Method Statement Plate Load Test

21
Method Statement for PLATE BEARING TESTS Chulalongkorn University Saraburi Campus Contractor: EMC Public company limited NOVEMBER 2009 BY

Transcript of Method Statement Plate Load Test

Page 1: Method Statement Plate Load Test

Method Statement for

PLATE BEARING TESTS

Chulalongkorn University Saraburi Campus

Contractor: EMC Public company limited

NOVEMBER 2009

BY

Page 2: Method Statement Plate Load Test

Infratech ASTM CO., LTD.

TABLE OF CONTENTS

Chapter Title Page

Table of Contents.................................................................................................................................. 1

List of Appendix.......................................................................................Error! Bookmark not defined.List of Figures..........................................................................................Error! Bookmark not defined.

1.0 PROJECT INFORMATION........................................................................................................ 3

2.0 PLATE LOAD TEST INFORMATIN .......................................................................................... 3

3.0 TEST APPARATUS .................................................................................................................. 3

4.0 TEST PROCEDURE ................................................................................................................. 3

5.0 RESULTS OF TEST ................................................................................................................. 4

Appendix

1

Page 3: Method Statement Plate Load Test

Infratech ASTM CO., LTD.

List of Appendix

Appendix A Data Recording FormAppendix B Sample of Graph of Load-Time-Settlement

Appendix C Sample of Test Data Appendix D Calibration of Hydraulic Jack

2

Page 4: Method Statement Plate Load Test

Infratech ASTM CO., LTD.

1.0 PROJECT INFORMATION

� Project Name : Chulalongkorn University Saraburi Campus

� Contractor : EMC Public Company Limited

� Location : Saraburi,Thailand

2.0 PLATE LOAD TEST INFORMATION

� Number of Tests : 11

� Plate Size : Dia . 12”x 25 mm

� Design Load : 20 Tons/sq.m.

� Proposed Test : 50 Tons/sq.m. (2.5 * design load)

� Testing Standard : AASHO T235-74 (1986) / ASTM D1195

3.0 TESTING APPARATUS

The test apparatus consists of the following:

1. A 10-ton hydraulic jack was used as loading device.

2. A dia.12”x 25 mm thick steel plate was used to distribute the load from the jack to the plate and to the ground.

3. Three dial gauges with accuracy of 0.01 mm were used to measure the deflections during loading and unloading.

4 .Back hoe axial was used as reaction load during loading .

4.0 TEST PROCEDURE

The test ground was loaded as per AASHO T 235-74 (1986) as per the loading and unloading steps. These steps were for all the tests conducted.

Loading: 0- 25% - 50% - 75% - 100% - 125% - 150% - 175% - 200% - 225% - 250% of the design load.

Unloading: 150% - 100% - 50% and 0% of the design load

3

Page 5: Method Statement Plate Load Test

Infratech ASTM CO., LTD.

Each loading and unloading stage was maintained for 15 minutes with readings made at 1, 2, 4, 8 and 15 minutes after the application or removal of load. During the test, records including plots of load vs. time and load vs. settlement were maintained progressively.

5.0 RESULTS OF TEST

Results of test will be presented in graph form show relationship among load-time-settlement and prediction of subgrade modulus.

4

Page 6: Method Statement Plate Load Test

Appendix-A

Data recording form

Page 7: Method Statement Plate Load Test

(ITP-C-116/LRS)

Chulalongkorn Saraburi Campus

LOAD SETTLEMENT - TIME RELATION SHIPS

System : ………..……….... Area : ………Pit 1Certification No. : Date : …26/10/2010

Soil Description : Silty SandPlate Size : Dia.12" x 25 mm.Area / Line No. : …………………………………………….

Def. Rate(mm/min)

10.30

Result : Accepted Rejected Re-Compact

Test by : Check by : ( Rungruang D. ) ( Poosit Sunlakaviset ) Soil Technician Soil EngineerDate ..…../……./……. Date ..…../……./…….

COMPANY SIGNATURE NAME DATE

(ITP-C-116/LRS) Rev.0 E:\05-PlateBearing-EMC\[PlateLoadTestEMC.xls]Basic Info

14 1.09 15.0

14 0.73 10.013 0.73 10.012 0.73 10.010 0.73 10.0

13 0.36 5.012 0.36 5.010 0.36 5.08 0.36 5.0

0 (bars)

31 (bars)

50.00

50.00

15.0

15.015.015.015.0

15.015.0

15.0

10.0

10.0

15.0

10.010.010.010.0

0.36

0.00 0.0

5.05.0

0.360.36 5.0

5.0

5.05.0

1.09

1.09

1.09

1.091.09

1.091.091.091.09

0.730.73

0.73

0.730.730.73

0.36

0.360.36

2

1248

1415

48

15

15

01

10

1312

0

0

124

0

DATE TIME(tons)TIME

26-Oct-10

REMARKS

51 (bars)

ELAPSED

ASTM Testing Co.,ltd. Kenber

72 (bars)

Rangsan Gamsantia Poosit S.

SUBMITTED BY RECEIVED BY

t/m^2G1 G3

(mm)G2

LOAD APPLIED Avg. Set.

50.00

50.00

Owner : CU

Main Conractor:EMC

Contractor :Footing

Page 8: Method Statement Plate Load Test

Appendix-A

Data recording form

Page 9: Method Statement Plate Load Test

(ITP-C-116/LRS)

Chulalongkorn Saraburi Campus

LOAD SETTLEMENT - TIME RELATION SHIPS

System : ………..……….... Area : ………Pit 1Certification No. : Date : …26/10/2010

Soil Description : Silty SandPlate Size : Dia.12" x 25 mm.Area / Line No. : …………………………………………….

Def. Rate(mm/min)

10.30

Result : Accepted Rejected Re-Compact

Test by : Check by : ( Rungruang D. ) ( Poosit Sunlakaviset ) Soil Technician Soil EngineerDate ..…../……./……. Date ..…../……./…….

COMPANY SIGNATURE NAME DATE

(ITP-C-116/LRS) Rev.0 E:\05-PlateBearing-EMC\[PlateLoadTestEMC.xls]Basic Info

14 1.09 15.0

14 0.73 10.013 0.73 10.012 0.73 10.010 0.73 10.0

13 0.36 5.012 0.36 5.010 0.36 5.08 0.36 5.0

0 (bars)

31 (bars)

50.00

50.00

15.0

15.015.015.015.0

15.015.0

15.0

10.0

10.0

15.0

10.010.010.010.0

0.36

0.00 0.0

5.05.0

0.360.36 5.0

5.0

5.05.0

1.09

1.09

1.09

1.091.09

1.091.091.091.09

0.730.73

0.73

0.730.730.73

0.36

0.360.36

2

1248

1415

48

15

15

01

10

1312

0

0

124

0

DATE TIME(tons)TIME

26-Oct-10

REMARKS

51 (bars)

ELAPSED

ASTM Testing Co.,ltd. Kenber

72 (bars)

Rangsan Gamsantia Poosit S.

SUBMITTED BY RECEIVED BY

t/m^2G1 G3

(mm)G2

LOAD APPLIED Avg. Set.

50.00

50.00

Owner : CU

Main Conractor:EMC

Contractor :Footing

Page 10: Method Statement Plate Load Test

Appendix-B

Sample of Graph for Load-Time-Settlement

Page 11: Method Statement Plate Load Test

(ITP-C-116/LRS)

Chulalongkorn Saraburi Campus

LOAD SETTLEMENT - TIME RELATION SHIPS

System : ………..……. Area : …………………

Certification No. : Date : ………………..……

Soil Description : Silty Clay

Plate Size : Dia. 304 mm. x 25 mm.

Area / Line No. : ………………………………………………………..

k = Subgrade modulus( t/sq.m./mm.) =9.3E = Soil Modulus(Mpa.) = k x Dx(1-u^2)/100 = 0.91xKx450/100 ,in which u = Poison ratio,D=Plate Diameter (Ref. Foundation analysis and design By Joseph E. Bowles 4th Edition page407 Eq.9.6a) For Silt,Sand&Dry clay, E = 26 MPA For wet clay, E = 22 MPA

Result : Accepted Rejected Re-Compact

Test by : Check by :

( Rungruang D. ) ( Poosit Sunlakaviset )

Soil Technician Soil Engineer

Date ..…../……./……. Date ..…../……./…….

COMPANY

SIGNATURE

NAME

DATE

(ITP-C-116/LRS) Rev.0 E:\99-07-PlateBearingTest\[PlateBearingTestReport.xls]Report (1)

SUBMITTED BY RECEIVED BY

Infratech ASTM Co.,ltd.

Rangsan Gamsantia

Owner : CU

Main Contractor: EMC

Contractor :

LOAD-SETTLEMENT CURVE

-7.0

-6.0

-5.0

-4.0

-3.0

-2.0

-1.0

0.00 10 20 30 40 50 60

PRESSURE, (t/m2)

SETT

LEM

ENT,

(mm

)

Actual loading

Unloading

Linear loading

TIME - LOAD CURVE

0102030405060

0.0 1.0 2.0 3.0 4.0TIME, (hrs)

PRES

SUR

E,(t/

m2 )

TIME-SETTLEMENT CURVE

-7.0-6.0-5.0-4.0-3.0-2.0-1.00.0

0.0 1.0 2.0 3.0 4.0

TIME, (hrs)

SETT

LEM

ENT,

(mm

)

Footing

P234 ������������� 1 Line No. 4/J-K

Page 12: Method Statement Plate Load Test

Appendix-C

Sample of Test Data

Page 13: Method Statement Plate Load Test

(ITP-C-116/LRS)

Chulalongkorn Saraburi Campus

LOAD SETTLEMENT - TIME RELATION SHIPS

System : ………..……….... Area : …………………Certification No. : Date : …26/10/2010

Soil Description : �������������Plate Size : Dia. 304 mm. x 25 mm.Area / Line No. : P 234 ������������� 1 [Line 4/J-K]

Def. Rate(mm/min)

15:05

15:0515:0615:0715:0915:1315:20

15:2015:2115:2215:2415:2815:35

15:3515:3615:3715:3915:4315:50

15:5015:5115:5215:5415:5816:05

16:0516:0616:0716:0916:1316:20

Result : Accepted Rejected Re-Compact

Test by : Check by : ( Rungruang D. ) ( Poosit Sunlakaviset ) Soil Technician Soil EngineerDate ..…../……./……. Date ..…../……./…….

COMPANY SIGNATURE NAME DATE

(ITP-C-116/LRS) Rev.0 E:\99-07-PlateBearingTest\[PlateBearingTestReport.xls]Report (1)

15 1.46 20.043.72 2.89

40.48 42.11 2.90

43.74 2.868 1.46 20.0 40.49 42.12

1.46 20.0 40.52 42.152 1.46 20.0 40.61 42.21 43.77 2.80

20.0 40.63 42.22 43.780 1.46 20.0 40.73 42.30 43.82 2.72 92 (bar)

44.02 2.39

15.0

15 1.09 15.044.02 2.398 1.09 15.0 41.23 42.58

15.0

1.09 15.0 41.33

41.271.09

43.04

41.71

41.80

42.6542.63

42.5842.60

42.58

45.00

42.825.0

42.81

0.0

5.05.0

43.53

43.5242.80

43.5342.82

42.80

45.00

43.5243.52

43.52

43.13

43.0743.0543.04

Rangsan Gamsantia

SUBMITTED BY RECEIVED BY Infratech ASTM Co.,ltd.

113 (bar)41.7641.7541.7341.72

72 (bar)

G3(mm)

G2LOAD APPLIED Avg. Set.

(t/m^2)G1

24

1

Jack Pressure

51 (bar)

26-Oct-10

0

1

DATE TIME(tons)TIME

ELAPSED

0.00

0.36

0

1.82

1.091.09

1 1.46

4

15

15

01

1

248

15

0

24

0

248

1.821.821.82

10.010.0

1.821.82

0.73

15.0

0.730.730.73

0.36

0.36

0.73

0.36

0.36

0.73

5.0

5.0

25.0

10.010.010.010.0

25.0

25.025.025.025.0

39.9039.88

41.23

42.80

42.0641.9941.8741.86

42.1043.11

39.87

41.86

39.9739.93

41.30

41.24

39.91

43.44

45.00

44.6444.6344.63

44.64

44.63

44.04

44.34

43.43

44.3444.35

43.49

44.0744.06

43.4643.46

43.47 3.28

2.3644.02 2.39

43.71

44.0444.3944.36

1.341.351.35

1.34

3.29

1.811.861.911.92

2.79

1.35

3.25

0 (bar)

31 (bar)

0.00

44.63 1.35

3.303.323.33

1.91

2.322.34

8 0.36 5.0

1.92

Owner : CU

Main Contractor: EMC

Contractor :FootingFooting

Page 14: Method Statement Plate Load Test

(ITP-C-116/LRS)

Chulalongkorn Saraburi Campus

LOAD SETTLEMENT - TIME RELATION SHIPS

System : ………..……….... Area : …………………Certification No. : Date : …26/10/2010

Soil Description : �������������Plate Size : Dia. 304 mm. x 25 mm.Area / Line No. : P 234 ������������� 1 [Line 4/J-K]

Def. Rate(mm/min)

16:2016:2116:2216:2416:2816:35

16:3516:3616:3716:3916:4316:50

16:5016:5116:5216:5416:5817:05

17:0517:0617:0717:0917:1317:20

17:2017:2117:2217:2417:2817:35

Result : Accepted Rejected Re-Compact

Test by : Check by : ( Rungruang D. ) ( Poosit Sunlakaviset ) Soil Technician Soil EngineerDate ..…../……./……. Date ..…../……./…….

COMPANY SIGNATURE NAME DATE

(ITP-C-116/LRS) Rev.0 E:\99-07-PlateBearingTest\[PlateBearingTestReport.xls]Report (1)

3.28 45.037.17 39.69 41.41 5.5837.14 39.64 41.37 5.62

8 3.28 45.037.23 39.76 41.50 5.504 3.28 45.0

3.28 45.0 37.32 39.85 41.59 5.4137.40 39.92 41.65 5.341 3.28 45.0

40.04 41.75 5.22 195 (bar)

2.92 40.0

3.28 45.0

5.0615 2.92 40.0 5.09

40.25

37.70 40.14 41.8837.73 40.18 41.92

2 2.92 40.0

8

40.311 2.92 40.0

4 2.92 40.0

5.77

4.79 175 (bar)

4.90

216 (bar)

4.85

4.97

6.1740.7940.91

5.905.97

42.1240.41 42.18

37.96 40.362.92 40.0

38.4838.44

2.55 35.0

2.552.55

2.55

Avg. Set.

6.06

42.95 3.95

3.75133 (bar)

4.61

8 2.19 30.0

42.44

42.7142.5642.53

2.19 3.98

4.40

40.73

42.3942.35

41.2141.0841.00

42.0842.01

39.04

43.1243.0643.00

43.18

39.07

36.59

38.26

36.9736.8536.78

38.03

37.8337.90

37.55

38.70

36.54

35.035.035.0 38.35

38.30

50.0

36.7150.050.050.050.0

2.19

2.552.55

30.030.0

2.192.19 30.0

2.1930.0

35.0

35.0

30.0

3.653.65

3.653.653.653.65

50.0

15

15

01

48

0

0

2

15

0

2

1248

15

24

0

DATE TIME(tons)TIMELOAD APPLIED

(t/m^2)

1

Jack Pressure

154 (bar)

ELAPSED

41.32

G3(mm)

G2

Infratech ASTM Co.,ltd.

6.23

41.19

Rangsan Gamsantia

SUBMITTED BY RECEIVED BY

40.9140.75

4.434.524.57

41.40

41.14

4.23

3.833.89

3.67

42.9241.11

39.30

G1

39.3039.2139.14

39.40

41.25

39.04

39.2139.10

40.7340.6440.6040.57

39.5039.38

Owner : CU

Main Contractor: EMC

Contractor :Footing

Page 15: Method Statement Plate Load Test

(ITP-C-116/LRS)

Chulalongkorn Saraburi Campus

LOAD SETTLEMENT - TIME RELATION SHIPS

System : ………..……….... Area : …………………Certification No. : Date : …26/10/2010

Soil Description : �������������Plate Size : Dia. 304 mm. x 25 mm.Area / Line No. : P 234 ������������� 1 [Line 4/J-K]

Def. Rate(mm/min)

17:3517:3617:3717:3917:4317:50

17:5017:5117:5217:5417:5818:05

18:0518:0618:0718:0918:1318:20

18:2018:2118:2218:2418:2818:35

18:3518:3618:3718:3918:4318:50

Result : Accepted Rejected Re-Compact

Test by : Check by : ( Rungruang D. ) ( Poosit Sunlakaviset ) Soil Technician Soil EngineerDate ..…../……./……. Date ..…../……./…….

COMPANY SIGNATURE NAME DATE

(ITP-C-116/LRS) Rev.0 E:\99-07-PlateBearingTest\[PlateBearingTestReport.xls]Report (1)

39.76

39.5639.6039.6239.6639.71

39.0339.0339.0339.03

39.04

G1

36.5436.5436.54

36.54 39.04

39.04

G3(mm)

0 (bar)

G2

39.0439.04

Infratech ASTM Co.,ltd.

Rangsan Gamsantia

SUBMITTED BY RECEIVED BY

5.50

Jack Pressure

151 (bar)

ELAPSED

39.04

DATE TIME(tons)TIMELOAD APPLIED

(t/m^2)

124

0

4815

15

012

4

0.00

0124815

1.461.46

1.46

15

01248

2.19

1.461.46

30.0

0.0

40.0

40.0

30.0

20.020.0

20.020.0

10.0

2.92

2.92

30.0

30.030.030.0

2.192.19

0.000.00

2.192.192.19

0.00

0.00

0.73

0.00

2.9240.040.0

2.922.92 40.0

0.00.00.00.00.0 36.90

36.8536.87

36.54

36.8036.81

36.5436.54

36.54

36.54

36.83

36.5436.5436.5436.54

39.0339.03

5.66

40.73

40.74

36.54

36.54

39.03 40.71

36.54 39.04

40.7240.7240.72

40.72

6.24

6.246.24

41.83

40.7140.71

41.5541.60

40.73

6.236.236.23

6.23 197 (bar)

8 2.92 40.0

5.60

6.23

40.7140.7140.71

5.6441.6441.70

6.24

39.046.23

40.72

Avg. Set.

6.24

40.71 6.24

6.23

5.55

6.23

6.18

41.76

6.24

5.70

6.23 104 (bar)

6.236.23

20.0 36.54 39.04 40.7340.73

39.04 40.731.46 20.0 36.54 39.04

0 0.73 10.0 36.56 39.08 6.19 58 (bar)40.801 0.73 10.0 36.56 39.08 40.80 6.192 0.73 10.0 36.56 39.08

39.09 40.8136.56 39.09

40.80 6.1936.56 6.18

8 0.73 10.0 40.81 6.1815 0.73 10.0 36.56 39.09 40.81

Owner : CU

Main Contractor: EMC

Contractor :Footing

Page 16: Method Statement Plate Load Test

Appendix-D

Jack Calibration

Page 17: Method Statement Plate Load Test
Page 18: Method Statement Plate Load Test
Page 19: Method Statement Plate Load Test

Pr

ojec

t :C

hula

long

korn

Sar

abur

i Cam

pus

Con

trac

tor

EMC

PC

L

Pla

te S

ize

0.30

48m

.(D

ia.)

Pla

te a

rea

0.07

30Sq

.m.

Jack

Rea

ding

and

Pla

te lo

ad T

able

PLA

TEJa

ckLo

adJa

ckPr

essu

re

App

lied

Load

(Y)

Cal

cula

te(X

)

(tons

/sq.

m.)

(kg)

bar

00

0LO

AD

ING

536

531

Y

= A

X+B

X=(

Y-B

)/A

1073

051

A=

17.7

758

1510

9472

2014

5992

UN

LOD

ING

2518

2411

3A

=15

.683

3

3021

8913

3B

=-1

76.3

889

3525

5415

4

4029

1917

5

4532

8319

5

5036

4821

6

4029

1919

7

3021

8915

1

2014

5910

4

1073

058

00

0

Page 20: Method Statement Plate Load Test

Appendix-E

Photograph from previous test

Page 21: Method Statement Plate Load Test