    MINE SURVEYMINE SURVEY

    For All Operators / Leading Hands and

    Foreman

    Untuk Semua Operator / Leading Hands

    dan Foreman

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

  • 7/25/2019 Mine Survey PSG_Sto

    2/16

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

  • 7/25/2019 Mine Survey PSG_Sto

    3/16

    Red flag = Code for crest of bench

    Pita merah = Kode untuk crest bench

    Pit boundary

    Batas pit

    Crest of bench & better slope

    Crest bench dan pengarah slope

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

    Crest To RL 70 Elev 76.5 cut 6.5 m 15/03/2015

    Penulisan di Pita Survey

    Crest 60 To RL 50 Elev 60.2 cut 9.8 m 15/03/2015

    Penulisan di Pita Survey

    - Crest = keterangan elev. design = Elev. Actual- To RL70 = target elevation yang dituju

    - Elev 76.5 = elevation aktual

    - Cut 6.5 = keterangan potong 6.5 m- 15/03/2015 = Tanggal Pemasangan Pita

    - Crest 60 = keterangan elevation design- To RL 50 = target toe elevation yang dituju- Elev 60.2 = elevation aktual (Sudah OnGrade)

    - Cut 6.5 = keterangan potong 9.8 m

    - 15/03/2015 = Tanggal Pemasangan Pita

  • 7/25/2019 Mine Survey PSG_Sto

    4/16

    BETTER PEG SLOPE

    Batter Peg/patok profil adalah patok control sloping yang menunjukkan besarnya sudutkemiringan terhadap bidang horizontal

  • 7/25/2019 Mine Survey PSG_Sto

    5/16

    InsertPoe

    rPointrefe

    rencenumberhere

    Red flag = Code for crest of bench

    Pita merah = Kode untuk crest bench

    Pit boundary

    Batas pit

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

    Crest 50 Elev 50.2 Cut 0.2 TO RL 40 15/03/2015

    Penulisan di Pita Survey di area yang belum On Grade

    - Crest 50 = keterangan elevation Crest design- RL 52.2 = elevation aktual (Belum On Grade)- Cut 2.2 = Di potong 2.2 m terlebih dahulu- To RL 40 = target Elevasi Toe yang di tuju

    - 15/03/2015 = Tanggal Pemasangan Pita

  • 7/25/2019 Mine Survey PSG_Sto

    6/16

    !oe of bench

    !oe bench

    Cut and check ele"ation

    Cut dan cek ele"asi

    #ello flag = Code for toe of bench$ highall

    Pita kuning = Kode untuk toe %kaki& bench$ higall

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

    Toe 70 To RL 60 Elev 63.2 Cut 3.2 m 15/03/2015

    - Toe 70 = keterangan elevation

    design- To RL 60 = target elevation yang

    dituju- Elev 63.2 = elevation aktual- Cut 3.2 m = Potong 3.2 m

    - 15/03/2015 = Tanggal Pemasangan Pita

  • 7/25/2019 Mine Survey PSG_Sto

    7/16

    !oe of bench

    !oe bench

    #ello flag = Code for toe of bench aste dump

    Bendera kuning = Kode untuk toe %kaki& bench disposal

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

    Toe 70 Elev 60.2 To RL 70 Fill 9.8 m 15/03/2015

    Penulisan di Pita Survey

    - Toe 70 = keterangan elevation design- To RL 70 = target elevation yang dituju- Elev 60.2 = elevation aktual (Sudah On

    Grade)- Fill 9.8 m = Penimbunan setinggi 9.8 m

    - 15/03/2015 = Tanggal Pemasangan Pita

    RL 60

    RL 70

  • 7/25/2019 Mine Survey PSG_Sto

    8/16

    #ello 'hite flag = Code for Coal (etting )imit

    Pita kuning Putih = Kode untuk batas pengambilan batu bara % *ata sudah di pick up tim

    +ur"ey&

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

  • 7/25/2019 Mine Survey PSG_Sto

    9/16

    InsertPoe

    rPointrefe

    rencenumberhere

    it !re!

    C,-CK -le" .0. Cut 0. m to R) .1

    R) .1

    'ill be R) .12kan jadi R) .1

    (reen Red flag = Code for refer of Cut area

    Bendera hijau Putih = Kode untuk menunjukkan Cut %Pemotongan& suatu area baik

    di disposal atau di area tambang aktif %pit&

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

  • 7/25/2019 Mine Survey PSG_Sto

    10/16

    "is#os!l !re!

    C,-CK -le" 3.0.$ 4ill 50. m to R)

    61

    R) 61

    'ill be R) 612kan jadi R) 61

    (reen 'hite flag = Code for refer of fill area

    Bendera hijau Putih = Kode untuk menunjukkan fill %penimbunan& suatu area baik di

    disposal atau di area tambang aktif %pit&

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

  • 7/25/2019 Mine Survey PSG_Sto

    11/16

    InsertPoe

    rPointrefe

    rencenumbe

    rhere

    Blue 'hite flag = Code for refer on grade area %for check ele"ation&

    Pita biru Putih = Kode untuk menunjukkan suatu bench atau area tertentu sudah

    sesuai dengan le"el yang ditentukan

    Check$ -le" 710 8n grade

    R) 71

    R) 1

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

  • 7/25/2019 Mine Survey PSG_Sto

    12/16

    +tation point for sur"ey instrument

    stand point

    !itik ikat untuk titik berdirinya

    instrument sur"ey

    Blue flag = Code for +tation Point

    Pita Biru = Kode untuk titik untuk berdiri alat !+

  • 7/25/2019 Mine Survey PSG_Sto

    13/16

    8range flag = Code for line of road and Centerline

    Bendera oranye = Kode untuk menentukan batas jalan dan 2s 9alan

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

  • 7/25/2019 Mine Survey PSG_Sto

    14/16

    )imit clearing

    Batas clearing / pembukaan lahan

    Red flag = Code for land clearing limit

    Pita :erah %Tanpa Tulisan&= Kode untuk menentukan batas clearing lahan

    Pegging StandardStandarisasi PitaPegging StandardStandarisasi Pita

  • 7/25/2019 Mine Survey PSG_Sto

    15/16

    Red ; #ello flag = Code for refer limit of concession

    Pita merah ; Kuning = Kode untuk menunjukkan batas

  • 7/25/2019 Mine Survey PSG_Sto

    16/16

    *isposal area

    !opsoil Bank

    'hite ; 8range flag = Code for refer limit of topsoil stock at disposal

    Pita putih ; 8range = Kode untuk menunjukkan batasan area untuk menimbun topsoil di