MET Tower Installation Techniques in Alaska
Alaska Energy AuthorityAlternative Energy and Energy Efficiency
Mia DevineReuben Loewen
![Page 2: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/2.jpg)
Presentation Overview• Introduction• General Installation Steps• Difficult Conditions• Summary
![Page 3: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/3.jpg)
Introduction• Site selection and approval
– Local governments, FWS, FAA, topography, vegetation, etc.
• Preparation, logistics, and planning– Limited resources at site? – Shipping the materials? – Time of year?
![Page 4: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/4.jpg)
General Installation Steps• Clear the site and measure anchor points
If you’re fortunate… If you’re not…
![Page 5: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/5.jpg)
General Installation Steps• Drive the anchor
![Page 6: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/6.jpg)
General Installation Steps• Lay out main tower:
sections attachments base plate
• Paint tower sections
![Page 7: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/7.jpg)
General Installation Steps• Horizontally assemble
tower sectionscollarsguy wiresgin pole
• Mount booms, sensors, sensor and ground wires
![Page 8: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/8.jpg)
General Installation Steps• Support and raise gin pole
![Page 9: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/9.jpg)
General Installation Steps• Final arrangement of booms and sensors
![Page 10: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/10.jpg)
General Installation Steps• Erect tower while controlling side guy wires
![Page 11: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/11.jpg)
General Installation Steps• Attach gin pole wires to anchor, and straighten
tower by adjusting guy wire tension
![Page 12: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/12.jpg)
General Installation Steps• Attach, wire, and configure data logger
![Page 13: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/13.jpg)
General Installation Steps• Clean-up and final check of site
![Page 14: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/14.jpg)
Difficult Conditions• Permafrost and anchors
– Drive anchors during summer– Contract a backhoe to bury them manually
![Page 15: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/15.jpg)
Difficult Conditions• Winter daylight hours shortened• Winter temperatures, protective clothing
complicate efforts
![Page 16: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/16.jpg)
Difficult Conditions• Broken or missing winch components• Expensive transportation of tools and
materials to job sites
![Page 17: MET Tower Installation Slideshow](https://reader031.fdocuments.us/reader031/viewer/2022030319/5868be7a1a28ab4a408bf64d/html5/thumbnails/17.jpg)
Summary• Installation of 30 m MET tower with instruments• Lack of resources, difficult locations require extensive
planning prior to installation
Photos Courtesy of Doug Vaught (V3 Energy, LLC), Hannah Manser, Mia Devine, and Zach Adam
Presentation Contacts:Mia Devine, Assistant Project Manager, AEAReuben Loewen, Project Manager, AEA