 23+820 19-Feb-15 23+808 23+820 25-Jan-15 10-Feb-15 22-Feb-15 25-Feb-15

    23+820 23+832 19-Feb-15 23+820 23+832 14-Jan-15 10-Feb-15 22-Feb-15 25-Feb-15

    23+832 23+844 11-Feb-15 17-Feb-15 23+832 23+844 14-Jan-15 10-Feb-15 22-Feb-15 25-Feb-15

    23+844 23+856 11-Feb-15 17-Feb-15 23+844 23+856 14-Jan-15 27-Jan-15 21-Feb-15 23-Feb-15

    23+856 23+868 11-Feb-15 17-Feb-15 23+856 23+868 15-Jan-15 27-Jan-15 21-Feb-15 23-Feb-15

    23+868 23+880 11-Feb-15 16-Feb-15 23+868 23+880 15-Jan-15 26-Jan-15 21-Feb-15 23-Feb-15

    23+880 23+892 11-Feb-15 16-Feb-15 23+880 23+892 15-Jan-15 25-Jan-15 15-Feb-15 23-Feb-15

    23+892 23+904 24-Jan-15 16-Feb-15 23+892 23+904 15-Jan-15 25-Jan-15 15-Feb-15 23-Feb-15

    23+904 23+916 24-Jan-15 16-Feb-15 23+904 23+916 15-Jan-15 24-Jan-15 15-Feb-15 23-Feb-15

    23+916 23+928 24-Jan-15 15-Feb-15 23+916 23+928 15-Jan-15 20-Jan-15 11-Feb-15 12-Feb-15

    23+928 23+940 24-Jan-15 15-Feb-15 23+928 23+940 15-Jan-15 20-Jan-15 11-Feb-15 12-Feb-15

    23+940 23+952 24-Jan-15 15-Feb-15 23+940 23+952 15-Jan-15 20-Jan-15 11-Feb-15 12-Feb-15

    BLINDING FRICTION SLABCONCRETE

    BARRIER

    BITUMEN

    PAINT

    CONCRETE

    BARRIER

    STATIONBLINDING FRICTION SLAB

    BITUMEN

    PAINT

    STATION

    AB2 - LHS

    FRICTION SLAB & CONCRETE BARRIER (@ AB2)

    AB2 - RHS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 17

    10.

    Rebars Concrete Rebars Concrete Rebars Concrete

    1 21+260 3 cells - 2.0 x 1.5 25.546 0 - - - - - - - -LHS Block 1 3 cells - 2.0 x 1.5 19.526 0 19-Oct-14 26-Oct-14 27-Oct-14 9-Nov-14 9-Nov-14 9-Nov-14 9-Nov-14 26-Nov-14RHS Block 2 3 cells - 2.0 x 1.5 14.473 0 19-Oct-14 4-Nov-14 4-Nov-14 15-Nov-14 15-Nov-14 15-Nov-14 15-Nov-14 26-Nov-14RHS Block 3 3 cells - 2.0 x 1.5 6.000 0 - - - - - - - -2 21+485 1 cell - 2.0 x 1.5 39.750 0 - - - - - - - -

    Block 1a 1 cell - 2.0 x 1.5 3.000 0 - - - - - - - -Block 1b 1 cell - 2.0 x 1.5 17.290 0 1-Jul-14 31-Aug-14 31-Aug-14 31-Aug-14 31-Aug-14 31-Aug-14 31-Aug-14 1-Sep-14Block 2a 1 cell - 2.0 x 1.5 7.710 0 1-Jul-14 31-Aug-14 31-Aug-14 31-Aug-14 31-Aug-14 31-Aug-14 31-Aug-14 1-Sep-14Block 2b 1 cell - 2.0 x 1.5 10.000 0 19-Oct-14 25-Oct-14 25-Oct-14 25-Oct-14 25-Oct-14 25-Oct-14 25-Oct-14 25-Oct-14Block 2C 1 cell - 2.0 x 1.5 11.730 0 - - - - - - - -

    3 21+838 2 x 4 cells (8) - 2.0 x 1.5 52.210 0 - - - - - - - -Block 1a 1 x 4 cells - 2.0 x 1.5 5.000 0 21-Jul-14 4-Sep-14 5-Sep-14 13-Oct-14 13-Oct-14 13-Oct-14 13-Oct-14 26-Nov-14Block 1b 1 x 4 cells - 2.0 x 1.5 17.600 0 3-Jul-14 4-Sep-14 5-Sep-14 13-Oct-14 13-Oct-14 13-Oct-14 13-Oct-14 26-Nov-14Block 2 1 x 4 cells - 2.0 x 1.5 22.600 0 3-Jul-14 20-Aug-14 20-Aug-14 30-Oct-14 30-Oct-14 30-Oct-14 30-Oct-14 26-Nov-14Block 3 1 x 4 cells - 2.0 x 1.5 5.000 0 3-Jul-14 8-Dec-14 8-Dec-14 16-Dec-14 16-Dec-14 16-Dec-14 16-Dec-14 29-Dec-14Block 3a 1 x 4 cells - 2.0 x 1.5 6.970 0 - - - - - - - -Block 4a 1 x 4 cells - 2.0 x 1.5 5.000 0 21-Jul-14 10-Sep-14 12-Sep-14 18-Oct-14 19-Oct-14 18-Oct-14 19-Oct-14 26-Nov-14Block 4b 1 x 4 cells - 2.0 x 1.5 17.600 0 3-Jul-14 10-Sep-14 12-Sep-14 18-Oct-14 19-Oct-14 18-Oct-14 19-Oct-14 26-Nov-14Block 5 1 x 4 cells - 2.0 x 1.5 22.600 0 3-Jul-14 23-Sep-14 24-Sep-14 24-Oct-14 25-Oct-14 24-Oct-14 25-Oct-14 26-Nov-14Block 6 1 x 4 cells - 2.0 x 1.5 5.000 0 3-Jul-14 21-Dec-14 21-Dec-14 27-Dec-14 27-Dec-14 27-Dec-14 27-Dec-14 29-Dec-14Block 6a 1 x 4 cells - 2.0 x 1.5 6.970 0 - - - - - - - -

    4 21+972.4 11 x 4 cells (44) - 3.0 x 2.0 57.629 0 - - - - - - - -Block 1 1 x 4 cells - 3.0 x 2.0 28.038 0 24-May-14 5-Jun-14 5-Jun-14 24-Jun-14 24-Jun-14 15-Jul-14 16-Jul-14 16-Aug-14Block 2 1 x 4 cells - 3.0 x 2.0 28.031 0 24-May-14 9-Jul-14 10-Jul-14 3-Aug-14 4-Aug-14 13-Aug-14 14-Aug-14 8-Sep-14Block 3 1 x 4 cells - 3.0 x 2.0 28.026 0 17-May-14 25-May-14 25-May-14 3-Jun-14 3-Jun-14 23-Jun-14 23-Jun-14 8-Sep-14Block 4 1 x 4 cells - 3.0 x 2.0 28.022 0 18-May-14 12-Jul-14 13-Jul-14 5-Aug-14 6-Aug-14 18-Aug-14 19-Aug-14 1-Oct-14Block 5 1 x 4 cells - 3.0 x 2.0 28.019 0 18-May-14 29-May-14 29-May-14 8-Jun-14 8-Jun-14 2-Jul-14 2-Jul-14 1-Oct-14Block 6 1 x 4 cells - 3.0 x 2.0 28.018 0 18-May-14 31-Jul-14 31-Jul-14 12-Aug-14 13-Aug-14 27-Aug-14 28-Aug-14 1-Oct-14Block 7 1 x 4 cells - 3.0 x 2.0 28.019 0 18-May-14 10-Jun-14 10-Jun-14 1-Jul-14 1-Jul-14 23-Jul-14 24-Jul-14 5-Oct-14Block 8 1 x 4 cells - 3.0 x 2.0 28.022 0 26-May-14 9-Aug-14 10-Aug-14 25-Aug-14 26-Aug-14 9-Sep-14 10-Sep-14 26-Nov-14Block 9 1 x 4 cells - 3.0 x 2.0 28.026 0 26-May-14 15-Jun-14 15-Jun-14 7-Jul-14 8-Jul-14 4-Aug-14 5-Aug-14 26-Nov-14Block 10 1 x 4 cells - 3.0 x 2.0 28.031 0 28-May-14 17-Aug-14 18-Aug-14 14-Sep-14 14-Sep-14 24-Sep-14 25-Sep-14 26-Nov-14Block 11 1 x 4 cells - 3.0 x 2.0 28.038 0 28-May-14 19-Jun-14 19-Jun-14 20-Jul-14 20-Jul-14 2-Sep-14 3-Sep-14 25-Sep-14

    BASE SLAB WALLF/P &

    BLINDING

    LHS

    RHS

    TYPE & DIMENSIONBituminous

    Paint (2 Coats)LENGTH (m)SKEW ( )

    RHS

    LHS

    LHS

    STATIONNO.

    LHS

    TOP SLAB

    RHS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 18

    Rebars Concrete Rebars Concrete Rebars Concrete

    Block 12 1 x 4 cells - 3.0 x 2.0 21.015 0 10-Aug-14 25-Aug-14 26-Aug-14 2-Sep-14 3-Sep-14 1-Oct-14 1-Oct-14 26-Nov-14Block 13 1 x 4 cells - 3.0 x 2.0 21.010 0 27-Jul-14 22-Sep-14 22-Sep-14 29-Sep-14 29-Sep-14 18-Oct-14 19-Oct-14 26-Nov-14Block 14 1 x 4 cells - 3.0 x 2.0 21.006 0 27-Jul-14 12-Oct-14 12-Oct-14 15-Oct-14 15-Oct-14 26-Oct-14 27-Oct-14 26-Nov-14Block 15 1 x 4 cells - 3.0 x 2.0 21.003 0 25-Jul-14 23-Aug-14 23-Aug-14 8-Sep-14 8-Sep-14 18-Sep-14 19-Sep-14 26-Nov-14Block 16 1 x 4 cells - 3.0 x 2.0 21.001 0 16-Jun-14 27-Jul-14 27-Jul-14 14-Aug-14 14-Aug-14 3-Sep-14 4-Sep-14 26-Nov-14Block 17 1 x 4 cells - 3.0 x 2.0 21.000 0 16-Jun-14 14-Sep-14 15-Sep-14 23-Sep-14 24-Sep-14 14-Oct-14 15-Oct-14 26-Nov-14Block 18 1 x 4 cells - 3.0 x 2.0 21.001 0 12-Jun-14 24-Oct-14 24-Oct-14 30-Oct-14 31-Oct-14 7-Nov-14 7-Nov-14 26-Nov-14Block 19 1 x 4 cells - 3.0 x 2.0 21.003 0 12-Jun-14 16-Oct-14 17-Oct-14 21-Oct-14 21-Oct-14 30-Oct-14 30-Oct-14 26-Nov-14Block 20 1 x 4 cells - 3.0 x 2.0 21.006 0 8-Jun-14 29-Sep-14 30-Sep-14 1-Oct-14 1-Oct-14 21-Oct-14 21-Oct-14 26-Nov-14Block 21 1 x 4 cells - 3.0 x 2.0 21.010 0 8-Jun-14 1-Sep-14 2-Sep-14 21-Sep-14 21-Sep-14 30-Sep-14 30-Sep-14 26-Nov-14Block 22 1 x 4 cells - 3.0 x 2.0 21.015 0 8-Jun-14 25-Jun-14 25-Jun-14 30-Jul-14 30-Jul-14 16-Sep-14 17-Sep-14 25-Sep-14Block 23 1 x 4 cells - 3.0 x 2.0 6.635 0 - - - - - - - -Block 24 1 x 4 cells - 3.0 x 2.0 6.782 0 - - - - - - - -Block 25 1 x 4 cells - 3.0 x 2.0 6.819 0 - - - - - - - -Block 26 1 x 4 cells - 3.0 x 2.0 7.217 0 - - - - - - - -Block 27 1 x 4 cells - 3.0 x 2.0 7.975 0 - - - - - - - -Block 28 1 x 4 cells - 3.0 x 2.0 8.571 0 - - - - - - - -Block 29 1 x 4 cells - 3.0 x 2.0 9.267 0 - - - - - - - -Block 30 1 x 4 cells - 3.0 x 2.0 9.949 0 - - - - - - - -Block 31 1 x 4 cells - 3.0 x 2.0 10.260 0 - - - - - - - -Block 32 1 x 4 cells - 3.0 x 2.0 10.262 0 - - - - - - - -Block 33 1 x 4 cells - 3.0 x 2.0 10.265 0 - - - - - - - -

    5 22+655 2 x 4 cells (8) - 2.0 x 2.0 95.482 45 R - - - - - - - -(9 cells) 1 cell - 2.0 x 2.0 - - - - - - - -Block 1 1 x 4 cells - 2.0 x 2.0 9.675 45 R 24-Nov-14 29-Nov-14 29-Nov-14 4-Dec-14 4-Dec-14 10-Dec-14 10-Dec-14 8-Jan-15Block 2 1 x 4 cells - 2.0 x 2.0 32.711 45 R 30-Jun-14 6-Aug-14 7-Aug-14 1-Sep-14 2-Sep-14 1-Sep-14 2-Sep-14 13-Oct-14Block 3 1 x 4 cells - 2.0 x 2.0 32.711 45 R 24-Jun-14 21-Jul-14 21-Jul-14 17-Aug-14 18-Aug-14 17-Aug-14 18-Aug-14 13-Oct-14Block 4 1 x 4 cells - 2.0 x 2.0 11.850 45 R 11-Sep-14 12-Oct-14 13-Oct-14 22-Oct-14 22-Oct-14 22-Oct-14 22-Oct-14 15-Nov-14Block 4a 1 x 4 cells - 2.0 x 2.0 13.130 45 R - - - - - - - -Block 5 1 x 4 cells - 2.0 x 2.0 19.035 45 R 24-Nov-14 4-Dec-14 4-Dec-14 8-Dec-14 8-Dec-14 18-Dec-14 18-Dec-14 8-Jan-15Block 6 1 x 4 cells - 2.0 x 2.0 32.711 45 R 29-Jun-14 27-Jul-14 28-Jul-14 13-Sep-14 14-Sep-14 13-Sep-14 14-Sep-14 13-Oct-14Block 7 1 x 4 cells - 2.0 x 2.0 32.711 45 R 24-Jun-14 28-Aug-14 28-Aug-14 24-Sep-14 26-Sep-14 24-Sep-14 26-Sep-14 13-Oct-14Block 8 1 x 4 cells - 2.0 x 2.0 10.95 45 R - - - - - - - -Block 9 1 cell - 2.0 x 2.0 25.03 45 R 24-Nov-14 13-Dec-14 13-Dec-14 18-Dec-14 18-Dec-14 24-Dec-14 24-Dec-14 8-Jan-15Block 10 1 cell - 2.0 x 2.0 32.711 45 R 28-Jun-14 20-Aug-14 23-Aug-14 2-Oct-14 3-Oct-14 2-Oct-14 3-Oct-14 13-Oct-14Block 11 1 cell - 2.0 x 2.0 32.711 45 R 29-Jun-14 3-Aug-14 4-Aug-14 2-Oct-14 3-Oct-14 2-Oct-14 3-Oct-14 13-Oct-14Block 12 1 cell - 2.0 x 2.0 4.960 45 R - - - - - - - -

    RHS

    RHS

    LHS

    RHS

    RHS

    LHS

    RHS

    NO.

    LHS

    WALL TOP SLAB Bituminous Paint (2 Coats)

    STATION TYPE & DIMENSION LENGTH (m)SKEW ( )F/P &

    BLINDING

    BASE SLAB

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 19

    Rebars Concrete Rebars Concrete Rebars Concrete

    6 23+492 1 x 4 cells (4) - 3.0 x 2.0 79.065 15 R - - - - - - - -(5 cells) 1 cell - 3.0 x 2.0 - - - - - - - -Block 1 1 x 4 cells - 3.0 x 2.0 6.457 15 R - - - - - - - -Block 2 1 x 4 cells - 3.0 x 2.0 31.546 15 R 24-Jun-14 9-Jul-14 9-Jul-14 30-Jul-14 30-Jul-14 16-Aug-14 17-Aug-14 6-Sep-14Block 3 1 x 4 cells - 3.0 x 2.0 31.546 15 R 24-Jun-14 14-Jul-14 15-Jul-14 3-Aug-14 3-Aug-14 21-Aug-14 21-Aug-14 6-Sep-14Block 4 1 x 4 cells - 3.0 x 2.0 7.982 15 R 9/172014 23-Sep-14 24-Sep-14 28-Sep-14 28-Sep-14 1-Oct-14 2-Oct-14 18-Oct-14Block 5 1 cell - 3.0 x 2.0 7.039 15 R - - - - - - - -Block 6 1 cell - 3.0 x 2.0 31.546 15 R 24-Jun-14 5-Aug-14 5-Aug-14 9 & 20/8/2014 9 & 23/8/2014 28-Aug-14 28-Aug-14 4-7/9/2014Block 7 1 cell - 3.0 x 2.0 31.546 15 R 24-Jun-14 6-Aug-14 6-Aug-14 11 & 25/8/2014 11 & 26/8/2014 31-Aug-14 1-Sep-14 4-7/9/2014Block 8 1 cell - 3.0 x 2.0 5.525 15 R 17-Sep-14 28-Sep-14 28-Sep-14 2-Oct-14 2-Oct-14 11-Oct-14 11-Oct-14 18-Oct-14

    11-Oct-14 11-Oct-14 - - -7 23+756.5 1 cell - 2.0 x 1.5 67.550 0 - - - - - - - -

    Block 1 1 cell - 2.0 x 1.5 12.090 0 - - - - - - - -Block 2 1 cell - 2.0 x 1.5 20.180 0 12-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 24-Jul-14Block 3a 1 cell - 2.0 x 1.5 14.430 0 12-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 24-Jul-14Block 3b 1 cell - 2.0 x 1.5 8.700 0 11-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 28-Aug-14Block 4 1 cell - 2.0 x 1.5 12.090 0 - - - - - - - -

    8 23+997 1 cell - 2.0 x 1.5 70.268 0 - - - - - - - -Block 1 1 cell - 2.0 x 1.5 16.128 0 - - - - - - - -Block 2a 1 cell - 2.0 x 1.5 4.933 0 - - - - - - - -Block 2b 1 cell - 2.0 x 1.5 13.860 0 8-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 24-Jul-14Block 3a 1 cell - 2.0 x 1.5 16.300 0 8-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 24-Jul-14Block 3b 1 cell - 2.0 x 1.5 4.942 0 10-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 31-Aug-14Block 4a 1 cell - 2.0 x 1.5 7.848 0 10-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 31-Aug-14Block 4b 1 cell - 2.0 x 1.5 6.197 0

    9 24+235 1 cell - 2.0 x 1.5 59.106 0 - - - - - - - -Block 1a 1 cell - 2.0 x 1.5 15.566 0 - - - - - - - -Block 1b 1 cell - 2.0 x 1.5 15.000 0 12-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 24-Jul-14Block 2a 1 cell - 2.0 x 1.5 8.900 0 12-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 23-Jul-14 24-Jul-14Block 2b 1 cell - 2.0 x 1.5 15.600 0 10-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 26-Aug-14 31-Aug-14Block 2c 1 cell - 2.0 x 1.5 4.020 0 - - - - - - - -

    10 24+570 1 cell - 2.0 x 1.5 51.953 0 - - - - - - - -LHS Block 1 1 cell - 2.0 x 1.5 25.846 0 14-Aug-14 25-Aug-14 25-Aug-14 25-Aug-14 25-Aug-14 25-Aug-14 25-Aug-14 31-Aug-14

    Block 2a 1 cell - 2.0 x 1.5 13.500 0 14-Aug-14 25-Aug-14 25-Aug-14 25-Aug-14 25-Aug-14 25-Aug-14 25-Aug-14 31-Aug-14Block 2b 1 cell - 2.0 x 1.5 12.587 0 24-Nov-14 1-Dec-14 1-Dec-14 1-Dec-14 1-Dec-14 1-Dec-14 1-Dec-14 6-Dec-14

    11 24+900 1 cell - 2.0 x 1.0 40.850 0 - - - - - - - -LHS Block 1 1 cell - 2.0 x 1.0 20.300 0 - - - - - - - -RHS Block 2 1 cell - 2.0 x 1.0 20.550 0 3-Feb-15 2-Mar-15 2-Mar-15 2-Mar-15 2-Mar-15 2-Mar-15 2-Mar-15 3-Mar-15

    RHS

    RHS

    LHS

    RHS

    LHS

    RHS

    RHS

    LHS

    LHS

    LHS

    RHS

    BASE SLABNO. STATION TYPE & DIMENSION LENGTH (m)SKEW ( )

    F/P &

    BLINDING

    WALL TOP SLAB Bituminous Paint (2 Coats)

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 20

    Inlet and Outlet Structures for Culverts:

    Cut-off Wall/Apron

    Slab: Rebars &

    Concrete

    Wingwall: Rebars &

    Concrete Bit. PaintCut-off Wall/Apron

    Slab: Rebars &

    Concrete

    Wingwall: Rebars &

    Concrete Bit. Paint

    1 21+260 3 cells - 2.0 x 1.5 - - - - - - - -2 21+485 1 cell - 2.0 x 1.5 - - - - - - - -3 21+838 2 x 4 cells - 2.0 x 1.5 - - - - - - - -4 21+972.4 11 x 4 cells - 3.0 x 2.0 - - - - - - - -

    22+655 2 x 4 cells - 2.0 x 2.0 - - - - - - - -

    1 cell - 2.0 x 2.0 - - - - - - - -

    23+492 1 x 4 cells - 3.0 x 2.0 - - - - 1-Feb-15 10-Feb-15 18-Feb-15 2-Mar-15

    1 cell - 3.0 x 2.0 - - - - - - - -

    7 23+756.5 1 cell - 2.0 x 1.5 - - - - - - - -

    8 23+997 1 cell - 2.0 x 1.5 - - - - - - - -

    9 24+235 1 cell - 2.0 x 1.5 - - - - - - - -

    10 24+570 1 cell - 2.0 x 1.5 - - - - - - - -

    11 24+900 1 cell - 2.0 x 1.0 - - - - - - - -

    PREVIOUS PREVIOUS MONTH THIS MONTH

    F/P &

    BLINDING

    OUTLET

    NO. STATION TYPEF/P &

    BLINDING

    5

    6

    INLET

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 21

    Rebars Concrete Rebars Concrete Rebars Concrete

    1 21+300 2 cells - 4.0 x 3.0 37.700 0 - - - - - - - - - -LHS Block 1 2 cells - 4.0 x 3.0 15.780 0 19-Oct-14 26-Oct-14 27-Oct-14 1-Nov-14 2-Nov-14 12-Nov-14 2-Nov-14 26-Nov-14 24-Feb-15RHS Block 2 2 cells - 4.0 x 3.0 21.900 0 28-Dec-14 4-Jan-15 4-Jan-15 11-Jan-15 11-Jan-15 20-Jan-15 20-Jan-15 19-Jan-152 24+600 2 cells - 4.0 x 3.0 44.051 0 - - - - - - - -

    LHS Block 1 2 cells - 4.0 x 3.0 21.620 0 22-Oct-14 3-Nov-14 3-Nov-14 11-Nov-14 12-Nov-14 19-Nov-14 20-Nov-14 8-Jan-15 26-Jan-15RHS Block 2 2 cells - 4.0 x 3.0 22.411 0 27-Jan-15 29-Jan-15 29-Jan-15 5-Feb-15 5-Feb-15 11-Feb-15 11-Feb-15

    Rebars Concrete Rebars Concrete Rebars Concrete

    1 23+284.40, SOL-1 1 cells - 4.0 x 4.0 103.772 0 - - - - - - - - -LHS Block 1 1 cells - 4.0 x 4.0 32.000 0 - - - - - - - - -LHS Block 2 1 cells - 4.0 x 4.0 19.886 0 18-Feb-15 21-Feb-15 21-Feb-15 1-Mar-15 1-Mar-15 - - - -LHS Block 3 1 cells - 4.0 x 4.0 25.943 0 21-Feb-15 25-Feb-15 25-Feb-15 5-Mar-15 5-Mar-15 - - - -RHS Block 4a 1 cells - 4.0 x 4.0 15.000 0 - - - - - - - - -RHS Block 4b 1 cells - 4.0 x 4.0 10.943 0 - - - - - - - - -2 24+360, SOL-1 1 cells - 4.0 x 4.0 59.614 0 - - - - - - - - -

    LHS Block 1 1 cells - 4.0 x 4.0 9.000 0 - - - - - - - - -LHS Block 2 1 cells - 4.0 x 4.0 20.777 0 15-Sep-14 1-Oct-14 1-Oct-14 19-Oct-14 19-Oct-14 30-Oct-14 31-Oct-14 27-Dec-14 5-Jan-15RHS Block 3 1 cells - 4.0 x 4.0 22.777 0 9-Dec-14 15-Dec-14 15-Dec-14 21-Dec-14 21-Dec-14 30-Dec-14 30-Dec-14 - 5-Jan-15RHS Block 4 1 cells - 4.0 x 4.0 7.000 0 - - - - - - - - -3 0+050, SOL-3 1 cells - 4.0 x 4.0 83.223 0 - - - - - - - - -

    LHS Block 1 1 cells - 4.0 x 4.0 17.721 0 - - - - - - - - -LHS Block 2 1 cells - 4.0 x 4.0 17.721 0 - - - - - - - - -LHS Block 3 1 cells - 4.0 x 4.0 17.721 0 - - - - - - - - -RHS Block 4 1 cells - 4.0 x 4.0 30.000 0 25-Nov-14 2-Dec-14 2-Dec-14 14-Dec-14 14-Dec-14 25-Dec-14 25-Dec-14 8-Jan-15 12-Feb-15

    PREVIOUSPREVIOUS

    MONTHTHIS MONTH

    Bituminous

    Paint (2

    Coats)

    WALLNO.

    LENGTH

    (m)

    SKEW (

    )

    F/P &

    BLINDINGTYPE & DIMENSION

    PEDESTRIAN UNDERPASS PROGRESS SCHEDULE (BARREL)

    TYPE & DIMENSIONLENGTH

    (m)

    SKEW (

    )

    TOP SLABVentilationSTATION

    STATIONBASE SLAB WALL

    F/P &

    BLINDING

    BASE SLAB

    Headwall Crash BarrierNO.

    ADDITIONAL BOX CULVERTS PROGRESS SCHEDULE (BARREL)

    TOP SLAB Bituminous Paint (2 Coats)

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 22

    11.

    Additional Box Culverts:

    UNIT 1 UNIT 2 UNIT 1 UNIT 2 UNIT 1 UNIT 2 UNIT 1 UNIT 2

    Length (Ln.m.) 15.000 15.000 15.000 15.000 15.000 15.000 15.000 15.000

    CRASH BARRIER - - - - - - - -

    WATER PROOFING 11-Jan-15 11-Jan-15 - - 7-Jan-15 7-Jan-15 - -WALL 6-Jan-15 5-Jan-15 - - 24-Dec-14 17-Dec-14 7-Mar-15 1-Mar-15BASE 23-Dec-14 21-Dec-14 3-Mar-15 5-Mar-15 9-Dec-14 9-Dec-14 1-Mar-15 22-Feb-15F/P & BLINDING 13-Dec-14 13-Dec-14 25-Feb-15 25-Feb-15 30-Nov-14 30-Nov-14 25-Feb-15 18-Feb-15

    LHS RHSSta. 21+300 Sta. 24+600

    LHS RHSACTIVITY

    Retaining Walls in Buraimi Road:

    ACTIVITY UNIT 1 UNIT 2 UNIT 3 UNIT 4 UNIT 5 UNIT 6 UNIT 7 UNIT 8

    Length (Ln.m.) 11.650 11.650 11.650 11.650 11.650 11.650 11.650 11.650

    CRASH BARRIER - - - - - - - -

    WATER PROOFING 29-Jan-15 29-Jan-15 4-Feb-15 4-Feb-15 28-Jan-15 28-Jan-15 11-Feb-15 11-Feb-15WALL 19-Jan-15 11-Jan-15 14-Jan-15 12-Jan-15 15-Jan-15 11-Jan-15 1-Feb-15 4-Feb-15BASE 15-Jan-15 6-Jan-15 10-Jan-15 8-Jan-15 11-Jan-15 5-Jan-15 27-Jan-15 1-Feb-15F/P & BLINDING 13-Jan-15 31-Dec-14 31-Dec-14 31-Dec-14 28-Dec-14 28-Dec-14 25-Jan-15 25-Jan-15

    ACTIVITY UNIT 9 UNIT 10 UNIT 11 UNIT 12 UNIT 13 UNIT 14 UNIT 15 UNIT 16

    Length (Ln.m.) 11.650 10.650 12.650 11.650 11.650 11.650 11.650 9.835

    CRASH BARRIER - - - - - - - -

    WATER PROOFING 11-Feb-15 11-Feb-15 11-Feb-15 11-Feb-15 6-Feb-15 6-Feb-15 5-Feb-15 5-Feb-15WALL 28-Jan-15 1-Feb-15 4-Feb-15 24-Jan-15 26-Jan-15 13-Jan-15 19-Jan-15 12-Jan-15BASE 25-Jan-15 26-Jan-15 1-Feb-15 19-Jan-15 22-Jan-15 10-Jan-15 13-Jan-15 6-Jan-15F/P & BLINDING 22-Jan-15 22-Jan-15 27-Jan-15 15-Jan-15 15-Jan-15 6-Jan-15 6-Jan-15 28-Dec-14

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 23

    12.

    DIA TYPE LAYING CONCRETE BACKFILL

    LEFT

    Middle

    RIGHT

    LEFT

    Middle

    RIGHT

    LEFT

    Middle

    RIGHT

    LEFT

    Middle

    RIGHT

    LEFT24-Sep-14 24-Sep-14 18-Oct-14 UTL-LAY- 104 UTL-CON-131A

    Middle

    RIGHT

    LEFT15-May-14 15-May-14 18-May-14 12-Jun-14 UTL-LAY- 81 UTL-CON- 65 UTL-BF- 01

    Middle11-Jun-14 11-Jun-14 12-Jun-14 10-Jul-14 UTL-LAY- 104 UTL-CON- 83 UTL-BF- 20

    RIGHT

    LEFT19-May-14 19-May-14 20-May-14 04-Jun-14 UTL-LAY- 87 UTL-CON- 66 UTL-BF- 03

    Middle14-Jun-14 14/06/14 14-Jun-14 21-Jun-14 UTL-LAY- 108 UTL-CON- 84 UTL-BF- 21

    RIGHT

    LEFT02-Oct-14 02-Oct-14 02-Oct-14 UTL-LAY-184 UTL-CON-135

    Middle

    RIGHT

    LEFT02-Oct-14 02-Oct-14 02-Oct-14 UTL-LAY-164 R1UTL-CON-134

    Middle

    RIGHT

    LEFT02-Oct-14 02-Oct-14 02-Oct-14 UTL-LAY-185 UTL-CON-136

    Middle

    RIGHT

    LEFT19-May-14 19-May-14 20-May-14 31-May-14 UTL-LAY- 85 UTL-CON- 63 UTL-BF- 02

    Middle15-Jun-14 15-Jun-14 15-Jun-14 UTL-LAY- 107 UTL-CON- 85

    RIGHT

    LEFT20-May-14 20-May-14 25-May-14 04-Jun-14 UTL-LAY- 86 UTL-CON- 64 UTL-BF- 05

    Middle15-Jun-14 15-Jun-14 15-Jun-14 08-Jul-14 UTL-LAY- 109 UTL-CON- 87 UTL-BF- 23

    RIGHT

    LEFT21-May-14 21-May-14 21-May-14 04-Jun-14 UTL-LAY- 89 UTL-CON- 67 UTL-BF- 04

    Middle16-Jun-14 16-Jun-14 18-Jun-14 10-Jul-14 UTL-LAY- 110 UTL-CON- 90 UTL-BF- 29

    RIGHT

    23 CCC/FQR/IR/10 SOL-3 0+300 200 UPVC

    CCC/FQI/SL/01 21+160 150 UPVC 45

    SETOUT/

    EXCV/ BED

    PREP

    DRAWING NO.

    21+500

    21+560

    CCC/FQI/SD/07

    450 CONC PIPECCC/FQI/SD/08

    UPVC

    4 CCC/FQR/WA/05 SR-1 0+600 300 UPVC

    6 CCC/FQI/EL/01 21+360 150

    300 UPVC

    11 CCC/FQI/EL/02 21+660 150

    7 CCC/FQI/IR/01 21+460

    UPVC

    12 CCC/FQI/IR/02

    2

    21+780 300 UPVC

    BACKFILLI

    NG

    RFI REF.S.

    NO.

    CHAINAG

    E

    PIPE

    2

    2UPVC

    INSTALLAT

    IONCONCRETE

    1CCC/FQI/IR/06 SERVICE

    ROAD-30+030 200 UPVC

    2 CCC/FQR/IR/11 SOL-2 0+150 300

    NO. OF

    WAYSSTAGE

    2

    3

    13 CCC/FQI/NAW.2

    3

    2

    CCC/FQI/SD/09 CONC PIPE

    UPVC10021+870

    10

    2

    450 CONC PIPE8

    9

    21+620 450

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 24

    DIA TYPE LAYING CONCRETE BACKFILL

    LEFT25-May-14 25-May-14 25-May-14 04-Jun-14 UTL-LAY- 90 UTL-CON-68 UTL-BF- 07

    Middle16-Jun-14 16-Jun-14 17-Jun-14 10-Jul-14 UTL-LAY- 111 UTL-CON- 88 UTL-BF- 28

    RIGHT

    LEFT30-Aug-14 31-Aug-14 14-Sep-14 30-Sep-14 UTL-LAY-158 UTL-CON-96 UTL-BF-64

    Middle27-Nov-14 14-Dec-14 23-Dec-14 UTL-EXC-63 UTL-CON-162 UTL-BF-115

    RIGHT21-Jan-15 21-Jan-15 21-Jan-15 28-Jan-15 UTL-EXC-246 SL-CON-173 UTL-BF-148

    LEFT17-Jun-14 17-Jun-14 18-Jun-14 09-Jul-14 UTL-LAY- 112 UTL-CON- 89 UTL-BF- 33

    Middle20-Jul-14 20-Jul-14 21-Jul-14 27-Jul-14 UTL-LAY- 131 UTL-CON- 106 UTL-BF-44

    RIGHT

    LEFT19-Jun-14 19-Jun-14 19-Jun-14 06-Jul-14 UTL-LAY- 114 UTL-CON- 92 UTL-BF- 31

    Middle20-Jul-14 20-Jul-14 21-Jul-14 17-Jul-14 UTL-LAY- 132 UTL-CON- 107 UTL-BF-46

    RIGHT

    LEFT19-Jun-14 19-Jun-14 19-Jun-14 05-Jul-14 UTL-LAY- 113 UTL-CON- 91 UTL-BF- 30

    Middle20-Jul-14 20-Jul-14 21-Jul-14 17-Jul-14 UTL-LAY- 133 UTL-CON- 108 UTL-BF-45

    RIGHT

    LEFT

    Middle

    RIGHT

    LEFT

    Middle

    RIGHT

    LEFT26-May-14 26-May-14 26-May-14 08-Jun-14 UTL-LAY- 88 UTL-CON- 69 UTL-BF- 08

    Middle11-Jun-14 11-Jun-14 11-Jun-14 22-Jul-14 UTL-LAY-106 UTL-CON- 81 UTL-BF-26

    RIGHT

    LEFT07-Jul-14 08-Jul-14 08-Jul-14 UTL-LAY-103A UTL-CON-98

    Middle12-Aug-14 13-Aug-14 14-Aug-14 15-Aug-14 UTL-LAY-150 UTL-CON-122A UTL-BF- 37A

    RIGHT

    LEFT09-Jul-14 09-Jul-14 09-Jul-14 UTL-LAY- 116 UTL-CON-100

    Middle12-Aug-14 13-Aug-14 14-Aug-14 25-Sep-14 UTL-LAY-151 UTL-CON-121 UTL-BF-81

    RIGHT12-Oct-14 13-Oct-14 12-Oct-14 08-Nov-14 UTL-LAY-187 UTL-CON-137 UTL-BF-99

    LEFT11-Jan-15 11-Jan-15 11-Jan-15 UTL-LAY-249 UTL-CON-174

    Middle

    RIGHT

    LEFT02-Jul-14 03-Jul-14 03-Jul-14 UTL-LAY-122 UTL-CON-93R1

    Middle10-Jul-14 10-Jul-14 14-Jul-14 UTL-LAY-126 UTL-CON-103

    RIGHT22-Jul-14 22-Jul-14 23-Jul-14 20-Aug-14 UTL-LAY-136 UTL-CON-110 UTL-BF- 50

    LEFT

    Middle

    RIGHT

    LEFT16-Jun-14 16-Jun-14 16-Jun-14 20-Jul-14 UTL-LAY- 102 UTL-CON- UTL-BF-19

    Middle08-Jul-14 08-Jul-14 09-Jul-14 27-Jul-14 UTL-LAY- 125 UTL-CON-99 UTL-BF-42

    RIGHT

    LEFT25-May-14 25-May-14 26-May-14 14-Jun-14 UTL-LAY- 91 UTL-CON- 71 UTL-BF- 06

    Middle11/06/201 11-Jun-14 11-Jun-14 23-Jun-14 UTL-LAY- 105 UTL-CON- 82 UTL-BF- 25

    RIGHT

    22+080

    UPVC

    CCC/FQI/OMANTEL.1

    22+510 150

    150

    CCC/FQI/SL/03 Rev A 22+820 150 UPVC 4

    UPVC 4

    23

    CCC/FQI/SL/04

    CCC/FQI/SL/02

    UPVC

    UPVC

    UPVC

    UPVC

    UPVC

    RC

    UPVC

    CCC/FQI/EL/05

    22+990

    CCC/FQI/SL/03 Rev A 22+830 150

    28 CCC/FQI/EL/07

    21 CCC/FQI/EL/06

    22+520

    19CCC/FQI/IR/04 JUNCTION

    CROSSING

    22+520

    LHS

    CCC/FQI/WA/01

    CCC/FQI/WA/02

    JUNCTION26

    27

    23+008

    LHS

    23+020

    22+760

    15023+060

    14 CCC/FQI/EL/03 21+880

    CCC/FQI/EL/04 22+260

    UPVC

    200

    200

    200

    16

    UPVC

    UPVC

    150

    20CCC/FQI/IR/05 JUNCTION

    CROSSING

    4

    3

    3

    3

    2

    2

    2

    3

    25

    150

    22+810

    15

    22 100

    4

    4

    1

    1

    3

    22+587

    LHS

    18 CCC/FQI/IR/03

    17

    150

    300

    900

    150

    S.

    NO.

    UPVC

    UPVC

    24

    RFI REF.DRAWING NO.

    CHAINAG

    E

    PIPE NO. OF

    WAYSSTAGE

    SETOUT/

    EXCV/ BED

    PREP

    INSTALLAT

    IONCONCRETE

    BACKFILLI

    NG

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 25

    DIA TYPE LAYING CONCRETE BACKFILL

    LEFT27-May-14 27-May-14 27-May-14 17-Jun-14 UTL-LAY- 92 UTL-CON- 72 UTL-BF- 09

    Middle

    RIGHT

    LEFT28-May-14 28-May-14 28-May-14 17-Jun-14 UTL-LAY- 93 UTL-CON- 70 UTL-BF- 10

    Middle

    RIGHT

    LEFT

    Middle

    RIGHT

    LEFT29-May-14 29-May-14 29-May-14 17-Jun-14 UTL-LAY- 94 UTL-CON- 73 UTL-BF- 11

    Middle30-Jul-14 12-Aug-14 30-Jul-14 26-Aug-14 UTL-LAY-142 UTL-CON- 115 UTL-BF-48

    RIGHT

    LEFT29-May-14 31-May-14 31-May-14 17-Jun-14 UTL-LAY- 96 UTL-CON- 74 UTL-BF- 12

    Middle10-Jul-14 10-Jul-14 13-Aug-14 26-Aug-14 UTL-LAY- 120 R1UTL-CON- 95 UTL-BF- 49

    RIGHT

    LEFT07-Sep-14 07-Sep-14 14-Oct-14 27-Oct-14 UTL-LAY-162 UTL-CON-124 UTL-BF-69

    Middle15-Sep-14 15-Sep-14 17-Jan-00 UTL-LAY-162R1

    RIGHT27-Oct-14 28-Oct-14 17-Nov-14 17-Nov-14 UTL-LAY-207 UTL-CON-152 UTL-BF-92

    LEFT29-May-14 02-Jun-14 02-Jun-14 17-Jun-14 UTL-LAY- 95 UTL-CON- 75 UTL-BF- 15

    Middle14-Jul-14 14-Jul-14 14-Jul-14 20-Aug-14 UTL-LAY- 124 UTL-CON- 102 UTL-BF- 36

    RIGHT

    LEFT29-May-14 02-Jun-14 02-Jun-14 17-Jun-14 UTL-LAY-97 UTL-CON- 76 UTL-BF- 13

    Middle14-Jul-14 14-Jul-14 15-Jul-14 20-Aug-14 UTL-LAY- 127 UTL-CON- 101 UTL-BF- 38

    RIGHT

    LEFT10-Aug-14 11-Aug-14 11-Aug-14 26-Aug-14 UTL-LAY-149A UTL-CON- 120A UTL-BF- 58

    Middle27-Oct-14 27-Oct-14 27-Oct-14 UTL-LAY- 206 UTL-CON- 153

    RIGHT21-Jan-15 21-Jan-15 21-Jan-15 UTL-LAY- 248 UTL-CON- 172

    LEFT 04-Nov-14 UTL-EXC-55

    Middle

    RIGHT

    LEFT29-May-14 02-Jun-14 03-Jun-14 19-Jun-14 UTL-LAY- 98 UTL-CON- 77 UTL-BF- 14

    Middle06-Aug-14 06-Aug-14 09-Aug-14 13-Aug-14 UTL-LAY- 134-R1UTL-CON- 109A UTL-BF- 53

    RIGHT

    LEFT

    Middle

    RIGHT

    LEFT03-Jun-14 04-Jun-14 04-Jun-14 23-Jun-14 UTL-LAY- 99 UTL-CON- 78 UTL-BF- 16

    Middle11-Aug-14 11-Aug-14 19-Aug-14 26-Aug-14 UTL-LAY-140 R1 UTL-CON-114 UTL-BF- 52

    RIGHT

    LEFT04-Jun-14 05-Jun-14 10-Jun-14 23-Jun-14 UTL-LAY- 100 UTL-CON- 79 UTL-BF- 17

    Middle23-Jul-14 24-Jul-14 19-Aug-14 26-Aug-14 UTL-LAY-139 UTL-CON-112-R1 UTL-BF- 47

    RIGHT

    34

    3

    2

    UPVC

    CCC/FQI/EL/19 UPVC 2

    1

    2

    600

    300

    UPVC

    CCC/FQI/IR/07

    RC

    RC

    UPVC

    UPVC

    37 CCC/FQI/SL/11 23+960 UPVC

    23+210

    150

    23+240

    23+560

    150

    150

    150

    150

    600

    23+820

    23+980

    24+000

    150

    UPVC

    UPVC

    UPVC

    UPVC

    3

    4

    33 CCC/FQI/NAW.3

    CCC/FQI/WA/0440

    39

    41

    CCC/FQI/EL/1242

    CCC/FQI/EL/11

    29 CCC/FQI/EL/13

    CCC/FQI/EL/0830

    3

    1

    3

    2

    CCC/FQI/EL/0932

    35

    CCC/FQI/WA/0336 23+900

    CCC/FQI/EL/10

    4

    38

    CCC/FQI/SD 23+400 60031

    CCC/FQI/EL/21 23+965 200

    23+580

    24+020

    24+120

    2

    CONC PIPE

    23+740 150

    100 UPVC

    STAGESETOUT/

    EXCV/ BED

    PREP

    INSTALLAT

    IONCONCRETE

    BACKFILLI

    NG

    RFI REF.S.

    NO.DRAWING NO.

    CHAINAG

    E

    PIPE NO. OF

    WAYS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 26

    DIA TYPE LAYING CONCRETE BACKFILL

    LEFT09-Jun-14 09-Jun-14 10-Jun-14 23-Jun-14 UTL-LAY- 101 UTL-CON- 80 UTL-BF- 18

    Middle06-Aug-14 06-Aug-14 06-Aug-14 26-Aug-14 UTL-LAY-138-R1 UTL-CON-111-B UTL-BF- 56

    RIGHT

    LEFT05-Jul-14 05-Jul-14 05-Jul-14 19-Aug-14 UTL-LAY- 123 UTL-CON- 94 UTL-BF- 39R1

    Middle4-Des-14 14-Dec-14 14-Dec-14 UTL-LAY- 222 UTL-CON- 97 R1

    RIGHT

    LEFT16-Jul-14 16-Jul-14 17-Jul-14 UTL-LAY- 130 UTL-CON- 105

    Middle27-Oct-14 27-Oct-14 27-Oct-14 27-Oct-14 UTL-LAY-190R1 UTL-CON- 148 UTL-BF- 72

    RIGHT

    LEFT21-Jul-14 04-Aug-14 05-Aug-14 UTL-LAY-137-R1 UTL-CON- 118

    Middle08-Aug-14 09-Aug-14 09-Aug-14 22-Sep-14 UTL-LAY-148A UTL-CON- 117 UTL-BF- 57

    RIGHT16-Sep-14 16-Sep-14 16-Sep-14 UTL-LAY-172 UTL-CON- 126

    LEFT14-Sep-14 14-Sep-14 14-Oct-14 20-Oct-14 UTL-LAY- 166 UTL-CON-125 UTL-BF-81

    Middle27-Oct-14 30-Oct-14 27-Oct-14 10-Dec-14 UTL-LAY- 205 UTL-CON- 150 UTL-BF-99

    RIGHT

    LEFT16-Sep-14 17-Sep-14 30-Sep-14 UTL-LAY-174 UTL-CON-127

    Middle14-Oct-14 18-Oct-14 14-Oct-14 UTL-LAY-188 UTL-CON-138

    RIGHT27-Oct-14 27-Oct-14 27-Oct-14 UTL-LAY-204 UTL-CON-151

    LEFT16-Sep-14 20-Sep-14 UTL-LAY- 173

    Middle27-Oct-14 27-Oct-14 27-Oct-14 09-Nov-14 UTL-LAY- 203 UTL-CON- 149 UTL-BF-100

    RIGHT

    LEFT03-Nov-14 10-Nov-14 11-Nov-14 07-Dec-14 UTL-LAY- 211 UTL-CON- 155 UTL-BF-106

    Middle

    RIGHT

    LEFT26-Feb-15 28-Feb-15 26-Feb-15 26-Feb-15 UTL-LAY-271 UTL-CON-191 UTL-BF-159

    Middle

    RIGHT

    LEFT

    Middle

    RIGHT4-Sep-14 4-Sep-14 28-Sep-14 22-Feb-15 UTL-LAY-159-B UTL-CON-132 UTL-BF-151

    LEFT

    Middle

    RIGHT

    LEFT

    Middle

    RIGHT

    LEFT16-Sep-14 17-Sep-14 30-Sep-14 18-Oct-14 UTL-LAY-167 UTL-CON-128 UTL-BF-78

    Middle

    RIGHT

    UPVC

    UPVC

    UPVC

    SOL-03

    SOL-02 (R/A)

    3

    Ch:

    0+054.459150

    UPVC 2

    2

    UPVC 6

    UPVC

    UPVC300

    24+850

    150

    150

    24+820

    24+960

    25+160

    43

    44

    45

    47

    49

    UPVC150

    300

    24+220

    24+340

    24+520

    46

    CCC/FQI/EL/14

    CCC/FQI/IR/08

    CCC/FQI/EL/15

    CCC/FQI/EL/16

    CCC/FQI/NAW.4 24+720 2

    2

    CCC/FQI/IR/09

    CCC/FQI/EL/1750

    1 CCC/FQI/Omantel/02

    UPVC

    1 CCC/FQI/SL/18

    4-Way

    x150mm

    SL Ducts

    150 UPVC 4

    100

    0+130 150

    0+138.348 110

    CCC/FQI/SL/14

    CCC/FQI/SL/15

    0+415 1503

    4

    UPVC 4

    CCC/FQI/SL/13

    2

    3

    3

    2

    3UPVC150

    UPVC 2-4WAY150CCC/FQI/SL/0148

    STAGESETOUT/

    EXCV/ BED

    PREP

    INSTALLAT

    IONCONCRETE

    BACKFILLI

    NG

    RFI REF.S.

    NO.DRAWING NO.

    CHAINAG

    E

    PIPE NO. OF

    WAYS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 27

    13.

    Project Name: Upgrading of Falaj Al Qabail Roundabout

    Progress Status up to End of: Jan-15

    Item Value SN ItemTotal

    number

    Number

    completed

    Number in

    progressBalance SN

    Color

    legendItem description

    Cumulative

    up to end of

    last month

    Executed

    this

    month

    Cumulative up to end

    of this month

    Relative

    weight

    (%)

    Remarks

    1 44-Cell Box Culvert 44.00 44.00 0.00 0.00 1 Road Diversion 69.96% 7.33% 77.29% 2.73 In Progress

    2 9-Cell Box Culvert 9.00 9.00 0.00 0.00 2 Earthwork 80.36% 5.00% 85.36% 5.27 In Progress

    Contingency R.O.1,402,155.613 3 8- Cell Box Culvert 8.00 8.00 0.00 0.00 3 Subbase layer 68.80% 6.00% 74.80% 0.49 In Progress

    4 5-Cell Box Culvert 5.00 5.00 0.00 0.00 4 Agg. Base course 13.00% 9.00% 22.00% 1.93 In Progress

    5 Single Cell Box Culvert 6.00 5.00 0.00 1.00 5 Bit. base course 0.00% - 0.00% 2.30 Not Started

    Commencement Date 28.12.2013 6 Pedestrian Underpass @ CH 24+360 - SOL1 1 0.8 0 0.20 6 Bit. wearing course 0.00% - 0.00% 1.27 Not Started

    Construction period 548 Days 7 Pedestrian Underpass @ CH 23+300 - SOL 1 1 0 0 1.00 7 Drainage 61.20% 5.00% 66.20% 1.50 In Progress

    Completion date 29.6.2015 8 Pedestrian Underpass @ CH 0+050 - SOL 3 1 0.3 0.3 0.70 8 MSE Walls 95.00% 5.00% 100.00% 6.84 In Progress

    9 Vehicular Underpass @ CH 21+300 1 1 0 0.00 9 MEP Works & Ducts 35.67% 4.00% 39.67% 4.03 In Progress

    10 Vehicular Underpass @ CH 24+600 1 0.5 0.5 0.50 10 Incidental Works 21.99% 3.80% 25.79% 13.33 In Progress

    Item Value 11 Bridge Foundation 10 10 0 0.00 11RCC Str.- Culverts &

    Underpasses 79.72% 4.25% 83.97% 38.19 In Progress 35

    12 Bridge Abutment 4 4 0 0.00 12 RCC Str. Bridges 65.26% 5.00% 70.26% 22.12 In Progress

    13 Bridge Pier Column 10 10 0 0.00

    Completion date 16.10.2015 14 Bridge Slab 4 2 1 2.00

    Client: Project: SCALE

    -

    CCC DATE

    Title: 28.02.2015

    RENARDET S.A. & Partners UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

    MONTHLY PROFRESS REPORT CHART

    SULTANATE OF OMAN

    Directorate General of Roads & Land Transport

    Revised Contract Details, if any

    Total contract including

    contingency

    Contract Particulars RCC Structures (Culvert, bridge, underpass, tunnel, pedestrian facility) Physical Progress of Main BOQ Items (QTY)

    Total contract excluding

    ContingencyR.O.16,482,247.387

    Total contract including

    contingencyR.O.17,884,403.000

    Overall project status (Sum of progress x weights) 67.88% 100.00

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 28

    BWC 6 cmTack Coat BBC 12 cm

    PRIME COAT PrimeABC 2 ND 15 cm ABC 2 ABC 2ABC 1 ST 15 cm ABC 1 ABC 1GSB 20 cm GSB GSBSubgrade Layr 9

    Layr 8

    Layr 7

    Layr 6

    Layr 5

    Layr 4

    Layr 3

    Layr 2EMBANK L 1 BED PREPOGL SURVEY

    21

    +1

    60

    21

    +1

    80

    21

    +2

    00

    21

    +2

    20

    21

    +2

    40

    21

    +2

    60

    21

    +2

    80

    21

    +3

    00

    21

    +3

    20

    21

    +3

    40

    21

    +3

    60

    21

    +3

    80

    21

    +4

    00

    21

    +4

    20

    21

    +4

    40

    21

    +4

    60

    21

    +4

    80

    21

    +5

    00

    21

    +5

    20

    21

    +5

    40

    21

    +5

    60

    21

    +5

    80

    21

    +6

    00

    21

    +6

    20

    21

    +6

    40

    21

    +6

    60

    21

    +6

    80

    21

    +7

    00

    21

    +7

    20

    21

    +7

    40

    21

    +7

    60

    21

    +7

    80

    21

    +8

    00

    21

    +8

    20

    21

    +8

    40

    21

    +8

    60

    21

    +8

    80

    OGL SURVEY

    BED PREPEMBANK L1layer 2

    layer 3

    layer 4 top of embankmentlayer 5

    layer 6layer 7

    layer 8

    layer 9

    Subgrade GSB 20 cm GSB GSBABC 1 ST 15 cm ABC 1 ABC 1 ABC 1ABC 2 ND 15 cm ABC 2 ABC 2 ABC 2PRIME COAT Prime PrimeBBC 12 cmTack Coat BWC 6 cm

    LH

    S

    3 cell & U.pass

    RH

    S

    3 cell & U.pass

    Be

    gin

    nin

    g o

    f th

    e P

    roje

    ct

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 29

    BWC 6 cmTack Coat BBC 12 cm

    PRIME COAT Prime PrimeABC 2 ND 15 cm ABC 2 ABC 2ABC 1 ST 15 cm ABC 1 ABC 1GSB 20 cm GSB GSB GSBSubgrade Sub grade Layr 9

    Layr 8

    Layr 7

    Layr 6 SubgrdeLayr 5 embank 2Layr 4 embankLayr 3 Top of embankment 3rd rock soilLayr 2 2nd rock soilEMBANK L 1 BED PREPOGL SURVEY

    21

    +9

    00

    21

    +9

    20

    21

    +9

    40

    21

    +9

    60

    21

    +9

    80

    22

    +0

    00

    22

    +0

    20

    22

    +0

    40

    22

    +0

    60

    22

    +0

    80

    22

    +1

    00

    22

    +1

    20

    22

    +1

    40

    22

    +1

    60

    22

    +1

    80

    22

    +2

    00

    22

    +2

    20

    22

    +2

    40

    22

    +2

    60

    22

    +2

    80

    22

    +3

    00

    22

    +3

    20

    22

    +3

    40

    22

    +3

    60

    22

    +3

    80

    22

    +4

    00

    22

    +4

    20

    22

    +4

    40

    22

    +4

    60

    22

    +4

    80

    22

    +5

    00

    22

    +5

    20

    22

    +5

    40

    22

    +5

    60

    22

    +5

    80

    22

    +6

    00

    22

    +6

    20

    22

    +6

    40

    OGL SURVEY

    BED PREPEMBANK L1 1st rock soillayer 2 2nd rock soil 2nd rock soillayer 3 3rd rock soil 3rd rock soillayer 4 4th rock soillayer 5 top of Embankment 5th rock soillayer 6 6th rock soillayer 7 embankmen 1layer 8 embankment 2

    layer 9 subgarde Subgrade SUBGRADEGSB 20 cm GSB GSB GSB

    ABC 1 ST 15 cm ABC 1 ABC 1 ABC 1ABC 2 ND 15 cm ABC 2 ABC 2 ABC 2PRIME COAT Prime Prime Prime

    BBC 12 cmTack Coat BWC 6 cm

    RH

    S

    U turn

    U turn

    LH

    S

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 30

    BWC 6 cmTack Coat BBC 12 cm

    PRIME COAT PrimeABC 2 ND 15 cm ABC 2ABC 1 ST 15 cm ABC 1GSB 20 cm GSBSubgrade top embankmentLayr 9 10 th rock soil

    Layr 8

    Layr 7 7th layer roock soil 7th layer of rock soil Layr 6 layer 15 of embankment

    Layr 5 3th layer of rock soil Layr 4 4th rock soil Embankment layer no 28Layr 3

    Layr 2

    EMBANK L 1 BED PREPOGL SURVEY

    22

    +6

    60

    22

    +6

    80

    22

    +7

    00

    22

    +7

    20

    22

    +7

    40

    22

    +7

    60

    22

    +7

    80

    22

    +8

    00

    22

    +8

    20

    22

    +8

    40

    22

    +8

    60

    22

    +8

    80

    22

    +9

    00

    22

    +9

    20

    22

    +9

    40

    22

    +9

    60

    22

    +9

    80

    23

    +0

    00

    23

    +0

    20

    23

    +0

    40

    23

    +0

    60

    23

    +0

    80

    23

    +1

    00

    23

    +1

    20

    23

    +1

    40

    23

    +1

    60

    23

    +1

    80

    23

    +2

    00

    23

    +2

    20

    23

    +2

    40

    23

    +2

    60

    23

    +2

    80

    23

    +3

    00

    23

    +3

    20

    23

    +3

    40

    23

    +3

    60

    23

    +3

    80

    23

    +4

    00

    23

    +4

    20

    23

    +4

    40

    23

    +4

    60

    23

    +4

    80

    23

    +5

    00

    23

    +5

    20

    OGL SURVEY

    BED PREPEMBANK L1layer 2

    layer 3

    layer 4 4th rock soil Embankment layer no 28layer 5 3th layer of rock soil layer 6 layer 15 of embankmentlayer 7 7th layer roock soil 7th layer of rock soil layer 8

    layer 9 10 rock soil 10th layer of rock soil Subgrade Embankment top embankment GSB 20 cm GSB

    ABC 1 ST 15 cm ABC 1ABC 2 ND 15 cm ABC 2PRIME COAT Prime

    BBC 12 cmTack Coat BWC 6 cm

    LH

    SR

    HS

    Bridge

    Bridge

    9 cell

    9 cell

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 31

    BWC 6 cmTack Coat BBC 12 cm

    PRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cm

    GSB 20 cm GSBSubgrade Rock soil 18 th layer Sub grdeLayr 9 top of embankment

    Layr 8 Rock siol 16thLayr 7

    Layr 6 6th rock soilLayr 5 5th rock soilLayr 4 4th rock soil Layr 3

    Layr 2 2nd rock soil2nd rock soilEMBANK L 1 1st rockBED PREPOGL SURVEY

    23

    +5

    40

    23

    +5

    60

    23

    +5

    80

    23

    +6

    00

    23

    +6

    20

    23

    +6

    40

    23

    +6

    60

    23

    +6

    80

    23

    +7

    00

    23

    +7

    20

    23

    +7

    40

    23

    +7

    60

    23

    +7

    80

    23

    +8

    00

    23

    +8

    20

    23

    +8

    40

    23

    +8

    60

    23

    +8

    80

    23

    +9

    00

    23

    +9

    20

    23

    +9

    40

    23

    +9

    60

    23

    +9

    80

    24

    +0

    00

    24

    +0

    20

    24

    +0

    40

    24

    +0

    60

    24

    +0

    80

    24

    +1

    00

    24

    +1

    20

    24

    +1

    40

    24

    +1

    60

    24

    +1

    80

    24

    +2

    00

    24

    +2

    20

    24

    +2

    40

    24

    +2

    60

    24

    +2

    80

    24

    +3

    00

    24

    +3

    20

    24

    +3

    40

    24

    +3

    60

    24

    +3

    80

    24

    +4

    00

    24

    +4

    20

    24

    +4

    40

    OGL SURVEY

    BED PREPEMBANK L1layer 2 2nd rock soil2nd rock soillayer 3

    layer 4 4th rock soil layer 5 5th layer rock soillayer 6 6th layer rock soillayer 7layer 8

    layer 9 top of Embankment Subgrade Rock soil 18 th layer Sub grade GSB 20 cm GSB

    ABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT

    BBC 12 cmTack Coat BWC 6 cm

    1st layer of embankment Rock siol 16th

    U turn & under pass

    U turn & under pass

    LH

    SR

    HS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 32

    BWC 6 cmTack Coat BBC 12 cm

    PRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cm ABC 1

    GSB 20 cm GSBSubgrade Layr 9

    Layr 8

    Layr 7

    Layr 6

    Layr 5

    Layr 4

    Layr 3

    Layr 2

    EMBANK L 1 BED PREP sub grade in cut - verge prepration sub grade in cut OGL SURVEY

    24

    +4

    60

    24

    +4

    80

    24

    +5

    00

    24

    +5

    20

    24

    +5

    40

    24

    +5

    60

    24

    +5

    80

    24

    +6

    00

    24

    +6

    20

    24

    +6

    40

    24

    +6

    60

    24

    +6

    80

    24

    +7

    00

    24

    +7

    20

    24

    +7

    40

    24

    +7

    60

    24

    +7

    80

    24

    +8

    00

    24

    +8

    20

    24

    +8

    40

    24

    +8

    60

    24

    +8

    80

    24

    +9

    00

    24

    +9

    20

    24

    +9

    40

    24

    +9

    60

    24

    +9

    80

    25

    +0

    00

    25

    +0

    20

    25

    +0

    40

    25

    +0

    60

    25

    +0

    80

    25

    +1

    00

    25

    +1

    20

    25

    +1

    40

    25

    +1

    60

    25

    +1

    80

    25

    +2

    00

    25

    +2

    23

    OGL SURVEY

    BED PREPEMBANK L1layer 2

    layer 3

    layer 4

    layer 5

    layer 6

    layer 7layer 8

    layer 9

    Subgrade GSB 20 cm GSB GSB

    ABC 1 ST 15 cm ABC 1ABC 2 ND 15 cmPRIME COAT

    BBC 12 cmTack Coat BWC 6 cm

    En

    d o

    f th

    e p

    roje

    ct

    LH

    SR

    HS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 33

    14.

    Sl. No. DESCRIPTIONPAYMENT FOR

    THE MONTH OF

    GROSS

    AMOUNT

    (R.O.)

    GROSS

    AMOUNT

    CLAIMED (R.O.)

    REVISED NET

    AMOUNT

    CLAIMED

    (R.O.)

    DATE

    SUBMITTED

    AMOUNT

    CERTIFIED (R.O.)DATE CERTIFIED

    AMOUNT

    RECEIVED

    (R.O.)

    DATE

    PAYMENT DUE

    DATE

    PAYMENT

    RECEIVED

    1PAYMENT APPLICATION No. 1

    (ADVANCE PAYMENT)Dec-13 1,648,225 1,648,225 1,648,225 23-Nov-13 1,648,225 29-Jan-14 1,648,225 6-Feb-14

    2 PAYMENT APPLICATION No. 2 Jan-14 2,291,277 643,052 514,442 12-Feb-14 514,442 02-Apr-14 513,608 30-May-14 10-Apr-14

    3 PAYMENT APPLICATION No. 3 Feb&Mar-14 2,808,644 517,367 434,917 06-Apr-14 434,917 03-May-14 414,674 30-Jun-14 22-Jul-14

    4 PAYMENT APPLICATION No. 4 Apr-14 3,302,738 494,094 374,179 08-May-14 407,538 05-Jun-14 395,257 2-Aug-14 22-Jul-14

    5 PAYMENT APPLICATION No. 5 May-14 3,770,362 467,624 374,172 05-Jun-14 445,708 04-Jul-14 374,172 31-Aug-14 22-Jul-14

    6 PAYMENT APPLICATION No. 6 Jun-14 4,293,764 523,402 418,721 15-Jul-14 382,116 16-Jul-14 418,721 12-Sep-14 9-Sep-14

    7 PAYMENT APPLICATION No. 7 Jul&Aug-14 5,697,543 1,403,779 1,123,023 14-Sep-14 1,123,023 18-Sep-14 1,123,023 15-Nov-14 19-Oct-14

    8 PAYMENT APPLICATION No. 8 Sep-14 6,858,550 1,161,007 875,594 21-Oct-14 928,805 06-Nov-14 875,594 3-Jan-15 18-Dec-14

    9 PAYMENT APPLICATION No. 9 Oct&Nov-14 8,435,464 1,576,914 1,053,584 17-Dec-14 1,306,552 29-Dec-14 1,053,584 27-Feb-15 15-Feb-15

    10 PAYMENT APPLICATION No. 10 Dec-14 9,304,199 868,735 876,223 12-Jan-15 876,223 10-Feb-15 11-Apr-15

    11 PAYMENT APPLICATION No. 11 Jan-15 10,102,517 798,318 718,579 26-Feb-15

    12 PAYMENT APPLICATION No. 12 Feb-15

    13 PAYMENT APPLICATION No. 13 Mar-15

    14 PAYMENT APPLICATION No. 14 Apr-15

    15 PAYMENT APPLICATION No. 15 May-15

    16 PAYMENT APPLICATION No. 16 Jun-15

    17 PAYMENT APPLICATION No. 17 Jul-15

    18 PAYMENT APPLICATION No. 18 Aug-15

    19 PAYMENT APPLICATION No. 19 Sep-15

    20 PAYMENT APPLICATION No. 20 Oct-15

    9,304,199 10,102,517 8,411,659 8,067,549 6,816,857 TOTAL AMOUNT (R.O.)

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 34

    15.

    Sl.

    No.CCC HIRED

    TOTAL

    AVAILABLE

    AT SITE

    1 COMPRESSOR

    2 AIR COMPRESSOR 1 1 2

    3 MILLER WELDING MECHINE 2 2

    4 GENERATOR 2 1 3

    5 CRANES -

    6 CRANES 30 TON / 25 TON / 70 TON 2 4 6

    7 VEHICLES H.D. -

    8 DIESEL TANKER -

    9 FLAT TRAILER 3 3

    10 HIAB TRUCK 3 3

    11 P/MOVER + TIPPING TRAILER 4 6 10

    12 TIPPER TRUCKS 13 7 20

    13 WATER TANKER 5000 & 10000 GAL 1 3 4

    14 EARTH MOVING PLANT

    15 BOBCAT 1 3 4

    16 EXCAVATOR 1 1

    17 JCB 4CX / 3CX 1 6 7

    18 SHOVEL / WHEEL LOADER 4 2 6

    19 DOZER D9N/D8R -

    20 TELEHANDLER -

    21 CIVIL ENGINEERING EQUIPMENT

    22 GREENE STABILIZER PLANT 1 1

    23 STEEL D/D ROLLER 1 1

    24 E/WORK ROLLER 3 3

    25 MOTOR GRADER 1 2 3

    26 TITAN PAVER MACHINE -

    27 TYRE / PTR ROLLER 1 1

    28 VOOGLE PAVER MACHINE 1 1

    29 L. D. VEHICLES & TRUCKS

    30 DYNA TRUCK 1 1

    31 MAINTENANCE TRUCKS 1 1

    32 ASHOK LEYLAND BUS 55 SEAT 5 5

    33 TOYOTA COASTER BUS 24 S 1 1

    34 TOYOTA COROLLA/CIVIC/YARIS 11 11

    35 TOYOTA PICKUP/ISUZU 6 7 13

    36 NISSAN PATHFINDER/X-TRAIL 5 5

    37 TOYOTA LAND CRUISER/FORTUNER 4 4

    38 Total 50 72 122

    DESCRIPTION

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report February 2015

    RENARDET S.A. & PARTNERS Page 35

    16.