International Muon Ionization Cooling Experiment MICE 1 MICE MICE COLABORATION MEETING BERKELEY:...

26
1 International Muon Ionization Cooling Experiment MICE MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo

Transcript of International Muon Ionization Cooling Experiment MICE 1 MICE MICE COLABORATION MEETING BERKELEY:...

Page 1: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

1International Muon Ionization Cooling Experiment MICE

MICE

MICE COLABORATION MEETING BERKELEY:ASSEMBLING THE PROPOSAL

preliminary logo

Page 2: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

2International Muon Ionization Cooling Experiment MICE

Summary 1. The MICE (Muon Ionization Cooling Experiment) as presented represents a research and development project to develop an intense source of neutrinos for a future neutrino factory. It is a technical and engineering project more so than an exploratory piece of basic science. Nonetheless it represents accelerator technology at the leading edge, and without results from an enterprise like MICE, it would be difficult in the future to present a credible proposal for a neutrino factory with predictable performance and realistic cost estimates.

THE JOINT CLRC/PPARC PANEL TO REVIEW THE MICE PROPOSAL  REPORT OF THE 1ST PANEL MEETING, HELD ON 25 MARCH 2002.

Page 3: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

3International Muon Ionization Cooling Experiment MICE

 2. The proponents are encouraged to write a full proposal with technical help from RAL who would act as the host laboratory for MICE. The proposal, along the guidelines required by the PPARC Project Peer Review Panel, should address the layout and integration of the experimental facility and cover all safety aspects. The financial, technical and experimental needs should be clearly spelled out along with their probable and realistic solutions.

3. It is important that the proposal can indicate strong UK university involvement of dedicated physicists. The committee was told that even though the HEP community in the UK had indicated a priority for a linear collider as the next global project, there remained a group (~ 20%) with a stated preference for a neutrino factory as the next step. It is therefore anticipated that this group will represent the main signatories of the proposal.

Page 4: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

4International Muon Ionization Cooling Experiment MICE

 4. The proposal should not address the scientific case for a neutrino factory, but rather concentrate on explaining how the technical and financial uncertainties can be reduced in a future proposal for a neutrino factory, by performing MICE at RAL. It should also attempt to answer the question as to why the proponents believe that the timescale for MICE is immediate.  5. At the stage of producing a proposal the risks to the CLRC are rather small and appear manageable. However the proposal must cover future demands on the laboratory especially the potential impact on the ISIS group and ISIS operations. Should an eventual proposal be successfully reviewed, RAL will become a significant player internationally as the host laboratory for the MICE project. The world needs only one MICE!

Page 5: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

5International Muon Ionization Cooling Experiment MICE

questions:

What will MICE be?Who will do what?Who will pay what?When can/should this be done?

Conclusion The Review Panel endorses the collaboration’s request for technical help from the host laboratory in preparation of a proposal to define the layout and integration of this experimental facility and to study the safety issues related to hydrogen absorbers, intense magnetic and RF fields. The Panel reserves the right to examine this proposal, its value for research, its timing and its implications for the domestic programme.

Page 6: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

6International Muon Ionization Cooling Experiment MICE

MICE Video Conferences and collaboration meetings 

MUCOOL/MICE Collaboration meeting 22-26 October @BerkeleyFinalize who does what and cost estimatesSchedule remaining open questions (decision tree)at that time the input to the proposal should be defined and proposal drafting underway.

Date of submission: 15 December 2002 Deadline for contributions 15 November 2002

dates for SG meeting 23dates for video conferences -> steering group meeting I.e. 24 afternooncollaboration board meeting Friday morning 7H30

NEXT Collaboration meeting: 27-29 March 2003

Geneva (CERN or Uni)

Page 7: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

7International Muon Ionization Cooling Experiment MICE

PRIORITIES (status as of RAL coll.meeting)

1. Find a home for the experiment

2. Understand the X ray issue and quantify it in terms of particle detector performance

2.’ Develop reconstruction with noise and efficiencies 3. Choose detectors

3’. Finalize parameters

4. Establish technical specs and cost estimates

4’ Distribute contributions and begin fund hunt mission

5. Write proposal

DONE

getting there, BRAVO!

Crisis…

pending questions on magnet match, beam sizes, absorber design, safety measures

no, but define set of criteria, actions and decision points

Page 8: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

8International Muon Ionization Cooling Experiment MICE

.43 X 4 cells = 1.7 m 11.5 MV for 1X 4 = 6.70 MV/m

16 MV for 2X4 = 4.65 MV/m

16 MV for 1X4 = 9.3 MV/m

=> 6.70 MV/m => 4.65 MV/m

Page 9: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

9International Muon Ionization Cooling Experiment MICE

Simulation of performance of cooling cell fairly well understood.

Now needed : … simulation of detector response, for design of e.g. downstream PID or to understand performance of Sci-Fi or TPG and first go at some systematics-----

… groundwork by Janot needs to be extended … large organized effort started in August 2002 much exists, some results will already be with us keep going!

SIMULATIONS

conceptual thinking of systematic uncertainties in the measurement needed magnetic field quality / measurements noise and efficiencies in trackers absorber thickness etc…

Page 10: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

10International Muon Ionization Cooling Experiment MICE

Proposed grand time line:

2001 Expose detectors to RF radiation (potential show stopper) write first description of experiment with two options

US design (200 MHz) or CERN design (88 MHz) US simulate CERN scheme [and vice versa if possible]

Evaluate availability and cost of main cost drivers: RF cavities / amplifiers/ power supplies/solenoids for each scheme evaluate beams + host labs

1st workshop 25-27 October 2001, CERN ! 16 Nov. 2001 ! Chose technology + host lab, write +

submit LETTER OF INTENT (that was 28 Nov 2001) 25 March 2002 CLRC reviewJune 2002 CLRC + PPARC invite submission of proposal

15/12/2002 Proposal submissionend 2004 1st beam (debugging of spectrometers)

end 2006 demonstrate ionization cooling

after that … … more systematic studies

Page 11: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

11International Muon Ionization Cooling Experiment MICE

MICE : WHEN?

GOAL: The long-term goal is to have a Conceptual Design Report for a Neutrino Factory Complex by the time of JHF and LHC start-up, so that, by that date, this would be a valid option for the future of HEP

(European Muon Coordination and Oversight Group, April 2002)

=2007

MICE must have measured cooling end 2006

Page 12: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

12International Muon Ionization Cooling Experiment MICE

P.Drumm

Page 13: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

13International Muon Ionization Cooling Experiment MICE

RAL experiment layout (P. Drumm)

Page 14: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

14International Muon Ionization Cooling Experiment MICE

First go at very incomplete tables of who does whatWill be updated during meeting

 

item comm. resp. LOI cost

rev.cost

US EU RAL/UK

JP

RF cells

critical path item

LNBL 0.8-1.3 1.6-2.8 1.6-2.8 ? -- --

powersourcesplumbing

CERN refurb

CERN 0.2 0.3 -- 0.3some

rad. monitors

rad. safetydark current

RALANL

-- ?? ?

?

Beam line

RAL(+PSI sol.)

-- -- -- ? ?

Page 15: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

15International Muon Ionization Cooling Experiment MICE

First go at very incomplete tables of who does what

 

item comments

resp. LOI cost

revisedcost

US EU RAL/UK

JP

flip coils 3-4 1.6 1.6

comp. coils 2-3 2 2

solenoids 2 1.6

Helium plant

same as beam

RAL -- ? ?

global supervision of coils necessary

(Green)

among Oxford/MUCOOL/RAL/LBL/Saclay/INFN

1.6

 Suggestion: Mike Green will organize a get-together of those who could bid for the magnets and share (at least the cost, maybe construction) and come up with a proposal.

Page 16: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

16International Muon Ionization Cooling Experiment MICE

First go at very incomplete tables of who does what

 

item comm. resp. LOI cost

revisedcost

US EU RAL/UK

JP

H2 absorbers

MUCOOL/KEK

MUCOOL/KEK

.7-.8 .15 x1 -- -- x2

LH2 Plant + safety

RAL 2(?) 2(?) 2(?)

solid absorbers

?

common funds

Page 17: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

17International Muon Ionization Cooling Experiment MICE

First go at very incomplete tables of who does what

 

item comm. resp LOI cost

revisedcost

US EU RAL/UK

JP

Sci fi >>2 planes of 3 double layers

ICL/FNAL/KEKLong/Bross/yoshimura

NA 5(?)

TPG Needs validation!

Legnaro/INFN

/CERN/ GVA (Gastaldi)

-- NA 0.5(?)

TOF most existsadequate

Milano/Padova -- 0.18 0.1

down-stream PID

technique not decided or both?

Louvain/Mississipi for Cerenkov

-- 0.1

DAQ Bari (Radicioni)

.32 .32

to be shared

point was made that slow control and online reconstruction should be addressed

Page 18: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

18International Muon Ionization Cooling Experiment MICE

draft Proposal for MICE proposal Layoutoverall edition: Blondel & Kaplan

Executive Summary 1 pagetable of contents 1 pagefull author list -------!!!!!! 2 pagesresponsibility structure 1 page

1. General motivation (S.Geer & K. Long) 1.1 Neutrinos and our lives (PR motivation)

1.2 Neutrino oscillations and the role of NuFact (Particle physics motivation) 1.3 other physics at NuFact complex and Muon collider

1.4 Neutrino Factory description (the accelerator) 1.5 Role of cooling in Neutrino Factory and muon collider, the need for MICE (Acc. physics motivation) 6 pages

2. Cooling (Kaplan) 2.1 principle of Ionization cooling 2.2 cooling channel design 2.3 possible extensions (gas cooling and ring coolers) 5 pages

3. The International Muon Ionization Cooling Experiment (Blondel, Hanke, Palmer) 3.1 Layout and principle 3.2 Experiments to be performed 3.3 Expected performance and statistical precision 3.4 Systematic errors and resulting requirements 3.5 possible development of the experiment in time 8 pages

Page 19: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

19International Muon Ionization Cooling Experiment MICE

draft Proposal for MICE proposal Layout (ctd)

4. The magnetic channel (Green/Rey) 4.1 layout and optics (Palmer / Fernow) 4.2 design of coils (Green/Rey) 4.3 services (->move to infrastructure chapter 10) 4.4 magnetic measurements (Rey) 4.5 return flux and constraints 8 pages 4.6 responsibilities cost and time line

5. The RF system (Li, Haseroth) 5.1 Cavities 5.2 Windows 5.3 Power supplies 5.4 achievable performance 8 pages 5.6 services and safety (->move to infrastructure chapter 10) 5.5 responsibilities, cost and time-line

6. The absorbers (Cummings/Ishimoto) 6.1 general design (incl. safety constraints) 6.2 windows 6.3 thermodynamics (heat exchanger, etc..) 6.4 accommodating different length and materials 6.6 responsibilities, cost and time-line 8 pages

Page 20: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

20International Muon Ionization Cooling Experiment MICE

draft Proposal for MICE proposal Layout (ctd)

7. Beam and beam line (Drumm) 7.1 layout and location 7.2 expected performance and time structure 7.3 time line 6 pages

8. Detectors (Bross/Palladino) 8.1 overall description, functionality and redundancy 8.2 TOF and trigger 8.3.1 tracking device (option I) Scintillating fiber tracker 8.3.2 tracking devices (option II) TPG 8.4 Particle ID 8.5 DAQ, on-line monitoring and reconstruction in each section : responsibilities, costs and time line 15 pages

9. RF radiation on detectors (Norem/McKigney) 9.1 general understanding and characteristics 9.2 measurement results and effect on detectors 9.3 projected effect on performance of MICE (with help of simulation team) 9.4 further measurements to come 6 pages

Page 21: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

21International Muon Ionization Cooling Experiment MICE

draft Proposal for MICE proposal Layout (ctd)

10. implementation of MICE at RAL (Ivaniouchenkov, Black) 10.1 Hall layout 10.2 services, cryogenics etc… 10.3 safety issues 10.4 interference with ISIS 10.5 installation plan, time-line, costs and requirements 6 pages

11. Summary of responsibilities, costs, funding and grand time line (Zisman, Edgecock) 6 pages

12. Summary and requirements from RAL 3 pages

references appendices (if needed)

92 pages…..

Page 22: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

22International Muon Ionization Cooling Experiment MICE

Page 23: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

23International Muon Ionization Cooling Experiment MICE

Page 24: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

24International Muon Ionization Cooling Experiment MICE

Page 25: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

25International Muon Ionization Cooling Experiment MICE

Page 26: International Muon Ionization Cooling Experiment MICE 1   MICE MICE COLABORATION MEETING BERKELEY: ASSEMBLING THE PROPOSAL preliminary logo.

26International Muon Ionization Cooling Experiment MICE

Steering group membership: I. Ivaniouchenkov is added as the project engineer.

Y. Torun will be invited as webmaster/secretary (and has agreed to generating minutes to be archived on the web and made public following review by the steering group)

Technical group conveners:

Concept development: A. Lombardi, R. Palmer. This includes cooling optics and general configuration issues

Experiment simulations: M. G. Catanesi, Y. Torun. Includes simulation, reconstruction and general software issues

Absorbers: M. A. Cummings, S. Ishimoto -- no change

RF cavities and power supplies: D. Li, H. Haseroth + (C. Church)

Magnet systems: M. Green, J. M. Rey -- no change

Detectors: A. Bross, V. Palladino -- no change

Beamline: P. Drumm only

RF radiation: E. McKigney, J. Norem -- no change

Engineering integration: E. Black, I. Ivaniouchenkov. This is a new working group on technical specifications, service needs, safety issues and installation.

from sg meeting in July: