MECHANICAL LEGEND LIST OF ABBREVIATIONS AND CONTROLS · 2016. 6. 29. · mechanical legend list of...
Transcript of MECHANICAL LEGEND LIST OF ABBREVIATIONS AND CONTROLS · 2016. 6. 29. · mechanical legend list of...
DURING DEMOLITION WORK, ALL MECHANICAL SYSTEMS AND BUILDING SERVICES SERVING OCCUPIED AREAS. SHALL BE MAINTAINED OPERATIONAL. WHERE SYSTEM OR SERVICE
INTERRUPTIONS ARE REQUIRED, COORDINATE AFTER HOUR ACCESS REQUIREMENTS AND
SECURITY EXECUTE WORK WITH CONSTRUCTION MANAGER.
INSULATE NEW DUCT AND PIPE CAPS.
SUPPLY AIR DUCTWORK AND PIPING NOT SHOWN HATCHED IS TO BE RETAINED, ANY DAMAGE
TO EXISTING INSULATION AND DUCTS TO BE REPAIRED TO MATCH EXISTING.
DEMOLITION OF EXTERIOR AND INTERIOR WALLS, ROOF CEILING AND FLOORS TO BE SEQUENCED WITH THE OWNER. IN AREAS WHERE ADJACENT OCCUPANCIES ARE
NOT IN THE DEMOLITION AREA BUT AFFECTED BY NOISE OF DEMOLITION, OR WHERE TRADE
REQUIRES ACCESS TO EXISTING OCCUPIED SPACES, CONTRACTOR SHALL COORDINATE TIMES OF
WORK THROUGH THE OWNER.
DEMOLISHED WORK SHALL INCLUDE FOR TEMPORARY AND PERMANENT WORK (I.E. SERVICE DIMENSIONS) REQUIRED TO KEEP ACTIVE PREMISES IN OPERATION. COORDINATE TIMES,
ACCESS, TEMPORARY HOARDING, TEMPORARY SCAFFOLDING, TOOL/LIGHT POWER REQUIREMENTS AND
OTHER MISCELLANEOUS ITEMS NEEDED TO COMPLETE WORK WITH GENERAL CONTRACTORIN OCCUPIED AREA AT NIGHT OR IN ACCORDANCE WITH THE OWNER APPROVED SCHEDULE.
INCLUDE FOR DISPOSAL (FROM SITE) OF ALL REMOVED EQUIPMENT AND SERVICES,
DUCTWORK, PIPING, PLUMBING, ETC. INCLUDING INSULATION AND HANGERS.
MECHANICAL TRADES BIDDING DEMOLITION WORK SHALL ALLOW FOR A FULL DAY ON SITE
TO REVIEW EXISTING MECHANICAL SERVICES AND EQUIPMENT IN DEMOLITION AND RENOVATED
PATCH AND MAKE GOOD (TO BASE BUILDING STANDARDS) MECHANICAL COMPONENTS AND
FINISHES DAMAGED DURING THE RENOVATION. PROVIDE INSULATED CAPPED CURBS EQUAL
TO OR BETTER THAN ROOF R-VALUE FOR FANS, GOOSE NECK OPENINGS AND VENTS BEINGADDED AND REMOVED.
GENERAL DEMOLITION NOTES:
6.
4.
5.
3.
2.
1.
AREAS. ACCESS WILL BE GIVEN TO ROOF AND EXISTING MECHANICAL AND ELECTRICAL ROOMS
AS REQUIRED. SEE TENDER FORM FOR DATE OF MANDATORY SITE MEETING.
7.
8.
GENERAL SCOPE NOTES:
PROVIDE ENTIRELY NEW DDC SYSTEM THAT INCLUDES HARDWARE,
SOFTWARE AND GRAPHICS. SYSTEM TO BE CAPABLE OF REMOTE
DAIL-IN. INTERNET CONNECTION TO BE PROVIDED BY OWNER.
1.
PROVIDE ALL COMPONENTS AND COORDINATE WITH THE ELECTRICAL
TRADE FOR POWER CONNECTIONS. ALL ELECTRICAL POWER WIRING
COSTS FOR DDC SYSTEM TO BE ALLOWED FOR BY CONTROLS
CONTRACTOR, INCLUDING POWER DISTRIBUTION FROM BREAKER TO
TRANSFORMER.
2.
PROVIDE DDC THERMOSTATS THAT ARE LCD TYPE UNITS WITH CO2
SENSORS IN THE WEIGHT ROOM FOR HV-2 AND THE GYM OFFICE FOR
HV-1. PROVIDE A BLANK THERMOSTAT WITH CO2 SENSOR IN THE
GYMNASIUM FOR HV-1. GYM OFFICE AND GYMNASIUM ARE TO BE
AVERAGING THERMOSTATS.
3.
ACCEPTABLE CONTROL SYSTEM MANUFACTURERS: DELTA CONTROLS,
RELIABLE CONTROLS.
ACCEPTABLE CONTROLS CONTRACTORS: ESC AUTOMATION, FRASER
VALLEY CONTROLS, HUOLE ELECTRIC, WEBBER.
4.
REFER TO MECH SPEC FOR FULL SCOPE DETAILS..5.
MECHANICAL LEGEND
LIST OF ABBREVIATIONS AND CONTROLS
COMPLETE WITH
EXHAUST AIRE/A
C/W
NOT TO SCALENTS
OUTSIDE AIRO/A
RETURN AIRR/A
RAIN WATER LEADERRWL
SUPPLY AIRS/A
TOP OF DUCTT.O.D.
TOP OF PIPET.O.P.
UNDERSIDE OF DUCTU.O.D.
UNDERSIDE OF PIPEU.O.P.
UNDERSIDEU/S
ABOVE FINISHED FLOORAFF
FROM ABOVE, TO ABOVEF/A, T/A
FROM BELOW, TO BELOWF/B, T/B
DOWNDN
FIRE RESISTANCE RATEDFRR
UNLESS NOTED OTHERWISEU.N.O.
CONNECT TO EXISTINGCTE
PLUMBING FIXTURE TAG
SANITARY DRAIN
STORM DRAIN
VENT PIPE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRC
FLOOR/ ROOF/ HUB/ AREA DRAIN
CLEAN OUT CO
?
?
RETURN LINE
EXISTING SERVICE
SUPPLY LINE
REMOVED SERVICE
RELOCATED ITEM
LIST OF SYMBOLS AND SERVICES
REMOVE ITEM
XXXS
STW
SAN
V
XXXR
P & T RELIEF VALVE
SHUT OFF VALVE
CHECK VALVE
UNION OR FLANGE
STRAINER -Y OR BASKET
AUTOMATIC AIR VENT
PIPE ELBOW RISER / DROP
CAP OR PLUG
BALANCING VALVE
PLUG VALVE
3-WAY CONTROL VALVE PRESSURE REDUCING VALVE
AUTOFLOW CONTROL VALVE
PRESSURE GAUGE
THERMOMETER
FLEXIBLE CONNECTION
REDUCED PRESSURE BACKFLOWASSEMBLY
PUMP
PIPE ANCHOR
PIPE GUIDE
GLOBE VALVE
SUPERVISED VALVE
2-WAY CONTROL VALVEM
S
DOUBLE CHECK VALVE ASSEMBLY
M
STACK UP/ DOWN
PIPE TEE DOWN
AAV
RPBADCVA
EQUIPMENT TAG
BALANCING DAMPER
SUPPLY OUTLET
RETURN OR EXHAUST INLET
STANDARD BRANCH
-
DUCTWORK
S/A OR O/A DUCTTO OR FROM ABOVE
S/A OR O/A DUCTTO OR FROM BELOW
R/A OR E/A DUCTTO OR FROM ABOVE
R/A OR E/A DUCTTO OR FROM BELOW
BD
ROUND DUCT DROP
ROUND DUCT RISERSINGLE LINE BRANCH
HEATING/COOLING COIL +/-
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: ##-####-_##
DWG. NO. TITLE SCALE
M-01 TITLE SHEET NTS
M-02 PLANT ROOM PLANS 1/4"=1'-0"
M-03 HYDRONIC SCHEMATICS NTS
M-04 SCHEDULES NTS
M-05 DETAILS NTS
LIST OF SEPARATE PRICES
# DESCRIPTION
SEPARATE PRICE #1
RE-LOCATE EXITING GAS FIRE DHWT,
ALL ASSOCIATED PIPING, AND
HOUSEKEEPING PAD TO INCREASE
ACCESSIBILITY TO NEW BOILERS.
XHV-1
XP2-3 XP2-3 XP2-3
XB1-1
XHV-2
XDHWT-1
XT2-1
1
2
4
3 3 3
EXISTING COMBUSTION
AIR TO REMAIN
5
XCU-16
XR
PB
A
7
8
9
EXISTING DUCTWORK
TO REMAIN
B1-2
HV-2
B1-4
B1-3
B1-1
P2-1
P2-3
P2-2XDHWT-1
3
S
4
2
M
ET2-1
6
75
CU-18
XHV-1
1
1 1
2
9
RP
BA
10
11
12
6
6
6
10
10
10
2
T
13
1
DEMOLITION NOTES:
REMOVE EXISTING GAS FIRED BOILER XB1-1 AND ASSOCIATED HEATING
SUPPLY AND RETURN PIPING, PUMPS AND VALVES AS SHOWN. CAP AND
MAKE GOOD FOR RECONNECTION.
2 REMOVE EXISTING GAS PIPING GAS SHOWN. CAP AND MAKE GOOD
FOR RECONNECTION.
3 COMPLETELY REMOVE EXISTING PUMP AND REPLACE WITH NEW.
PUMP TO BE WIRED TO DDC.
4 COMPLETELY REMOVE EXISTING XB1-1 FLUE UP THROUGH ROOF.
CONTRACTOR TO PATCH AND MAKE GOOD ALL EXISTING BASE
BUILDING WALLS AND ROOF TO MATCH BASE BUILDING AS REQUIRED
FOR DEMOLITION OF DUCTWORK.
5 RELOCATE DOMESTIC WATER TEMPERING VALVES AND ASSOCIATED
PIPING AS REQUIRED TO POSITION BOILERS WITHIN 10" OF WALL.
MAINTAIN MINIMUM CLEARANCE REQUIREMENTS OF MANUFACTURER.
6 EXISTING CONDENSING UNIT SERVING XHV-2 LOCATED OUTSIDE
UNDER STAIR CASE TO BE COMPLETELY REMOVED INCLUDING
REFRIGERANT PIPING.
7 EXISTING DOMESTIC HOT WATER TANK TO REMAIN. RELOCATE
SEISMIC BRACING TO OPPOSITE SIDE OF TANK TO ALLOW FOR
BOILER CLEARANCE.
8 COMPLETELY REMOVE EXISTING HV-2. CAP AND MAKE GOOD
EXISTING DUCTWORK CONNECTIONS AND MAKE GOOD FOR
RE-CONNECTION. CONTRACTOR TO COORDINATE DOWN TIME OF AHU
WITH CLIENT ON SITE AND PROVIDE TEMPORARY VENTILATION AS
REQUIRED. CONTRACTOR TO REVISE ELECTRICAL DISCONNECT
CONNECTION TO HV-1 AS REQUIRED.
9 REMOVE AND REPLACE EXISTING RPBP WITH NEW TO MATCH EXISTING
SIZE.
1
CONSTRUCTION NOTES:
CONNECT NEW PUMP AND ASSOCIATED PIPING/VALVES TO EXISTING
PIPING. ENSURE ALL NEW PUMP TRIM AND VALVES ARE INSTALLED AS
SHOWN ON MECHANICAL DRAWINGS. RE-BALANCE NEW PUMP
2 CONNECT NEW PIPING TO EXISTING.
3 CONNECT GAS TO EXISTING. PIPE NEW 12"ø GAS PIPE TO EACH BOILER
COMPLETE WITH SHUTOFF VALVE AND REGULATOR.
4 PROVIDE NEW GAS SOLENOID WIRED TO EMERGENCY GAS SHUTOFF
BUTTON TO DE-ACTIVATE BOILERS AND GAS SUPPLY TO BOILERS.
5 ALL NEW ELECTRICAL WORK IS THE RESPONSIBILITY OF THE
CONTRACTOR TO DESIGN AND APPLY FOR THE REQUIRED PERMITS.
6 MODIFY EXISTING BOILER HOUSE KEEPING PAD AS REQUIRED TO FIT
NEW BOILERS.
7 INSTALL NEW HV-2 AS PER MECHANICAL SCHEDULE AND
SPECIFICATIONS. ADJUST EXISTING DUCTWORK AND HYDRONIC PIPING
TO SUIT NEW HV-2 CONFIGURATION. CONTRACTOR TO REVISE WORKS
RELATED TO ELECTRICAL CONNECTION TO HV-2 AS REQUIRED
INCLDUING PERMITS COORDIATION AND INSTALLATION. NEW UNIT TO
MATCH DIMENSIONS OF EXISTING UNIT. ALLOW FOR NEW STRAINER,
ISOLATION VALVE AND BALANCING VALVE FOR HOT WATER HEATING
COIL. CONNECT NEW CONDENSATE DRAIN TO EXISTING.
8 NEW CONDENSING UNIT SERVING HV-2 LOCATED OUTSIDE UNDER
STAIRS. ALLOW FOR EXTENDING CHAIN LINK FENCE ENCLOSURE TO FIT
NEW UNIT.
9 NEW EXPANSION TANK TO MATCH EXISTING. MOUNT AT HIGH LEVEL
ABOVE WATER ENTRY STATION.
10 (4) NEW 6"ø BOILER FLUES UP THROUGH ROOF. ENSURE TERMINATIONS
AND MINIMUM DISTANCES FROM FLUE EXHAUST ARE INSTALLED AS PER
CSA AND MANUFACTURER'S REQUIREMENTS.
11 NEW 8"ø DHWT FLUE UP THROUGH ROOF. ENSURE TERMINATIONS AND
MINIMUM DISTANCES FROM FLUE EXHAUST ARE INSTALLED AS PER CSA
AND MANUFACTURER'S REQUIREMENTS.
12 INSULATED REFRIGERANT PIPING. ROUTE AS PER EXISTING
REFRIGERANT PIPING.
13 TO GYM OFFICE AND GYMNASIUM THERMOSTATS. REFER TO GENERAL
NOTES ON M-01.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: ##-####-_##
21 80 4
SCALE: 14" = 1'-0"
PLANT ROOM - DEMO
21 80 4
SCALE: 14" = 1'-0"
PLANT ROOM - NEW
LWCO
XB1-1
EXPANSION
TANK
34"ø DCW
XP2-3
M
M
1"ø HWS/R TO
WEIGHT ROOM
HV-2
1-12"ø HWS/R TOHV-1
XP2-1
XP2-2
CHEMICAL POT
FEEDER
XET2-1
2-12"ø HWS
2-12"ø HWR
2"ø NG TO
DHWT-1
1-14"ø HWS/RDOWN
RPBP
1
2
2
M
2
2-12"ø NG
3
3
3
EXPANSION
TANK
P2-3
M
M M
1"ø HWS/R TO
WEIGHT ROOM
HV-2
1-12"ø HWS/R TOHV-1
P2-1
P2-2
CHEMICAL POT
FEEDER
ET2-1
1-14"ø HWS/R TOGROUND FLOOR
RADIATION
B1-1 B1-2 B1-3 B1-4
2"ø NG TO
DHWT-1
FIL
TE
R FLOW
INDICATOR
CROSS FOR OPTIONAL
CORROSION TEST
TO EXISTING
FLOOR DRAIN
2
2
3
EXISTING
2-12"ø NG
3
3"ø HWS/R
HEADER
T
6
5
7
RPBP
M
S4
2
2
2
T T
1-12"ø HWS/R18.5 GPM
(TYP)
1
1
1
180°F200°F
1
CONSTRUCTION NOTES:
CONNECT NEW PUMP AND ASSOCIATED PIPING/VALVES TO EXISTING
PIPING. ENSURE ALL NEW PUMP TRIM AND VALVES ARE INSTALLED AS
SHOWN ON MECHANICAL DRAWINGS. RE-BALANCE EXISTING PUMP TO
EXISTING FLOW NOTED ON MECHANICAL PUMP SCHEDULE. UPDATE ALL
BMS GRAPHICS AND CONTROLS AS REQUIRED FOR NEW PUMPS.
2 CONNECT NEW PIPING TO EXISTING AND MATCH EXISTING PIPE SIZE.
CONTRACTOR TO CONFIRM EXACT PIPE SIZE ON SITE.
3 CONNECT GAS TO EXISTING. PIPE NEW 12"ø GAS PIPE TO EACH BOILER
COMPLETE WITH SHUTOFF VALVE AND REGULATOR.
4 PROVIDE NEW GAS SOLENOID WIRED TO EMERGENCY GAS SHUTOFF
BUTTON TO DE-ACTIVATE BOILERS AND GAS SUPPLY TO BOILERS.
5
6 PROVIDE 3" CAPPED CONNECTIONS C/W WITH ISOLATION VALVES FOR
FUTURE BOILERS
PROVIDE 2" CAPPED CONNECTIONS C/W WITH ISOLATION VALVES FOR
FUTURE DOMESTIC HOT WATER HEATING TIE IN.
7 PIPE NEW RPBP DRAIN, C/W AIR GAP TO EXISTING FLOOR DRAIN.
DEMOLITION NOTES:
2 COMPLETELY REMOVE EXISTING 3-WAY VALVE AND REPLACE WITH
NEW. 3-WAY VALVE TO BE WIRED TO EXISTING DDC. UPDATE ALL BMS
GRAPHICS AND CONTROLS AS REQUIRED FOR CONTROL VALVES.
1 REMOVE EXISTING GAS FIRED BOILER XB1-1 AND ALL ASSOCIATED
HEATING PIPING, PUMP, AND VALVES SERVING EXISTING DOMESTIC
HOT WATER TANK. CAP AND MAKE GOOD FOR RECONNECTION.
3 REMOVE EXISTING PUMP AND MAKE GOOD PIPING FOR
RECONNECTION.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: ##-####-_##
SCALE: N.T.S.
HYDRONIC SCHEMATIC - DEMO
SCALE: N.T.S.
HYDRONIC SCHEMATIC - NEW
AIR HANDLING UNIT SCHEDULE (HV-1)
Manfacturer Engineered Air
Model LM2/C/R
Supply Air Fan
Air Flow Rate (CFM) 2,000 Fan Speed * (RPM) 1275
External Static Pressure (in wg) 0.50 Absorbed Power * (HP) 0.85
Total Static Pressure (in wg) 1.75 Motor Rating * (HP) 1.0
Inverter Driven (Yes/No) No MCA* (Amps) 22.0
Fan Type Centrifugal MOCP* (Amps) 30.0
Total Fan Efficiency * (%) 65 Electrical Supply 208/3/60
Heating Coil Information
Air On Coil Temperature (°F) 53.0 Supply Water Temperature (°F) 200
Air Off Coil Temperature (°F) 84.0 Return Water Temperature (°F) 180
Duty (Btuh) 68,100 Water Flow Rate (gpm) 6.8
Maximum Pressure Drop
DX Cooling Coil Information
Air On Coil Temperature (°F) 80.0 Sensible Cooling (BTU/HR) 48,168
Air Off Coil Temperature (°F) 57.7 Total Cooling (BTU/HR) 59,500
Compressor Type Digital Scroll
Refrigerant R-410A
Supply Filtration
Panel Filter Grade MERV 8
Supply Fan Sound Power Levels Total 63Hz 125Hz 250Hz 500Hz 1kHz 2kHz 4kHz 8kHz
Intake * (dB(A))
Discharge * (dB(A))
Notes
Unit to come complete with:
1) Variable capacity digital scoll compressor
2) Expoxy painted casing and fan and Heresite coated coils
3) TAMCO 1500SW dampers
4) Freezestat and flash intercoolers
Expansion Tank Schedule
Bladder Expansion Tank Information ET2-1
Location Mechanical Room
Service Heating Water
Manufacturer Amtrol
Model Extrol
Orientation Horizontal
Material Steel
Working Pressure (psi) 15.0
Maximum Working Pressure (psi) 125.0
Tank Volume (gal) 24
Dimensions (øxL) (Inch) 12 x 48
Acceptance Volume (gal) 15
Weight (lbs)
Note:
1) All Tanks should be Bladder type, designed and constructed as per ASME Section V111, Division-1
Standards.
PUMP SCHEDULE
TAG No. Description Location
Electrical Details Motor Details
NotesDesign
Capacity
(gpm)
Selected
Capacity
(gpm)
Design
Head
(ft w.g.)
Selected
Head
(ft w.g.)
Electrical
Voltage
(V)
Electrical
Supply
Phase
(1 or 3)
Frequency
(Hz)
Motor
Starting
Method
Total
Minimum
Efficiency
(%)
Absorbed
Power
(BHP)
Motor
Rating
(BHP)
Motor
Speed
(RPM)
Manufacturer Model
P2-1 Ground Floor Radiation Mechanical Room 9.6 10.6 15.0 18.2 115 1 60 INV 60 0.1 frac 1750 Grundfos Magna3 1, 2
P2-2 Heating & Ventilation Unit 1 Mechanical Room 22.5 24.8 18.0 21.8 115 1 60 INV 60 0.2 0.5 1750 Grundfos Magna3 1, 2
P2-3 Heating & Ventilation Unit 2 Mechanical Room 6.8 7.5 8.0 9.7 115 1 60 INV 60 0.0 farc 1750 Grundfos Magna3 1, 2
Notes
1) Constant speed pumping control c/w BACNET output/input
2) Complete with Magna Integrated Variable Speed Drive (VFD)
BOILER SCHEDULE (B1-1 to B1-4)
Tag No. B1-1 to B1-4
Boiler Information
Location Mechanical Room
Manufacturer Viessman
Model Vitocrossal 300 CU3A-57
Type Gas Fired High Mass Condensing Boiler
Design Information
Input Gas Requirement (BTUH) 199,000
Boiler Output Capacity (BTUH) 185,000
Thermal Efficiency (%) 93.0
Min/Max Natural Gas Pressure (in w.g.) 4 / 14
Water Flow (gpm) 18.5
Maximum Water Pressure Drop (ft w.g.) 2
Maximum Operating Pressure (psi) 30
Weight (lbs) 352
Gas Type Natural Gas
Burner stages Fully Modulating
Dimensions (WxDxH) (in) 26 x 31.5 x 67
Boiler Connections
Gas Valve (in) 3/4
Supply (in) 1 1/4
Return (in) 1 1/4
Flue Gas (in) 4
Drain Valve (in) 1
Condensate Drain (in) 3/4
Electrical Requirements
Burner Motor HP frac.
Electrical Requirements Volt / Phase 120/1/60
Notes
1. CPVC flue gas system installed to manufacturer's recommnedations. Flue material is to be certified together with boiler
as a constructed unit.
2. Complete with boiler control with cascade and/or DDC interface.
3. Complete with Viessman acid neaturalization sysetm.
4. Multiple boiler installation requires detached boiler native cascade control (Vitotronic 300-K MW2C Cascade Control)
5. Any aluminum, baffle, fin, or fire tube down fired design is not considered equal.
6. Separate 120V/1Ph required for boilers and controllers
7. Contractor resopnsible to register boiler with BC Safety Authority prior to substantial completion.
CONDENSING UNIT SCHEDULE
Tag No. CU-1
Boiler Information
Location Outdoor
Manufacturer Engineered Air
Model CUE52
Design Information
Nominal Tons (Tons) 5
Compressor Stages 2
Dimensions (L x W x H) (Inch) 69 x 41 x 42
Weight (lbs) 740
Refrigerant R-410A
Electrical Information
Voltage V / Ph 208
MCA 43
Notes
1) Confirm existing voltage/phase and match existing.
2) Complete with Suction Accumulators, Low Pressure Bypasses, Discharge Holding Tanks
3) Complete with epoxy painted casing and fan and heresite coated coils
4) Contractor to confirm electrical data of existing condensing unit on site prior to submission of shop drawings.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: ##-####-_##
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: ##-####-_##
NOTES:
P
VERTICAL IN LINE PUMP INSTALLATION
SUPPORT FOOT BOLTED
TO PUMP FLANGE
SUPPORT FOOT
CONSTRUCTED FROM 10mm
[3/8"] THICK STEEL PLATE.
VIBRATION ISOLATORS
AS SPECIFIED.
SEISMIC SPRING
ISOLATORS
PIPE SIZE AS
SHOWN ON PLAN
GATE VALVE
COMBINATION BALANCING/
CHECK VALVE OR LONG
SWEEP ELBOW &
INDIVIDUAL CHECK W/
BALANCE VALVES.
MAX. 250mm [10"]
100mm [4"]CONC. PAD
VIBRATION ISOLATORS
(SEE SPECIFICATION)
SUCTION GUIDE
STRAINER
GATE VALVE
SUPPORT FOOT TO BE BOLTED TO THE FLOOR SLAB, THROUGH THE
CONC. PAD USING NEOPRENE WASHERS AND BUSHINGS ON THE BOLTS
(MIN. 2 BOLTS).
NOTES:
FRONT VIEW
SCALE NTS
END VIEW
PUMP
CHEMICAL
POT FEEDER
CHEMICAL POT FEEDER
DRAIN VALVE
ISOLATION BALL
VALVEUNION
ISOLATION
BALL VALVE
BALANCE LINE
UNION
ISOLATION
BALL VALVE
300 Min.
SCALE NTS
HANGER ROD
CLEVIS HANGER
REFER TO SPEC.
VAPOUR SEAL
PREFORMED PIPE
INSULATION. REFER TO
SPEC.
CLEVIS HANGER
REFER TO SPEC.
PREFORMED PIPE
INSULATION IF
REQ''D. REFER TO
SPEC.
HANGER DETAIL FOR PIPING WITH VAPOUR SEALED INSULATION
(FOR COLD PIPING 10°C [50°F] OR LESS)
HANGER DETAIL FOR INSULATED HOT PIPING UP TO NPS
3 (75mm) OR ALL SIZES OF BARE PIPE
PIPE HANGERS
FOR NPS 2-1/2 PIPE AND
LARGER. REFER TO SPEC.
FOR INSERTS OR HIGH
DENSITY INSULATION AT
INSULATION PROTECTION
SHIELDS.LOCKING NUT
SUPPORT NUT
PIPE
INSULATION
PROTECTION SHIELD AT
HANGER. REFER TO
SPEC.
HANGER ROD
LOCKING NUT
SUPPORT NUT
PIPE
SCALE NTS