Current Status of the LBNL Procurement System Allan DeMello 9/1/2004
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory...
-
Upload
ezra-parks -
Category
Documents
-
view
223 -
download
0
description
Transcript of MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory...
![Page 1: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/1.jpg)
MICE Prototype Coupling Coil Fabrication Update
Allan DeMelloLawrence Berkeley National Laboratory
MICE CM38 - Napa California February 25, 2014
![Page 2: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/2.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 2Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Outline
•Cold mass•Prototype vacuum vessel•Prototype thermal shield•Prototype cooling circuit
![Page 3: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/3.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 3Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
MICE Cooling ChannelTwo coupling coil magnets integrated into the RFCC modules
Spectrometer solenoid magnets
Focus magnets
![Page 4: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/4.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 4Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Coupling Coil Sub-assemblies
![Page 5: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/5.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 5Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Coupling Coil Cold Mass
•Preparation cold mass coil #1 finished at LBNL January 2013
•Preparation of cold mass coils #2, #3 and #4 at LBNL to begin when coils arrive from China
Strain Gauges
Cernox Sensor
Voltage TapsQuench
Protection
Superconductor Lead Stabilizers
![Page 6: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/6.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 6Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Cold Mass Magnetic Test at Fermilab
The 1st cold mass is currently undergoing magnetic testing at Fermilab
![Page 7: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/7.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 7Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Coupling Coil Vacuum Vessel•LBNL mechanical shop is in the process of fabricating the first cryostat vacuum vessel
•Estimated completion the end of March (vacuum vessel, tower, warm bore)
•Drawings will be updated to reflect the “as built” cryostat
![Page 8: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/8.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 8Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Coupling CoilCoupling coil magnet integrated into the RFCC
RFCC Module
![Page 9: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/9.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 9Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Coupling Coil Scallop ClearanceTight tolerance for vacuum vessel scallops• Because of the tight clearance
distance (2 mm) between the concave radius of the scallop and the O.D. of the RF coupler vacuum vessel spool a tight tolerance was placed on the final locations of the welded scallops.
• The tolerance is true position within 0.254 mm
Scallops
![Page 10: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/10.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 10
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Coupling Coil Scallop Clearance
MLI superinsulation must also fit inside the 12.5 mm gap between the thermal shield and the inner surface of the scallop.
Limited space between inner surface of the scallop and the thermal shield
![Page 11: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/11.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 11
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Coupling Coil Vacuum Vessel Tolerance
Tight tolerance on the final locations of the welded scallops.
![Page 12: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/12.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 12
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Coupling Coil Scallop
Original Scallop Design• Original thin walled scallop
deformed during welding
Gap shows the distortion from welding the scallop to the vacuum vessel
![Page 13: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/13.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 13
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Coupling Coil Scallop
New Scallop Design• New design has thicker walls
at location of welds to help minimize the distortion
![Page 14: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/14.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 14
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Alignment Fixture for Welding ScallopsScallop alignment
fixture• LBNL shop developed a
go/no go alignment fixture to ease the welding process for the scallops
Scallop alignment fixture• Nominal and ± indicators
![Page 15: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/15.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 15
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Vacuum Vessel Welding Complete
Next steps for vacuum vessel
• LBNL shop will machine the central bore and the tower flange
• Finish machine the tower• Complete the warm bore roll-up• Vacuum check the vessel, the
tower and the warm bore
Ports and bore shown covered due to the bead blasting process
![Page 16: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/16.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 16
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Thermal Shield
Status• Initial thermal shield design and
drawings were completed• Reviewed by LBNL Superconductor
Magnet Group• Design is being revised for ease of
fabrication and assembly (see following slides)
![Page 17: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/17.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 17
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
New Concept For The Thermal Shield• Design concept from Fermilab
shown• Thermal shield fabricated in two
symmetric halves• Eliminates welding of TS as final
assembly step• Removes the risk of damage to
the MLI wrapped around the cold mass
• New model and drawings will need to be generated
![Page 18: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/18.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 18
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
New Concept For The Thermal Shield• Concept model of split thermal
shield with edge lip for fasteners
Lips joined by fasteners Half of assembly
Full assembly
![Page 19: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/19.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 19
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Prototype Cooling Circuit Assembly
Status
• Initial design drawings have been finished and reviewed by the LBNL Superconducting Magnet group
• Revisions required before requesting quotes from outside vendors
• Also requires addition of fiducial target mount points
• LBNL will ship cooling circuit as two sub-assemblies, to be integrated at FNAL in final assembly
![Page 20: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/20.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 20
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Cold Mass / Thermal Shield Mock-up
A wood mock-up of the cold mass/thermal shield is being planned to assist in defining the coupling coil magnet assembly procedure
![Page 21: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/21.jpg)
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 21
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Projected Schedule
• Cryostat vacuum vessel components • Completed end of March, shipped to FNAL in April• Incorporation of red-lines into final drawings by ~mid-June
• Thermal shield• Redesign & drawings to be completed by end of March• Fabrication estimated complete by end of May
• Cooling circuit• Drawing revisions to be completed by mid-April• Fabrication estimated complete by July/August
• Cold mass mockup• Design complete by end of February• Fabrication complete by end of March
![Page 22: MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.](https://reader030.fdocuments.us/reader030/viewer/2022020108/5a4d1b5b7f8b9ab0599ab0ba/html5/thumbnails/22.jpg)
MICE RFCC Module – MICE Schedule Review at RAL, UK
Page 22Derun Li - Lawrence Berkeley National Lab – May 24, 2011
Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California
Page 22
Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014
Summary of Prototype Coupling Coil• Cold Mass
• LBNL finished cold mass preparation work January 2013• Cold mass is currently being tested at Fermilab
• Cryostat Vacuum Vessel• LBNL mechanical shop is fabricating the first cryostat vacuum vessel• Scheduled to finish the end of March
• Thermal Shield• Initial design drawings have been finished and have been reviewed by the LBNL
superconducting magnet group• New thermal shield concept introduced by Fermilab• New model and drawings need to be generated prior to fabrication
• Cooling Circuit• Initial design drawings have been reviewed by the LBNL superconducting magnet group
• Revisions required before requesting fabrication quotes• LBNL will integrate components into two sub-assemblies to be shipped to FNAL this summer