AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the...

19

Transcript of AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the...

Page 1: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;
Page 2: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;
Page 3: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;
Page 4: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;
Page 5: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;
Page 6: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;
Page 7: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

1

PROGRESS ON IMPLEMENTATION OF EXTENSION REQUEST IN

ACCORDANCE WITH ARTICLE 5 OF THE CONVENTION

12th Meeting of the States Parties to the

Ottawa Convention Geneva, 3 December – 7 December 2012

TAJIKISTAN

Page 8: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

2

C O N T E N T

1. Introduction 2. Available capacity in 2012 3. Status of work to be conducted (Assumptions in accordance with extension request) 4. Status of work conducted (Progress made in 2012) 5. Contaminated areas as of November 2012 6. Financial support in 2012 7. Operational plans for 2013 8. Risk Education

Page 9: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

Tajikistan Extension Request 3

Introduction

Page 10: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

4

Available land release capacity in 2012

2 FSD Survey Teams 8 FSD Multipurpose Teams 6 FSD MDD Teams (12 dogs) 2 FSD mechanical demining teams - 2 MV-4 machines 2 MoD Multipurpose Teams 1 MoD mechanical demining team - 1 Mini MineWolf machine 5 NPA Multipurpose Teams 5 NPA MDD teams (10 dogs

Demining Operators: • FSD – Swiss Foundation for Mine Action • NPA – Norwegian Peoples‘ Aid • MoD – Ministry of Defense

MDD = Mine Detection Dogs

Page 11: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

5

Status of work to be conducted Assumptions for 2012 in accordance with Work Plan of Extension Request 

  

Land to be released by  

 

Number of areas to be cleared or reduced  

Size to be cleared or reduced, m²  

Tajik Afghan border  

MDM 0  0 

MDD 17  400,000 

Manual 9  200,000 

Central Region   MDM 1  200,000 

Manual 1  100,000 

Total      28  900,000 

Page 12: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

6

Status of work conducted 

Land released by

Number of cleared areas

Cleared size, m²

 Tajik Afghan border

MDM - -

MDD 14 1 000 000

Manual 4 694 000

Area reduction - 102 000

Central Region MDM - - Manual 1 13 000

19 1 809 000

Progress made in 2012 by November 

Note: Mechanical demining machines (MDM) support clearance but are not sufficient for actual clearance. Land prepared by machines: 1 102 000 m².

Page 13: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

56900 129156  172558  190582  209948 

847278  807358  791353 705471 

0 0 

0  12560  0 

0  0  0 0 

0 0 

161189 237374 

529957 

440971 441504 

730316 1001531 

13983 0 

115755 

139645 

485623  630543 

559878 102393 

0 0 

177707 

158258 

2004  2005  2006  2007  2008  2009  2010  2011  2012 0 

200'000 

400'000 

600'000 

800'000 

1'000'000 

1'200'000 

1'400'000 

1'600'000 

1'800'000 

2'000'000 

2'200'000 

Cleared area from beginning of activity as of 30 Nov 2012 

BAC 

Reduced 

MDD 

Manual 

733 978 

333 774 

1 037 808 

70 883 

1 773 872 

129 156 

1 879 405 2 081 547 

1 809 395 

Page 14: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

0

20'000

40'000

60'000

80'000

100'000

120'000

140'000

160'000

180'000

200'000

220'000

240'000

260'000

280'000

300'000

320'000

7383 14546

54074 77348

52657 73786

109986 111694 129478

74519

0 3102

183040 165132

103810 90007

105698 86706

160991

103045

0 0

0 0

0 0

0

0

0

0

0 0

0

20100

31591 0

0

0

21832

28870

Monthly statistics of the cleared areas in 2012 as of November

Reduced

MDD

Manual

7 383 17 648 

237 114 

262 580 

188 058 

163 793 

198 400 215 684 

312 301 

206 434 

Page 15: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

9

Total size of contaminated and leftover areas: Tajik-Afghan Border: 160 areas – 5,4 kм2

Central region: 31 areas - 2,3 kм2

Tajik-Uzbek border: 57 areas - partially surveyed

Contaminated areas as of November 2012

Page 16: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

Main Development partners of Tajikistan Mine Action Programme

Canada

Germany

UK

Norway

OSCE

UNDP

Switzerland

Sweden

USA

Japan

Belgium

Australia

Page 17: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

11

Operational plans for 2013

• Clearance and BAC in Central Region • Clearance along Tajik Afghan Border • Finalize Non-technical Survey along the Tajik-Uzbek Border

• Details on Survey and Clearance not less than 500,000 m² manually;

not less than 500,000 m² by MDDs;

Technical survey and land preparation of not less than 1,000,000 m² by the MDM, followed by manual clearance or MDD verification.

Page 18: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

12

Mine Risk Education in 2012

MRE implementing partners and facilitators: • Red Crescent Society

volunteers (43) • Community volunteers (27) • 165 teachers in 111 schools 153 at-risk villages reached in 25 districts 62 327 persons reached • this total includes 20 900 pupils

Total of all MRE recipients 

   62 327    Men/  Boys 

Women/ Girls 

27 940     

34 387     

Page 19: AP Mine Ban Convention: AP Mine Ban Convention...• Finalize Non-technical Survey along the Tajik-Uzbek Border • Details on Survey and Clearance not less than 500,000 m² manually;

Thank you for your attention